Bond Construction Update

Citizens Oversight Committee

Bond Construction Update

Citizens Oversight Committee

Long Beach Community College District April 18, 2011

EDUCATE ENGAGE EMPOWER 1

Page 2: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

Agenda

Completed Construction Projects LAC Parking Structure LAC Building O Complex PCC Walnut Ave. Arrival Court District Wide – Monument Signs

Current Construction Projects LAC Building A – Student Services Retrofit LAC Infrastructure Improvements Project and District Wide –

Energy Efficiency Project LAC Building I (Bookstore) LAC South Walkway Extension LAC W Trailers Demo LAC Master Landscape PCC MDAB (Multi-Disciplinary Academic Building) PCC Tech1 (Sheet Metal)

Upcoming Construction Projects PCC Building CC Retrofit

Q & A

2

Page 3: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

Completed Construction ProjectsLAC Parking Structure – Measure E 2008

3

Spaces for 893 vehicles Solar generation system is commissioned and

operational Project is complete and being used for student parking

Page 4: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

Completed Construction ProjectsLAC Building O Complex – Measure E 2008

4

Two structures totaling 87,000 square feet Occupants for Building O2 are Foundation, ERD, LBNP and

ALCI IITS and BMT are moved in, Warehouse Facility moving Project is complete with some punch walk items left

Page 5: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

Completed Construction Projects

5

UU/VV demo completed Site converted to a parking lot April 4th, 2011

PCC Walnut Ave. Arrival Court - Measure E 2008

Page 6: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

Completed Construction ProjectsDistrict Wide – Monument Signs

Measure E 2008

6

District Wide Monument Signs Locations:

LAC-Clark/Conant – completed January 8, 2011 PCC-20th/Walnut Ave. – Completed March 30, 2011

Installation of building designators for LAC Bldg. O1 and O2 completed

LAC Bldg. Designator LAC Monument SignPCC Monument Sign

Page 7: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

Current Construction ProjectsLAC Building A – Student Services Retrofit

Measure E 2008

7

New home for A&R, Counseling, Health Services, Cashier, Transfer Center

Project currently in demolition and structure upgrade

Construction fence and temporary walkways complete

End of construction anticipated Summer 2012

Page 8: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

8

LAC Infrastructure Improvement Project and District Wide Energy Efficiency Project Measure E 2008

Current Construction Projects

Total annual estimated savings of 1.5 mil. Kwh Project started Fall 2009; currently hydro seeding all

affected areas(All phases) Majority of existing building HVAC systems to be

upgraded and connected to the Central Plant Buildings C,D, G,H, & J are connected Buildings B and E will be scheduled by end of April

Exterior lighting and controls upgrades All parking lots north of Lew Davis are on new system

New Reclaimed Water tie-ins to irrigation connected New gas lines installed for Buildings B, C, D, E, G, H, J, M,

N, and P New domestic lines installed for Buildings B, C, D, E, F, G,

H, I Trailers, J, K,L, M, N, P Anticipated end of construction Winter 2011

Page 9: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

Current Construction Projects

9

Adds additional 4,000 square feet to existing building Architecture to match LAC Mediterranean Theme G2K Construction working on demolition and utilities End of Construction anticipated Fall 2011

LAC Building I - Measure E 2008

Page 10: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

Current Construction ProjectsLAC South Walkway Extension

Measure E 2008

10

99% complete Palm trees to be replaced May 2011 Continues Master Plan pedestrian corridor

Page 11: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

Current Construction Projects

11

Green Giant Construction has removed old W trailers Grading of lot to commence in this month Project will address storm run off issues with bio swales Site to be converted to a parking lot Estimated project completion Summer 2011

LAC W Trailers Demo - Measure E 2008

Page 12: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

Current Construction Projects

12

Currently in Design Phase Quad areas North and South areas of Bldg. A bid Winter 2012 Remaining areas designed at 25% Scope includes new hardscape/landscape and pedestrian

pathways

LAC Master Landscape - Measure E 2008

Page 13: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

Current Construction ProjectsPCC MDAB

(Multi-Disciplinary Academic Building)Measure E 2002 and 2008

13

MDAB building remodel project Phase 1 of 2 currently under construction Project currently in demolition and structural reinforcement Phase 1 Project to be completed Summer 2012

Page 14: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

Current Construction Projects

14

Currently in bid process Construction to start Summer 2011 Projected to be completed before Fall 2011

PCC Tech 1 (Sheet Metal) - Measure E 2008

Page 15: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

Upcoming Construction ProjectsPCC Building CC Retrofit - Measure E 2008

15

Houses the Fitness Center, Gymnasium, Weight Room, and Faculty and Staff Offices

Swing space located on PCC Campus (Bldg. GG) Approved by DSA on 1/27/11. Currently in bid process To be completed concurrently with MDAB project phase 1 Anticipated end of construction 2012

Page 16: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

l i b

e r

a l

a r

t s

Liberal Arts CampusSite Plan

Page 17: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

p a

c i f

i c

c

o a

s t

Pacific Coast CampusSite Plan

Page 18: Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 18, 2011 EDUCATE ENGAGE EMPOWER 1

QUESTIONS&

ANSWERS

EDUCATE ENGAGE EMPOWER 18