brey tucker portfolio 2002-2013
DESCRIPTION
Selected works from my diverse background in the architectural and creative fields.TRANSCRIPT
Aubrey [email protected]
Portfolio
2002-2013
page 2 of 34
PROFILE
To assist in the implementation and management of digital design, building information models,
digital fabrication and creative design to the creative arts, architecture, engineering and
construction industries.
CONTENTS
4 Work History
5 Professional Project Work
6 CMA
10 NASA CAIL 29
13 KAUST
15 Selected Medical Equipment
17 Equipment Collaborative Database Design
18 Creative Work
19 Digital Fabrication
24 Festival Projects
31 Graphic Work
34 Web Presence
page 3 of 34
PROJECT
EXPERIENCEEMPLOYMENT
EXPERIENCEuniversity of houston - herald d hines college of architecture
HOK Equipment Collaborative
Morris
ST BM2012
CORE BM2012
Flipside2012
NASA CAIL bld 29
CMA Tower
UH Master Plan Model
Perkins+Will
Miami DawnTown
KAUST
OSU Cancer Center
Database Design
Gov. NBAF
811 Tower
Natex
UHCOA Computer Lab
CORE BM2013
Brey Tucker Creative
started using
RevitProfessionally
Certi!ed for Revit
started using
Grasshopper
started using
Rhino
LITE Beam
Inverted Chair
started using
CNC construction methods
Research for CompetitionHouston TX, Hometown - many projectsCummins Engineering CampusSculpture Work for Burning Man
Research for CompetitionCMA SkyScraper BIM Lead
Research for Competition
Canopy Design
20132011200920072005
page 4 of 34
Professional
Project Work
CMA Tower
Saudi Arabia
BIM Lead
HOK
Capital Market
Authority Tower.
This was a massive e�ort
by HOK where I was given
the distinct privilege to
lead the entire BIM e�ort
for a multi-o�ce,
multidiscipline project
from the design submission
model work that was
completed in Rhino to
the Construction
Documents that were
delivered to the
construction team in
Bahrain.
page 7 of 34
page 8 of 34
Even though the scope of this project was staggering and the
team often a little too disconnected for true e�ciency, I
worked closely with all of the greatest leaders in the BIM
world to make a model that could transfer among all the
o�ces cleanly. This did take some time to understand but
at the end of the project we were working in Revit, AutoCAD,
Tekla, Navisworks, Rhino and SketchUp and doing full
material takeo�s that were incredibly accurate.
page 9 of 34
NASA CAIL 29
BIM Lead
HOK
NASA CAIL, Building 29 was an incredibly interesting project,
especially considering this was my �rst project in Revit.
The building was very unique in its original construction as
it was intended to house the centrifuge testing facility.
This quickly taught me the limitations of BIM and when
the 60/40 modelling rule is most apparent. I modelled all of
the structural components on this building along with
the architectural. page 10 of 34
page 11 of 34
KAUST was a challenging project from its undertaking as a �rm
split across four o�ces in the USA down to the extensive
coordination required among the disciplines that often occurs
in fast track projects. Showcased here is my �rst work with
interference checking which I did solely in Revit and then
imaged in Photoshop.
page 12 of 34
KAUST was an incredible project with a diabolical amount of
equipment. The lab showcased in these �nal construction
drawings was for a laser study laboratory that utilized an
incredible amount of custom equipment that was all �rst
developed in our three dimensional BIM model for
space study.
These pages display the desire for clean execution of
construction documents within Revit.
page 13 of 34
page 14 of 34
My time in the medical equipment planning industry provided
a lot of opportunity for me to learn how to be a consultant,
work with a multitude of design related individuals in one of,
if not the most, complicated �elds.
My time here still provided architectural work, rendering below
showcases some of my rendering ability put to use, and
allotted an incredible amount of time for me to master BIM
tools and their appropriate applications.
page 15 of 34
page 16 of 34
E-Catalist Logo
P E CNationWide UCI Cook Tower MDAOSUMC
Departments Rooms Equipment Reports Procurment History
N
P
C
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
E-Catalist Logo
P E CNationWide UCI Cook Tower MDAOSUMC
Departments Rooms Equipment Reports Procurment History
N
P
C
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
E-Catalist LE-Catalist LogoE-Catalist LE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist Logoogog
P E CP EP EP E CP EP EP E CP EP EP E CP EP EP E CP EP EP E CP E CP EP EP E CP EP EP E CP EP ENati Wide UCI C k To r MDAI C k r MOSUMCNationWide UCI Cook Tower MDAI C k To r MOSUMCNati Wide UCI C k To r MDAI C k To r MOSUMCNationWide UCI Cook Tower MDAI Cook Tower MOSUMCNationWide UCI Cook Tower MDAI Cook Tower MOSUMCNationWide UCI Cook Tower MDAI Cook Tower MOSUMCNationWide UCI Cook Tower MDAI Cook Tower MOSUMCNationWide UCI Cook Tower MDAI Cook Tower MOSUMCNationWide UCI Cook Tower MDAI Cook Tower MOSUMC
De rt nts R Equi t R tss R Pr ntDepartments Rooms Equipment Reportss R Procurment HistoryDe rt nts R Equi t R tss R Pr nt HistDepartments Rooms Equipment Reportss R Procurment HistoryDepartments Rooms Equipment Reportss R Procurment HistoryDepartments Rooms Equipment Reportss R Procurment HistoryDepartments Rooms Equipment Reportss R Procurment HistoryDepartments Rooms Equipment Reportss R HistoryDepartments Rooms Equipment Reportss R History
De rt nt N X De rt nt N X De rt nt N XDepartment Name X Department Name X Department Name XDe rt nt N X De rt nt N X De rt nt N XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name Xpa pa papa pa paBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted
Budget Planned Budget Planned Budget PlannedBudget Planned i Budget Planned i Budget Planned iBudget Planned Budget Planned Budget PlannedBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudg Budg BudgBudg Budg Budg
NNNNN
PPPPPDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name Xpa pa papa pa pa
Budget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted
Budget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iCC Budg Budg Budg
Department Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted
Budget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned i
x
DEPARTMENT MM
Department Name
Sort Title
Room Name
Room Name
Room Name
Room Name
Room Name
Room Name
Room Name
Room Name
Room Name
m i
m i
m i
m i
m i
m i
m i
S
m i
m i
+
Sort Title
Department Info
E-Catalist Logo
P E CNationWide UCI Cook Tower MDAOSUMC
Departments Rooms Equipment Reports Procurment History
All By Department All By Equipment TypeAll By Room
By Signi!cant Client Validation StatusBy Design Leader
Chosen StatusBy Floor Working Status
Common Estimates Summaries
E-Catalist Logo
P E CNationWide UCI Cook Tower MDAOSUMC
Departments Rooms Equipment Reports Procurment History
N
P
C
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
E-Catalist LE-Catalist LogoE-Catalist LE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoogoE-Catalist Logo
P E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI C r MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMC
Departments R Equi t Reportsnts R Proc ntDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments R Equi t Reportsnts R Proc nt HistoDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R HistoryDepartments Rooms Equipment Reportsnts R History
Department Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted
Budget Planned Budget Planned Budget PlannedBudget Planned i Budget Planned i Budget Planned iBudget Planned Budget Planned Budget PlannedBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned Budget Planned Budget PlannedBudget Planned Budget Planned Budget Planned
NNNNN
PPPPPDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name X
Budget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted
Budget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iCC Budget P Budget P Budget P
Department Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted
Budget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned i
x
DEPARTMENT MM
Department Name
Sort Title
Room Name
Room Name
Room Name
Room Name
Room Name
Room Name
Room Name
Room Name
Room Name
m i
m i
m i
m i
m i
m i
m i
S
m i
m i
+
Sort Title
Department Info
Note
Comment
E-Catalist Logo
P E CNationWide UCI Cook Tower MDAOSUMC
Departments Rooms Equipment Reports Procurment History
N
P
C
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
Department Name XBudget Allotted
Budget Planned i
E-Catalist LE-Catalist LogoE-Catalist LE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoogoE-Catalist Logo
P E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI C r MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMC
Departments R Equi t Reportsnts R Proc ntDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments R Equi t Reportsnts R Proc nt HistoDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R HistoryDepartments Rooms Equipment Reportsnts R History
Department Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted
Budget Planned Budget Planned Budget PlannedBudget Planned i Budget Planned i Budget Planned iBudget Planned Budget Planned Budget PlannedBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned Budget Planned Budget PlannedBudget Planned Budget Planned Budget Planned
NNNNN
PPPPPDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name X
Budget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted
Budget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iCC Budget P Budget P Budget P
Department Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted
Budget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned i
x
DEPARTMENT MM
Department Name
Sort Title
Room Name
Room Name
Room Name
Room Name
Room Name
Room Name
Room Name
Room Name
Room Name
m i
m i
m i
m i
m i
m i
m i
S
m i
m i
+
Sort Title
Department Info
x
COMMENT MM
Note Location
blah blah blah blah blah blah
blah blah blah blah blah blah
blah blah blah blah
Date Date
User Info of Commenter
Addressed To
Comment Ticket #
Email Copy
Current Comment Status
E-Catalyst.
On this project I was
given the opportunity
to step out of my
conventional roles
and try my hand at
database design on
a network level and
human interaction
for the graphic
interface portion of
the project.
The project was never
put into use and was
abandoned due to
the company having
to close its doors but
the schematic work
done by me has been
greatly appreciated
by those in the
Medical Equipment
Planning �eld.
page 17 of 34
Creative
Project Work
Digital Fabrication
BIM, CNC, Wiring, Design,
Metal&Wood Construction
LITE Beam was a class project for the Digital Fabrication class of 2005 where I
was responsible for the CNC cut �les, electrical wiring and general construction.
This was a massive moment for the rest of my career as it generated all of my interests
in parametric design and BIM.
page 20 of 34
The Inversion Chair.
This project was an exploration in ergonomics,
CNC design and the use of modular furniture.
The completed sample below would have been
one piece that would be arrayed in a polar fashion
to create a semi-circle for lounge seating of 3-6
people. The schematic model image to the right
displays that �nal idea.
page 21 of 34
page 22 of 34
University of Houston Master Plan Model. This project was comprised
of 7 large tables hat held all of the buildings of the campus and
projected master plan layout for the future. All of the buildings
were modelled, set to CNC cut �les, glued into formation and
placed on the tables which were also cut to reveal lighting holes.
page 23 of 34
Festival Projects
Design Lead
Digital Fabrication
Construction MGMT
Wood Work
Metal Work
Singularity Transmissions
Honorarium 2012
Burning Man Festival
I was the concept design lead and structural CNC productionist. The top
image was the completed project at the festival and the bottom image
was the rendering used to submit the project for grant money. page 25 of 34
This project had many
challenges for CNC
work but it proved to
remain interesting and
full of reward.
Utilizing the shape
of a pentagon for the
main geometry of the
tower and then having
the tower taper made
the connections all
very unique but
operating with
parametric control
on the design made
the process fairly
simple. Images
showcase Rhino
modelling and �nished
structure.
page 26 of 34
ReinCOWnation
CORE 2012
Burning Man Festival
page 27 of 34
page 28 of 34
This project best shows my complete set of abilities.
The story of Houston CORE at Burning Man 2012.
The images of the story start on the previous page.
This project started conceptually with a clay model
that was captured with photogrammetry via
Audodesk 123D catch that I then developed into a
3D Rhino model to understand the structural forces
that then produced the 90 CNC cut �les that our
team built here in Houston �rst, skinned with
recycled scrap wood and then delivered to
Black Rock City to be built in the Nevada desert
and burned after a glorious showing in the chosen
circle of regional e�gies.
page 29 of 34
The team was comprised of about 30
other individuals who are all project
enthusiasts who wanted to complete
something challenging for the �ne
honor we received to represent the city
of Houston.
This project covered a wide array of
jobs from marketing/fund-raising
to full construction, assembly and
transportation. It was a wonderful
experience of total design.
page 30 of 34
Graphic
Work
In my pursuit of great design,
graphic delivery is always a
deep consideration of mine
that I try to push, keep original
and full of organized chaos.
These examples are just a few
of my selected projects from
which I have many over the
years. Clean communication,
problem solving and
simplifying massive data
are my graphic motivators.
page 32 of 34
page 33 of 34
ONLINE PRESENCE
Linked in @ http://www.linkedin.com/in/breytucker
Google+ @ https://plus.google.com/108390849404697060638/about
Archinect @ http://archinect.com/people/cover/16328445/brey-tucker
Behance @ http://www.behance.net/BreyTucker
issuu @ http://www.issuu.com/ Brey_Tucker
Coro!ot @ http://www.coro!ot.com/Brey_Tucker
FolioHD@ http://breytucker.foliohd.com/all
Carbonmade @ http://breytucker.carbonmade.com
Shown’d@ http://shownd.com/breytucker/
Taleo @ https://www.talentexchange.com/pro"le/breytucker
Talent House@ http://www.talenthouse.com/negativeispositive
Flickr@ http://www.!ickr.com/photos/breytucker/sets
ww
w.B
reyT
uck
er.
com
page 34 of 34