Bakhvi 4 HPP

www.energy.gov.ge

Page 2: Bakhvi 4 HPP

Bakhvi 4 HPP is located in Guria region, Ozurgeti district, village Mtispiri

on river Bakhvistskali .

www.energy.gov.ge

Page 3: Bakhvi 4 HPP

Installed Capacity - 1 MW

Average Annual Generation – 5.64 GW/h

Regulation Type – Run-off-the-river

Capacity Usage Ratio – 64.4%

www.energy.gov.ge

Page 4: Bakhvi 4 HPP

Construction Cost – 2.00 million USD

Construction Period – 1 years

Domestic Tariff – 4.8 USc/kWh

Export Tariff – 8 USc/kWh

Project IRR – 14%

Project NPV – 0.64 million USD

Equity IRR – 22 %

Equity NPV – 0.70 million USD

Payback Period – 9 years

Note: All the calculations are based on preliminary

assumptions. Therefore any clarifications will

cause appropriate changes in the final results.

www.energy.gov.ge

Page 5: Bakhvi 4 HPP

Site Location: - Guria region, Ozurgeti district, village Mtispiri

- Name of the River: Bakhvistskali

- GPS Coordinates: X=265322 Y=4646315

HPP Type: Diversion, Run-off-the-river

Site Description: Head unit, diversion channel, surge tank, turbine conduit, power house, tailrace channel.

Head unit conveys Tyrolean weir, height - 3.0m, which ensures maximum water discharge, reinforced concrete water intake and silt basin with sluice. Diversion is represented by covered channel, dimensions - 2.0x2.0m, length - 0.7km.

Reinforced concrete pressure tank is located at the end of the diversion, dimensions - 5.0x20.0m. Turbine conduit is 1.0m diameter metal pipe. Power house dimensions - 12.0x24.0m, height - 18.0m. Tailrace covered channel is a reinforced concrete construction, dimensions - 2.0x2.0m, length - 50.0m.

www.energy.gov.ge

Page 6: Bakhvi 4 HPP

Technical Parameters

Installed Capacity MW 1.00

Average Annual output GWh 5.64

Autumn-winter (Oct-March) generation GWh 2.11

Capacity usage ratio/Efficiency % 64.4

Type of regulation Run-off-the-river

Scheme of energetic usage potential Full

Hydrology

Hydrological Data (number of years) Year 52

Year of the average multi annual discharge Year 1960

Catchment area km2 92.15

High water flow m3/sec 5.88

Average water flow m3/sec 4.43

Low water flow m3/sec 3.06

PMF (1%) m3/sec 189.00

Rated water discharge m3/sec 4.90

Maximum gross head m 31.50

Minimum gross head m 27.20

Reservoir

Full supply level (FSL) masl 272.00

Minimum Operation level (MOL) masl Unnecessary

Total volume at FSL mln. m3 Unnecessary

Active reservoir level mln. m3 Unnecessary

Dam

Type Tyrol

Crest Elevation masl 271.50

www.energy.gov.ge

Page 7: Bakhvi 4 HPP

Spillway

Type Unnecessary

Crest Elevation masl Unnecessary

Length of spillway crest m Unnecessary

Reservoir elevation during PMF masl 273.50

Spillway capacity at reservoir level PMF m3/sec 189.00

Water intake

Sill elevation masl 269.70

Stop log type and number Flat surface

Quantity unit 1

Sluice or bottom spillway

Type and number Unnecessary

Quantity unit Unnecessary

Dimensions (w x h) or (d) m Unnecessary

Diversion

Type of diversion Covered channel

Dimensions (w; l) or (d; l) m 2x2; 700

Stilling basin or shaft

Dimensions (w x l) or (d ) m 5x20

Powerhouse

Type Above-ground

Dimensions (w x h x l) m 12x18x24

Elevation of tailrace outlet sill masl 243.00

Tailrace

Type Covered channel

Dimensions (w x h) m 2x2

Elevation of outlet sill masl 238.50

www.energy.gov.ge

Page 8: Bakhvi 4 HPP

Turbines/Generators

Turbine Type and number F. HLD74-WJ-60; 2

Rated discharge m3/sec 2.45

Rated output MW 0.52

Maximum output MW 0.58

Generator Type SFW630-8/990

Generator nominal output MW 0.50

Generator nominal output rpm 752

Transformers

Type Three-phase

Number unit 2

Nominal power MVA 0.7

Transformer dimensions (l x w x h) m 4.5x3.15, 15x4.8

Seismic background of the construction site

Richter scale Magnitude 6.0

Economic - Financial Parameters

Costing mln. USD 2.00

Duration of the construction Year 1.00

Investment per 1 kV Thousand USD 1.35

Investment per 1 kV/h USD 0.29

Revenue per USD spent (Average price new HPP - 4,8 cents) USD 0.16

Estimated carbon credit generation T. 2.4

Social and Environmental Parameters

Special environmental requirements

Social Impact Additional workplace; Development of infrastructure

Ecological risks Low

Transmission lines

Parameters kV 35

Distance to inter connection point km 0.90

Infrastructure

Existing roads Earth

Roads to be constructed km 0.30

www.energy.gov.ge

Page 9: Bakhvi 4 HPP

Number of observed years – 52

Chosen Year - 1960

www.energy.gov.ge

Page 10: Bakhvi 4 HPP

www.energy.gov.ge

Page 11: Bakhvi 4 HPP

www.energy.gov.ge

Page 12: Bakhvi 4 HPP

www.energy.gov.ge

Page 13: Bakhvi 4 HPP

www.energy.gov.ge

Page 14: Bakhvi 4 HPP

www.energy.gov.ge