babson college water bottle filling stations - new

33
WATER BOTTLE FILLING STATIONS SURVEY & PROPOSALS The Sustainability Office Brandon Schwartz and Lisa Cole

Upload: brandon-schwartz

Post on 17-Aug-2015

50 views

Category:

Documents


6 download

TRANSCRIPT

WATER BOTTLE FILLING STATIONS SURVEY & PROPOSALS

The Sustainability OfficeBrandon Schwartz and Lisa Cole

= Current locations of hydration stations

RESIDENCE HALLS

Park Manor NorthForest HallPutney Hall

Mandell Family HallColeman Hall

Van Winkle Hall

Pietz HallMcCollough Hall

Canfield HallKeith Hall

Bryant Hall

PARK MANOR NORTH

Current Fountain:• Traffic: Medium• Number of Units: 1• Fountain Style:

Hydration Station• Cost: N/A• Location Notes: In the

basement…next to the Foc’sle, bathrooms, common room and laundry room

Proposed Retrofit• None (renovated in 2014)

FOREST HALL

Current Fountain:• Traffic: Medium• Number of Units: 1• Fountain Style: Wall

Mounted Drinking Fountain

• Cost:-Parts…$100-Labor…$150-Filter…$100/Year

• Location Notes: 2nd floor; by the main stairwell, entrance by the basketball courts

Proposed Retrofit:

or

PUTNEY HALL

Current Fountain:• Traffic: High• Number of Units: 1• Fountain Style: Wall

Mounted Drinking Fountain

• Cost: TBD• Location Notes: Near

the main entrance

Proposed Retrofit:• Uncertain

MANDELL FAMILY HALL

Current Fountain:• Traffic: High• Number of Units: 1• Fountain Style: Wall

Mounted Drinking Fountain

• Cost:-Parts…$100-Labor…$150-Filter…$100/Year

• Location Notes: Near the main entrance

Proposed Retrofit:

or

COLEMAN HALL

Current Fountain:• Traffic: Low-High

-Basement: low-First Floor: High-Second Floor: Medium-Third Floor: Low

• Number of Units: 4• Fountain Style: In-Wall

Bubbler Water Fountain• Cost: TBD• Location Notes:

adjacent to bathrooms

Proposed Retrofit:Multiple options

or

In-wall unitcould replace existing station or be installed adjacent to existing station.

VAN WINKLE HALL

Current Fountain:• Traffic: Medium• Number of Units: 8• Fountain Style: In-Wall

Bubbler Water Fountain• Cost: TBD• Location Notes: one

water fountain in each tower (A-1, A-2, A-3,B-2, B-3, C-1, C-2, C-3)

Proposed Retrofit:

or

OTHER RESIDENCE HALLS

Current Fountain:• No existing fountains in building, often suite

style units. • Traffic: Low (Bryant/McCollough/Pietz) –

Medium (Canfield, Keith• Cost:

-$26.99 - $46.99 / Filter (Parts)- ~$150 Labor-$29.99 - $36.99 / Filter Replacement

• Location Notes: Canfield, Keith, McCollough and Pietz Suites; Bryant Kitchens

Proposed Retrofit:

or other under sink filter

NON- RESIDENCEHALLS BUILDINGS

Trim Dining Hall

Hollister Hall

Reynolds Campus Center

Sorenson Center for the Arts

Gerber Hall

Horn Library

Babson Hall

Tomasso Hall

Luksic Hall/Blank Center

Olin Hall

Malloy Hall/Knight Auditorium

Webster Center

TRIM DINING HALL

Current Fountain:• Traffic: High• Number of Units: 1• Fountain Style:

Hydration Station• Cost: TBD• Location Notes: 3rd

Floor, near faculty offices

Proposed Retrofit:• None

HOLLISTER HALL

Current Fountain:• Traffic: Medium• Number of Units: 3

(2 each)• Fountain Style: Bowl

Bubbler• Cost: TBD• Location Notes:

-1st Floor, near Health Center and bathrooms-2nd Floor, near bathrooms-3rd Floor, near bathrooms

Proposed Retrofit:

REYNOLDS CAMPUS CENTER

Current Fountain:• Traffic: High• Number of Units: 2• Fountain Style:

Hydration Station• Cost: N/A• Location Notes: 1st

Floor, near the bathrooms

Proposed Retrofit:• None

REYNOLDS CAMPUS CENTER

Current Fountain:• Traffic: Medium• Number of Units: 2• Fountain Style:

Hydration Station• Cost:

-Parts…$100-Labor…$150-Filter…$100/Year

• Location Notes: 2nd Floor, near the bathrooms and Student Life Suite

Proposed Retrofit:

or

SORENSON CENTER FOR THE ARTS

Current Fountain:• Traffic: High• Number of Units: 2• Fountain Style:

Bowl Bubbler• Cost:

-Parts…$100-Labor…$150-Filter…$100/Year

• Location Notes: Between the bathrooms on the first floor

Proposed Retrofit:

or

GERBER HALL

Current Fountain:• Traffic: Medium• Number of Units: 2• Fountain Style: In-Wall

Bubbler Water Fountain• Cost:

-Parts…$100-Labor…$150-Filter…$100/Year

• Location Notes:-1st Floor, near the men’s bathroom and classrooms-3rd Floor, near the women’s bathroom and classrooms

Proposed Retrofit:

or

HORN LIBRARY

Current Fountain:• Traffic: High• Number of Units: 1• Fountain Style:

Hydration Station• Cost: N/A• Location Notes: 1st

Floor, near the bathrooms

Proposed Retrofit:• None

HORN LIBRARY

Current Fountain:• Traffic: Low• Number of Units: 1• Fountain Style: Bowl

Bubbler• Cost:

-Parts…$100-Labor…$150-Filter…$100/Year

• Location Notes: 2nd Floor, near the IT Department

Proposed Retrofit:

or

HORN LIBRARY

Current Fountain:• Traffic: Medium• Number of Units: 1• Fountain Style: Wall

Mounted Drinking Fountain

• Cost:-Parts…$100-Labor…$150-Filter…$100/Year

• Location Notes: 2nd Floor, near the bathrooms

Proposed Retrofit:

or

HORN LIBRARY

Current Fountain:• Traffic: Medium• Number of Units: 1• Fountain Style:

Wall Mounted Drinking Fountain

• Cost:-Parts…$100-Labor…$150-Filter…$100/Year

• Location Notes: 3rd Floor, near faculty offices

Proposed Retrofit:

or

BABSON HALL

Current Fountain:• Traffic: Low-Medium• Number of Units: 2• Fountain Style: In-Wall

Bubbler Water Fountain• Cost:

-Parts…$100-Labor…$150-Filter…$100/Year

• Location Notes:-1st Floor, near the Writing Center-2nd Floor, near the entrance

Proposed Retrofit:

or

TOMASSO HALL

Current Fountain:• Traffic: Medium• Number of Units: 1• Fountain Style: Wall

Mounted Drinking Fountain

• Cost:-Parts…$100-Labor…$150-Filter…$100/Year

• Location Notes: Bottom Floor, near the staircase and vending machine

Proposed Retrofit:

or

TOMASSO HALL

Current Fountain:• Traffic: High• Number of Units: 1• Fountain Style:

Hydration Station• Cost: N/A• Location Notes: Main

Floor, nearest Park Manor West Entrance

Proposed Retrofit:• None

LUKSIC HALL / ARTHUR M. BLANK CENTER

Current Fountain:• Traffic: Low-Medium• Number of Units: 4

(2 each)• Fountain Style: Bowl

Bubbler• Cost: TBD• Location Notes:

-Luksic: 1st Floor, near the restrooms and staircase-2nd Floor, near the exit of the staircase-3rd Floor, near the exit of the staircase-Blank Center: 1st Floor, hidden in the back of several faculty offices

Proposed Retrofit:

or

OLIN HALL

Current Fountain:• Traffic: High• Number of Units: 2• Fountain Style:

Hydration Station• Cost: TBD• Location Notes: Bottom

Floor, near Olin Café and restrooms

Proposed Retrofit:• None

OLIN HALL

Current Fountain:• Traffic: High• Number of Units: 2• Fountain Style: Bowl

Bubbler• Cost: TBD• Location Notes: 1st

Floor, near the main entrance and bathrooms

Proposed Retrofit:

or

OLIN HALL

Current Fountain:• Traffic: Medium• Number of Units: 2• Fountain Style:

Hydration Station• Cost: TBD• Location Notes: 2nd

Floor, near several classrooms

Proposed Retrofit:• None

OLIN HALL

Current Fountain:• Traffic: Low• Number of Units: 2• Fountain Style: Bowl

Bubbler• Cost: TBD• Location Notes: 3rd

Floor, near several classrooms

Proposed Retrofit:

or

MALLOY HALL / KNIGHT AUDITORIUM

Current Fountain:• Traffic: Medium• Number of Units: 1• Fountain Style: Wall

Mounted Drinking Fountain

• Cost:-Parts…$100-Labor…$150-Filter…$100/Year

• Location Notes: near side entrance and vending machine in Malloy Hall

Proposed Retrofit:

or

WEBSTER CENTER

Current Fountain:• Traffic: Very High• Number of Units: 1• Fountain Style:

Hydration Station• Cost: TBD• Location Notes: 1st

Floor, near the main entrance and squash/racquetball courts

Proposed Retrofit:• None

WEBSTER CENTER

Current Fountain:• Traffic: High• Number of Units: 1• Fountain Style: Wall

Mounted Drinking Fountain

• Cost: TBD• Location Notes:

-1st Floor, outside the Lunder Fitness Center-2nd Floor, next to the track and cardio machines

Proposed Retrofit:

BUILDINGS CURRENTLY WITHOUT WATER BOTTLE FILLING STATIONS

Trim Dining Hall

Hollister Hall

Reynolds Campus Center

Sorenson Center for the Arts

Gerber Hall

Horn Library

Babson Hall

Tomasso Hall

Luksic Hall/Blank Center

Olin Hall

Malloy Hall/Knight Auditorium

Webster Center