block- kalpa
TRANSCRIPT
IIRD Shimla
1 Detailed Project Report (DPR) of Kalpa watershed under IWMP
DDEETTAAIILLEEDD PPRROOJJEECCTT RREEPPOORRTT
IInntteeggrraatteedd WWaatteerrsshheedd MMaannaaggeemmeenntt PPrrooggrraammmmee ((IIWWMMPP)),,
BBlloocckk-- KKaallppaa
Submitted to,
The Chief Executive Officer
State Level Nodal Agency
Department of Rural Development, H.P
Prepared by,
Institute for Integrated Rural Development (IIRD)
An ISO 1900:2008 Certified Institute
Bye Pass Road, Shanan, Sanjauli, Shimla – 6
www.iirdshimla.org
IIRD Shimla
2 Detailed Project Report (DPR) of Kalpa watershed under IWMP
1 Name of the project IWMP – VI Kalpa
2 District Kinnaur
3 Block Kalpa
4 Project Area 5 panchayats of Pooh
block
5 Area proposed for treatment 2500 hectares
6 Cost 3.75 crores
7 Panchayats covered under the project 5
8 Total Micro Watersheds 5
9 Financial Projection in the DPR as
9
(i)
Project Fund 3.75 crores
9
(ii)
Convergence 216268.00
Total (9 i + 9 ii) 37716268.00
10 Whether the year wise annual action plan
prepared or not
Yes
11 Whether activity-wise project fund and
convergence funds indicated separately or
not
Yes
12 Whether Khasra No. of civil structure
indicated or not
No
13 Phy. And Fin. Target of the project period
mentioned in the AAP or not
Yes
14 Micro watershed- wise code mentioned or
not
Yes
15 Proposed activities NRM
Water harvesting structure, Soil conservation measures.
IIRD Shimla
3 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Livelihood
Poultry Farm , Small Restaurant, Carpenter Tools, Electrical Tools , Nursery Raising , Medicinal plant Cultivation , Khadi Center , Vermi Compost , Sheep Rearing , Sewing Center , Dairy Farm, Shop , Pickle making , Juice Making, Knitting Machine, Power Tiller, Power Spray, Bee Keeping Production system
Agriculture Vegetable Cultivation,
Medicinal Cultivation
Horticulture
Plant Distribution,
Horticulture Collection
Center
Livestock
Pasture development.
Microenterprise
Sheep Rearing, Poultry
Farming, Piggery Farm,
Khadi Center,
Carpenter Tools,
Plantation, Nursery
Raising, Blacksmitht
Tools, Jewellery Tools,
Power Spry Machine,
Knitting Machine,
IIRD Shimla
4 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Sewing Center.
16 Provision of funds for water
conservation/Harvesting activities
Yes
17 Area proposed to be brought under
Supplemental irrigation
45 ha
18 Whether the draft DPR has been approved by
18 (i) The Gram Sabha/Gram Panchayat Yes
18 (ii) The District Level Resource Group Yes
19 Expected Outcome Production system Agriculture
Vegetable Cultivation-
Increase of Rs 3000
per month/per HH.
Medicinal plant
cultivation- Earning of
Rs 20,000 in one
season per household
during a year
Horticulture
Plant distribution-
10000 saplings per
hectare.
Horticulture Collection
Center- Availability of
200 quintal storage
facility
NRM
Increase in water
storage capacity to the
tune of 15397 cu mt.
Livelihood Pasture development
IIRD Shimla
5 Detailed Project Report (DPR) of Kalpa watershed under IWMP
– Availability of fodder
throughout the year.
20 Status Quo Analysis
Total Geographical Area under the project 17818 ha
Area under cultivation 868 ha
Fallow land -
Forest Area 618 ha
Community land 12415 ha
Other land 3917 ha
Current cropping pattern Wheat, Oats, Barely,
Pulses, Peas, Potato
and Tomato
21 Water harvesting
Current status of Water Harvesting activities -
Water Harvesting Potential in terms of Cubic mtrs.
15397 cu mt
Proposed activities Irrigation channels,
Tanks, Pipeline, stone
fencing, crate wire,
bench terracing,
plantation.
Water potential to be created in Cubic litres 15397000
22 Farm based interventions:
Agriculture based activities proposed in the DPR
Vegetable cultivation.
Plant Distribution,
Medicinal plant
cultivation.
Agriculture allied activities proposed in the DPR
None
23 Non Farm Based inventions:
Skill development 5% of the total fund
allocated for capacity
IIRD Shimla
6 Detailed Project Report (DPR) of Kalpa watershed under IWMP
building during 1st,2nd
and 3rd year.
Proposed Micro Enterprises Sheep Rearing, Poultry
Farming, Piggery Farm,
Khadi Center,
Carpenter Tools,
Plantation, Nursery
Raising, Blacksmith
Tools, Jewellery Tools,
Power Spray Machine,
Knitting Machine,
Sewing Center
24 Financial Envelop
Watershed Project 3.75 crores
Convergence 216268.00
25 Outcome Production system Increase of Rs 3000/-
per month from
vegetable cultivation.
Earning of 20000/-
from medicinal plant
cultivation.
NRM Increase in water
storage capacity to the
tune of 15397 cu m.
Livelihood Increase in monthly
income by Rs 6222/-
per month, owing to
implementation of
various livelihood
activities.
Quantifiable indicators NRM
Irrigation channels-
Availability of water
IIRD Shimla
7 Detailed Project Report (DPR) of Kalpa watershed under IWMP
for irrigation
throughout the year.
Tanks- Additional
water storage capacity
of 1620 cu.mt
Crate Wire- Approx.
10 feet increase in
ground water level
Plantation- Increased
production of apple.
Bench terracing-
Reduction in soil
erosion.
Pipeline- Availability
of drinking water
round the year.
Stone fencing- Safety
from wild animals.
Livelihood Activities
Increase in average
monthly income by Rs
6222/-.
Production System
Agriculture
Vegetable Cultivation-
Increase in monthly
income by Rs 3000/-
Medicinal cultivation –
Income of Rs 20000/-
per season.
Horticulture
Plant Distribution
10000 Sapling
IIRD Shimla
8 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Prepared by____IIRD Shimla______ (Rs crores and area in hectares) Budget -3.75 crores Area- 2500
hectares
production at HH
level.
Establishment of 4
horticulture collection
centres leading to
availability of 200
quintal storage space.
Livestock
Pasture development
Availability of fodder
throughout the year.
Microenterprise
Average monthly
income for household
from these activities
will be around Rs
4625/- per month.
IIRD Shimla
9 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Abbreviation
IWMP - Integrated Watershed Management Programme
I&PH - Irrigation and Public Health
WDF - Watershed Development Fund
NPK - Nitrogen Phosphorus Potassium
GP - Gram Panchayat
AF - Afforestation
GT - Grass land with Trees
GS - Grass Seed
CCT - Continuous Contour Trench
SCT - Staggered Contour Trench
AH - Agro Horticulture
CP - Compost Pit
DH - Dry land Horticulture
S.CPCT - Strengthening of Continuous Peripheral Contour Trench
CPL - Community Pasture Land
MPT - Mini Percolation Tank
PT - Percolation Tank
NPM - Non Pesticide Management
MN - Micro Nutrients
EPA - Entry Point Activity
UG - User Group
D1 - Very Shallow (0.15)
D2 - Shallow (0.30)
D3 - Moderately deep (0.45)
D4 - Deep (more than 5)
E1 - Sheet erosion
E2 - Rill erosion
E3 - Small Gullied Erosion
E4 - Severe Gulled Erosion
S1 - Slope (15% -20%)
S2 - Slope (20% -25%)
S3 - Slope (25% -30%)
IIRD Shimla
10 Detailed Project Report (DPR) of Kalpa watershed under IWMP
2. Watershed at a Glance
General Information
1 Name of the watershed Name not provided
2 Name of the Panchayats Sangla, Rroghi. Thaimgarang,Brua, Shong
3. Name of the Block Kalpa
4 Name of the District Kinnaur
5. Geographical Area of the Watershed 17818 Hectares
6. Micro Watershed consist of Watershed
and Watershed Codes
Rogi khas 01979100, Sangla 02005900,
Shong khas 02004800, Brua khas 02003000
Panpo Kanda 02006500,
7. Major Water Source Setluj
8. River flowing nearby the watershed
area
Setluj
9. Livelihood Options Major: Horticulture, Agriculture, Animal
Husbandry
Minor: Business, Wages, Govt. Job
Demography
10. Population 6506 Persons
11. Number of Males 3250
12. Number of Females 3256
Agriculture
13. Major Crops Wheat, Oats, Barley, Vegetables, Pulses
14. Marketing Local
Horticulture
15. Major Crops Apple, Pear, Plum, Grapes, Chulli, Kharmani,
Pecanut, Almond
IIRD Shimla
11 Detailed Project Report (DPR) of Kalpa watershed under IWMP
16. Marketing Outstation (Shimla, Chandigarh, Delhi)
Animal Husbandry
18 Livestock Cow, OX, Sheep, Goat
19 Daily Milk Production per family 2 Litres
3. Executive Summary
The Integrated Watershed Management Program (IWMP) is a set of common guideline for
implementing watershed projects in the country. The Ministry of Rural Development (MoRD),
Ministry of Agriculture and the National Wasteland Development Project for Rainfed Areas use this
guideline for making the process of planning and implementation of watershed projects more
participatory, inclusive, sustainable and equitable.
The proposed watershed area in Kinnaur district is located in its Kalpa block spanning across 5
Panchayats and 41 villages. The micro watershed includes Rogi khas 01979100, Sangla 02005900,
Shong khas 02004800, Brua khas 02003000 and Panpo Kanda 02006500.
The Institute for Integrated Rural Development, IIRD Shimla is supporting the Department of Rural
Development, H.P. in preparing integrated watershed planning in many districts including the one for
Kangra district. The watershed area under reference consists of gram panchayats namely Shong, Brua,
Thaimgarang, Roghi and Sangla located in Kalpa Block of Kinnaur district. As per the Panchayat
records, the watershed project has a total 1303 households with a population of 6506, out of which
3250 are male and 3256 female.
Agriculture and horticulture are the major source of livelihood in the watershed area. The agricultural
production is mainly aimed to meet the local needs. The major crops cultivated by the farmers are
Wheat, Oats, Barely, Pulses, Peas, Potato and Tomato etc. The farmers rely on the old techniques and
patterns for agriculture production. Horticulture is considered as a major livelihood source of the
watershed area. All the households in the watershed area are involved in horticulture activity. The
major horticulture produce in the area is apple. Other produces in the area includes Apricot, Pear,
Plum, Wild Apricot, Pecanut, Almond and Grapes etc.
The process of preparing the integrated watershed planning to produce Detailed Project Report started
with data collection from the field both from secondary sources like the Patwari, Gram Panchayat and
primary data collection through household surveys and PRA exercises. Focused Group Discussions
and transact walks were organized to involve community participation in planning development
IIRD Shimla
12 Detailed Project Report (DPR) of Kalpa watershed under IWMP
activities in the watershed areas. Gram Sabhas were organized to pass resolutions to approve the
proposed development works relating to agriculture and horticulture productivity, soil and water
resources conservation, micro enterprises development and common property resources etc.
Some of the activities proposed by the respective Gram Sabhas in enhancing agriculture productivity
in the watershed area are construction of Kulh (irrigation channels) pond and distribution of improved
varieties of crop seeds etc. In horticulture people have proposed nursery raising and distribution of
high yielding varieties of horticulture plants and construction of fruit collection centers.
Around 162 people have expressed interest to undertake farm based micro enterprises such as
Piggery, Poultry farming, and Khaddi center etc. Some of the livelihood enhancement activities
proposed by the project beneficiaries include activities such as opening small restaurants, food
processing plants, poultry farming, etc. For improving soil, water and common property resources in
the proposed watershed area certain activities such as construction of Check dams, Gully plugs,
Contour trenching and plantation etc have been proposed in the detailed project report.
IWMP fund as per the guideline is Rs 37500000.00 with beneficiary contribution to the tune of Rs
1875000.00 and Rs 216268.00 through Convergence.
IIRD Shimla
13 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Chapter One
Introduction, Objectives &
Methodology
IIRD Shimla
14 Detailed Project Report (DPR) of Kalpa watershed under IWMP
4. Introduction
The Integrated Watershed Management Programme (IWMP) is designed with the aim of integrated
development of the rural areas of the country. The objective of the Integrated Watershed Management
Programme is to harness locally available natural resources in an optimum manner to achieve the
overall goal of sustainable development.
This objective is sought to be realized by conserving, protecting, developing natural resources,
restoring the ecological balance, preventing soil erosion, degradation of top soil cover, regeneration of
natural vegetation, surface water conservation and recharging of the ground water etc. The
programme also gives specific importance to the productivity enhancement of
agriculture/horticulture/animal husbandry activities and livelihood development. The activities for
resource development and usage will be planned to promote farming and allied activities to promote
local livelihoods while ensuring resource conservation and regeneration.
Watershed based development has the potential to bring about a balance among environment, natural
& human resources while encouraging community participation. This would help bring about
accountability, effectiveness, efficiency & transparency.
5. Objective
To prepare detail implementation plan on participatory basis for conservation and rejuvenation of
natural resources for strengthening the livelihood of the people besides creating additional livelihood
options.
Guiding principle
The Integrated Watershed Management Programme envisages bringing together all stakeholders
including local community, Panchayati raj, concern government departments and any other party
involved in watershed management program for a coordinated planning, implementation and
IIRD Shimla
15 Detailed Project Report (DPR) of Kalpa watershed under IWMP
maintenance of natural resources for sustainable development in rural areas of the country. Some of
the overarching aims of this programme are outline below:
5.1 Resource development: Resource development and usage to promote farming and allied
activities to support local livelihoods while ensuring resource conservation and regeneration.
5.2 Equity and Gender Sensitivity: Project Implementing Agencies (PIAs), must facilitate the
equity processes such as a) enhanced livelihood opportunities for the poor through investment
in their assets and improvements in productivity and income, b) improving access of the poor,
especially women to the benefits, c) enhancing role of women in decision making processes
and their representation in the institutional arrangements and d) ensuring access to usufruct
rights from the common property resources for the resource poor.
5.3 D e c e n t r a l i z a t i o n : P r o j e c t m a n a g e m e n t w o u l d i m p r o v e w i t h
decentralization, delegation and professionalism. Establishing suitable institutional
arrangements within the overall framework of the Panchayati Raj Institutions (PRIs), and the
operational flexibility in norms to suit varying local conditions will enhance decentralization.
Empowered committees with delegation to rationalise the policies, continuity in
administrative support and timely release of funds are the other instruments for effective
decentralization.
5.4 Centrality of Community Participation: Involvement of primary stakeholders is at the
centre of planning, budgeting, implementation, and management of watershed projects.
Community organizations may be closely associated with and accountable to Gram Sabhas in
project activities.
6. Methodology
During the process of preparation of Detailed Project Report (DPR) the following methodology
was employed to collect data relating to land records, educational status, agriculture and
horticulture practices etc. It involved collection of data from local government functionaries like
the Patwari, Gram Panchayat and research station of Dr. YS Parmar University of Horticulture
and Forestry at Tabo.
IIRD Shimla
16 Detailed Project Report (DPR) of Kalpa watershed under IWMP
6.1 Collection of Secondary Data
Secondary data relating to rainfall, health status, education, irrigation and drinking water, land
records, agriculture and horticulture productivity, availability of common property resources etc
were collected from various sources such as the local Patwari, Gram Panchayat, and Sharbo
research station of Dr. YS Parmar University of Horticulture and Forestry.
6.2 Collection of primary data through conduct of PRA exercises
PRA approach was adopted wherein the local people enthusiastically involved themselves in
planning for their respective panchayats. PRA exercises were conducted for ensuring participation
of the various stakeholders. These exercises were conducted during the months of October &
November in which most of the local community attended and participated in it. All these
exercises were properly documented along with signatures of the participants.
The team from IIRD Shimla visited the villages located within the watershed area for conducting
the PRA exercises. Following rounds of initial discussions and rapport building meetings the team
conducted the following PRA exercises to collect the required information and data for preparing
the Detailed Project Report under the IWMP.
Social resource mapping
Seasonality Analysis
Natural Resource mapping
Venn Diagram
Pie-Chart Diagram
Time Line Analysis
Transact walk
Focused Group Discussion
6.3 Participatory Planning
All the activities proposed in the DPRs have been planned after conducting thorough discussions
with the local community at Panchayat level meetings. People from all wards had attended in
these meetings to suggest development needs of the area and proposed activities for improving
common property resources, agriculture productivity, dairy development and infrastructure
development, etc.
IIRD Shimla
17 Detailed Project Report (DPR) of Kalpa watershed under IWMP
IIRD Shimla
18 Detailed Project Report (DPR) of Kalpa watershed under IWMP
77.. SWOT Analysis ooff MMiiccrroo--WWaatteerrsshheedd ooff IInnddoorraa BBlloocckk..
Sl. No Area of
Interventions Strengths Weaknesses Opportunities Threats
1. Agriculture
The area is suitable for
cultivation of wheat, oats,
barley, pulses, peas, potato
and tomato.
Availability of a ready
market for the agriculture
produces in the nearby
towns of Reknong Peo.
Lack of irrigation facilities.
Lack of knowledge on crop
rotation practices.
If provided with proper
irrigation considerable
increase in agriculture
production can be assured
Glacier movement affecting
crops.
2. Horticulture
Existence of Regional
Horticulture research Sub-
station at Sharbo.
Good Apple production
Good Dry Fruits
production.
Lack of storage facilities
Availability of surplus
Land for further
intensification of
horticulture activity.
Interest of the villagers to
expand horticulture
activities
Climate Change
IIRD Shimla
19 Detailed Project Report (DPR) of Kalpa watershed under IWMP
3. Animal
Husbandry
Favorable environment to
raise goats and sheep
Majority of households are
engaged in activities
related to animal
husbandry.
Lack of adequate supply of
fodder through the year
Promotion of nursery
raising and pasture
development will address
the lack of fodder
availability.
Prevalence of animal
diseases.
4. Natural
Resources
Availability of traditional
irrigation infrastructure
(kulhs) and pipelines.
Kulhs do not connect all
villages.
Prevalence of soil erosion in
the region
Construct water storage
structutres for irrigation
Creation of Gully Plugs to
stop soil erosion at the
watershed area.
Kulhs drying due to climate
change.
Lack of proper maintenance
of pipelines.
6.
Micro-
Enterprises and
Production
Systems
People are doing some
micro-enterprises in an
unorganized way
People having the basic
skills on khaddi usage,
knitting and weaving.
Lack of organized micro-
enterprise activities.
Lack of management skills
Lack of technical support
If provided good technical
support and motivation
they can run the units in an
organized way.
Promotion of organized
micro enterprises as an
additional livelihood
option.
Lack of knowledge of
government incentives may
fail to make an impact at
ground level.
IIRD Shimla
20 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Chapter Two
Overview of the Watershed Area
IIRD Shimla
21 Detailed Project Report (DPR) of Kalpa watershed under IWMP
8. Overview of the Watershed
8.1 Background of the area
The watershed area under reference consists of villages located in five gram panchayats of
Kalpa Block of Kinnaur district. In the north direction there is very steep slope hills, in the
east fault land called Bale Medan, in the south one tributory second order river and in the
west, hills are located.
Geographical Characteristics
The entire watershed is extremely hilly with complex topography with an elevation up to
2700 m. The general slope is from North West to South East. The major physiographic units
Map of watershed area
IIRD Shimla
22 Detailed Project Report (DPR) of Kalpa watershed under IWMP
delineated are steep to very steep hill slopes, moderately steep to very steep hill slopes, hill
terraces, hill slopes with pasture and hill slopes with forest cover. The relief is excessive and
the watershed is drained by perennial streams. All local streams are merging in Baspa River.
8.2 Geographical Characteristics
8.2.1 Climate
The climate of the project area is characterized by cool and dry climate. Meteorologically, the
year can be divided into three distinct seasons. Winter season sets in from the month of
October and continues up to February, followed by summer season from March to June. The
area receives rainfall under the influence of southwest monsoons over a period of three
months from July to September. Temperature rises rapidly after March and the month of June
is the hottest month of the year with mean daily maximum temperature going up to 25.0oC.
With the withdrawal of monsoons, by the end of October, there is a sharp decrease in
temperature. The months of January and February are the coolest months of the year, with
mean daily minimum temperature as low as -8.2oC. The total annual rainfall is about 766.5
mm per annum. The maximum precipitation is received in the months from January to
March. About 55% of the precipitation is received during winter season. The average
`humidity’ observed in the project area is about 50% apart from the monsoon months.
Humidity is generally low from 35 to 54.2%. In monsoon months, humidity is more than
80%.
8.2.2 Soil Type
The skeletal and calcareous soils occur on gently sloping to almost level valleys. The pH of soil at
various sites lies within neutral range. The levels of NPK indicate moderate to high soil productivity.
The sodium levels do not indicate any potential for soil salinization or adverse impacts on soil
productivity.
IIRD Shimla
23 Detailed Project Report (DPR) of Kalpa watershed under IWMP
8.3 Land use pattern of the watershed area
S.
N
o
Name of the
villages
Geographica
l Area of the
village
Fores
t
Area
Land
under
agricultur
e (ha)
Rainfe
d area
Permanen
t pastures
(ha)
Cultivabl
e
wastelan
d
Un
cultivabl
e
wastelan
d
1 Rogi khas,
Talangchos,
Kastyo,
Dakhaye,
(Rogi)
903 0 55 0 346 318 184
2 Sangla,
Thapasaring,
Sangla
Kanda Dhar,
Rupan Dhar,
Dewar
(Sangla)
10431 426 583 0 9215 0 207
3 Shonkhas,
Dhar, Pashel,
Dhar,
Damber
(Shong)
3017 0 5 2 52 712 339 1862
4 Panpo kanda,
Boning
saring,
Dewar
Kanda
(Themgarang
)
1347 192 190 0 95 0 870
5 Brua khas,
Anti Dhar,
Tilcho Khula
Dhar
(Brua)
2120 0 40 7 2047 5 21
IIRD Shimla
24 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Total 17818 618 868 59 12415 662 3144
8.4 Demographic information
As per the Panchayat records, the watershed project has a total 1303 households with a population of
6502, out of which 3250 are male and 3235 female. From this data it emerges that there is a healthy
sex ratio as the female population is greater than male population. The average size of the family is
5 persons per household. The population of this area exclusively belongs to the Scheduled Tribe
Category.
Gram Panchayat Wise Population & Households
G.P Male Fimale Total
Population
SC
Households
ST
Households
BPL
Households
Total
Households
Sangla 1466 1527 3005 282 280 68 562
Shong 415 420 840 119 67 17 178
Thamgara
ng 409 318 727 46 121 12 167
Brua 608 626 1234 144 97 32 241
Rogi 352 344 696 61 94 27 155
Total 3250 3235 6502 652 659 156 1303
Source: Baseline Survey Conducted by IIRD, Shimla.
IIRD Shimla
25 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Chapter Three
Preparatory, Work Execution and
Consolidation phases
IIRD Shimla
26 Detailed Project Report (DPR) of Kalpa watershed under IWMP
9. Phase 1: Preparatory
The initial year of the project will be devoted for preparatory activities being facilitated by the
Watershed Development Team. The activities contain primarily ensuring community participation,
entry point activities, preparation of DPR, methods & mechanism, strengthening local institutions
(SHG and UG).
9.1 Entry point activities
Total Budget for the entry point activities in the watershed is Rs 15,00,000.
9.2 Preparation of DPRs
Institute for Integrated Rural Development (IIRD) Shimla was assigned to prepare the Detailed
Project Report (DPR) for the implementation of the watershed project under Integrated Watershed
Management Programme (IMWP-X).
9.3 Strengthening PIA
Strengthening the PIA is imperative for effective implementation of the development work to be
carried in the watershed area. Capacity building forms an important part of this strategy. District level
capacity building exercise involving orientation on innovation in watershed management as
construction of gully plugs, rain water harvesting structures need to be included while orienting the
PIA on common property resource management.
Similar innovations need to be tried while formulating capacity building exercises for the PIA in other
development areas related to the watershed region.
First Year:
1. Orientation of Watershed Development Teams and Panchayat Officials
2. Orientation course on Fund Management for Watershed Development Teams, User Groups &
SHGs.
Second Year:
IIRD Shimla
27 Detailed Project Report (DPR) of Kalpa watershed under IWMP
1. Orientation programme on Group management and Livelihood Activities with special focus
on Medicinal Plants, Nursery Raising, Diary Development, Goat rearing, Sheep Rearing,
Basket making & Small Restaurant.
2. Orientation for members of User Groups (UGs) and Self Help Groups (SHGs).
3. Orientation of Watershed Development Team (WDT) on Monitoring and Evaluation of the
Project with special focus on RTI, Social Audit and Transparency.
4. Details of Activity for Preparatory Phase (Initiation of Cluster level institution, Capacity
building, IEC activities, Baseline Survey, Hydrogeological survey, identifying technical
support agency are explained as below.
Budget for Administrative, monitoring & evaluation activities (Preparatory phase)
Rupees Ninety Six Lakh Eight Thousand Four Hundred only
Budget for Preparatory Phase
S. No Particulars Details Amount
First Year
A Preparation of DPR 1 %
375,000.00
B Entry Point Activities 4 %
1,500,000.00
C Institutional and Capacity Building 5 % 1,875,000.00
SL. No. Particulars Details Amount
1 Administrative Cost Rs. 750000@
5 year 3750000.00
2 Monitoring Rs. @125000
3 Year (2nd
,3rd
,4th) 375000.00
3 Evaluation
Rs. 125000 @
4 Year (3rd
4th 5
th )
375000.00
Total
4500000.00
IIRD Shimla
28 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Distt. Level
Project Management
Innovations in Watershed management
Project Monitoring & Evaluation
Conceptual frame works of watershed
development
Common Guideline
Identification of watershed Area
Problem Analyses
Support system to watershed project
PIA.s
GIS application in watershed Project
10 per @2000 for
5days
No of Trainings: 1
100000.00
WDT Level
Conceptual frame works of watershed
development
Social &Managerial aspects of
watershed Dev.
Technical aspects of watershed Dev.
Project Implementation Process
&Strategies
Participatory Monitoring of watershed
Project
Agri.Hort.Livestock Agro-Forestry
Practices in watershed
MIS application in Watershed Work
GIS application in watershed Project
4 per @ 1500 for
5days
No of Trainings: 4
120000.00
GP Level
Livelihood &IGA Strategies
Conceptual frame works of watershed
development
Community Institute Capacity building
Sustainable Livelihood Area specific
Project process documentation
20 per @ 1000 for
5 days.
No of trainings: 7
405000
Second Year
District
Level
Project Management
Innovations in Watershed management
Project Monitering &Evaluation
Conceptual frame works of watershed
10 per @2000 for
5days
No of Trainings: 1
100000.00
IIRD Shimla
29 Detailed Project Report (DPR) of Kalpa watershed under IWMP
development
Command Guideline
Identification of watershed Area
Problem Analyses
Support system to watershed project
PIA.s
GIS application in watershed Project
WDT Level
Conceptual frame works of watershed
development
Social &Managerial aspects of
watershed Dev.
Technical aspects of watershed Dev
Social &Managerial aspects of
watershed Dev.
Project Implementation Process
&Strategies
Participatory Monitoring of watershed
Project
Agri.Hort.Livestock Agro-Forestry
Practices in watershed
MIS application in Watershed Work
GIS application in watershed Project
4 per @ 1500
for 5days.
No of
Trainings: 4
120000.00
GP Level
Livelihood &IGA Strategies
Conceptual frame works of watershed
development
Community Institute Capacity building
Sustainable Livelihood Area specific
Project process documentation
20 per @ 1000 for
5 days.
No of trainings: 7
405000
Third Year
District
Level
Project Management
Innovations in Watershed management
Project Monitering &Evaluation
Conceptual frame works of watershed
development
Command Guideline
10 per @2000 for
5days
No of Trainings: 1
100000.00
IIRD Shimla
30 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Identification of watershed Area
Problem Analyses
Support system to watershed project
PIA.s
GIS application in watershed Project
WDT Level
Conceptual frame works of watershed
development
Social &Managerial aspects of
watershed Dev.
Technical aspects of watershed Dev
Social &Managerial aspects of
watershed Dev.
Project Implementation Process &
Strategies.
Participatory Monitoring of watershed
Project
Agri.Hort.Livestock Agro-Forestry
Practices in watershed
MIS application in Watershed Work
GIS application in watershed Project
4 per @ 1500 for
5days.
No of Trainings: 4
120000.00
GP Level
Livelihood &IGA Strategies
Conceptual frame works of watershed
development
Community Institute Capacity building
Sustainable Livelihood Area specific
Project process documentation
20 per @ 1000 for
5 days.
No of trainings: 7
405000.00
Total Institutional and Capacity Building 1,875,000.00
Total 3750000.00
10 Phase 2: Work Execution
10.1 Natural Resources Management
Existing Status
Natural Resource Management is very crucial for the survival of any human society. The
watershed area is prone to soil erosion and landslides due to movement of glaciers. Due to the
IIRD Shimla
31 Detailed Project Report (DPR) of Kalpa watershed under IWMP
sudden melting of glacier the downstream areas sometimes get flooded causing loss of life
and property. This area is required to be treated so that further degradation of the soil and
landslides can be checked. Beside these the area also does not have enough water storage
facility leading to poor irrigation facility in the area.
Proposed activities
S.
No Activity
No of
Units
No of
Beneficiaries
IWMP
Fund
Area to be
Treated(h
a)
Outcome
(Quantified)
1 Plantation, Ha 18 870 H.H 1530000
1300 ha Increased greenery
and slope coverage.
2 Irrigation Channel 7050 rmt 430 H.H 7785880 570 ha Increase in irrigated
land.
3 Irrigation Tank 10 100 H.H 2498298 350 ha
Additional water
storage capacity of
1620 cu.mt
4 Crate wire 5275rmt 420 H.H 2373750 160 ha Increase in slope
stabilization.
5 Pipe line 11600rmt 400 H.H 3501071 400 H.H
Increase of 6347 rm
of water and
increase availability
of drinking water
round the year
6 Stone Fencing 2190rmt 210 H.H 1525109 53 ha Protection from wild
animals
7 Bench Terracing 8ha 270 H.H 2002160 22 ha Reduction in soil
erosion.
Total - - 21216268 2500 ha
Outcome and justification
The proposed interventions are supposed to benefit around 1303 households in the project area. It
would help in improving ground water recharging, reduce soil erosion and increase water availability
for drinking as well as for irrigation purposes. All these activities are expected to improve natural
resources and its sustainable management.
Construction of Crate wire and Bench terraching would help in improving ground water recharge in
49 hectares in the watershed area. These structures would help to break the slope and reduce the
IIRD Shimla
32 Detailed Project Report (DPR) of Kalpa watershed under IWMP
velocity of surface runoff and improves ground recharge and soil moisture of the adjoining areas.
Construction of Irrigation tank would help in increasing storage of 1620 cu m. Around 13777 running
meter of water availability could be ensured for irrigation purpose through construction of irrigation
channel and Pipe lines in the watershed area.
10.2 Livelihood Activities
Existing status: The common livelihood options of the people living in the watershed area are
agriculture with vegetable cultivation as the main activity, labor works from government programs
like MNREGA etc. However agriculture in the area is dependent on rainfall and so it is a seasonal
activity. There is very little irrigation facilities among the people in the area.
Proposed activities: In order to supplement and strengthen the existing livelihood option of the
people the following activities have been proposed that will help in improving the income level of the
people.
SL.
No Activity
No. of
Units
No of
Beneficiaries
Funds from
IWMP Total Cost
Expected
increase in
Monthly
income per HH
(Rs)
a Poultry Farm 9 9H.H 270000 270000 5000.00
b Small Restaurant 3 3 H.H 90000 90000 10000.00
c Carpenter Tools 37 37 H.H 516000 516000 30000.00
d Electrical Tools 2 2 H.H 60000 60000 4000.00
e Nursery Raising 20 20 H.H 500000.00 500000.00 5000.00
f Medicinal plant
Cultivation 3 3 H.H 75000 75000
3000.00
g Khadi Center 18 18 H.H 170000.00 170000.00 5000.00
h Vermi Compost 5 5 H.H 150000.00 150000.00 3500.00
i Sheep Rarring 4 4 H.H 120000.00 120000.00 3000.00
j Sewing Center 15 15 H.H 88000.00 88000.00 3000.00
k Dairy Farm 6 6 H.H 180000.00 180000.00 5000.00
IIRD Shimla
33 Detailed Project Report (DPR) of Kalpa watershed under IWMP
lm Shop 2 2 H.H 60000 60000 8000.00
n Pickle making 9 9 H.H 180000.00 180000.00 2000.00
o Juice Making 1 1 H.H 30000 30000 4000.00
p Knitting Machine 6 6 H.H 60000 60000 6000.00
q Power Tiller 2 2 H.H 301000 301000 4000.00
r Power Spry 11 11 H.H 165000 165000 6000.00
s Bee Keeping 18 18 H.H 360000.00 360000.00 5500.00
Total
3375000.00
Outcome and justification
The proposed activities would benefits around 1303 households which are members of 211 SHGs in
the project area. It would provide employment opportunities to these households and is expected to
increase their average monthly income by Rs 6222/-.
10.3 Production system
10.3.1 Agriculture
Existing Status
Agriculture is considered as a major source of livelihood in the watershed area. The agricultural
production is mainly aimed to meet the local needs. The major crops cultivated by the farmers are
Wheat, Oats, Barely, Pulses, Peas, Potato and Tomato etc. The farmers rely on the old techniques and
patterns for agriculture production. Most of the agriculture is rain fed in nature whereas at some
places the people have developed irrigation facilities by way of construction of ponds, tanks etc.
Proposed Interventions
The following activities have been proposed by the community in the proposed watershed area. The
community will benefit from the following interventions in improving vegetable production, irrigate
more farm land and intensify rice cultivation.
S.
No Activity
No of
Panchayats
No of
Beneficiaries
(HH)
IWMP Fund
Area to be
Treated
(ha)
Outcome
(Quantified)
1 Vegetable
Cultivation 5
315 H.H 315000 -
Income in
family income
of Rs 3,000/hh
per month
IIRD Shimla
34 Detailed Project Report (DPR) of Kalpa watershed under IWMP
2 Medicinal
Cultivation 1
10 H.H 100000 -
Earning of Rs
20,000 in one
season per
household
during a year
Outcome and Justification
The proposed activities will benefit 325 households in the 5 Gram Panchayats of the watershed area.
It will help to increase household monthly income by around Rs 3,000/ per month from vegetable
cultivation and medicinal plant one gram panchayat 20,000 in one seasion.
10.3.2 Horticulture
Existing Status
Horticulture is considered as a major livelihood source of the watershed area. All the households in
the watershed area are involved in horticulture activity. The major horticulture produce in the area is
apple. Other produces in the area includes Apricot, Pear, Plum, chilgoza, Wild Apricot, Pecanut,
Almond and Grapes etc. Most of the families in the watershed area are involved in Horticulture
activities.
Proposed Interventions
S. No Activity No of
Panchayats
No of
Beneficiaries
(HH)
IWMP
Fund
Area to be
Treated (ha)
Outcome
(Quantified)
1 Plant Distribution
5 122H.H 875000 122 ha 10000
saplings
produced/ha
2 Horticulture
Collection Center 4 320 H.H 600000 4 Unit
Availability
of 200 quintal
storage
facility.
Outcome and Justification
The proposed intervention will benefit 122 households across 5 panchayats of the watershed area.
Approximately 122/ha saplings of fruit plants like Orange, Mango and Pear etc would be distributed
IIRD Shimla
35 Detailed Project Report (DPR) of Kalpa watershed under IWMP
among households in the watershed area. The horticulture collection centre will provided storage
facility of around 200 quintal per unit and is expected to generate revenue to the panchayats. It can
charge Rs 320 per household for storage of horticulture crops. It will benefit the fruits growers of the
watershed area by facilitating storage facility and enable to avail good price of their produces.
10.3.3 Livestock
Existing status
Animal Husbandry is one of the major livelihood activities in the watershed area. As per the survey,
maximum numbers of households in the area are engaged in animal husbandry activities. Chief among
the domesticated animals in the watershed area are Cows, Goat, Sheep, ox,, Churu, Horse, Donkey
and Mule.
Existing arrangements of fodder
In general villagers collect green fodder from the personal lands. As the demand for the
fodder cannot be met from the locally available sources all the time, the villagers also buy
fodder from the local vendors.
Present status of grass lands and pasture lands
Presently there are 618 ha of forest land and 12415 ha of permanent pasture lands in the
area. The pasture lands are generally dry in nature and provide pasture only during the
months from May to November. Forest Land is also totally dry and not a good source for
fodder.
Status of green fodder available in a year
The green fodder is available in the area during the summer season where as due to severe
winter conditions prevailing during the winter season, fodder is procured from outside.
Proposed Interventions
S. No Activity No of
Panchayats
No of
Beneficiaries
(HH)
IWMP
Fund
Units/Area
to be
Treated
(ha)
Outcome
(Quantified)
1 Pasture
Development 5 450 h.h. 310000 14 ha
It will ensure
fodder
availability for
around 9 months
of the year.
IIRD Shimla
36 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Outcome and Justification
450 households will benefit from the proposed interventions in 5 Gram Panchayats. 14 hectares of
pasture land is expected to be developed upon implementation of the proposed activities which is
expected to ensure fodder availability for around 9 months of the year.
10.3.4 Micro-enterprises
Existing status of micro enterprises
There were very few Micro enterprises undertaken by the people in the watershed area. Most of the
households have small land holdings and are engaged in agriculture while also practising dairy
farming. Another source of income is the labor work from government sponsored programme like the
MNREGA particularly for families from the low income group.
Proposed micro enterprises activities
S. No Micro-Enterprises Unit Beneficiaries
(HHs)
Total Cost
(Rs)
Expected
Outcome
Average
Increase in
monthly
income
(Rs)/HH
1 Sheep Rarring 4 4 100000
10000
2 Poultry Farming 3 3 70000
4000
3 Piggery Farm 1 1 30000
4000
4 Khadi Center 35 35 350000
5000
5 Carpenter Tools 1 1 30000
5000
6 Plantation 12 12 120000
7000
7 Nursery Raising 7 7 105000
4000
8 Blacksmitht Tools 4 4 80000
1500
9 Jewellery Tools 5 5 100000
5000
10 Power Spry Machine 1 1 15000
2000
11 Knitting Machine 21 21 210000
5000
12 Sewing Center 68 68 340000
3000
IIRD Shimla
37 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Total
162 162 1550000.00 4625
Outcome and Justification
Upon successful implementation of the proposed activities around 162 households would be
benefited from activities like Poultry farming, Sewing center, Nursery Raising, and Khaddi
centre etc. The expected average monthly income for household from these activities will be
around Rs 4625.
11. Consolidation Phase
This phase is to create innovative nature-based, sustainable livelihood and boost productivity
levels of the augmented resources and local economic development plans developed during the
Watershed Works Phase.
The following activities are planned to be carried out during this stage.
Documentation: It is proposed to document the activities carried out during the
watershed implementation period. The documentation work can be video, audio, paper &
process documentation. It will assist to uphold the records and identify and propagate the
successful activities carried out under the project.
Effective Experiments: It is proposed to identify the best practices carried out during the
project period and prepare learning documents up-scaling the same as per feasibility and
spread the same among others members of the watershed area.
Evaluation: Evaluation is an essential activity to assess the Impact & consequence of the
intervention. It is proposed to carry out evaluation at the following levels.
i. Social Audit: It is proposed to conduct the social audit of the programme at the
watershed level where the Gram Sabhas will evaluate the programme where the
beneficiaries should explain their benefits and current status of the activity. The
Watershed Committee should place the books of accounts of watershed programme
for approval.
ii. Evaluation by External Agency: An external agency with experience in
implementation and monitoring and evaluation of watershed projects should be
assigned for the evaluation of the watershed programme
S. No Consolidation Phase Amount (Rs)
IIRD Shimla
38 Detailed Project Report (DPR) of Kalpa watershed under IWMP
a Documentation 337500.00
b Scaling up of Successful experiments 337500.00
c Capacity Building & Training 450000.00
Total
1125000.00
IIRD Shimla
39 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Chapter Four
Institutional Arrangement, Action
Plan and Budget
IIRD Shimla
40 Detailed Project Report (DPR) of Kalpa watershed under IWMP
12. Institutional Arrangements
State Level Nodal Agency
A dedicated State Level Nodal Agency (SLNA) (Department / Mission / Society/Authority) has been constituted by the State Government having an independent bank account.
The main functions of the SLNA will be to:
Prepare a perspective and strategic plan of watershed development for the state on the basis of plans prepared at the block and district level and indicate implementation strategy and expected outputs/outcomes, financial outlays and approach the Nodal Agency at
the central level in the Department for appraisal and clearance.
Establish and maintain a state level data cell from the funds sanctioned to the States, and connect it online with the National Level Data Centre.
Provide technical support to Watershed Cell cum Data Centre (WCDC), throughout the state. Common Guidelines for Watershed Development Projects.
Approve a list of independent institutions for capacity building of various stakeholders within the state and work out the overall capacity building strategy in consultation with NRAA/Nodal Ministry.
Approve Project Implementing Agencies identified/selected by WCDC/ District Level Committee by adopting appropriate objective selection criteria and transparent systems.
Establish monitoring, evaluation and learning systems at various levels (internal and external/ independent systems).
Ensure regular and quality on-line monitoring of watershed projects in the state in association with Nodal Agency at the central level and securing feedback by developing partnerships with independent and capable agencies.
Constitute a panel of Independent Institutional Evaluators for all watershed projects within the state, get this panel duly approved by the concerned Nodal Agencies at the central level and ensure that quality evaluations take place on a regular basis.
Prepare State Specific Process Guidelines, Technology Manuals etc in coordination with the Nodal Ministry/ NRAA and operationalise the same.
District Watershed Development Agency / DWDA
A separate Cell has been established at the district level, which will oversee the implementation of watershed programme in each district and will have separate independent accounts for this purpose. It will be set up in DRDA/Zilla Parishad/District Level Implementing
Agency/Department in all programme districts as per the convenience of the State Governments and strengthen the same with professional support in the districts implementing large number of watersheds with area more than 25,000 ha. WCDC will function in close co-
ordination with the District Planning Committee. District Collector/ CEO, ZP may be designated as Chairman of WCDC and a District Officer of the Department, in which WCDC has been located, may be called the Project Manager for WCDC. The Project Manager will
attend to day to day functioning of WCDC and implementation of watershed programs in their jurisdiction whereas, District Collector/CEO, ZP will have role in securing ZP will have role in securing Common Guidelines for Watershed Development Projects 21
coordination and convergence along with periodical review of the programme. Representatives of MGNREGS, BRGF implementing agency at the district level
should be included in the periodical review meeting of the programme for convergence.
The functions of DWDA will be as follows:
Identify potential Project Implementing Agencies (PIAs) in consultation with Zila Parishad/Zila Panchayat/ District Council as per the empanelment process to be decided by the respective State Governments.
Take up the over all responsibility of facilitating the preparation of strategic and annual action plans for watershed development projects in respective districts.
Providing professional technical support to Project Implementing Agencies (PIAs) in planning and execution of watershed development projects.
Develop action plans for capacity building, with close involvement of resource organizations to execute the capacity building action plans.
Carry out regular monitoring, evaluation and learning.
Ensure smooth flow of funds to watershed development projects.
Ensure timely submission of required documents to SLNA / Nodal Agency
of the Department at central level.
Facilitate co-ordination with relevant programs of agriculture, horticulture
Institutional Arrangements at Project Level
Project Implementing Agency (PIA)
The SLNA has appointed the DWDA as the PIA, who would be responsible for implementation of watershed projects in different districts. These PIAs may include relevant line departments, autonomous organizations under State/ Central Governments, Government
Institutes/ Research Bodies, Panchayats, Voluntary Organizations (VOs).
Watershed Development Team
IIRD Shimla
41 Detailed Project Report (DPR) of Kalpa watershed under IWMP
The WDT is an integral part of the PIA which is already functioning. Each WDT is constituted of four members, broadly with knowledge and experience in agriculture, soil science, water management, social mobilisation and institutional building. One of the WDT
members is a woman.
The WDT will guide the Gram Panchayat in the formulation of the watershed action plan. An indicative list of the roles and responsibilities of the WDT would include among others, the following.
Organizing and nurturing User Groups and Self-Help Groups.
Mobilizing women to ensure that the perspectives and interests of women are adequately reflected in the watershed action plan.
Conducting the participatory base-line surveys, training and capacity building.
Preparing detailed resource development plans including water and soil conservation or reclamation etc. to promote sustainable livelihoods at household level.
Common property resource management and equitable sharing.
Preparing Detailed Project Report (DPR) for the consideration of Gram Sabha.
Undertake engineering surveys, prepare engineering drawings and cost estimates for any structures to be built.
Monitoring, checking, assessing, and undertaking physical verification and measurements of the work done.
Facilitating the development of livelihood opportunities for the landless.
Maintaining project accounts.
Arranging physical, financial and social audit of the work undertaken.
Setting up suitable arrangements for post-project operation, maintenance and future development of the assets created during the project period.
Institutional Arrangements at the Village Level and People’s Participation
Self Help Groups
The Gram Panchayats have constituted SHGs in the watershed area with the help of WDT from amongst poor, small and marginal farmer households, landless/asset less poor agricultural laborers, women, shepherds and SC/ST persons. These Groups are homogenous
groups having common identity and interest who are dependent on the watershed area for their livelihood. Each Self Help Group will be provided with a revolving fund of an amount to be decided by the Nodal Ministry.
User Groups
The Watershed Committee (WC) has also constituted User Groups in the watershed area with the help of WDT. These shall be homogenous groups of persons most affected by each work/ activity and shall include those having land holdings within the watershed areas.
Each User Group shall consist of those who are likely to derive direct benefits from a particular watershed work or activity. The Watershed Committee (WC) with the help of the WDT shall facilitate resource-use agreements among the User Groups based on the principles
of equity and sustainability.
Gram Panchayat
In Himachal Pradesh Gram Panchayats will implement the Watershed project with the technical support of the WDT in the village. The Gram Sabha may elect/appoint any suitable person from the village as the Chairman of Watershed Committee. Sarpanch and /or ward
member/ Panchayat members may also be member of WC. The Watershed Committee (WC) will comprise of at least 10 members, half of the members shall be representatives of SHGs and User Groups, SC/ST community, women and landless persons in the village. One
member of the WDT shall also be represented in the Watershed Committee (WC). Funds may be released to WC. Alternatively, the WC shall be constituted by the GS and it will be a subcommittee of GP. In such situation, WC need not be registered under Society
Registration Act. Funds will be released to Gram Panchayat.
TECHNICAL SUPPORT: In order to bring tangible impacts of the interventions proposed, it is very essential to contract some competent agency as for technical support and the kind of support to be given by the agency can be in the areas as below:
1. Training & Capacity Building
2. Mobilising communities and form cooperatives or federations to upscale the business activities
3. Skill up-gradation especially in micro-enterprises & other livelihood activities
4. Contioneous guidance in overall management of the project to ensure impacts
5. Monitoring and Documentation of success stories
IIRD Shimla shall be available for the above support if some sustainable support mechanism is jointly devised by DWDA and IIRD.
13. Consolidated Action Plan
IIRD Shimla
42 Detailed Project Report (DPR) of Kalpa watershed under IWMP
IWMP - IV Name of StatHi:machal Pradesh e Name of Panchayat:arang Themg Total Area in Ha: 500
Name of DistKi:nnaur t Total No. of Village: 3 Total Sanctioned Amount7,500,000 : Rs.
Name of Block :pa
kal
Sr.No
1
Work Component
GENERAL
Total No. Micro watershed:
1
I Year Plan
IWMP
IWMP
II Year Plan
Convergence
IWMP
III Year Plan
Convergence
IWMP
IV Year Plan
Convergence
V Year Plan IWMP
Grand Total
a Ad. Cost 750000.00 150000.00 150000.00 150000.00 150000.00 150000.00 7 5 0 0 0 0 .0
0
b Monitoring 75000.00 25000.00 25000.00 25000.00 75000 c
Evaluation 75000.00 25000.00 25000.00 25000.00 75000
Total 900000.00 150000.00 200000.00 175000.00 200000.00 175000.00 9 0 0 0 0 0 .0
0
2 PREPARATORY PHASE
a EPA 300,000.00 300000.00 3 0 0 0 0 0 .0
0 Institutional &
b Capacity Building 375,000.00 93750.00 187500.00 93750.00 3 7 5 0 0 0 .0 0
c DPR 75,000.00 1 75000.00 7 5 0 0 0 .0 0
Total 750000.00 468750.00 187500.00 93750.00 750000
3 WATERSHED WORKS PHASE 4200000.00 WATERSHED DEVELOPMENT WORKS
a Plantation, Ha 333.33ha 510000.00 14385.00 55.55 85000.00 388.88ha 5 9 5 0 0 0 .0
0
b Irrigation Tank, (486cum)No 1 181647.00 1 181647.00 1 181647.00 3 5 4 4 9 4 2 .0 0 c Creat Wire,(2000 Rmt) 7.36ha
416250.00 14386 8.55ha 483750.00 15.91ha 9 0 0 0 0 0 .0 0 d stone Fenshing, (750Rmt) 16.65ha 674928.00 1.50ha
60822.00 18.15ha 7 3 5 7 5 0 .0 0
e Pipe Line, Rmt 1605rmt 384207.00 1605rmt 384207.00 790rmt 202951.00 4000 9 7 1 3 6 4 .0 0 f Bench Terraching, Ha
1ha 250270.00 14385.00 1ha 250270.00 4440.00 2 5 0 0 5 4 0 .0 0
Total Estimated cost 0.00 565854.00 2417302.00 43156 1264440.00 4440 4247596 Fund
from IWMP 565854.00 2374146.00 1260000.00 4200000.00 LIVELIHOOD ACTIVITIES 675000.00
a Power Sapray 3 45000.00 4 60000.00 4 60000.00 11 1 6 5 0 0 0 .0
0
b Power Tiller 1 150000.00 1 1 5 0 0 0 0 .0 0 c Bee Keeping 6 120000.00 6 120000.00 6
120000.00 18 3 6 0 0 0 0 .0 0
Total 315000.00 180000.00 180000.00 6 7 5 0 0 0 .0
0 Micro Enterprise and other
II related activities 750000.00
1 Horticulture Development
a Plant Distribution 28.57ha 50000.00 28.57ha 50000.00 4ha 20ha 77.14ha 135000
Total 50000.00 50000.00 135000
4 Micro-Enterprises
a Sheep Rarring 1 25000.00 2 50000.00 1 25000.00 4 100000
b Poltary Farm 1 30000.00 1 30000
c Pigray Farm 1 30000.00 1 30000
d Khadi Center 5 50000.00 10 100000.00 5 50000.00 20 200000
e Carpenter Tools 1 30000.00 1 30000
f Plantion (12Farmer) 12.5ha 30000.00 25ha 60000.00 12.5ha 30000.00 50ha 120000
g Nursary 2 30000.00 3 45000.00 2 30000.00 7 105000
Total 225000.00 255000.00 135000.00 615000
Av
ail
ab
l
e
IWM
P
fun
d
Fin
anci
al
Ph
ysic
al
Fin
an
ci
al
Fin
an
ci
al
Ph
ys
ic
al
Ph
ys
ic
al De
p
t
Na
me
of
Fin
an
ci
al
Fin
an
ci
al De
pt
t
Na
me
of
Fin
an
ci
al
Fin
an
ci
al
Ph
ys
ic
al
De
ptt
/
Na
me
of
Fin
an
ci
al
Ph
ys
ic
al
Ph
ys
ic
al
Fin
anci
al
Ph
ysic
al
IIRD Shimla
43 Detailed Project Report (DPR) of Kalpa watershed under IWMP
4 Consolidation Phase 225000.00
a Documentation & Recording 67500.00 1 67500.00 6 7 5 0 0 .0 0
Scaling up of successful experiments 67500.00 b 1 67500.00 6 7 5 0 0 .0 0
c Capacity Building & Training 90000.00 90000.00 9 0 0 0 0 .0 0
Total 225000.00 225000 225000
Grant Total 7500000.00
IIRD Shimla
44 Detailed Project Report (DPR) of Kalpa watershed under IWMP
IWMP - IV
Name of State:machal Pradesh Hi Name of Panchayat: Sangla Total Area in Ha: 500
Name of Distt:nnaur Ki Total No. of Village: 5 Total Sanctioned Amoun7,:5Rs0.,000 t0
Name of Block l:pa
Ka
Sr.No
Work Component
Total No. Micro watershed:
I Year Plan
IWMP
1 IWMP
II Year Plan
Convergence
IWMP
III Year Plan
Convergence
IWMP
IV Year Plan
Convergence
V Year Plan IWMP
Grand Total
1 a
b
c
Ad. Cost
Monitoring
Evaluation
Total
GENERAL
750000.00 75000.00
75000.00
900000.00
150000.00 150000.00
150000.00
25000.00
25000.00
200000.00
150000.00
25000.00
175000.00
150000.00
25000.00
25000.00
200000.00
150000.00
25000.00
175000.00
750000.00
75000
75000
900000.00
2 PREPARATORY PHASE
a EPA 300,000.00 300000.00 300000.00 Institutional &
b Capacity Building 375,000.00 93750.00 187500.00 93750.00 375000.00
c DPR 75,000.00 1 75000.00 75000.00
Total 750000.00 468750.00 187500.00 93750.00 750000
3 WATERSHED WORKS PHASE 4200000.00
WATERSHED DEVELOPMENT WORKS
a Creat Wire,(675 Rmt) 3.18ha 180000.00 18618 2.18ha 123750.00 5.36ha 303750.00
b Irrigation Channel,(2800 Rmt) 34.82ha 541146.00 107ha 1667615.00 18618 56.73ha 883504.00 198.64ha 3092265.00 c Pipe Line, Rmt
1300rmt 225764.00 1500rmt 362711.00 1000 270345.00 17599.00 3800 858820.00
Total Estimated cost 0.00 766910.00 2210326.00 37236 1277599.00 17599 4254835 Fund
from IWMP 766910.00 2173090.00 1260000.00 4200000.00
4 LIVELIHOOD ACTIVITIES 675000.00
a Carpenter Tools 33 10 120000.00 13 156000.00 10 120000.00 33 396000
b Nitting Machine 6 2 20000.00 2 20000.00 2 20000.00 6 60000 c
Sewing Center 7 2 8000.00 3 12000.00 2 8000.00 7 28000 d
Khadi Center 5 1 8000.00 3 24000.00 1 8000.00 5 40000 e
Power Tiller 1 1 151000.00 1 151000
Total 307000.00 0.00 212000.00 156000.00 0.00 675000 Micro Enterprise and other
5 related activities 750000.00
1 Agriculture Development
a Vegetable Cultivation 30 H.H 30000.00 50 H.H 55000.00 30 H.H 30000.00 110 H.H 115000
Total 30000.00 55000.00 115000
2 Horticulture Development
a Plant Distribution 28.57ha 50000.00 28.57ha 50000.00 7ha 28.57ha 85.71ha 150000
b Horticulture Collection Center 1 150000.00 1 150000
Total 200000.00 50000.00 0.00 300000
4 Micro-Enterprises
a Black Smitt Tools 4 1 20000.00 2 40000.00 1 20000.00 4 80000
b Jewallers Tools 5 1 20000.00 3 60000.00 1 20000.00 5 100000
c Poltary Farm 2 2 40000.00 2 40000
d Power Spary 1 1 15000.00 1 15000
e Nitting Machine 10 3 30000.00 4 40000.00 3 30000.00 10 100000
Total 65000.00 0.00 140000.00 50000.00 335000
6 Consolidation Phase 225000.00
a Documentation & Recording 67500.00 1 67500.00 67500.00
67500.00 b Scaling up of successful experiments 1 67500.00 67500.00 c Capacity Building & Training 90000.00 90000.00 90000.00
Total 225000.00 225000 225000
Av
ail
ab
l
e
IWM
P
fun
d
Fin
anci
al
Ph
ysic
al
Ph
ys
ic
al l
Fin
an
c
ia
Ph
ys
ic
al l
Fin
an
c
ia D
ep
t
Na
me
of
l
Fin
an
c
ia
Ph
ys
ic
al l
Fin
an
c
ia De
pt
t
Na
me
of
l
Fin
an
c
ia
Ph
ys
ic
al l
Fin
an
c
ia
Ph
ys
ic
al
De
ptt
/
Na
me
of
l
Fin
an
c
ia
Fin
anci
al
Ph
ysic
al
IIRD Shimla
45 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Grant Total 7500000.00
IIRD Shimla
46 Detailed Project Report (DPR) of Kalpa watershed under IWMP
IWMP - IV Name of State: Himachal Pradesh Name of Panchayat: Brua Total Area in Ha: 500
Name of Distt:
Name of Block
:
Sr.No
Kinnaur
Kalpa
Total No. of Village:
Total No. Micro watershed:
I Year Plan
3
1
Total Sanctioned Amount7,500,000 :
Rs.
II Year Plan
III Year Plan
IV Year Plan
V Year Plan
Grand Total
1 a
Ad. Cost
Work Component
GENERAL
750000.00
IWMP
150000.00
IWMP
150000.00
Convergence IWMP
150000.00
Convergence IWMP
150000.00
Convergence IWMP
150000.00
7 5 0 0 0 0 .0 0
b Monitoring 75000.00 25000.00 25000.00 25000.00 75000 c
Evaluation 75000.00 25000.00 25000.00 25000.00 75000
Total 900000.00 150000.00 200000.00 175000.00 200000.00 175000.00 9 0 0 0 0 0 .0
0
2 PREPARATORY PHASE
a EPA 300,000.00 300000.00 3 0 0 0 0 0 .0
0 Institutional &
b Capacity Building 375,000.00 93750.00 187500.00 93750.00 3 7 5 0 0 0 .0 0
c DPR 75,000.00 1 75000.00 7 5 0 0 0 .0 0
Total 750000.00 468750.00 187500.00 93750.00 750000
3 WATERSHED WORKS PHASE 4200000.00
WATERSHED DEVELOPMENT WORKS
a Plantation, Ha 222.22ha 340000.00 14140.00 55.55ha 85000.00 277.77ha 4 2 5 0 0 0 .0
0
b Irrigation Tank, (324cum) 2no 558102.00 2 5 5 8 1 0 2 .0 0 c Creat Wire, (1650Rmt) 8.75ha 495000.00 4.37ha 247500.00
5019 13.12ha 7 4 2 5 0 0 .0 0
d Pipe Line, Rmt 500rmt 157979.00 500rmt 157979.00 500rmt 157979.00 1500 4 7 3 9 3 7 .0 0 e Bench Terraching,
Ha 4ha 1001080.00 15000.00 2ha 500540.00 6 1501620.00 f Stone Fenshing, (1000rmt) 12.10ha
274000.00 15000.00 12.10ha 274000.00 24.20ha 5 4 8 0 0 0 .0 0
Total Estimated cost 716081.00 2268059.00 44140 1265019.00 5019 4249159.00
Fund from IWMP 716081.00 2223919.00 1260000.00 4200000.00 LIVELIHOOD ACTIVITIES 675000.00
a Nursary Rasing 3 90000.00 4 120000.00 3 90000.00 10 300000
b Shop 1 30000.00 1 30000 c Sewing Center 1 7000.00
3 21000.00 1 7000.00 5 35000 d Poltary Farm 1 30000.00
1 30000.00 1 30000.00 3 90000 e juse Making 1 30000.00
1 30000 f Khadi Center 1 10000.00 2 20000.00 1 10000.00
4 40000 g Vermi Compost 2 60000.00 2 60000 h Dairy Farm 1
30000.00 1 30000.00 1 30000.00 3 90000
Total 227000.00 281000.00 167000.00 675000 Production System &Micro-
II Enterprisess 750000.00
1 Agriculture Development
a Medicinal cultivation 30000.00 40000.00 30000.00 100000
30000.00 40000.00 100000
2 Horticulture Development
a Plant Distri bution 28.57ha 50000.00 28.57ha 50000.00 28.57ha 50000.00 85.71ha 150000
b Horticulture Collection Center 1 150000.00 1 150000
Total 200000.00 50000.00 50000.00 300000
3 Animal Husbandry
a Pasture Development 2ha 40000.00 2ha 50000.00 4ha 90000
Total 40000.00 50000.00 90000
Av
ail
ab
l
e
IWM
P
fun
d
Fin
anci
al
Ph
ysic
al
Fin
an
ci
al
Fin
an
ci
al De
p
t
Na
me
of
Fin
an
ci
al
Fin
an
ci
al De
pt
t
Na
me
of
Fin
an
ci
al
Fin
an
ci
al
Ph
ys
ic
al
De
ptt
/
Na
me
of
Fin
an
ci
al
Ph
ys
ic
al
Ph
ys
ic
al
Ph
ys
ic
al
Ph
ys
ic
al
Fin
anci
al
Ph
ysic
al
IIRD Shimla
47 Detailed Project Report (DPR) of Kalpa watershed under IWMP
3 Micro-Enterprises
a Khadi Center 2 20000.00 4 40000.00 2 20000.00 8 80000
b Sewing Center 10 50000.00 16 80000.00 10 50000.00 36 180000
Total 70000.00 120000.00 70000.00 260000
4 Consolidation Phase 225000.00
a Documentation & Recording 67500.00 1 67500.00 6 7 5 0 0 .0 0
b Scaling up of successful experiments 67500.00 1 67500.00 6 7 5 0 0 .0 0
c Capacity Building & Training 90000.00 90000.00 9 0 0 0 0 .0 0
Total 225000.00 225000 225000
Grant Total 7449159 618750.00 1640581.00 0.00 3037809.00 88280.00 1752019.00 10038 400000 7500000.00
IIRD Shimla
48 Detailed Project Report (DPR) of Kalpa watershed under IWMP
IWMP - IV Name of State: Himachal Pradesh Name of Panchayat: Shong Total Area in Ha: 500
Name of Distt: Kinnaur
Name of Block :Kalpa
Sr.No
Total No. of Village:
Total No. Micro watershed:
I Year Plan
3
1
Total Sanctioned Amount7,500,000 :
Rs.
II Year Plan
III Year Plan
IV Year Plan
V Year Plan
Grand Total
1 a
Ad. Cost
Work Component
GENERAL
750000.00
IWMP
150000.00
IWMP
150000.00
Convergence IWMP
150000.00
Convergence IWMP
150000.00
Convergence IWMP 150000.00
7 5 0 0 0 0 .0 0
b Monitoring 75000.00 25000.00 25000.00 25000.00 75000 c
Evaluation 75000.00 25000.00 25000.00 25000.00 75000
Total 900000.00 150000.00 200000.00 175000.00 200000.00 175000.00 9 0 0 0 0 0 .0
0
2 PREPARATORY PHASE
a EPA 300,000.00 300000.00 3 0 0 0 0 0 .0
0 Institutional &
b Capacity Building 375,000.00 93750.00 187500.00 93750.00 3 7 5 0 0 0 .0 0
c DPR 75,000.00 1 75000.00 7 5 0 0 0 .0 0
Total 750000.00 468750.00 187500.00 93750.00 750000
3 WATERSHED WORKS PHASE 4200000.00
WATERSHED DEVELOPMENT WORKS
a Irrigation Tank, (486cum) 1 279051.00 1 279051.00 38122 1 279051.00 3 8 3 7 1 5 3 .0
0
b Irrigation Channel,(2000 Rmt) 28.36ha 441752.00 70.92ha 1104380.00 42.55ha 662628.00 1895 141.83ha 2208760.00 c
Creat Wire,(750 Rmt) 5.97ha 337500.00 5.97ha 3 3 7 5 0 0 .0 0
d Pipe Line, Rmt 750rmt 536388.00 550rmt 320216.00 1300 8 5 6 6 0 4 .0
0
Total Estimated cost 0.00 720803.00 2257319.00 38122 1261895.00 1895 4240017 Fund
from IWMP 720803.00 2219197.00 1260000.00 4200000.00 LIVELIHOOD ACTIVITIES 675000.00
a Dairy Farm 1 30000.00 1 30000.00 1 30000.00 3 90000
b Khadi Center 1 10000.00 1 10000 c Sheep Rarring 1 30000.00
1 30000.00 1 30000.00 3 90000 d Shop 1 30000.00
1 30000 e Poltary Farm 1 30000.00 1 30000.00 2 60000 f
Carpenter Tools 1 30000.00 1 30000 g Sewing Center 1.00 15000.00
1 15000 h Small Restrutant 1 30000.00 1 30000 i Nursary Rasing 2 40000.00
3 60000.00 2 40000.00 7 140000 j Pickls Making 3 60000.00
3 60000.00 3 60000.00 9 180000
Total 245000.00 270000.00 160000.00 675000 Micro Enterprise and other
II related activities 750000.00
1 Agriculture Development
a Vegetable Cultivation 30 H.H 30000.00 40 H.H 40000.00 30 H.H 30000.00 1 0 0 H .H 100000
Total 30000.00 40000.00 30000.00 100000
2 Horticulture Development
a Plant Distribution 40ha 70000.00 85.71ha 150000.00 40ha 70000.00 165.71ha 2 9 0 0 0 0 .0
0
b Horticulture Collection Center 1 1500000.00 1 150000
Total 1570000.00 150000.00 70000.00 440000
3 Animal Husbandry
a Pasture Development 50000.00 2ha 50000.00 4ha 100000
Av
ail
ab
l
e
IWM
P
fun
d
Fin
an
ci
al
Ph
ysic
al
Fin
an
ci
al
Fin
an
ci
al De
p
t
Na
me
of
Fin
an
ci
al
Fin
an
ci
al
Fin
an
ci
al
Fin
an
ci
al
Fin
an
ci
al
Ph
ys
ic
al
Ph
ys
ic
al
Ph
ys
ic
al
De
pt
t
Na
me
of
Ph
ys
ic
al
Ph
ys
ic
al
De
ptt
/
Na
me
of
l
Ph
ysi
ca a l
Fin
an
ci
IIRD Shimla
49 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Total 50000.00 50000.00 100000
4 Micro-Enterprises
IIRD Shimla
50 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Sewing Cent IWMP - IV
Name of State: Himachal Pradesh Name of Panchayat: Rogi Total Area in Ha: 500
Name of Distt: kinnaur
Name of Block : Kalpa
Sr.No
Total No. of Village:
Total No. Micro watershed:
I Year Plan
4
1
Total Sanctioned Amount :500,000
7, Rs.
II Year Plan
III Year Plan
IV Year Plan
V Year Plan
Grand Total
1 a
Ad. Cost
Work Component
GENERAL
750000.00
IWMP
150000.00
IWMP
150000.00
Convergence IWMP
150000.00
Convergence IWMP
150000.00
Convergence IWMP
150000.00
750000.00
b Monitoring 75000.00 25000.00 25000.00 25000.00 75000 c Evaluation
75000.00 25000.00 25000.00 25000.00 75000
Total 900000.00 150000.00 200000.00 175000.00 200000.00 175000.00 900000.00
2 PREPARATORY PHASE
a EPA 300,000.00 300000.00 300000.00 Institutional &
b Capacity Building 375,000.00 93750.00 187500.00 93750.00 375000.00
c DPR 75,000.00 1 75000.00 75000.00
Total 750000.00 468750.00 187500.00 93750.00 750000
3 WATERSHED WORKS PHASE 4200000.00
WATERSHED DEVELOPMENT WORKS
a Plantation, Ha 166.66ha 255000.00 15236.00 166.66ha 255000.00 333.32ha 510000.00
b Irrigation Channel, (2250Rmt) 53.19ha 828285.00 56.73ha 883504.00 49.64ha 773066.00 4000.00 159.56ha 2484855.00
Irrigation Tank, (324cum) 2 558102.00 2 558102.00 d Creat
Wire,(200Rmt) 200 90000.00 1.59ha 90000.00
e Pipe Line, Rmt 1000rmt 340345.00 1000 340345.00 f Stone Fencing (440rmt) 10.64ha 241359.00 5425.00
10.64ha 241359.00
Total Estimated cost 0.00 828285.00 2126951.00 15236 1269425.00 9425 4224661.00
Fund from IWMP 828285.00 2111715.00 1260000.00 4200000.00 LIVELIHOOD ACTIVITIES 675000.00
a Polrary Farm 4.00 1 30000.00 2 60000.00 1 30000.00 4 120000
b Small Restrutant 2.00 2 60000.00 2 60000 c Carpenter Tools 3.00 1
30000.00 1 30000.00 1 30000.00 3 90000 d Electrition Tools 2.00 1
30000.00 1 30000.00 2 60000 e Nursary Rasing 3.00 1
20000.00 1 20000.00 1 20000.00 3 60000 f Medicanl Cultivation 3.00 1
25000.00 1 25000.00 1 25000.00 3 75000 g Khadi Center 8.00 2
20000.00 4 40000.00 2 20000.00 8 80000 h Vermi Compost 3.00 1
30000.00 1 30000.00 1 30000.00 3 90000 i Sheep Rarring 1.00 1
30000.00 1 30000 j Sewing Center 2.00 1 5000.00 1 5000.00 2 10000
Total 31.00 0.00 185000.00 0.00 330000.00 60000.00 0.00 675000 Production System &Micro-
II Enterprisess 750000.00
1 Agriculture Development
a Vegetable Cultivation 30 H.H 30000.00 40 H.H 40000.00 30 H.H 30000.00 100 H.h 100000
Total 30000.00 40000.00 30000.00 100000
2 Horticulture Development
a Plant Distribution 28.57ha 50000.00 28.57ha 50000.00 28.57ha 50000.00 85.71ha 150000
b Horticulture Collection Center 1 150000.00 1 150000
Total 200000.00 50000.00 50000.00 300000
3 Animal Husbandry
a Pasture Development 2ha 40000.00 2ha 40000.00 2ha 40000.00 6ha 120000
Total 40000.00 40000.00 40000.00 120000
4 Micro-Enterprises
a Nitting Machine 11.00 2 20000.00 6 60000.00 3 30000.00 11 110000
b Sewing Center 10.00 3 15000.00 5 25000.00 2 15000.00 10 55000
c Khadi Center 7.00 2 20000.00 3 30000.00 2 20000.00 7 70000
Total 0 55000.00 115000.00 65000.00 235000 4 Consolidation Phase 225000.00
Av
ail
ab
l
e
IWM
P
fun
d
Fin
an
ci
al
Ph
ys
ic
al
Fin
an
ci
al
Fin
an
ci
al
Fin
an
ci
al
Fin
an
ci
al
Fin
an
ci
al
Fin
an
ci
al
Fin
an
ci
al
Fin
an
ci
al
Ph
ys
ic
al
Ph
ys
ic
al De
p
t
Na
me
of
Ph
ys
ic
al
De
pt
t
Na
me
of
Ph
ys
ic
al
Ph
ys
ic
al
De
ptt
/
Na
me
of
Ph
ys
ic
al
IIRD Shimla
51 Detailed Project Report (DPR) of Kalpa watershed under IWMP
a Documentation & Recording 67500.00 1 67500.00 67500.00
Scaling up of successful experiments 67500.00 b 1 67500.00 67500.00
c Capacity Building & Training 90000.00 90000.00 90000.00
Total 225000.00 225000 225000
Grant Total 7329661 618750.00 1695785.00 0.00 2930701.00 30472.00 1684425.00 18850 400000 7405000.00
IIRD Shimla
52 Detailed Project Report (DPR) of Kalpa watershed under IWMP
IWMP - X Name of State: Himachal PradeshTotal No. of Panchayat 5 Total Area in Ha: 2500
Sr.No
Name of Distt:
Name of Block
:
Kinnaur
Kalpa
Total No. of Village:
Total No. Micro watershed:
I Year Plan
18
5
Total Sanctioned Amount : Rs.37,500,000
II Year Plan
III Year Plan
IV Year Plan
V Year Plan
Grand Total
1
a
Ad. Cost
Work Component
GENERAL
3750000.00
IWMP
750000.00
IWMP
750000.00
Convergence IWMP
750000.00
Convergence IWMP
750000.00
Convergence IWMP
750000.00
3750000.00
b Monitoring 375000.00 125000.00 125000.00 125000.00 375000 c Evaluation
375000.00 125000.00 125000.00 125000.00 375000
Total 4500000.00 750000.00 1000000.00 875000.00 1000000.00 875000.00 4500000.00
2 PREPARATORY PHASE
a EPA 1,500,000.00 1500000.00 1500000.00 Institutional &
b Capacity Building 1,875,000.00 625000.00 625000.00 625000.00 1875000.00
c DPR 375,000.00 1 375000.00 3 7 5 0 0 0 .0
0
Total 3750000.00 2500000.00 625000.00 625000.00 3750000
3 WATERSHED WORKS PHASE 21000000.00
WATERSHED DEVELOPMENT WORKS
a Plantation, Ha 0 0.00 722.22ha 1105000.00 43761.00 277.77ha 425000.00 1000ha 1530000
b Irrigation Channel (7050Rmt) 116.31ha 1811183 234.75ha 3655499.00 18618 148.93ha 2319198.00 5895 500ha 7785880 c
Irrigation Tank.(1620 cum) 4no 1018800.00 4 1018800.00 38122.00 2 460698.00 10no 2498298 d Creat wire(5275mtrs) 27ha 1518750.00
33004.00 15ha 855000.00 5019 42ha 2373750 e Pipe line 3405rmt 767950.00 5355rmt 1781630.00 2840rmt
951491.00 17599 11600rmt 3501071 f Stone Fencing (2190rmt) 28.75ha 948928.00 15000.00 24.24ha 576181.00 5425
53ha 1525109 G Bench Terracing(2000Rmt) 5ha 1251350.00 29385.00 3ha 750810.00 4440 8ha 2002160
Total 3597933.00 11279957.00 177890.00 6338378.00 38378 21216268
IWMP Fund 3597933.00 11102067.00 6300000.00 21000000 LIVELIHOOD ACTIVITIES 3375000.00
a poultary farming 3 90000.00 4 120000.00 2 60000.00 9 270000
b small resturant 3 90000.00 3 90000 c Carpenter Tools 11 150000.00
15 216000.00 11 150000.00 37 516000 d Electrical Tools 1 30000.00 1 30000.00
2 60000 e Nursary Raising 6 150000.00 8 200000.00 6 150000.00 20 5 0 0 0 0 0
.0 0 f Medicinal plants cultivation 1 25000.00 1 25000.00 1 25000.00 3 75000 g Khadi Centre
5 48000.00 984000.00 4 38000.00 18 1 7 0 0 0 0 .0 0 h Vermi Compost 1 30000.00
3 90000.00 130000.00 5 1 5 0 0 0 0 .0 0 i Sheep Rearing 1 30000.00 2 60000.00
1 30000.00 4 1 2 0 0 0 0 .0 0 j Sewing Centre 5 35000.00 7 38000.00
3 15000.00 15 8 8 0 0 0 .0 0 k Dairy Farming 2 60000.00 2 60000.00
2 60000.00 6 1 8 0 0 0 0 .0 0 lm Shop 2 60000.00 2 60000 n Pickle making
3 60000.00 360000.00 3 60000.00 9 1 8 0 0 0 0 .0 0 o Juice making 1 30000.00
1 30000 p knitting machine 2 20000.00 2 20000.00 2 20000.00 6 60000 q Power Tiller
machine 2 301000.00 2 301000 r Power Spary Machine 3 45000.00 4 60000.00
4 60000.00 11 165000 s Bee Keeping 6 120000.00 6 120000.00
6.00 120000.00 18 3 6 0 0 0 0 .0 0
55 1284000.00 70 1273000.00 46 818000.00 3375000 Micro Enterprises and other
5 related activities 3750000.00
1 AgricultureDevelopment
a Vegetable Cultivation 90 H.H 90000.00 130H.H 135000.00 90 H.H 90000.00 3 1 0 H .H 315000
b Medicinal plants cultivation 30000.00 40000.00 30000.00 100000
2 Horticulture Development
a Plant Distribution 154.28ha 270000.00 200ha 350000.00 145.71ha 255000.00 500ha 875000
b Horticulture Collection Center 4 Unit 600000.00 4 Unit 600000
3 Animal Husbandary
Av
ail
ab
l
e
IWM
P
fun
d
Fin
an
ci
al
Ph
ys
ic
al
Fin
an
ci
al
Fin
an
ci
al De
p
t
Na
me
of
Fin
an
ci
al
Fin
an
ci
al De
pt
t
Na
me
of
Fin
an
ci
al
Fin
an
ci
al
Fin
an
ci
al
Fin
an
ci
al
Ph
ys
ic
al
Ph
ys
ic
al
Ph
ys
ic
al
Ph
ys
ic
al
Ph
ys
ic
al
De
ptt
/
Na
me
of
Ph
ys
ic
al
IIRD Shimla
53 Detailed Project Report (DPR) of Kalpa watershed under IWMP
a Pasture Development 6ha 130000.00 6ha 140000.00 2ha 40000.00 14ha 310000
4 Micro-Enterprises
a Sheep Rearing 1 25000.00 2 50000.00 1 25000.00 4 100000 b Poultary farming 1 30000.00 2 40000.00
3 70000 c Piggary Farm 1 30000.00 1 30000 d Khadi Centre 9 90000.00 17
170000.00 9 90000.00 35 350000 e Carpenter Tools 1 30000.00 1 30000 f
Plantation(12Farmers) 12.5ha 30000.00 25ha 60000.00 12.5ha 30000.00 50ha 120000 g Nursery Raising 2 30000.00
3 45000.00 2 30000.00 7 105000 h Black Smitt Tools 1 20000.00 2 40000.00 1 20000.00 4 80000 i
Jewallery tools 1 20000.00 3 60000.00 1 20000.00 5 100000 j Power Spray Machine 1 15000.00 1 15000 k
knitting mchine 5 50000.00 10 100000.00 6 60000.00 21 210000 l Sewing Centre 20 100000.00 29
140000.00 19 100000.00 68 340000
Total 43 1590000.00 68 1370000.00 39 790000.00 150 3750000 6 Consolidation Phase 1125000.00
a Documentation & Recording 337500.00 1 337500.00 3 3 7 5 0 0 .0
0
b Scaling up of successful experiments 337500.00 1 337500.00 3 3 7 5 0 0 .0
0
c Capacity Building & Training 450000.00 450000.00 4 5 0 0 0 0 .0
0
Total 1125000.00 1125000 1125000
Grant Total 37500000.00
IIRD Shimla
54 Detailed Project Report (DPR) of Kalpa watershed under IWMP
14. Budget
Total Fund Flow
Sl. No Particulars
IWMP Beneficiary
Contribution
Converge
nce Amount
(Rs.)
1 GENERAL
a Ad. Cost
3750000.00 - -
b Monitoring
375000.00 - -
c Evaluation
375000.00 - -
Total
4500000.00 - -
2 PREPARATORY PHASE
a EPA
1,500,000.00 - -
b
Institutional & 1,875,000.00
- -
Capacity Building
c DPR
375,000.00 - -
Total
3750000.00
3 WATERSHED WORKS PHASE
WATERSHED DEVELOPMENT
WORKS
a Plantation, 1530000 76500 43761
IIRD Shimla
55 Detailed Project Report (DPR) of Kalpa watershed under IWMP
b Irrigation Channel 7785880 389294 24513
c Irrigation Tank
2498298 124915
38122
d Creat wire 2373750 118687 38023
e Pipe line 3501071 175053 17599
f Stone Fencing 1525109 76255 20425
G Bench Terracing 2002160 100108 33825
Total 21216268 1060812 216268
4 LIVELIHOOD ACTIVITIES
a Poltary Farm 270000 - -
b Small Restrutant 90000 - -
c Carpenter Tools 516000 - -
d Electrical Tools 60000 - -
e Nursary Rasing 500000.00 - -
f Medicnal Cultivation 75000 - -
g Khadi Center 170000.00 - -
IIRD Shimla
56 Detailed Project Report (DPR) of Kalpa watershed under IWMP
h Vermi Compost 150000.00 - -
i Sheep Rarring 120000.00 - -
j Sewing Center 88000.00 - -
k Dairy Farm 180000.00 - -
lm Shop 60000 - -
n Pickls making 180000.00
o Juse Making 30000
p Nitting Machine 60000
q Power Tiller 301000
r Power Spary 165000
s Bee Keeping 360000.00
Total 3375000
5 Production System &Micro-Enterprises
1 Agriculture Development
A Vegetable Cultivation
315000 31500 -
B Medicinal Cultivation
100000 10000 -
IIRD Shimla
57 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Total
415000 41500 -
2 Horticulture Development
-
a Plant Distribution
875000 87500 -
b Horticulture Collection Center
600000 60000
Total
1475000 147500
3 Animal Husbandry
a Pasture Development
310000 31000
Total
310000 31000
4 Micro-Enterprises
a Sheep Raring 100000 10000 -
b Poltary Farm 70000 7000 -
c Piggery Farm 30000 3000
35000
-
d Khadi Center 350000 -
e Carpenter Tools 30000 3000 -
f Plantation 120000 12000 -
g Nursery Rising 105000 10500 -
h Black Smith Tools 80000 8000 -
IIRD Shimla
58 Detailed Project Report (DPR) of Kalpa watershed under IWMP
i Jewellers Tools 100000 10000
j Power Spary Machine 15000 1500
k Nitting Machine 210000 21000
l Sewing Center 340000 34000
Total 1550000 155000 -
6 CONSOLIDATION PHASE
a Documentation 337500.00 - -
b Scaling up of Successful experiments
337500.00 - -
c Capacity Building & Training 450000.00 - -
Total
1125000.00 - -
Grant Total 37500000
Proposed Final Budget
S. No Particulars Amount (Rs.)
1 Total Funds from IWMP 37500000.00
2 Beneficiary Contribution 1435812.00
IIRD Shimla
59 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Per Hectare Expenditure from IWMP 15000par ha
Gram Panchayat Rogi
Demographic Profile
Male Female Total Population SC H.H ST H.H
BPL
H.H Total H.H
352 344 700 61 94 27 155
Watershed work
S.No. Activity Location Dimension Budget
1 Pipe Line Runag to Ragmo 1000 mtrs 340345
3 Proposed Convergence 216268.00
IIRD Shimla
60 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Tiskao to Kotan runig
Kara to Shalba
2 Plantation Dakha Shalba
333.3 ha 510000
Plantation pango
3 Stone Fencing Dakha Shalba
440rmt 241359
Pango
4 Crate Wire Pango
200mtrs 90000
Chango & Shunali
5 Tank Dakha Shalba
2 558102
Shonmala
Tiskao
6 Channal Majang Kulang to Road
2250mtrs 2484855
Lamba Nala to Jomsa Nala
Agriculture Development
S.No Activity Name of the
Farmer
/Community
Based
No of
Units
No of
Village
Benefited
IWMP
Fund
Area to be
Treated(ha)
1 Vegetable Cultivation
Community
Based 1 100 H.h 100000 8 ha
Horticulture Development
1
Plant Distribution
Community
Based 1 100 H.H 150000 13 ha
2
Horticulture Collection
Center
Community
Based 1 100 H.H 150000 -
IIRD Shimla
61 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Animal Husbandry
1 Pasture Development
Community
Based 1 80 H.H 120000 6ha
Livelihood Activity
S.No. Activity Beneficiaries Location Budget
1 Poultry Farm
davender Singh s/o Ratan Lal
(APL) Rogi Village 30000
2 Poultry Suni Lal s/o Narsane (BPL) Rogi Village 30000
3 Poultry Kalesh Chand s/o sohan Lal (APL) Rogi Village 30000
4 Poultry Kavi Raj s/o Gayan Singh (BPL) Rogi Village 30000
5 Small Restaurant Ganga Ram s/o Thakur Ram (APL) Rogi Village 30000
6 Small Restaurant
Arun kumar s/o Durga Nand
(APL) Rogi Village 30000
7 Carpenter tools Sant Ram s/o Payar Lal (APL) Rogi Village 30000
8 Carpenter tools Amer Chand s/o Umar Dass (BPL) Rogi Village 30000
9 Carpenter tools Jagdesh s/o Ram Kader (APL) Rogi Village 30000
10 Electrician tools
Kishor Kumar s/o Man Chand
(BPL) Rogi Village 30000
11 Electrician tools Jivan Parkash s/o Davi sukh (APL) Rogi Village 30000
12 Nursery
Ajindar Kumar s/o Baldev singh
(APL) Rogi Village 20000
13 Nursery
Vimal Kumar s/o Ganga Singh
(APL) Rogi Village 20000
14 Nursery Santi Lal s/o payar Lal (BPL) Rogi Village 20000
IIRD Shimla
62 Detailed Project Report (DPR) of Kalpa watershed under IWMP
15 Medicinal Cultivation
Promila Devi w/o Gayan Parkash
(APL) Rogi Village 25000
16 Medicinal Cultivation Rajiv Kumar s/o Prabhu Lal (APL) Rogi Village 25000
17 Medicinal Cultivation Hari Pal Singh s/o Daya Ram (BPL) Rogi Village 25000
18 Sheep Rearing Naresh Kumar s/o Bhgsaran (BPL) Rogi Village 30000
19 Sewing Center Pram Davi w/o Ram Kishan (BPL) Rogi Village 5000
20 Sewing Center Kul Dev s/o Kasri nand (BPL) Rogi Village 5000
21 Vermi Compost Vidya Bhagat s/o Jagat Ram (APL) Rogi Village 30000
22 Vermi Compost Padam Chand s/o Ram Saran (APL) Rogi Village 30000
23 Vermi Compost Padam Sukh s/o Vaya Dass (APL) Rogi Village 30000
24 Khadi Shawl
Chimdi Dolma w/o Mohan Lal
(BPL) Rogi Village 10000
25 khadi Bhader Mani w/o Davakar Rogi Village 10000
26 khadi Hira Lal w/o Dhan Pur Rogi Village 10000
27 khadi Payar Davi w/o Mangal Charing Rogi Village 10000
28 khadi Anand Kumari w/o Nak Ram Rogi Village 10000
29 khadi Sushma Davi w/o Shayam Singh Rogi Village 10000
30 khadi Gur Kum Mani w/o Sunder Lal Rogi Village 10000
31 khadi Kiran Kumari d/o Nar Jit Rogi Village 10000
Micro Enterprises
S.No. Activity Beneficiaries Location Budget
1 Knitting Center Raj Bhagat s/o Kadher Sukh (BPL) Rogi Village 10000
(Raj Knitting
SHG)
Rattan Manjari w/o Rajesh Kumar
(APL) Rogi Village 10000
IIRD Shimla
63 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Sudarshanaw/o Rahul (APL) Rogi Village 10000
Chatana d/o Narander (APL) Rogi Village 10000
Klavati w/o Manoj Kumar (APL) Rogi Village 10000
Jai Vanti w/o Bhagat Chand (APL) Rogi Village 10000
Ringjin Lamo w/o Surat Ram (BPL) Rogi Village 10000
Nima Devi w/o Akal Chand (BPL) Rogi Village 10000
Pram Kumar s/o hari Krishan (APL0 Rogi Village 10000
Kanti Davi w/o Ram Pal (APL) Rogi Village 10000
Padam Davi w/o Jiya Lal (APL) Rogi Village 10000
2 Sewing Centre Sarasvati SHG
Jai Davi w/o Hira Chand (APL) Rogi Village 5000
ShiShla w/o Shar Singh (APL) Rogi Village 5000
Shiv Davi w/o Shiv Lal (APL) Rogi Village 5000
Kunti Davi w/o Vikram Ram (APL) Rogi Village 5000
Klavati w/o Manoj Kumar (APL) Rogi Village 5000
Chosan Dolma w/o Naresh Kumar
(BPL) Rogi Village 5000
Cadub Dolma w/o Udhay Singh (BPL) Rogi Village 5000
Virma Davi w/oShiv Chand (APL) Rogi Village 5000
Manisha d/o Mahar Singh (APL) Rogi Village 5000
Pram Kumar s/o Hari Krishan (APL) Rogi Village 5000
3
Khadi (Piti
Lum) Bishnu Bun Kar SHG
(Vishnu Hat Ram s/o Dhram Johar Rogi Village 10000
IIRD Shimla
64 Detailed Project Report (DPR) of Kalpa watershed under IWMP
samuhik bunkar
group)
Roshan Lal s/o Dhram Johar Rogi Village 10000
Meena Kumari w/oDav Raj Rogi Village 10000
Chander Ghani w/o Ajansh kumar Rogi Village 10000
Sumitra Davi w/o Har Dav Rogi Village 10000
Rajni Davi d/o Prabhu Lal Rogi Village 10000
Davi Sukh s/o Yang Sukh Rogi Village 10000
Gram Panchayat Brua
Demographic Profile
Male Female Total Population
SC
H.H
ST
H.H
BPL
H.H Total H.H
608 626 1234 144 97 32 241
Watershed work
S.No. Activity Location Dimension Budget
1 Plantation Tamal Dung
277.77 ha 425000
Rokchid
2 Stone Fencing Tamal Dung
1000 rmt 548000
Rokchid
3 Bench Tracing Tamal Dung 6 ha 1501620
IIRD Shimla
65 Detailed Project Report (DPR) of Kalpa watershed under IWMP
4 Pipe line Brua Khad to Dimraling 1500 rmt 473937
5 Crate Wire Kuliyaring
1650 mtrs 742500
Kancha Nala
6 Tank Kuliyaring
2no. 558102
Tamal Dung
Agriculture Development
SNo Activity Name of the
Farmer
/Community
Based
No of
Units
No of
Village
Benefited
IWMP
Fund
Area to
be
Treated
(ha)
1
Medicinal
Cultivation Community Based 1 20 H.H 100000 4 ha
Horticulture Development
1 Plant
Distribution Community Based 1 150000 13 ha
2
Horticulture
Collection
Center Community Based 1 80 H.H 150000 -
Animal Husbandry
1
Pasture
Development Community Based 1 50 H.H 90000 4ha
Livelihood Activities
IIRD Shimla
66 Detailed Project Report (DPR) of Kalpa watershed under IWMP
S.No. Activity Beneficiaries Location Budget
1 Nursery
Surender Singh s/o Hira Singh
(BPL) Brua Village 30000
2 Nursery Chander Bhagti w/o Dharm Pal Brua Village 30000
3 Nursery Dava Singh s/o Layak Ram Brua Village 30000
4 Nursery Sabala Nand s/o Ishwari Lal (BPL) Brua Village 30000
5 Nursery
Govind Singh s/o Bhim Chand
(BPL) Brua Village 30000
6 Nursery Rakash kumar s/o Gir Chand (BPL) Brua Village 30000
7 Nursery Subhash s/o Nand Lal (BPL) Brua Village 30000
8 Nursery Payar Chand s/o Bhai Dass (BPL) Brua Village 30000
9 Nursery
Yangbar Singh s/o Dhnar Singh
(BPL) Brua Village 30000
10 Nursery
Lashman Kumar s/o Shayam Chand
(BPL) Brua Village 30000
11 Shop
Chuman Singh s/o Karan Dass
(BPL) Brua Village 30000
12 Sewing Center Sarla Davi w/o Babu Ram Brua Village 7000
13 Sewing Center Shila devi w/o Bud Singh (BPL) Brua Village 7000
14 Sewing Center
Ram Kumari w/oPadam Singh
(BPL) Brua Village 7000
15 Sewing Center Kamlash Kumari w/o Baght veer Brua Village 7000
16 Sewing Center Bagat Puri w/o Subi Chand Brua Village 7000
17 Poultry Prem Lal s/o Hukam Chand Brua Village 30000
18 Poultry Chander Veer s/o Tak chand (APL) Brua Village 30000
19 Poultry Sunder Singh s/o Gopi Chand (APL) Brua Village 30000
20 Juice Making Shrang Yubak Mandal Brua Village 30000
21 Khadi Shawl Anu Kumari d/o Mahander Singh Brua Village 10000
IIRD Shimla
67 Detailed Project Report (DPR) of Kalpa watershed under IWMP
22 Khadi Shawl Bhagjin d/o Mal Pur Brua Village 10000
23 Khadi Shawl saryum w/o Duni Chand Brua Village 10000
24 Khadi Shawl Bhag Rati w/o Narander Brua Village 10000
25 Vermi Compost Trilok Singh s/o Ram Bhiri Brua Village 30000
26 Vermi Compost Anand Singh s/o Muni Lal Brua Village 30000
27 Dairy Farm Rajman Singh s/o Hardav Singh Brua Village 30000
28 Dairy Farm Jagmohan s/o Ishwar singh Brua Village 30000
29 Dairy Farm Lashman Bagat s/o Bhagwan dass Brua Village 30000
Micro Enterprises
S.No. Activity Beneficiaries Location Budget
1 Khadi Shawl Tabarpati w/o jai Chand (BPL) Brua Village 10000
Jai banti w/o Sunar Lal (BPL) Brua Village 10000
Pram Kali w/o Ram Kumar (BPL) Brua Village 10000
Shiv Dassi w/o Jai Lal (BPL) Brua Village 10000
Gayan Bhagti d/o Thakur Lal (APL) Brua Village 10000
Kamla w/o Shayam Nar (BPL) Brua Village 10000
Shankar Daviw/o Pram dav(APL) Brua Village 10000
Bhag Davi d/o Lashman Sukh (APL) Brua Village 10000
2 Sewing Center Tara Davi w/o Surender (BPL) Brua Village 5000
Gaga Lamo d/o Davi Singh (APL) Brua Village 5000
Muni Davi d/o Shayam Dass (APL) Brua Village 5000
Anjan davi w/o Parvinder (BPL) Brua Village 5000
Savitri Davi w/o Puran Ram (APL) Brua Village 5000
Vinay Kumari w/o Ashvani (APL) Brua Village 5000
Meena Davi w/o Dewan Singh (APL) Brua Village 5000
Bajan Davi w/o Sobalanand (BPL) Brua Village 5000
Bidhya Mani w/o Lashman Kumar (BPL) Brua Village 5000
IIRD Shimla
68 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Anita Davi w/o Yang Bar Singh (BPL) Brua Village 5000
Shanti Davi d/o Gir Chand (BPL) Brua Village 5000
Pratima Davi w/o Gobind Singh (BPL) Brua Village 5000
Sujata Davi w/o Subhash (APL) Brua Village 5000
Dhachan w/o Ranjit Brua Village 5000
Sushila Kumari w/o Raj Pal Brua Village 5000
Sudash Kumari w/o Nand Kishor Brua Village 5000
Basananti Davi w/o Ramshawer Brua Village 5000
Sangita w/o Khayar Singh Brua Village 5000
Davanti w/o Mangal Singh Brua Village 5000
Kalpana w/o Gajander Singh Brua Village 5000
Narsungh Pati w/o Lal Bhadur Brua Village 5000
Gayan Bhagti w/o Krishan Singh Brua Village 5000
Laxmi Davi w/o Surjeet Brua Village 5000
Geeta Davi w/o Hans Raj Brua Village 5000
Joyti w/o Nand kumar Brua Village 5000
Bhut Manti w/o Basant Kumar Brua Village 5000
Puran Bhagtiw/o Birbal Singh Brua Village 5000
Sunita Davi w/o Surender Brua Village 5000
Kapila Davi w/o Chander kumar Brua Village 5000
Sushila Davi w/o Pals Ram Brua Village 5000
Parvarti Davi w/o Deepk Kumar Brua Village 5000
Satata Davi w/o Vigayan Singh Brua Village 5000
Sundari Davi w/o Lach Veer Brua Village 5000
Madhu Davi w/o Nargu Ram Brua Village 5000
Sujata Davi w/o Subhash Yulam Brua Village 5000
Bisham Payari w/o Vijander Brua Village 5000
Gram Panchayat Tamgarang
IIRD Shimla
69 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Demographic Profile
Male Female Total Population
SC
H.H
ST
H.H
BPL
H.H Total H.H
409 318 727 46 121 12 167
Watershed Activities
S.No. Activity Location Dimension Budget
1 Pipe Line Bangla to Boning Saring 4000 mtrs 971364
2 Plantation Near By Panchayt House
388.88 ha 595000
Biting Cho
3 Stone Fencing Biting Cho
750 rmt 735750
Near By Panchayt House
4 Tank Biting Cho 3no. 544942
5 Bench Tracing Biting Cho 2ha 500540
6 Crate Wire Baspa Khad 2000rmt 900000
Horticulture Development
Sr.No Activity Name of the
Farmer
/Community
Based
No of
Units
No of
Village
Benefited
IWMP
Fund
Area to be
Treated(ha)
1 Plant
Distribution Community Based 1 112 H.H 135000 12 ha
IIRD Shimla
70 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Micro-Enterprises
S.No. Activity Beneficiaries Location Budget
Sheep Raring Vishamitar s/o Sanam Yang Chan (BPL) Tamgarang 25000
Sheep Raring Chander Parkash s/o Shar Singh (BPL) Tamgarang 25000
Sheep Raring Yang Kum Davi d/o laxmi Nand (BPL) Tamgarang 25000
Sheep Raring Shiv Singh s/o Jeet ram (BPL) Tamgarang 25000
Poultry Kakesh Kumar s/o Rattan sukh (BPL) Tamgarang 30000
Piggery Ram Rattan s/o Muril (BPL) Tamgarang 30000
Auto Tools Amit Kumar s/o Ratan Sukh Tamgarang 30000
Khadi Ram Singh s/o Valas Pur (BPL) Tamgarang 10000
Khadi Bidhya Sukh s/o Sanam Pur (BPL) Tamgarang 10000
Khadi Tashi Dolma w/o Ganga ram (BPL) Tamgarang 10000
Khadi Bimla davi w/o var Sukh (BPL) Tamgarang 10000
Khadi Ranveer Singh s/o Bhm Sukh (BPL) Tamgarang 10000
Khadi Shiv Ram s/o BhimSukh Tamgarang 10000
Khadi Nak Ram s/o Sukh Bar Tamgarang 10000
Khadi Ram Kumar s/o Bhim Sukh Tamgarang 10000
Khadi Astha d/o Pawan Singh Tamgarang 10000
Khadi Ram Payri w/o Gulab Charing Tamgarang 10000
Khadi Partap singh s/o Bhagi Sukh Tamgarang 10000
Khadi Himmat lal s/o Bhagi nur Tamgarang 10000
Khadi Lal Pur s/o Gayan Pur Tamgarang 10000
Khadi Dharm Lal s/o Guran Sukh Tamgarang 10000
Khadi Ganga Chand s/o Nima Saran Tamgarang 10000
Khadi mangal Chand s/o dash Chand Tamgarang 10000
Khadi Virender Kumar s/o Sunder Lal Tamgarang 10000
Khadi Ram Bhagat s/o Bilaspur Tamgarang 10000
Khadi Sohan Lal s/o Balak Ram Tamgarang 10000
Khadi Nirmala davi w/o Lachu ram Tamgarang 10000
IIRD Shimla
71 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Plantation Shiv Singh s/o Jeet Singh Tamgarang 10000
Plantation Virma Mitra s/o sanam Pachan Tamgarang 10000
Plantation Ranveer Singh s/o Bhm Sukh Tamgarang 10000
Plantation Ram Singh s/o Vilarupur Tamgarang 10000
Plantation Amit Kumar s/o Ratan Sukh Tamgarang 10000
Plantation Bidhya Sukh s/o Sanam Pur Tamgarang 10000
Plantation Mam Sukh Davi w/o veer Pal Tamgarang 10000
Plantation Vimla Davi d/o Nar Sukh Tamgarang 10000
Plantation Yashi Dolma s/o Ganga ram Tamgarang 10000
Plantation Ram Ratan s/o Muril Tamgarang 10000
Plantation Chander Parkash s/o Shar Singh Tamgarang 10000
Plantation Rakesh s/o Ratan Sukh Tamgarang 10000
Nursery Hai Parkash s/o Sai Lal Tamgarang 15000
Nursery Chander Dav s/o Vayas Baghat Tamgarang 15000
Nursery Jugan Kisheor s/o jagdesh Chander Tamgarang 15000
Nursery Ravinder Singh s/o Shaam Chand Tamgarang 15000
Nursery Chander Kishor s/o Maya ram Tamgarang 15000
Nursery Naveen Kumar s/o Maya Bhagat Tamgarang 15000
Nursery Roshan lal s/o Panma ram Charing Tamgarang 15000
Livelihood Activity
S.No. Activity Beneficiaries Location Budget
1 Power Spray Sovan Singh s/o Maya Ram Tamgarang 15000
Power Spray Kuldeep Singh s/o Lachi Ram Tamgarang 15000
Power Spray Vav Chand s/o Gayan Veer Tamgarang 15000
Power Spray Atma Ram s/o Mohar Singh Tamgarang 15000
Power Spray Chander Kanta s/o Balam Singh Tamgarang 15000
Power Spray Ray Bhadur s/o Udav san Tamgarang 15000
Power Spray Krishan Lal s/o Jamashi Tamgarang 15000
IIRD Shimla
72 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Power Spray Gulab Chari s/o Surat Lal Tamgarang 15000
Power Spray Sawa San s/o Surat Lal Tamgarang 15000
Power Spray Krishan Lal s/o Tit Pur Tamgarang 15000
Power Spray Bilaspur s/o Akam Tamgarang 15000
2 Power Tiller (01
no)
Raj Bhagat s/o Radha Balab
Tamgarang
150000
Raj Gopal s/o Sanam Ram
Harish Chand s/o Banti Lal
Bilvar Singh s/o rata Jeet
Murkam pati w/o Gayan Singh
Shoba ram s/o kamla Sukh
hari Lal s/o Diklua
Baghat Chand s/o Bajan dass
Khajan Singh s/o TotPur
Krishan Bant s/o Donjor
3 Bee Keeping Tashi Lal s/o Lakhan Pur Tamgarang 20000
Bee Keeping Ram Parsad s/o Sukh Bar Tamgarang 20000
Bee Keeping Surinder kumar s/o Joyati Lal Tamgarang 20000
Bee Keeping Nak Ram s/o Sukh Bar Tamgarang 20000
Bee Keeping Hardav Singh s/o Hukam Singh Tamgarang 20000
Bee Keeping ray Bhadur s/o Dhayan Pur Tamgarang 20000
Bee Keeping Sunder Jin w/o Purbu Tamgarang 20000
Bee Keeping Murv Doraja s/o Bhim San Tamgarang 20000
Bee Keeping Padam Bushan s/o Mohar ram Tamgarang 20000
Bee Keeping ham Chand s/o Ram Singh Tamgarang 20000
Bee Keeping Manglu s/o Utanchaya Tamgarang 20000
Bee Keeping Man Ganga s/o Jawala Bhagat Tamgarang 20000
Bee Keeping Yangur San s/o Lal San Tamgarang 20000
Bee Keeping Hari Lal s/o Kaser Nand Tamgarang 20000
Bee Keeping KaramChand s/o Dhram Ram Tamgarang 20000
IIRD Shimla
73 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Bee Keeping Chander Parkash s/o Kapoor Singh Tamgarang 20000
Bee Keeping Kishor Kumar s/o Natar Pal Tamgarang 20000
Bee Keeping Bal Krishan s/o Jag Veer Tamgarang 20000
Gram Panchayat Shong
Demographic Profile
Male Female Total Population
SC
H.H
ST
H.H
BPL
H.H Total H.H
415 420 840 119 67 17 178
Watershed Activities
S.No. Activity Location Dimension Budget
1 Tank Jalodan , Chalopan, Jokandan 3no 837153
2 Crate Wire Rangnak Nala
750mtrs 337500
Shong Khad
Chidodan to Chito dan
3 Pipe Line Choti to Jokandan 1300rmt 856604
4 Channel Choti to Vayrada 2000 rmt 2208760
Agriculture Development
S.No Activity
Name of the Farmer
/Community Based
No of
Units
No of
Village
Benefite
IWMP
Fund
Area to
be
Treated
IIRD Shimla
74 Detailed Project Report (DPR) of Kalpa watershed under IWMP
d (ha)
1
Vegetable
Cultivation Community Based 1 100 HH 100000 8 ha
Horticulture Development
S.No Activity
Name of the Farmer
/Community Based
No of
Units
No of
Village
Benefite
d
IWMP
Fund
Area to
be
Treated(h
a)
1 Plant
Distribution Community Based 1 165 HH 290000 24 Ha
2
Horticulture
Collection
Center Community Based 1 80 H.H 150000 -
Animal Husbandry
Sr.N
o
Activity
Name of the Farmer
/Community Based
No of
Units
No of
Village
Benefite
d
IWMP
Fund
Area to
be
Treated(h
a)
1
Pasture
Development Community Based 1 80 HH 100000 4ha
Livelihood Activity
S.No. Activity Beneficiaries Location Budget
1 Dairy Kanya Davi w/o Sudarshan Shong Village 30000
2 Dairy Purab Bhagati w/o Kamar dass Shong Village 30000
3 Dairy Naram Chand s/o Amal Sukh Shong Village 30000
IIRD Shimla
75 Detailed Project Report (DPR) of Kalpa watershed under IWMP
4 Khadi Shawl Jarman Singh s/o Kali Dass Shong Village 10000
5
Sheep & Goat
Raring Ram Lal s/o Naram Chand Shong Village 30000
6
Sheep &Goat
Raring Karam Singh s/o sarta Pur Shong Village 30000
7
Sheep &Goat
Raring Kushi Ram s/o Bari Chand Shong Village 30000
8 Shop Bhajan Singh s/o Bhagat Singh Shong Village 30000
9 Poultry Nima Charing s/o Sukh Lal Shong Village 30000
10 Poultry Payar Lal s/o Pal Sukh Shong Village 30000
11 Nursery Kishori Lal s/o Ashok Sukh Shong Village 20000
12 Nursery dalip Singh s/o Anand Singh Shong Village 20000
13 Nursery Jai Bharat s/o Mohan Singh Shong Village 20000
14 Nursery Vasu dav s/o Parkash Chand Shong Village 20000
15 Nursery Pardeep Kumar s/o Kushi Ram Shong Village 20000
16 Nursery Dhram Dav s/o Sonam Shong Village 20000
17 Nursery
Sanjay Kumar s/o Jagdesh
Singh Shong Village 20000
18 Carpenter Tool Dil Lal s/o Shayam Sukh Shong Village 30000
19 Sewing Center Ram Payari w/o Rajesh Kumar Shong Village 15000
20 Small Restaurant Gulab Cand s/o Amer Sukh Shong Village 30000
21 Pickle Making Sujata Davi w/o Trilok Singh Shong Village 20000
22 Pickle Making
Amrit Kumari w/o Pritam
Singh Shong Village 20000
23 Pickle Making Yangur Davi w/o Krishn Bal Shong Village 20000
IIRD Shimla
76 Detailed Project Report (DPR) of Kalpa watershed under IWMP
24 Pickle Making
Sunder Bhagti w/o Mohan
Singh Shong Village 20000
25 Pickle Making Sunila w/o Vinay Singh Shong Village 20000
26 Pickle Making Shkuntala w/o Kartar Singh Shong Village 20000
27 Pickle Making Sunita Davi w/o Veer Parkash Shong Village 20000
28 Pickle Making Karuna Davi w/o Shayam Lal Shong Village 20000
29 Pickle Making Shanti davi w/o Kushi Ram Shong Village 20000
Micro-Enterprises
S.No. Activity Beneficiaries Location Budget
1 Stitching Machine
Sukh Sarni w/o Dav Singh Shong Village 5000
Roshni Davi w/o Dash raj Shong Village 5000
Sushma Bharati w/o Pardeep
Kumar Shong Village 5000
Sushma w/o Vidha Singh Shong Village 5000
Narbag w/o Raju Shong Village 5000
Karni Vijay d/o Kartar Singh Shong Village 5000
Sunila w/o Chat Ram Shong Village 5000
Yangur Davi w/o Krishn
Bhadur Shong Village 5000
Sunder Bhagti w/o Mohan
Singh Shong Village 5000
Sunila w/o Vinay Singh Shong Village 5000
Babita w/o Shakti Kumar Shong Village 5000
Ram Mani w/o Amar Lal Shong Village 5000
IIRD Shimla
77 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Dahan Vati w/o Ajeet Singh Shong Village 5000
Jeet Mani w/o Rup Lal Shong Village 5000
Nasib Lamo w/o Dil Chan Shong Village 5000
Anju Davi w/o Bal Krishan Shong Village 5000
kanta Davi w/o Balak Ram Shong Village 5000
Sunder Davi w/o Mahinder
Singh Shong Village 5000
Jai davi w/o Jitander Singh Shong Village 5000
Sunder davi w/o Raj Charing Shong Village 5000
Shanta davi w/o Babu ram Shong Village 5000
Inder Mani w/o Kawal ram Shong Village 5000
Gram Panchayat Sangla
Demographic Profile
Male Female Total Population SC H.H
ST
H.H
BPL
H.H Total H.H
1466 1527 3005 282 280 68 562
Watershed Activities
S.No. Activity Location Dimension Budget
1 Channel Ropati Khad to Kashmir
2800 mtrs 3092265
Chudo Nala to Krishn Parkash
IIRD Shimla
78 Detailed Project Report (DPR) of Kalpa watershed under IWMP
2 Pipe Line Tong Tong- Cho Nala to Khala saring
3800 mtrs 858820
Tong Tong- Cho Nala to Korkho
Saring
Kocha vayu to Rashwal
3 Crate Wire Tong Tong- Cho Nala 675 mtrs 303750
Agriculture Development
S.No Activity
Name of the Farmer
/Community Based
No of
Units
No of
Village
Benefite
d
IWMP
Fund
Area to
be
Treated
(ha)
1
Vegetable
Cultivation Community Based 1 110 H.H 115000 9 ha
Horticulture Development
S.No Activity
Name of the Farmer
/Community Based
No of
Units
No of
Village
Benefite
d
IWMP
Fund
Area to
be
Treated(h
a)
1 Plant
Distribution Community Based 1 130 H.H 150000 13 ha
2
Horticulture
Collection
Center Community Based 1 80 H.H 150000 -
Livelihood Activity
S.No. Activity Beneficiaries Location Budget
IIRD Shimla
79 Detailed Project Report (DPR) of Kalpa watershed under IWMP
1 Carpenter Tools Himalayan SHG Sangla Village 12000
2 Carpenter Tools Meena Lal s/o Surjan Singh (APL) Sangla Village 12000
3 Carpenter Tools Deepak Kumar s/o Pani Lal (BPL) Sangla Village 12000
4 Carpenter Tools Anand Sagar s/o Neema Dorja (BPL) Sangla Village 12000
5 Carpenter Tools Mangat Ram S/o Utam Ram (BPL) Sangla Village 12000
6 Carpenter Tools Surat ram s/o Shambu Ram (BPL) Sangla Village 12000
7 Carpenter Tools
Virender Kumar s/o Kalam Singh
(BPL) Sangla Village 12000
8 Carpenter Tools Lal Veer s/o Roshan Lal (BPL) Sangla Village 12000
9 Carpenter Tools Roshan Lal s/o Cand Dass (BPL) Sangla Village 12000
10 Carpenter Tools Gopi Chand s/o Nagat Charing (BPL) Sangla Village 12000
11 Carpenter Tools Bhagat Chand s/o Roshan Lal (BPL) Sangla Village 12000
12 Carpenter Tools Mogu Ram s/o Nagat Charing (BPL) Sangla Village 12000
13 Carpenter Tools Gulab Singh s/o Tamat dandub(APL) Sangla Village 12000
14 Carpenter Tools Surjan Singh s/o Dharshan dass (APL) Sangla Village 12000
15 Carpenter Tools Amir Chand s/o Dharshn dass (BPL) Sangla Village 12000
16 Carpenter Tools Jiya Lal s/o Shiv Lal (BPL) Sangla Village 12000
17 Carpenter Tools Arjun s/o Charing Lal (BPL) Sangla Village 12000
18 Carpenter Tools Naresh Kumar s/o Satya Pal (BPL) Sangla Village 12000
19 Carpenter Tools
Davinder Kumar s/o Amir Chand
(BPL) Sangla Village 12000
20 Carpenter Tools Jag jeevan Ram s/o Pram (BPL) Sangla Village 12000
21 Carpenter Tools
Sandesh Kumar s/o Charing Lal
(APL) Sangla Village 12000
22 Carpenter Tools
Shayam Lal s/o Urgayan Dandub
(APL) Sangla Village 12000
23 Carpenter Tools Chuni Lal s/o Tanwa Charing (APL) Sangla Village 12000
24 Carpenter Tools Sanam Dorja s/o Charing Lal (APL) Sangla Village 12000
25 Carpenter Tools Charing Lal s/o Roshan Lal (APL) Sangla Village 12000
IIRD Shimla
80 Detailed Project Report (DPR) of Kalpa watershed under IWMP
26 Carpenter Tools Naryan Singh s/o Mohan Lal (APL) Sangla Village 12000
27 Carpenter Tools Mangal Pur s/o Bali Pur (APL) Sangla Village 12000
28 Carpenter Tools Moti Ram s/o Nagdat Charing (BPL) Sangla Village 12000
29 Carpenter Tools Basant Ram s/o Samu ram (BPL) Sangla Village 12000
30 Carpenter Tools Pram Sagar s/o Bangyal (APL) Sangla Village 12000
31 Carpenter Tools Daulat ram s/o Jimad Dorja (APL) Sangla Village 12000
32 Carpenter Tools Ganga Sagar s/o Bangyal (APL) Sangla Village 12000
33 Carpenter Tools Hir Chand s/o Roshan Lal (APL) Sangla Village 12000
34 Knitting Centre Sukh Davi w/o Rajesh (APL) Sangla Village 10000
35 Knitting Centre Hina davi w/o Amit Kumar (APL) Sangla Village 10000
36 Knitting Centre Sudarshan d/o Ram lal (APL) Sangla Village 10000
37 Knitting Centre Radha davi w/o Davi ram (BPL) Sangla Village 10000
38 Knitting Centre shashi Kala w/o Om Krishan (APL) Sangla Village 10000
39 Knitting Centre
Krishan Davi w/o Rajesh Kumar
(APL) Sangla Village 10000
40 Sewing Center Sunita w/o Mukash Kumar (BPL) Sangla Village 4000
41 Sewing Center Laxmi Davi w/o Kishor Kumar (APL) Sangla Village 4000
42 Sewing Center
Charing Jagmo w/o Charing dandup
(APL) Sangla Village 4000
43 Sewing Center Vijay Shanti w/o davinder (APL) Sangla Village 4000
44 Sewing Center Shayam Davi w/o jordan (APL) Sangla Village 4000
45 Sewing Center Bhag Davi w/o Sunder Lal (APL) Sangla Village 4000
46 Sewing Center Uma Davi w/o Panchi Lal (APL) Sangla Village 4000
47 Khadi Center Rattan Davi w/o Mag Ram(APL) Sangla Village 8000
48 Khadi Center Rattan Kumariw/o Hari Sukh (APL) Sangla Village 8000
49 Khadi Center Gulab Davi w/o Khajan Singh(APL Sangla Village 8000
50 Khadi Center Meena Kumari w/o Raju(BPL) Sangla Village 8000
51 Khadi Center Suraj Mani d/o Gayal Jan (BPL) Sangla Village 8000
52 Power Tiller Krishan Ram s/o thakur Singh (BPL) Sangla Village 151000
IIRD Shimla
81 Detailed Project Report (DPR) of Kalpa watershed under IWMP
(01 no) Vishmashwar s/o Shayam Parkash
(BPL) Sangla Village
Ashok Kumar s/o ganga Nand (APL) Sangla Village
Pushkar Singh s/o Thakur Singh
(BPL) Sangla Village
Daya Ram s/o Lashman Singh (APL) Sangla Village
Parmod Kumar s/o Kunjan Ram
(APL) Sangla Village
Tashi Dorja s/o Thakur Singh (APL) Sangla Village
Daya Dav s/o Ganga Chand (APL) Sangla Village
Hari Sukh s/o Dharam Sukh (BPL) Sangla Village
Bhag Davi d/o Dharam Sukh (BPL) Sangla Village
IIRD Shimla
82 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Micro-Enterprises
S.No. Activity Beneficiaries Location Budget
1
Black Smith
Tools Hira Lal s/o Sanam Goru (APL) Sangla Village 20000
Black Smith
Tools
Tamant Dandup s/o Nadup
Charing Sangla Village 20000
Black Smith
Tools
Tnajin Chopal s/o Samtan
Chodup Sangla Village 20000
Black Smith
Tools Shayam datt s/o Nant ram (BPL) Sangla Village 20000
2 Jeweler tools
Ram Singh s/o tanjin Chopal
(BPL) Sangla Village 20000
Jeweler tools
Hoshyar Singh s/o Jimad Dorja
(APL) Sangla Village 20000
Jeweler tools
Rakesh Soni s/o TopGay Ram
(BPL) Sangla Village 20000
Jeweler tools
Sanju Ram s/o Chandu Ram
(APL) Sangla Village 20000
Jeweler tools
Tashi Namgayal s/o Samtan
Chodup(APL) Sangla Village 20000
4 Poultry Farm Mohan Lal s/o Sukh Dass (APL) Sangla Village 20000
Poultry Farm Bhagat Ram s/o Sar Dass (APL) Sangla Village 20000
5 Power Spray
Manhor Singh s/o Tashi Ram
(APL) Sangla Village 15000
6 Knitting Centre
Meera Davi w/oParma nand
(BPL) Sangla Village 10000
Knitting Centre Nar Davi w/o San Ram APL) Sangla Village 10000
IIRD Shimla
83 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Knitting Centre
Charing Dolma w/o Shayam
Singh (BPL) Sangla Village 10000
Knitting Centre Daya Mani w/o Amit (APL) Sangla Village 10000
Knitting Centre Vijata w/o Jitaender (APL) Sangla Village 10000
Knitting Centre
Tara Davi w/o Shami Chand
(APL) Sangla Village 10000
Knitting Centre Vayas Davi w/o Mam Chand Sangla Village 10000
Knitting Centre kamlesh w/o Bhumashwar(APL) Sangla Village 10000
Knitting Centre Krishna d/o Shir Cand (APL) Sangla Village 10000
Knitting Centre Satya davi d/o Pram Lal (APL) Sangla Village 10000
Kalpa
Project and Micro watershed wise Financial Targets
Activity
Target as per DPR
1st year 2nd year 3rd year 4th year
5th year Total
Land Dev. Afforestation (on wasteland )
Afforestation (other Land ) 1105000 425000
1530000
Horticulture (on wasteland )
Horticulture (other land ) 270000 350000 255000
875000
Agriculture (on waste land )
Agriculture (other Land ) 90000 135000 90000 315000
Pasture (on waste land )
Pasture (other Land ) 130000 140000 140000 310000
Other (on waste land )
IIRD Shimla
84 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Other (other land )
S&MC Retain Wall
Stone Fencing 948928 576181 1525109
C.C T
Bench terracing 1251350 750810 2002160
Other (please specify)
Engg. Structures Earthen checks
Create Wire 1518750 855000 2373750
Gully plug
Loose Boulders
Gabion Structures
Other (please specify)
WHS (New created ) Farm Pond
Check dam
Water Harvesting Tank
Percolation tanks
Irrigation Tanks 1018800 1018800 460698 2498298
Ground water recharge structures
Irrigation Kulh 1811183 3655499 2319198 7785880
HDP pipe Line 767950 1781630 951491 3501071
Other (please specify)
WHS (Renovated ) Farm Pond
Check dam
Nallab bund
Percolation tanks
Irrigation Tanks
IIRD Shimla
85 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Ground water recharge structures
Other (please specify)
WHS (Storage capacity of New Structure
Farm Pond
Check dam
Water Harvesting Tank
Percolation tanks
Irrigation Tanks 648 cu.mt 648 cu.mt 324 cu.mt 1620 cu.mt
Ground water recharge structures
Irrigation Kulh HDP pipe Line Other (please specify)
WHS (Storage capacity of New Structure
Farm Pond
Check dam
Nallab bund
Percolation tanks
Irrigation Tanks
Ground water recharge structures
Other (please specify)
IIRD Shimla
86 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Project and Micro watershed wise Physical Targets
Activity
Target as per DPR
1st year 2nd year 3rd year 4th year
5th year Total
Land Dev. Afforestation (on wasteland ) ha
Afforestation (other Land ) ha 722.22 ha 277.87ha 1000 ha
Horticulturen(on wasteland ) ha
Horticulturen(other land ) ha 154.28 ha 200 ha 145.7ha
500 ha
Agriculture (on waste land ) ha
Agriculture (other Land ) ha 90 HH 130 HH 90 HH 310 HH
Pasture (on waste land ) ha 6 ha 6 ha 2 ha 14 ha
Pasture (other Land ) ha
Other (on waste land ) ha
Other (other land ) ha
S&MC Retain Wall ha
Stone Fencing ha 1188rmt. 1002rmt. 2190rmt.
C.C T ha
Bench terracing ha 1250 mtr 750 mtr 2000 mtr
Other (please specify) ha
Engg. Structures Earthen checks mm
Create Wire mm 3375mtrs (27 ha)
1900 mtrs (15 ha)
5275mtrs (42 ha)
Gully plug mm
Loose Boulders mm
Gabion Structures mm
IIRD Shimla
87 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Other (please specify) mm
WHS (New created ) Farm Pond no
Check dam no
Water Harvesting Tank no
Percolation tanks no
Irrigation Tanks no 4no 4 no 2no 10 no
Ground water recharge structures no
Irrigation Kulh mm 1640 mtrs 3310mtrs 2100 mtrs 7050mtrs
HDP pipe Line mm 3405 mtrs 5355 mtrs 2840mtrs 11600 mtrs
Other (please specify) no
WHS (Renovated ) Farm Pond no
Check dam no
Nallab bund no
Percolation tanks no
Irrigation Tanks no
Ground water recharge structures no
Other (please specify) no
WHS (Storage capacity of New Structure
Farm Pond cu.mt
Check dam cu.mt
Water Harvesting Tank cu.mt
Percolation tanks cu.mt
Irrigation Tanks cu.mt 648 cu.mt 648 cu.mt 324 cu.mt 1620 cu.mt
Ground water recharge structures cu.mt
Irrigation Kulh cu.mt HDP pipe Line cu.mt
IIRD Shimla
88 Detailed Project Report (DPR) of Kalpa watershed under IWMP
Other (please specify) cu.mt
WHS (Storage capacity of New Structure
Farm Pond cu.mt
Check dam cu.mt
Nallab bund cu.mt
Percolation tanks cu.mt
Irrigation Tanks cu.mt
Ground water recharge structures cu.mt
Other (please specify) cu.mt