bim & asset management at denver international airport

16
BIM & Asset Management at Denver Interna2onal Airport Brendan Dillon, BIM Manager DENVER INTERNATIONAL AIRPORT September 13 th , 2016

Upload: sun-w-kim

Post on 14-Apr-2017

180 views

Category:

Software


1 download

TRANSCRIPT

Page 1: BIM & Asset Management at Denver International Airport

BIM  &  Asset  Management  at   Denver  Interna2onal  Airport

Brendan  Dillon,  BIM  Manager  DENVER  INTERNATIONAL  AIRPORT  September  13th,  2016  

Page 2: BIM & Asset Management at Denver International Airport

2

•  Building  InformaFon  Modeling  Or  Building  InformaFon  

Management  is  about  the  flow  of  

informaFon  about  a  facility/structure  

• Most  commonly  thought  of  in  terms  of  a  Project,  but  also  applicable  to  

ongoing  programs  •  ExisFng  CondiFons  •  Design  •  ConstrucFon  /  ConstrucFon  Admin  •  Cx/AcFvaFon  •  Closeout  •  FM/O&M  

BIM  Overview

Existing BIM / Assets

Construction Model

Design Model

Project Start

Data Harvest

Cx / CxDMA

Accurate Living

Building Model

Page 3: BIM & Asset Management at Denver International Airport

3

•  BIM  is  all  about  the  flow  of  informaFon  for  a  project  •  ExisFng  CondiFons  •  Design  •  ConstrucFon  /  ConstrucFon  Admin  •  Cx/AcFvaFon  •  Closeout  •  FM/O&M  

How  BIM  is  o:en  described

Existing BIM / Assets

Construction Model

Design Model

Project Start

Data Harvest

Cx / CxDMA

Accurate Living

Building Model

Page 4: BIM & Asset Management at Denver International Airport

4

DSM  –  EDCI  (Electronic  Data  Collec2on  &  Interchange)

Page 5: BIM & Asset Management at Denver International Airport

5

•  Base  Revit  Model  supplied  by  DEN    

•  Floors,  doors,  walls,  roofs  

•  Based  on  exisFng  CAD  

•  Requires  field  verificaFon  

•  Used  as  linked  background  file  (do  not  do  design  

within  the  DEN  models  

•  Templates  and  Family  Library  supplied by DEN  

•  ExisFng  CAD  supplied  by  DEN  

•  Laser  Scan  may  be  requested  

•  DEN  sets  up  Glue/Field  Sites  on  DEN  deployment  

Exis2ng  Condi2ons

ExisFng  CondiFons  

Design  

ConstrucFon  

ConstrucFon  Admin  

Commissioning  

AcFvaFon  

Closeout  

FM/O&M  

Page 6: BIM & Asset Management at Denver International Airport

6

•  Design  •  BIM  Design  model    

•  SpaFal  CoordinaFon  in  BIM  360  Glue    

•  Model  Reviews  at  kickoff/30/60/90/100  

•  Assets  IdenFfied  

•  Preliminary  Asset  Data  

Design  Phase

ExisFng  CondiFons  

Design  

ConstrucFon  

ConstrucFon  Admin  

Commissioning  

AcFvaFon  

Closeout  

FM/O&M  

Page 7: BIM & Asset Management at Denver International Airport

7

•  ConstrucFon  •  ConstrucFon  model  

•  Coordinated  Clash  DetecFon  

•  BIM  360  Field  populated  from  Glue  models  

•  Assets  Tagged  

•  Asset  Data  checked  and  developed  

Construc2on  Phase

ExisFng  CondiFons  

Design  

ConstrucFon  

ConstrucFon  Admin  

Commissioning  

AcFvaFon  

Closeout  

FM/O&M  

Page 8: BIM & Asset Management at Denver International Airport

8

•  CxA  •  Commissioning,  inspecFons  &  asset  tagging  

done  with  Field  

•  ConstrucFon  

•  Forma[ed  O&Ms  submi[ed  to  Design  for  

approval;  to  DEN  as  FYI  

•  Asset  Data  checked  and  developed  

•  DEN  

•  Field  data  exported  to  Revit  via  Glue  

•  Preliminary  data  load  to  MAXIMO  

Commissioning

ExisFng  CondiFons  

Design  

ConstrucFon  

ConstrucFon  Admin  

Commissioning  

AcFvaFon  

Closeout  

FM/O&M  

Page 9: BIM & Asset Management at Denver International Airport

9

•  Final  inspecFons  done  with  Field  

•  Asset  Data  Finalized  

•  ConstrucFon  

•  Final  Forma[ed  O&Ms  

•  Asset  Data  Finalized  

•  DEN  

•  Final  data  load  to  MAXIMO  

Ac2va2on

ExisFng  CondiFons  

Design  

ConstrucFon  

ConstrucFon  Admin  

Commissioning  

AcFvaFon  

Closeout  

FM/O&M  

Page 10: BIM & Asset Management at Denver International Airport

10

•  ConstrucFon  •  ConstrucFon  model  

•  Coordinated  Clash  DetecFon  

•  BIM  360  Field  populated  from  Glue  models  

•  Assets  Tagged  

•  Asset  Data  checked  and  developed  

Construc2on  Phase

ExisFng  CondiFons  

Design  

ConstrucFon  

ConstrucFon  Admin  

Commissioning  

AcFvaFon  

Closeout  

FM/O&M  

Page 11: BIM & Asset Management at Denver International Airport

11

•  Project  opens  

•  ConstrucFon  •  As-­‐Builts  Delivered  

• Design  •  Record  Model  delivered  

Maximo  connec2on  via  ModelStream

Page 12: BIM & Asset Management at Denver International Airport

12

•  Project  opens  

•  ConstrucFon  •  As-­‐Builts  Delivered  

• Design  •  Record  Model  delivered  

So:ware  Capabili2es

Page 13: BIM & Asset Management at Denver International Airport

13

•  DEN  •  Model  updated  by  MAXIMO  

•  Model  uFlized  by  Maintenance  to  locate  assets  

•  Model  Informs  Future  Projects  

Facility  Maintenance  &  Opera2on

Page 14: BIM & Asset Management at Denver International Airport

14

•  IniFal  FuncFonality  adjustments  

•  Risks  of  adopFng  new  soaware  

• Model  Viewer  interacted  with  Beta  tools  

•  Developer  worked  with  DEN  Maximo  

support  staff  to  add  funcFonality  

•  DEN  Maximo  instances  

• Maximo  Upgrade  

•  Facility  Gap  

So:ware  Experience

Page 15: BIM & Asset Management at Denver International Airport

15

•  Reference  DSM  EDCI  for  Design  and  ConstrucFon  projects  

•  h[ps://business.flydenver.com/bizops/documents/denEDCIComplianceDSM.pdf  

•  Brendan  Dillon,  BIM  Manager  

[email protected]  

Ques2ons  &  References

Page 16: BIM & Asset Management at Denver International Airport