bh-1 & 2

1
KROOKI BOUNDARY KROOKI BOUNDARY RAW MATERIAL WEARHOUSE BOILER ROOM INTAKE BLD BLD BLD RUWI MUTTRAH COMPOUND WALL AR-001 SKR P.M A1 SKR 1:20 1. DO NOT SCALE FROM THE DRAWINGS.ONLY WRITTEN DIMENSIONS TO BE FOLLOWED. 2. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE ENGINEER. 3. ALL DIMENSIONS AND LEVELS INDICATED IN THE DRAWINGS ARE FROM UNFINISHED SURFACES. 4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS OF THE SPECIFICATIONS. 5. DISCREPANCY IN THE DRAWINGS IF ANY, SHALL BE BROUGHT TO THE NOTICE OF THE CONCERNED ENGINEER PRIOR TO THE CONSTRUCTION. THIS DRAWING IS THE COPYRIGHT OF DG-BIM CONSULTANTS, AND AS SUCH, MUST NOT BE RETAINED, COPIED OR USED WITHOUT THE CONSULTANT'S PERMISSION. GENERAL NOTES: JOB No: NORTH: DRG, NO: SCALE: DATE: APPROVED: CHECKED: DESIGN: D.R.K DRAWING TITLE: PROJECT: REV No: CONSULTANT: CLIENT: SHEET: PLOT NO DRAWN: R.NO DATE. BY CKD. APP. REVISION P0 PROPOSED EARTH CUTTING WORK AT MUTTRAH PLANT BOREHOLE LOCATION MIS 14.04.2015 OMAN FLOUR MILLS - MUTTRAH

Upload: cheligp1981

Post on 25-Sep-2015

233 views

Category:

Documents


0 download

DESCRIPTION

qwert

TRANSCRIPT

  • KROOKI

    BOUNDA

    RY

    KROOKI BOU

    NDARY

    RAW

    MAT

    ERIA

    L

    WEA

    RHOU

    SE

    BOILER ROOM

    INTAKE

    BLD

    BLD

    BLD

    RUWI

    MUTTRAH

    COMPOUND

    WALL

    AR-001

    SKR

    P.MA1

    SKR1:20

    1. DO NOT SCALE FROM THE DRAWINGS.ONLY WRITTENDIMENSIONS TO BE FOLLOWED.

    2. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERSUNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIEDON SITE & APPROVED BY THE ENGINEER.

    3. ALL DIMENSIONS AND LEVELS INDICATED IN THE DRAWINGSARE FROM UNFINISHED SURFACES.

    4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITHOTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICALAND ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS OFTHE SPECIFICATIONS.

    5. DISCREPANCY IN THE DRAWINGS IF ANY, SHALL BE BROUGHTTO THE NOTICE OF THE CONCERNED ENGINEER PRIOR TO THECONSTRUCTION.

    THIS DRAWING IS THE COPYRIGHT OF DG-BIM CONSULTANTS,AND AS SUCH, MUST NOT BE RETAINED, COPIED OR USEDWITHOUT THE CONSULTANT'S PERMISSION.

    GENERAL NOTES:

    JOB No:

    NORTH:

    DRG, NO:

    SCALE:

    DATE:

    APPROVED:

    CHECKED:

    DESIGN:

    D.R.K

    DRAWING TITLE:

    PROJECT:

    REV No:

    CONSULTANT:

    CLIENT:

    SHEET:

    PLOT NO

    DRAWN:

    R.NO DATE. BY CKD. APP.REVISION

    P0

    PROPOSED EARTH CUTTING WORK ATMUTTRAH PLANT

    BOREHOLE LOCATION

    MIS14.04.2015

    OMAN FLOUR MILLS - MUTTRAH