blinds first | how to install vertical blinds
DESCRIPTION
TRANSCRIPT
INSTALLATION INSTRUCTIONS
CUSTOMER SUPPORT: 1-888-553-3811ships next day, guaranteed
BLINDSFIRST.COM
CHILD SAFETY
fb.com/[email protected]
Vertical Blinds
SHORTENING CHORD HEIGHT
CLEANING AND CARE
Now that you have your stylish new window treatments installed, lets make sure that they stay in great shape! In order to keep them in tip top condition be sure to follow all of the recommended methods for care and maintenance. Regular care means your windows will stay looking great and performing opti-mally year after year.
FABRIC = X / VINYL = O
Dusting Hand-Held Vacuum
Compressed Air
Hair Dryer SpotCleaning
WaterImmersion
UltrasonicCleaning
X X X X
O O O O O
G
With headrail traversed closed, to adjust cord height on a split draw vertical blind:
Locate knots on end of cords in lead carrier.
Select one of the 2 cord ends and pull on the knot.
Observe the carriers to be sure that they do not traverse when you pull the cord. If they do then select the other cord end. (CAUTION-Cutting wrong cord will damage beyond repair.)
Pull this cord until the cord loop reaches desired height. Refer to section H for an illustrated view of cord loop.
Tie new knot in cord and cut off excess. To adjust cord height on a one way draw blind, locate knot on end of cord in lead carrier (Fig. 1). Pull knot until cord loop reaches desired position (Fig. 2). Refer to section H for an illustrated view of cord loop. Tie new knot in cord and cut off excess (Fig. 3).
FIGURE 2
FIGURE 3
FIGURE 11.
2.
3.
4.
5.
F INSTALLING VANES INTO CARRIERS
With headrail traversed closed, pull beaded chain to rotatecarriers to the opened position (Fig. 1).
To install vanes push vanes up &snap into carriers (one vane ata time.) (Fig. 2).
FIGURE 1
Installed Vertical Blinds (Opened Position.)
FIGURE 2
1.
2.
INSTALLING PULLEY & CORD TENSIONERH
Wrap blinds’ cord loop around pulley then insert pulley and cord loop into cord tensioner.
Push pulley into tensioner. Pulley is in position when you hear a snap (Fig. 1).
Use two screws to secure cord tensioner to wall (Fig. 2).For hollow walls use screwsin conjunction with anchors, pro-vided.
FIGURE 1 FIGURE 2
1.
2.
3.
At Blinds First child safety is a top priority. While getting the right blinds should be a fun experience, making sure they are safe is an important and real concern. That’s why all of our products are fitted with the highest quality components to adhere to industry safety measures. Browse our child safety brochure for more information and check out all of the products, created by our family for yours.
www.blindsfirst.com
ships next day, guaranteed
Your Blinds First Vertical Blinds’ sorting label is packaged with your vanes. This appears as seen below:
On this label, you will recognize:
1. Order size of the blind 2. Room location (If not present, info not given at time of order.)3. Whether the blind was ordered inside mount (IB), or outside mount (OB)
blinds width To 40”
40” To 60” 60” To 100” 100” To 130”
number of mounting clips2345
GETTING STARTEDA
THE TOOLSB
SORTING YOUR BLINDSC
BRACKET INSTALLATIOND
2-Room Location
1-Order Size of Blind
Work Order Number
3-Type of Mount
INSTALLING VERTICAL BLINDS INTO MOUNTING CLIPSE
Important Note:Screws provided are for installation into wooden frames only. For metal surfaces, use suitable sheet metal screws and pre-drill holes. For concrete, stone, brick, or tile, use a carbide drill and appropriate anchors and screws. For wallboard or plaster, use hollow wall anchors and/or longer screws to reach framing or stud.In all cases, follow the fastener manufacturer’s recommendations.
1.
1.
1.
1.
1.
2.
2.
2.
2.
2.
The Parts: Before starting, please remove and identify the following parts required for the installation of your blinds:
To install your blinds please referto section E.
Inside MountClips
Outside Mount Brackets
Valance Clips
Pulley
Cord Tensioner Anchors
CordTensioner
MountingScrews
Cord TensionerScrews
Place valance to the underside, top of the window frame orceiling. Position one mounting clip over the first groove onunderside of valance’s dust cover as shown below.
Secure mounting clip and valance to window frame or ceiling with one mounting screw, per clip. To install your blinds please refer to section E.
Inside mounted headrail & valance (side view).
If you are inside mounting your blinds with valance proceed to the “Inside Mount With Valance”portion of these instructions.
Install mounting clips to the underside, top of the window frame.
Secure with one mounting screw through top ofeach clip.
Install two mounting brackets to the flat surface above thewindow frame.
Secure two mounting screws throughback of each bracket.
Inside Mount With No Valance
Outside Mount With No Valance
Inside Mount With Valance
FIGURE 1 FIGURE 2
Slide valance clips’ front notches into headrail’s front lip (Fig. 1).
Push down and snap the back of valance clips to fit intoheadrail’s back lip (Fig. 2).
Vertical Blinds
FIGURE 3Slide valance to fit into
valance clips.
FIGURE 4Valance, valance clip &
headrail side view.
Tilt and slip the front lip of the headrail into the front side of the mounting clips (Fig. 1).
Raise and snap the back of the headrail into the rear of the mounting clips so that it fits securely (Fig. 2).
FIGURE 1 FIGURE 2
Outside Mount With Valance
To install your Blinds First Vertical Blinds, you will need a few basic tools:Phillips head screwdriver*, or 1/4” nut driver**Power screwdriver or power drill with #2 Phillips attachment or 1/4” nut driver attachment may be used.