BARGE DAVY CROCKETT RESPONSE. History. The Barge DAVY CROCKETT is a 432’ converted Liberty Ship built in 1942 Liberty Ship sold by MARAD in 1969 to American Ship Dismantlers for scrap Converted to a Barge in the 1980’s & brought to Portland in 1993 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: BARGE DAVY CROCKETT RESPONSE

BARGE DAVY CROCKETT RESPONSE

Page 2: BARGE DAVY CROCKETT RESPONSE

History• The Barge DAVY CROCKETT is a 432’ converted Liberty Ship built in

1942

• Liberty Ship sold by MARAD in 1969 to American Ship Dismantlers for scrap

• Converted to a Barge in the 1980’s & brought to Portland in 1993

• May 2008: Owner requested Temporary Load Line Certificate to tow to Mexico to scrap

• April 2009: Barge came loose at anchorage & COTP Order issued requiring a marine inspector to survey the hull/mooring arrangement

• April 2009: Letter of Concern drafted by USCG urging owner to remove all free oil

• October 2010: Barge sold to current owner

Page 3: BARGE DAVY CROCKETT RESPONSE

DAVY CROCKETT IN 2008

Page 4: BARGE DAVY CROCKETT RESPONSE

What Happened? During the timeframe between

December 2010 and January 2011 illegal scrapping operations caused the number 3 hold on the Davy Crocket to buckle resulting in a sheen

Additional king tides further degraded the structural integrity of the barge and weakened the keel resulting in further oil discharges

Page 5: BARGE DAVY CROCKETT RESPONSE

DAVY CROCKETT IN 2011

Page 6: BARGE DAVY CROCKETT RESPONSE

Davy Crockett ResponsePhoto Taken 13 Feb

Page 7: BARGE DAVY CROCKETT RESPONSE

Response TimelineJan 20: An oil sheen was reported from the Barge Davy Crockett. Coast Guard and WA DOE Responded to scene

Jan 21: An Admin Order Issued to owner to remove visible oil and oily products from barge due to sheening.

Jan 24: Owner met requirements of Admin Order and no sheen observed

Jan 27: New sheen reported. Pollution Investigators observed vessel partially submerged with a oil sheen in vicinity. Sector Columbia River established an ICP at MSU Portland with WA DOE, and OR DEQ

Page 8: BARGE DAVY CROCKETT RESPONSE

Response TimelineJan 31: Contractors attempting to stabilize vessel to enable divers to inspect tanks, voids and other spaces. Feb 2: Deployed 8 concrete anchors (4 each to port andstarboard sides) to steady stern section in order to conduct ballasting operations.

Feb 3: Pumped nearly 600,000 gallons of river water into the after holds of the barge to sink the stern into the riverbottom in order to further stabilize the vessel.

Feb 16: Received CG Commandant Approval to remove/destroy the barge

Mar 4: Stern removal plan approved

Page 9: BARGE DAVY CROCKETT RESPONSE

Camas Staging Area & Boat Ramp

6,800’ Sorbent BoomAlong shoreline

2,800’ Hard Boom around vessel with3,000’ Sorbent Boom coiled within

400’ Hard BoomCascade Vista Mill

DAVY CROCKETT STATUS 080700 MAR 11

Vessel LocationSorbent BoomHard BoomSecurity ZonePersonnel (7 Mar) 63

Oil/Water Recovered 43,891 GalDebris Recovered 305 TonsFunds Obligated 5.3 MCeiling Remaining 2.9 M

400’ Hard BoomGRP 114.8

500’ Hard BoomGRP 113.3

Ballard Staging AreaVancouver, WA

1,000’ Hard BoomGRP 115.01,200’ Hard

Boom GRP 113.8b

2 x 700’ Hard BoomGRP 115.7

Page 10: BARGE DAVY CROCKETT RESPONSE

Stern Section“Swimming Pool”

SectionBow Section

Approximate Cut Lines

Page 11: BARGE DAVY CROCKETT RESPONSE
Page 12: BARGE DAVY CROCKETT RESPONSE

SS TWIN HARBORSWWII Liberty Ship

TWIN HARBORS was an identical vessel to DAVY CROCKETT before CROCKETT was converted to a barge

These photos show the vessel being dismantled in Tacoma, WA last year

The photo above shows the hull configuration and double-bottom

The photo to the right show how liberty ships used various materials for ballast in their holds – DAVY CROCKETT uses bricks instead of the gravel that was used aboard TWIN HARBORS

Page 13: BARGE DAVY CROCKETT RESPONSE

CHALLENGES• Limitations on authorities & jurisdiction

• Coast Guard• USACE • WA DOE• OR DEQ• DNR

• Sampling• Hazardous Waste Removal• Public Affairs• Public Expectation• Right Size of Organization

Page 14: BARGE DAVY CROCKETT RESPONSE

KEY SUCCESSES ICS Works!

USCG COMDT Destruction Approval Letter

Use of Special Teams External Affairs Outreach

Documentation Classification Policy

Had the Right People involved

Outreach to the Tribal Nations

Public Affairs

Page 15: BARGE DAVY CROCKETT RESPONSE

STATS• Through 9 March• 128 Responders (highest level)• 10,000 ft Sorbent Boom Deployed• 7,700 ft Hard Boom Deployed• 317 Tons of Debris Removed• 65,256 Gallons Oily Water Removed• 5.3 million spent through 9 March• Criminal Investigation Pending

Page 16: BARGE DAVY CROCKETT RESPONSE

THE WAY FORWARD