avs co project & miso update · avs co2 project & miso update august 18, 2011 page page 11...
TRANSCRIPT
8/30/20118/30/2011
11
AVS COAVS CO22 Project Project & MISO Update& MISO Update
August 18, 2011August 18, 2011August 18, 2011August 18, 2011
Page Page 11
Dale NiezwaagDale NiezwaagBasin Electric Power CooperativeBasin Electric Power Cooperative
Central MontanaCentral MontanaCentral MontanaCentral Montana Upper Upper MissouriMissouri
Upper Upper MissouriMissouri
Central Central PowerPowerCentral Central PowerPower
District 9District 9District 9District 9
East East RiverRiverEast East RiverRiverRushmoreRushmoreRushmoreRushmore
Powder Powder RiverRiver
Powder Powder RiverRiver L & OL & OL & OL & O
TriTri--StateStateTriTri--StateState
Corn Belt Corn Belt PowerPower
Corn Belt Corn Belt PowerPowerNIPCONIPCONIPCONIPCO
Basin Electric Basin Electric MembershipMembership
AreaArea
8/30/20118/30/2011
22
33
BOILERBOILER
AVS COAVS CO22Demonstration ProjectDemonstration Project
SCRUBBERSCRUBBER BAGHOUSEBAGHOUSE
COCO22COCO2285%85%85%85% 99+%99+%99+%99+%
SOSO22SOSO22
TURBINETURBINE
85%85%85%85% 99+%99+%99+%99+%99% 90%
COCO221 Million Tons1 Million Tons
COCO221 Million Tons1 Million Tons
8/30/20118/30/2011
33
AVS Carbon Capture ProjectAVS Carbon Capture ProjectRequirements:Requirements:• Technology• Oil Company CO2 Sales Contract and
Transport• Environmental Assessment (NEPA)
• Technology• Oil Company CO2 Sales Contract and
Transport• Environmental Assessment (NEPA)• FEED Study• Financing• FEED Study• Financing
Capital Cost EstimateCapital Cost Estimate
66
8/30/20118/30/2011
44
Doosan Estimate Did Not IncludeDoosan Estimate Did Not Include•• Costs to modify the boiler and turbineCosts to modify the boiler and turbine•• Cost of COCost of CO22 sequestrationsequestration•• Cost for environmental permittingCost for environmental permitting•• Costs for project contingency and riskCosts for project contingency and risk•• Interest during constructionInterest during construction•• Project management and engineeringProject management and engineering
77
Total Cost To CaptureTotal Cost To Capture
D ti t dD ti t d $50$50 $60 t CO$60 t CODoosan estimatedDoosan estimated($282.5 million)($282.5 million)
All inclusive costAll inclusive cost($500 million)($500 million)
$50 $50 -- $60 per ton CO$60 per ton CO22
$65 $65 -- $75 per ton CO$75 per ton CO22
($ )($ )
88
8/30/20118/30/2011
55
Current StatusCurrent Status• Project on Hold• Project on Hold
–– Lack of regulation developmentLack of regulation development–– Present economic conditionsPresent economic conditions–– Full cost of the project Full cost of the project
•• Too difficult to develop a compelling Too difficult to develop a compelling business casebusiness case
–– Lack of regulation developmentLack of regulation development–– Present economic conditionsPresent economic conditions–– Full cost of the project Full cost of the project
•• Too difficult to develop a compelling Too difficult to develop a compelling business casebusiness casebusiness casebusiness case
•• Dec. 2010 Basin Board placed the Dec. 2010 Basin Board placed the project on hold until further notice.project on hold until further notice.
business casebusiness case•• Dec. 2010 Basin Board placed the Dec. 2010 Basin Board placed the
project on hold until further notice.project on hold until further notice.
99
Knowledge Gained & SharedKnowledge Gained & Shared•• Identified viable approach to technical Identified viable approach to technical
h llh llchallengeschallenges•• Developed Capital and O&M cost est.Developed Capital and O&M cost est.•• Refined known economic challengesRefined known economic challenges•• Utilities able to understand impacts to Utilities able to understand impacts to
their station if this technology is appliedtheir station if this technology is appliedtheir station if this technology is appliedtheir station if this technology is applied
1010
8/30/20118/30/2011
66
TransmissionTransmissionTransmission Transmission UpdateUpdatepp
1111
North Dakota Area TransmissionNorth Dakota Area TransmissionOwnership
72.3%
15.5%12.2%
ISMISOOthers
8/30/20118/30/2011
77
Current ActivitiesCurrent Activities• Placing some generation & load into
th MISO t• Placing some generation & load into
th MISO tthe MISO system• Studying several options
– Stay independent– Join MISO or SPP– Develop Hybrid Type of System
the MISO system• Studying several options
– Stay independent– Join MISO or SPP– Develop Hybrid Type of System– Develop Hybrid Type of System
• Discussing with members• Monitoring cost allocation debate
– Develop Hybrid Type of System• Discussing with members• Monitoring cost allocation debate
Protest of MISO FilingProtest of MISO Filing• Members of the Integrated System (IS)
d t t iff h b MISO• Members of the Integrated System (IS)
d t t iff h b MISOopposed recent tariff changes by MISO before FERC
• If MISO & Customer have path to same entity, each partner may use the others contract path capacity
opposed recent tariff changes by MISO before FERC
• If MISO & Customer have path to same entity, each partner may use the others contract path capacitycontract path capacitycontract path capacity
8/30/20118/30/2011
88
Protest of MISO FilingProtest of MISO Filing• Allows MISO to use a path that it has
i ht f ith t i• Allows MISO to use a path that it has
i ht f ith t ino rights for without paying any compensation
• FERC approved MISO’s request• IS partners are exploring options
no rights for without paying any compensation
• FERC approved MISO’s request• IS partners are exploring options
RecentRecentRecent Recent Construction Construction
ActivitiesActivitiesActivitiesActivities1616
8/30/20118/30/2011
99
GenerationGeneration
WillistonWillistonWillistonWilliston
Oil/Gas/CoalOil/Gas/Coal
PowderPowderRiverRiverBasinBasin
PowderPowderRiverRiverBasinBasin
BasinBasinBasinBasin
8/30/20118/30/2011
1010
Williston Williston -- TiogaTioga
Western NDWestern NDBuild Out PlanBuild Out Plan
Charlie Creek Charlie Creek ––Williston UprateWilliston Uprate
Belfield Belfield -- RhameRhame
Transmission “Loop”Transmission “Loop”
8/30/20118/30/2011
1111
Long Term:Long Term:Beef Up LoopBeef Up Loop
????????
Questions?Questions?
08/18/2011
(
(
12