Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18 th -19 th October 2017

Upload: vulien

Post on 05-Jun-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

Austrian Power Grid

Current Developments in AustriaElectrical Power System

SEERC Meeting Istanbul 18th-19th October 2017

Page 2: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

The Electricity System Of Austria

2

WinkelnTAUERN

St. Peter

OBER-SIELACH

Hessenberg

WIENSÜDOST

Bisam-berg

Energie AG

Ranshofen

Ternitz

Lienz

CZ

SK

H

SLO

CH

Westtirol

Zell amZiller

Obermooweiler

Kainachtal

Südburgenland

Dürnrohr

Pradella

Salzach

PleintingPirach

Simbach

YbbsfeldHausruck

Weißenbach

SoverzenePodlog

Maribor

Slavetice Sokolnice

GyörGyör

Neusiedl

Steweag-Steg

Steweag-Steg

Steweag-Steg

Steweag-Steg

ERNSTHOFEN

Oststeiermark

Pongau

SalzachNeu

Saras-dorf

IT

Tirol

Steiermark

Wien/NÖ-Ost

Oberösterreich

D

Obermooweiler

Neuötting

Altheim

Hydro Storage (~ 8.000 MW) thereof ~ 3.800 MW Pumps

Thermal power plant (~ 6.800 MW)

Wind power plants (~ 2.800 MW)Solar power plants (~ 1000 MW)

Run of river power plants (~ 5500 MW)

Key Figures Austria (2016) Yearly Consumption ~64 TWh Peak Load ~10 GW Installed Capacity ~24 GW

Page 3: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

Development NET Generation Capacity ATIn AT Based On TYNDP 2016

MW ; %

3

[Pump-] StorageOther RES

WindRun of River

Solar [PV]Hard Coal and other fossil fuels

Gas

Page 4: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

Development Wind & PV in Austria

4

0

1

2

3

4

5

6

7

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2020 2030

Cumulative Capacity [GW]

Wind AT PV AT

Divergent Scenarios - Technology Roadmap for PV in AT (June 2016): 9,7 GW PV until 2030

Potential

Page 5: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

Increasing Volatilities Change Grid CharacteristicsExample: Burgenland, Eastern Austria

5

Page 6: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG 6

Import/Export Control Zone APGYearly Volumes according to schedules

Page 7: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

Datenbasis: Vulcanus2017: bis inkl. 13.02.2017

~10.300 Thermische Übertragungskapazität AT/DE

Page 8: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

FE

D

C

B

ACluster

APG‘s Grid in 2030…

1 Salzburg line (Part of 380-kV-Circle)2 German line (hub St. Peter)

3 Wind Power Plant Integration East4 Grid region Corinthia (Part of 380-kV-Circle)5 Italien line (Lienz-Veneto)6 Grid Region Tyrol (Grid enhancement)

7 Upgrade to 380-kV (TyrolWest-Memmingen)

8 Reschenpass9 General Renewal 220-kV lines10 Grid enhancement Bodensee region

Page 9: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

• Total investment AT ~ est. 2,4 bill. €

• Planning horizon: 2017-2026

• New lines: est. 370 km*

• Upgrade of lines: est. 390 km*

• New projects and extensions/upgrades of many substations:est. 150 new bays on 380-/220-/110-kV

• est. 35 new transformers

• In line with pan European “Ten Year Network development Plan”

Network Development Plan of APG

* Corridor length 9

Approval 1.Instance

12/2015Final. Appr.

Expec. Q1/2018

Final Approval 10/2017

Approval 1.Instance

Expect. Q1/2018

Final Approval 01/2016

Page 10: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

backup

15.11.2017 10

Page 11: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

● APG is certified as ITO (Independent Transmission Operator)● APG is 100% owned by VERBUND AG● ~ 460 employees (2016)● System length 6.971 km, thereof:

− 380 kV 2.577 km− 220 kV 3.212 km− 110 kV 1.182 km

● About 12.000 towers● 63 substations● 27.160 MVA transformer output● 46.164 GWh transport volume● Appr. 12.000 schedules/month for imports

and exports

Data and facts about APG

11

Page 12: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG0

10

20

30

40

50

60

70

80

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

1000

0

1100

0

1200

0

1300

0

€/M

Wh

Leistung in MW

Öl

Gas

Importe

Kohle

Speicher

Lauf

Sonst.

Solar

Wind

Last

Verb

rauc

h

0

10

20

30

40

50

60

70

80

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

1000

0

1100

0

1200

0

1300

0

€/M

Wh

Leistung in MW

Öl

Gas

Importe

Kohle

Speicher

Lauf

Sonst.

Solar

Wind

Last

Verb

rauc

h

0

10

20

30

40

50

60

70

80

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

1000

0

1100

0

1200

0

1300

0

€/M

Wh

Leistung in MW

Öl

Gas

Importe

Kohle

Speicher

Lauf

Sonst.

Solar

Wind

Last

Verb

rauc

h

0

10

20

30

40

50

60

70

800

1000

2000

3000

4000

5000

6000

7000

8000

9000

1000

0

1100

0

1200

0

1300

0

€/M

Wh

Leistung in MW

Öl

Gas

Importe

Kohle

Speicher

Lauf

Sonst.

Solar

Wind

Last

Verb

rauc

h

Principle Market MechanismVerbrauchsdeckung AT - Marktabschluss

Impo

rt

Verbrauchsdeckung AT - Physikalisch

Deckungs-lücke

!

Verbrauchsdeckung AT - Systemreserve

Transport-Limit hauptsächlich aufgrund

innerdeutscher Netzprobleme

!

Thermische KW in AT!

Impo

rt

?

1 2

3

ImportMarktabschluss

Impo

rt

Deckungs-lücke

!

Verbrauchsdeckung AT – ausreichend Kraftwerke?4

Künftige Verfügbarkeit gefährdet!

Page 13: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

15.11.2017

von 01.01.2017 00:15 So

bis 26.02.2017 00:00 So

Einheit: MW

+...Import, -...Export

Fahrpläne (ohne Istwertaufschaltungen)NTC

-5 000

-4 000

-3 000

-2 000

-1 000

0

1000

2000

3000

4000

5000

CZ

-5 000

-4 000

-3 000

-2 000

-1 000

0

1000

2000

3000

4000

5000 HU

-5 000

-4 000

-3 000

-2 000

-1 000

0

1000

2000

3000

4000

5000 SL

-5 000

-4 000

-3 000

-2 000

-1 000

0

1000

2000

3000

4000

5000 IT

-5 000

-4 000

-3 000

-2 000

-1 000

0

1000

2000

3000

4000

5000 CH

-1 0000

-9 000

-8 000

-7 000

-6 000

-5 000

-4 000

-3 000

-2 000

-1 000

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

DE

-1 0000

-9 000

-8 000

-7 000

-6 000

-5 000

-4 000

-3 000

-2 000

-1 000

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

REGLER

8342 GWh100%

-277 GWh

-702 GWh

-968 GWh-399 GWh

-1306 GWh

-4690 GWh~ 56%

-3652 GWh~ 44%

Exchange with Control Zones–Schedules and NTC, before Redispatch

real. Fahrpläne(ohne Istwertaufschaltungen)

Page 14: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

von 01.01.2017 00:15 So

bis 26.02.2017 00:00 So

Einheit: MW

+...Import, -...Export

Fahrpläne (ohne Istwertaufschaltungen)NTC

-5 000

-4 000

-3 000

-2 000

-1 000

0

1000

2000

3000

4000

5000

CZ

-5 000

-4 000

-3 000

-2 000

-1 000

0

1000

2000

3000

4000

5000 HU

-5 000

-4 000

-3 000

-2 000

-1 000

0

1000

2000

3000

4000

5000 SL

-5 000

-4 000

-3 000

-2 000

-1 000

0

1000

2000

3000

4000

5000 IT

-5 000

-4 000

-3 000

-2 000

-1 000

0

1000

2000

3000

4000

5000 CH

-1 0000

-9 000

-8 000

-7 000

-6 000

-5 000

-4 000

-3 000

-2 000

-1 000

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

DE

-1 0000

-9 000

-8 000

-7 000

-6 000

-5 000

-4 000

-3 000

-2 000

-1 000

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

REGLER

-277 GWh

-702 GWh

-968 GWh-399 GWh

-1306 GWh

-3652 GWh~ 57%

6380 GWh100%

-2728 GWh~ 43%

real. Fahrpläne(ohne Istwertaufschaltungen)

Exchange with Control Zones–Schedules and NTC, after Redispatch

Page 15: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

Covering Demand During Week 3 2017Market Results (Simplified)

Thermal/Gas

Thermische KW im Einsatz aufgrund Markt/Wärmeauskopplung

15

Storage Others Wind River Load (incl Pumps) Load (excl. Pumps) Load (excl. Pumps)

Page 16: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

Physical Coverage Of DemandDuring Week 3 20, incl. Redispatch

Activation largely based on Redispatch request by APG

16

CoalStorage Others Wind River Load (incl Pumps) Load (excl. Pumps) Load (excl. Pumps)

Page 17: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

0

50

100

150

200

250

2011 2012 2013 2014 2015 2016 28.02.2017

[Mio

. €]

Redispatch Costs since 2011Kosten regionaler Partner APG-Anteil

Congestion Management –Development of Costs, Volumes

Max. > 200MEUR

17

> 70 MEUR

Accrued Expenses Regional Partners

Accrued Expenses APG

Page 18: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

12.06.2016 Ausfall PST Tauern (Fehlerhafter 220kV SF6-Kabelendverschluss in der Schaltanlage des PST)

IBN der Anlage: 01.12.2006

Page 19: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

Kabelstecker mit Kabel

Page 20: Austrian Power Grid Current Developments in Austria ... Current... · Austrian Power Grid Current Developments in Austria Electrical Power System SEERC Meeting Istanbul 18th-19th

AUSTRIAN POWER GRID AG

APG‘s High Voltage Grid

20

Key Figures Austria (2016):● Yearly Consumption ~64 TWh● Peak Load ~10 GW

● Installed Capacity ~24 GW