Best practices for independent verification and validation (IV&V) and risk management Brad Ring 1 Article extract: Keywords: blade servers, A/C data center solution, best practices, program management, strategic planning, IT infrastructure and fiber optic conduit integrity Technology leadership, System engineering, Transportation, tolling, ITS, intelligent transportation system, fiber optic cable, system integration, design review, requirements review, cap ex, op ex, testing, review, schedule, scalability, maintainability. Establish IV&V vendor at the initial point of project inception.

Upload: bradr998

Post on 19-Jun-2015

725 views

Category:

Technology


2 download

DESCRIPTION

Establish IV&V vendor at the initial point of project inception when managing large scale technology integration projects.

TRANSCRIPT

Page 1: Best practices for independent verification and validation iv&v

Best practices for independent verification and validation (IV&V) and risk management

Brad Ring

1

Article extract:

Keywords: blade servers, A/C data center solution, best practices, program management, strategic planning, IT infrastructure and fiber optic conduit integrity Technology leadership, System engineering, Transportation, tolling, ITS, intelligent transportation system, fiber optic cable, system integration, design review, requirements review, cap ex, op ex, testing, review, schedule, scalability, maintainability.

Establish IV&V vendor at the initial point of project inception.

Page 2: Best practices for independent verification and validation iv&v

Methodology

2

Independent review of System Engineering Deliverables. Integrated Master Schedule incorporating schedules.

Ongoing schedule risk analysis and reporting.

Perform On-site inspections.

Page 3: Best practices for independent verification and validation iv&v

Recommended process

3

Page 4: Best practices for independent verification and validation iv&v

Benefits of independent technical reviewer

4

1. Integrated Master Schedule integrates 4 different schedules

2. tracks critical path to ensure we meet planned SCD. 3. Implemented Mandrel Test to improve fiber

installation.4. Reviews and approves all system engineering

deliverables.

Page 5: Best practices for independent verification and validation iv&v

Participating stakeholders

5

Brad Ring

Multiple system integrators

For more information contact: [email protected]