baran geotechnics - bkp-group.combkp-group.com/bkp-en-cv.pdf · baran geotechnics participate in...
TRANSCRIPT
Contents:
1- History
2- Fields of Activity
3- Personnel and Equipment
4- Memorandum of Understanding with Cathie Associates
5- Cooperation
6- Company Background
7- Notable Clients
8- Certificates, Memberships and Honors
9- Other Activities
10- Special Specifications
11- Quality Control Program
2
1- History
Baran Geotechnics is a leading geotechnical consultancy company in Iran
founded in 2007 by a group of experienced specialists in geotechnical
engineering and engineering geology.
Baran Geotechnics participate in more than 500 geotechnical projects
including mines, power stations, refineries, airports, bridges, roadways,
onshore, near shore and offshore oil terminal, oil fields, high rise buildings,
dams and soil improvement projects.
Ability to perform near shore and offshore geotechnical surveys, is the
special excellence of Baran Geotechnics.
Baran Geotechnics has succeeded to obtain the certificate of competence for
geotechnical consulting services (1st grade) from Management and Planning
Organization and the certificate of technical and laboratory services in the
geotechnical and concrete field from Ministry of Roads & Urban
Development.
Our prospect is to stand amongst the most powerful geotechnical companies
in the Middle East.
3
Contents:
1- History
2- Fields of Activity
3- Personnel and Equipment
4- Memorandum of Understanding with Cathie Associates
5- Cooperation
6- Company Background
7- Notable Clients
8- Certificates, Memberships and Honors
9- Other Activities
10- Special Specifications
11- Quality Control Program
4
1-
Rotary drilling by several methods such as
continuous coring, wash boring and auger.
Performance of special drilling including
earthing well (up to 0.5 m diameter), drilling
in all kind of lands including swamp, loose
and dense soil and rock.
Onshore disturbed (bulk and SPT) and
undisturbed (Shelby, pitcher, U4, monolith
and …) sampling in soil and sampling in
rock (double and triple tube core barrel).
6
1-
Performance of in- situ tests including:
Standard penetration test (SPT)
Cone penetration test (CPT) and CPTu
Pressuremeter
In- situ direct shear test
Plate loading test
Lefrance and Lugeon tests
Vane shear test
In- situ California bearing ratio (CBR)
In- situ density
Heat conductivity test
8
Near shore drilling by Jack up
Near shore drilling by vessel
Offshore drilling by rigs equipped with heave
compensation
Sampling in shallow, semi- deep and deep water by
drop coring and vibro coring
Performance of continuous and sectional CPTu in
sea
Laboratory services on deck (in sea) including all
physical and strength tests including vane shear test
(in- situ and miniature), penetrometer, triaxial
unconsolidated undrained test
Performance of geophysics operation on seabed
2-
10
3-
Conducting physical, mechanical and
settlement tests of soil.
Conducting physical, mechanical and
durability test for rock and aggregate.
Conducting mechanical strength tests for
cement, concrete, asphalt, bitumen and steel.
Conducting chemical tests for soil, rock and
water.
Quality control services and establishment of
the laboratory in sites.
12
4-
Bearing capacity calculation of shallow and
deep foundations
Estimation of static and dynamic ground lateral
active and passive coefficients
Determination of problematic soils and their
related problems, corrosion potential and ground
heat conductivity.
Designing urban excavations stabilization
system
Designing soil improvement systems
Seismic surveys and structure special spectrum
according to different codes
Consulting about geophysical operations
Consulting about offshore, near shore and
onshore drilling
15
KeyLab Professional
HoleBase SI Professional
Plaxis
GeoStudio
Flac
Abaqus
E-Tabs
SAP
Geo-Slope
Mat Lab
Ansys
AutoCAD
SolidWorks
Primavera
MS Project
Softwares:
4-
16
5-
Nowadays instrumentation and monitoring of structures, attains specific place in
Iran and it is an inseparable part of large projects such as dams, tunnels and
bridges, during and after construction. Instrumentation and monitoring helps
engineers to assure technical quality and structure stability, and has a major role in
interpretation of stabilization. It is possible to forecast structure behavior by
monitoring data, comparing it with theoretical models and analyzing the stability of
structures.
17
6-
Seismic 2D and 3D survey including down hole, reflection and refraction
Geoelectric operations (1D, 2D and 3D)
Gravimetery
Georadar (GPR)
18
9-
Designing, manufacturing and repairing of drilling rigs and their spare parts.
Designing and manufacturing of laboratory devices.
21
3- Personnel and Equipment
Baran Geotchnics has more than 15 specialists with PhD., MSc. and B.S. in
civil, geotechnics, marine structures, mining, engineering geology and oil
geology, and more than 20 technician of drilling and manufacturing
machineries.
23
3- Personnel and EquipmentDrilling rigs, Soil Improvement and Excavation
Stabilization Equipment
Geotechnical drilling
rigs and equipment Drilling rigs including : B53
(American), SKV4 (Russian)
and XU-300 and XY-1
(Chinese)
Special water pumps for
geotechnical operations
Drilling segments including
core barrels, down hole test
equipment, core bits and rock
bits.
Drilling rigs for tunnels
Asphalt and concrete corers
All types of samplers including
drop, grab and vibro.
Soil Improvement and Excavation
Stabilization Equipment Craelius, Russell and Derail wagon drilling rig
(DTH)
Casagrandr-C8 hydraulic drilling rig
METAX-MP7 (JG) high pressure injection set
Link- Belt 40 tones crane
Vibro-flotation unit set
Micropile drilling unit
Injection pump unit
Deep mixing unit
Air compressor, water pomp and diesel generator
Shotcrete unit
Hydraulic ram ENERPACK and OCT (50 to 100
tones)
Reaction beams for pile loading
24
3- Personnel and EquipmentLaboratory and In -situ Devices and Instrumentation
Monitoring and Instrumentation
equipment
Casagrande piezometer
Inclinometer
Triangle flow meter
Accelerometer
Water level readings ruler
Electrical piezometer
Pressure meter
Piezometer for rock
Extensometer
Laboratory tests equipment
Triaxial compression system
Direct shear test system
Audeometer test system
Permeability test system
test system CBR
Uniaxial compression system
Schmidt hammer
Ultrasonic system
Point load system
In- situ tests equipment
Standard penetration test (SPT) system
Cone penetration pest (CPT) and CPTu
system
Persiometer system
In- situ direct shear test system
Plate loading test system
Lefrance and Lugeon tests system
Vane shear test system
In- situ California bearing ratio (CBR)
system
In- situ density system
Heat conductivity test system
25
Jack- ups capable of drilling up to 20 m water depth
Vessels equipped with Active Heave Compensation system
CPTu complete unit Laboratory onboard
Offshore geophysics equipment
Various kind of corers including gravity, vibro, drop and grab corer
3- Personnel and EquipmentOffshore and Near-shore Equipment
26
Contents:
1- History
2- Fields of Activity
3- Personnel and Equipment
4- Memorandum of Understanding with Cathie Associates
5- Cooperation
6- Company Background
7- Notable Clients
8- Certificates, Memberships and Honors
9- Other Activities
10- Special Specifications
11- Quality Control Program
28
4- Memorandum of Understanding with
Cathie AssociatesBaran Geotechnics has a memorandum of understanding with the European
company, Cathie Associates, in order to access up to date knowledge and
technology and present the best services to the clients. Cathie Associates are
experts in the following fields:
Oil and gas exploration and drilling
Consultancy in oil and gas geotechnical studies
29
Monitoring of piles in oil and gas platforms and marine wind power stations
Professional consultant of oil companies such as Total and Sell Global
4- Memorandum of Understanding with
Cathie Associates
30
Contents:
1- History
2- Fields of Activity
3- Personnel and Equipment
4- Memorandum of Understanding with Cathie Associates
5- Cooperation
6- Company Background
7- Notable Clients
8- Certificates, Memberships and Honors
9- Other Activities
10- Special Specifications
11- Quality Control Program
31
5- Cooperation
We are able to perform a complete collection of geotechnical studies,
geotechnical supervision and control, and also soil improvement and excavation
stabilization, nailing, anchorage and pile as well as foundation projects, in
partnership with Saman Pey and Baspar Pey Iranian.
We are professional consultants for geotechnical contractors such as Saman Pey
and Baspar Pey Iranian.
32
Contents:
1- History
2- Fields of Activity
3- Personnel and Equipment
4- Memorandum of Understanding with Cathie Associates
5- Cooperation
6- Company Background
7- Notable Clients
8- Certificates, Memberships and Honors
9- Other Activities
10- Special Specifications
11- Quality Control Program
33
6- Company Background
Conducting geotechnical studies for more that 500 projects.
• Conducting geotechnical studies throughout the country.
Conducting offshore, near shore and onshore geotechnical studies
• Conducting monitoring and instrumentation studies of dams, tunnels and bridges.
Conducting ground improvement projects.
• Conducting excavation stabilization projects.
Conducting geotechnical quality control and material strength operations.
34
6- Company Background
Selected geotechnical studies performed by Baran Geotechnics:
High- rise towers and buildings
Mines, tunnels, subways and underground installations
Monitoring and instrumentation
Bridges, roadways and
pipelines
Monuments and historical buildings
Oil terminals
Powerhouses, refineries,
hospitals and airports
35
Contents:
1- History
2- Fields of Activity
3- Personnel and Equipment
4- Memorandum of Understanding with Cathie Associates
5- Cooperation
6- Company Background
7- Notable Clients
8- Certificates, Memberships and Honors
9- Other Activities
10- Special Specifications
11- Quality Control Program
37
7- Notable Clients
Technical Consultancy Organization of Tehran
Municipality
Deputy of Technical & Development Affairs -
Tehran Municipality
ASP Construction Company
Mobile Telecommunication Company of Iran
Hirgan Energy Engineering Company
Lorestan Province Regional Water Authority
Kermenshah Province Regional Water
Authority
38
Contents:
1- History
2- Fields of Activity
3- Personnel and Equipment
4- Memorandum of Understanding with Cathie Associates
5- Cooperation
6- Company Background
7- Notable Clients
8- Certificates, Memberships and Honors
9- Other Activities
10- Special Specifications
11- Quality Control Program
39
8- Certificates, Memberships and Honors
Certificates:
Certificate of competence for geotechnical consulting services (1st grade)
from Management and Planning Organization
Certificate of technical and laboratory services in the geotechnical and
concrete field from Ministry of Roads & Urban Development
Quality Management System (ISO 9001: 2015),
Environmental management system (ISO 14001: 2015),
Occupational Health and Safety Management System (OHSAS 18001: 2007)
and
Health, Safety and Environmental Management System (HSE-MS) from TUV
Group
40
8- Certificates, Memberships and HonorsMembership in the Vendor list of following companies:
Pars Oil and Gas Company
Iran International Engineering Company (IRITEC)
MAPNA Group (Management of Power Station Projects
in Iran)
Iranian Offshore Oil Company (IOOC)
Manufacturing Support and Procurement Kala Naft
Tehran
National Iranian Copper Industries Company
Nargan Engineering and Construction
Sazeh Consultants Engineering and Construction
Namvaran Consulting Engineers, Managers
Construction Engineering Corporation Mellat Bank
Non-ferrous Industries Process Engineering and
Construction company (NIPEC)
Neyr Perse
41
Contents:
1- History
2- Fields of Activity
3- Personnel and Equipment
4- Memorandum of Understanding with Cathie Associates
5- Cooperation
6- Company Background
7- Notable Clients
8- Certificates, Memberships and Honors
9- Other Activities
10- Special Specifications
11- Quality Control Program
42
9- Other Activities
Participation in the 21st international oil, gas, refining and petrochemical
exhibition along with the colleague company, Cathie Associates
43
Participation in the 5th international geotechnical engineering and soil
mechanics
9- Other Activities
44
Contents:
1- History
2- Fields of Activity
3- Personnel and Equipment
4- Memorandum of Understanding with Cathie Associates
5- Cooperation
6- Company Background
7- Notable Clients
8- Certificates, Memberships and Honors
9- Other Activities
10- Special Specifications
11- Quality Control Program
45
10- Special Specifications
Special Specifications
Utilization of novel
techniques in geotechnical
projects Collaboration with credible
European companies
Utilization of specialists
Utilization of advanced
equipment
High experience
and appropriate background
Education, Research and Development
46
Contents:
1- History
2- Fields of Activity
3- Personnel and Equipment
4- Memorandum of Understanding with Cathie Associates
5- Cooperation
6- Company Background
7- Notable Clients
8- Certificates, Memberships and Honors
9- Other Activities
10- Special Specifications
11- Quality Control Program
47
11- Quality Management Program
Our Geotechnical Services Quality Management Program (QMP) is a
strategy for learning and continuous improvement. It applies to project
deliverables and project work processes at the project level, the office
level and system-wide. The result of the QMP is to yield effective
delivery, stewardship and service with processes that are efficient and
effective in meeting the goals of the Department.
Quality Control (QC)
Baran Geotchnics has processes, practices and activities performed at the
project team level, during the project delivery process to monitor and
verify that project deliverables meet defined quality standards.
48
11- Quality Management Program
Project Specific Quality Control Plan (PSQC Plan)
The project specific plan, developed and managed by the geotechnical
design team, that assures quality for each component of the work.
Quality Assurance (QA)
Baran Geotchnics has a system to monitoring and verification that all
Quality Controls are completed during the project delivery process that
provide confidence that the project team has followed the established
Project Specific Quality Control Plan. Quality assurance activities occur at
the office level.
49