balance scorecard — oxford brookes university

3
5/28/12 Balance scorecard Oxford Brookes University 1/3 www.brookes.ac. uk/estates/new /aboutus/balance.ht ml Balanced scor ecard The foll owing ob jecti ves and Key Perf orm ance Indicators contribute t o t he EFM dir ectorate’s mission; a full li st of objectives and KPI’s is available through the individual Divisional business plans. Innovation and Learning / Continuous Improvement Centre for Sport: Finish within the Top 30 of the Br iti sh Uni versities an d Coll ege s Sport (form erly BUS A) stand ings by 20 10 Cam pus services: Im prove functional suitabil ity across teaching and learning space from level 4 to 2 by 2010 Ach ieve HSE Br on ze Award, MSC accreditation and Good E gg accreditation.  A dire ctorat e risk regi ster wi ll b e  pro du ced i n p artn ershi p wi th t he  Fin an ce an d Lega l Se rvice s directorate  An EFM-wi de co nsu lt at io n pro cess will be und ertaken to inform target  sett in g wi th in t he n ew bu sine ss  pl an ni ng p roce ss by Ju ly 2 00 9 Capi tal projects: Develop cros s depa rtm ental an d d ivi sional link s (eg, campus brightening and transitional art/events/works) Pr operty services: Implem entat ion o f Hand held co m put ers for m aintenan ce staff and us e Hel pdes k r eports to st ream li ne work proces ses in readiness for greater dem and wi th t he ex pans i on of the Maintenance Hel pdes k service  Develo p a p an -uni versit y Co rpo rat e  Respo nsib ili ty framewo rk a nd achieve ISO14001 at Wheatley campus Internal B us iness Pr oces ses / Ski ll s an d Capabilities To operate compliant with UUK Code of Pr actice wi th zero su bs tant iated complaints To enhance communications and internal operations, EFM will co-locate  ph ys icall y d uring 2009 and launc h a new website EFM will take steps to reach IIP level 4 within 3 years in line with University aspirations (and will lead on CR) Com m un icate a ll m att ers a rising from  bu il ding wo rks or plann ed b uilding work s to internal and ex ternal st akeholders in a tim ely and a ccurate way Property services: To produce an integrated forwar d an d mai nten ance report and Lif e cycle cos ting ana lysis for the university estate, and investigate means of reducing the Sports Di vision’s current Ener gy Cons umption (27 8.1 8 Kwh per m2) by 10 %, so as t o bring in li ne with the Br oo kes ave rage (25 03. 68 Kw h per m 2)  

Upload: sameerkhan60

Post on 04-Apr-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Balance scorecard — Oxford Brookes University

7/29/2019 Balance scorecard — Oxford Brookes University

http://slidepdf.com/reader/full/balance-scorecard-oxford-brookes-university 1/3

28/12 Balance scorecard — Oxford Brookes University

ww.brookes.ac.uk/estates/new/aboutus/balance.html

Balanced scorecard

The following objectives and Key Performance Indicators contribute to the EFM directorate’s mission; a full list of 

objectives and KPI’s is available through the individual Divisional business plans.

Innovation and Learning / Continuous

Improvement

Centre for Sport: Finish within the

Top 30 of the British Universities and

Colleges Sport (formerly BUSA)

standings by 2010

Campus services: Improve functionalsuitability across teaching and

learning space from level 4 to 2 by

2010

Achieve HSE Bronze Award, MSC

accreditation and Good Egg

accreditation.

 A directorate risk register will be

 produced in partnership with the

 Finance and Legal Services

directorate

 An EFM-wide consultation process

will be undertaken to inform target  setting within the new business

 planning process by July 2009

Capital projects: Develop cross

departmental and divisional links (eg,

campus brightening and transitional

art/events/works)

Property services: Implementation of 

Hand held computers for maintenance

staff and use Helpdesk reports to

streamline work processes in

readiness for greater demand with the

expansion of the MaintenanceHelpdes k service

 Develop a pan-university Corporate

 Responsib ili ty framework and 

achieve ISO14001 at Wheatley

campus

Internal Business Processes / Skills and

Capabilities

To operate compliant with UUK Code

of Practice with zero substantiated

complaints

To enhance communications and

internal operations, EFM will co-locate

 physically during 2009 and launch a

new website

EFM will take steps to reach IIP level 4

within 3 years in line with University

aspirations (and will lead on CR)

Communicate all matters arising from

 building works or planned buildingworks to internal and external

stakeholders in a timely and accurate

way

Property services: To produce an

integrated forward and maintenance

report and Life cycle cos ting analysis

for the university estate, and

investigate means of reducing the

Sports Division’s current Energy

Consumption (278.18 Kwh per m2) by

10%, so as to bring in line with the

Brookes average (2503.68 Kwh per m2)

 

Page 2: Balance scorecard — Oxford Brookes University

7/29/2019 Balance scorecard — Oxford Brookes University

http://slidepdf.com/reader/full/balance-scorecard-oxford-brookes-university 2/3

28/12 Balance scorecard — Oxford Brookes University

ww.brookes.ac.uk/estates/new/aboutus/balance.html

MissionCustomer Focus

Campus services: Increase standard

of cleaning definitively across all

academic sites to 80%, with

aspirations to increase to 85% from

2010 onwards

Centre for Sport: Raise the number of 

students participating in university

sports competition by 5% annually for 

each of the next 2 years

Campus services: Reduction in crime

reported across all of the University

Estate by 10%

85-90% of students will agree or 

strongly agree that they had a good

customer experience in Halls of 

residence (variety of metrics used)

Conferences will receive an overall

rating of 70% in the venue masters

mystery buyer survey and 90% local

rating as good or excellent overall.

 A cross-directorate customer service

champion will be appointed during 

2008/9

Capital projects: Achieve a planning

cons ent for Phase 1 of the Gipsy Lane

masterplan

Property services: Integrate with

relevant Student societies, delivering

lectures to s tudents and offering

student placements within the

division

 Map space use across the university

and establish a proactive approach

to improving the quality of the built 

environment for students and staff,

together with targets for space

occupancy

Finance

 EFM directorate will meet agreed 

 financial targets

 Assess financial KPI’s starting with

 EMS data to enable the expansion of 

 EFM services to reach upper quarti le

 performance without incurring an

increase in total property costs.

These include:

Centre for Sport: Increase

sports membership sales

revenue by 10% annually for 

each of the next 3 years, anddecrease the annual overspend

attributed to Sport while not

compromising service

 provision

Campus services: reduce mail

cos ts by 7 - 10% with the

introduction of clean mail

(date)

Hospitality services to achieve

a target surplus of £1,389,000

Capital projects: Assess and

report on project fees as a percentage of total project

costs

 

Related links

Find out more about our strategy

Find out more about the Brookes strategy

Privacy policy

© 2011 Oxford Brookes University, Headington Campus, Gipsy Lane, Oxford OX3 0BP, UK - Tel: +44 (0)1865

Page 3: Balance scorecard — Oxford Brookes University

7/29/2019 Balance scorecard — Oxford Brookes University

http://slidepdf.com/reader/full/balance-scorecard-oxford-brookes-university 3/3

28/12 Balance scorecard — Oxford Brookes University

ww.brookes.ac.uk/estates/new/aboutus/balance.html

741111