artigo construction and demolition waste, its variability and recycling in brazil

10
Construction and Demolition Waste, its Variability and Recycling in Brazil Sérgio Cirelli Angulo, MEng. 1 Leonardo Fagundes Rosemback Miranda, MEng 1 Vanderley M. John, Dr. Eng. 2 1 Ph.D. candidates. Escola Politécnica da Universidade de São Paulo. Av. Prof. Almeida Prado, trav 2. 05508-900. São Paulo. Brazil. Phone: +55 11 3091-5459. Fax: +55 11 3091- 5544. E-mail: [email protected] ; [email protected] 2 . Escola Politécnica da Universidade de São Paulo. Dept. of Civil Construction Eng. Av Prof. Almeida Prado, trav 2. 05508-900. São Paulo Brazil. Phones: +55 11 3091-5794; Fax: +55 11 3901-5544. E-mail: [email protected] 1 CDW GENERATION RATE IN BRAZIL There are few consistent studies on construction and demolition waste (CDW) generation rates in Brazil. However, the available data does allow suggesting that the amount of CDW is probably higher than the amount (w/w) of Municipal Solid Waste (MSW). A typical Brazilian per capita CDW generation rate for some cities is above 500 kg/year (Table 1). Table 1 CDW Quantity, population and some generation rates in Brazil (Pinto, 1999). City State Population (Inhab.) CDW Quantity (ton/year) CDW per capita (kg/year) Data from year Santo André São Paulo 625,564 369,745 591 1997 Vitória da Conquista Bahia 242,155 113,150 467 1998 Ribeirão Preto São Paulo 456,252 380,695 834 1995 São José do Rio Preto São Paulo 323,627 250,755 775 1997 These values are consistent with reported international generation rates. The reported CDW participation in the total MSW varies from 13% (Bossink; Brouwers, 1996) to 67% (Lauritzen, 1994). A study conducted by the European Union reports a variation of the per capita generation from 136 kg/year up to 3359 kg/year (EU, 1999). A significant portion of the variation in CDW generation rates is a direct result of CDW definition. Other sources of variation are the differences in the industrial structure and the degree of development as well as the characteristics of the building technologies used in each country, etc. 2 ORIGIN OF CDW Like most developing countries, Brazil is still under construction. The construction related business is about 15% of the Brazilian GNP. Because of the relatively high production of construction waste at building sites, CW represents approximately 50% of the total CDW generated (Pinto, 1999). In more developed countries, like those of Europe and the USA, the construction activity is responsible for about 1/3 of the total CDW produced (Lauritzen, 1994; Peng et al, 1997)

Upload: talyta-mohamed-ghandour

Post on 11-Nov-2015

216 views

Category:

Documents


2 download

DESCRIPTION

Construction and Demolition Waste, its Variability andRecycling in Brazil Sérgio Cirelli Angulo, MEng.1Leonardo Fagundes Rosemback Miranda, MEng 1Vanderley M. John, Dr. Eng.

TRANSCRIPT

  • Construction and Demolition Waste, its Variability and Recycling in Brazil

    Srgio Cirelli Angulo, MEng.1

    Leonardo Fagundes Rosemback Miranda, MEng 1 Vanderley M. John, Dr. Eng. 2

    1 Ph.D. candidates. Escola Politcnica da Universidade de So Paulo. Av. Prof. Almeida Prado, trav 2. 05508-900. So Paulo. Brazil. Phone: +55 11 3091-5459. Fax: +55 11 3091-

    5544. E-mail: [email protected] ; [email protected] 2. Escola Politcnica da Universidade de So Paulo. Dept. of Civil Construction Eng. Av Prof. Almeida Prado, trav 2. 05508-900. So Paulo Brazil. Phones: +55 11 3091-5794; Fax: +55 11

    3901-5544. E-mail: [email protected] 1 CDW GENERATION RATE IN BRAZIL

    There are few consistent studies on construction and demolition waste (CDW) generation rates in Brazil. However, the available data does allow suggesting that the amount of CDW is probably higher than the amount (w/w) of Municipal Solid Waste (MSW). A typical Brazilian

    per capita CDW generation rate for some cities is above 500 kg/year (Table 1).

    Table 1 CDW Quantity, population and some generation rates in Brazil (Pinto, 1999).

    City State Population

    (Inhab.)

    CDW Quantity (ton/year)

    CDW per capita

    (kg/year)

    Data from year

    Santo Andr So Paulo 625,564 369,745 591 1997

    Vitria da Conquista Bahia 242,155 113,150 467 1998

    Ribeiro Preto So Paulo 456,252 380,695 834 1995

    So Jos do Rio Preto So Paulo 323,627 250,755 775 1997

    These values are consistent with reported international generation rates. The reported CDW

    participation in the total MSW varies from 13% (Bossink; Brouwers, 1996) to 67% (Lauritzen, 1994). A study conducted by the European Union reports a variation of the per capita generation from 136 kg/year up to 3359 kg/year (EU, 1999). A significant portion of

    the variation in CDW generation rates is a direct result of CDW definition. Other sources of variation are the differences in the industrial structure and the degree of development as well as the characteristics of the building technologies used in each country, etc.

    2 ORIGIN OF CDW

    Like most developing countries, Brazil is still under construction. The construction related

    business is about 15% of the Brazilian GNP. Because of the relatively high production of construction waste at building sites, CW represents approximately 50% of the total CDW generated (Pinto, 1999). In more developed countries, like those of Europe and the USA, the

    construction activity is responsible for about 1/3 of the total CDW produced (Lauritzen, 1994; Peng et al, 1997)

  • In Brazil, construction waste quantities are increased due to high rates of material wastage at

    building sites. Table 2 presents selected wastage rates measured at about 63 new building sites in Brazil (Souza et al., 1999). This data is valid only for the formal construction industry. Until now, there has been no data about material wastage for the informal (do-it-yourself)

    construction sector, which produces most of the low-cost houses in Brazil.

    Table 2 Material wastage in new building sites and estimations of construction waste

    (Souza et al, 1999; Andrade, 2001).

    Wastage (%) Waste (%) Materials

    Median Minimum Maximum 2.1.1 Median

    Concrete 9 2 23 1.3

    Steel 11 4 16 7.7

    Blocks and bricks 13 3 48 13

    Ceramic tiles 13 5 19 13

    Mortar (screed) 42 8 288 2.1

    3 CDW TRADITIONAL MANAGEMENT IN BRAZIL

    As a rule, municipal policy towards CDW residues has been to ignore them. The only strategy towards CDW traditionally adopted by local authorities has been to repeatedly clean fly

    tipping areas and, sometimes, operate a CDW landfill or accept CDW dumping in the municipal solid waste landfill. Nevertheless, the landfill never succeeds in attracting more than a fraction of the total CDW generated and fly tipping is the most common private

    solution adopted for disposing of CDW. The landfill operated by the city of So Paulo attracts only 15% of the total CDW generated in that area (Schneider, 2002).

    Fly tipping areas can be streets (Figure 1), parks, private areas and creek banks. The environmental impact associated with this kind of dumping is important. The proliferation of pests (rats and poisonous insects, among others), traffic hazards and landscape destruction are

    part of this issue. The city of So Paulo estimates that illegal dumping in public areas is as high as 20% of the total CDW (Schneider, 2002).

    Removing this illegally dumped CDW is also very expensive. In city of So Paulo, the local authorities report spending about R$45 million a year (about US $19 million) removing illegally dumped CDW (Schneider, 2002) from the one official CDW landfill.

    (a) (b)

  • Figure 1 Illegal dumping sites in city of So Paulo. (a) Street used as dumping area just

    after being cleaned by the local authorities (2002-08-30) (b) the same area after two months (2002-11-04).

    Most middle-sized and big cities do have private CDW landfills. Most of these landfills operate without a license. Environmental licensing is very difficult because there are no consolidated regulations. Also, private dumping sites do not have any design that ensures

    stability and there is no practical control over the waste dumped, leading to great risk of environmental contamination. It is known that one illegal C&D landfill collapsed about 10 years ago in So Paulo, killing 13 persons.

    As a consequence, CDW management is a profitable business, with revenues estimated to be higher than US $40 million/year in the city of So Paulo alone (John; Agopyan, 2000). Most

    CDW in Brazilian middle-sized and big cities is collected and transported by specialized private companies, using open containers (chain lift skips).

    In big cities like So Paulo, there are no longer so many places suited to be landfills. So the landfill prices are increasing. Also a significant part of the CDW generated in So Paulo is, at present, being exported to other municipalities within the metropolitan area and illegally

    dumped there. This additional distance adds to the cost of transport and disposal. The price for removing and dumping a 4m3 container (including the renting fee for up to a week) can be as high as US $30,001 in So Paulo.

    There are some companies that recycle CDW as rendering mortar using a small rotating mill installed at the building site (Miranda, 2000). Grigoli (2000) reports other uses of CDW in-

    site. 4 TRENDS ON CDW MANAGEMENT IN BRAZIL

    Management of CDW is changing very fast. In the next few years most municipalities are expected to develop specific policies towards CDW.

    Some municipalities, such as Belo Horizonte, have already implemented successful systems to manage CDW and others are in the process of doing the same. This system includes registration of companies that transport CDW, a well-located network of CDW deposit sites

    which attract most of the CDW and a recycling plant, which produces aggregates and gives proper destination to the metallic and organic fraction. Education is an important component of the system as well as an effective structure to prevent and punish fly tipping. In big cities,

    like So Paulo, stations sort the waste and transfer it to bigger trucks, making the system cheaper and reducing the impact of transporting the CDW in urban area.

    The CDW recycling plant belongs to the municipality, which consumes most of the aggregates as road base. Very frequently, political changes halt the entire system. So Paulo, Londrina and So Jos dos Campos are examples.

    The National Council for the Environment (CONAMA) is in the process of approving a directive on CDW management that will require all municipalities and building contractors to

    set up management schemes. This directive has been negotiated with the community. Additionally, the CDW Task Group of the Environmental Chamber of the Construction

    1 Exchange rate US $1 = R$2.4

  • Industry of the State of So Paulo is drafting drafts of technical standards related to the use of

    recycled aggregates as well as proposals of regulations for licensing CDW landfills and transfer stations.

    As a result of these efforts, recycling construction demolition waste is expected to become an important business in Brazil in the near future.

    5 RECYCLING PLANTS TECHNOLOGY

    Brazilian CDW recycling plants are simple and stationary. As in Europe, most of plants are derived from mining engineering but do not apply any better technological equipment or new

    ways of more elaborate separation and concentration (Hendriks, 2000). As a rule, these plants consist only of manual pre-sorting system, crushers, manual sorting that removes contamination, conveyor belts and screenings (Figure 2). A magnetic separator is used in

    some plants such as the ones in So Paulo and Belo Horizonte. There is no systematic control of the arriving material although there is visual inspection. Likewise, there is no systematic quality control of the delivered aggregates.

    Figure 2 Typical Brazilian CDW recycling plant (City Municipality Vinhedo So

    Paulo state) aggregates for road base. Most of the aggregates produced by the recycling plants are used as road base in urban paving

    activities. Some tentative applications of selected recycled aggregates for concrete component production (concrete blocks and paving blocks) have been made, in the cities of Vinhedo, Belo Horizonte and Santo Andr. However, in at least one case, the cement consumption rate

    was at least 30% higher that the required for natural aggregates. 6 CDW, ITS VARIABILITY AND RECYCLING POSSIBILITIES

    6.1 Sources of composition variability

    CDW is a mixture of the materials used in the building (Figure 3 and Figure 4) and the

    composition is highly variable. In Brazil, the typical building waste is a mixture of ceramic or concrete blocks, mortar, reinforced concrete, steel, plastic, asbestos cement and wood. The use of gypsum as plasterboard or plaster is on the rise and is expected to become a significant

    part of the waste in a few years time.

  • Figure 3 Contamination of a CDW container in downtown So Paulo, by litter. In addition to the litter, there is mixture of waste from masonry, concrete, wood

    and rubber.

    Construction waste, which is about 50% of the Brazilian CDW, is considered to be more

    mixed and variable because there is less discipline in waste discharge. This is due to the wide variety of contractors, the high cost of waste separation, insufficient areas for waste discharge and different waste period production in building sites (Hendriks, 2000). In Brazil, demolition

    waste also tends to be a mixture of all phases, because sophisticated selective demolition techniques are only applied to very old residential buildings, where the bricks, windows, etc have a high market value.

    As most of the CDW containers are parked in the streets or in front of the building site, neighbours often place additional litter in the containers, further increasing the contamination

    (Figure 3). So, without changes in CDW management at both construction and demolition sites, it will be very difficult to classify the arriving waste as predominantly concrete or masonry, as specified

    by European countries (Rilem Recommendation, 1994; Hendriks, 2000).

  • Figure 4 Brazilian CDW in containers typically contains a mixture of masonry, mortar

    and concrete.

    6.2 Composition variability

    As can be seen in Table 3, the composition of Brazilian CDW recycled aggregates is highly

    variable. Angulo (2000) presents results of the most comprehensive investigation about the variability and quality of CDW aggregate produced in Brazil. While studying the operation of an experimental recycling plant in Santo Andre (So Paulo Metropolitan Area), the author

    took hourly samples during 12 working days. Zordan (1997) results are after three random samples.

    Table 3 Reported composition and its variability for some Brazilian CDW aggregate recycling plants.

    Angulo (2000) Zordan (1997) Composition

    (%) Min Av Max Brito (1999)

    Carneiro et

    al. (2001) Min Av Max

    Concrete 23 44 62 20 21 22

    Gravel 3 23 50 10 19 28

    Mortar 10 28 61

    32 53

    35 37 39

    Ceramic 0 4 13 33 15 16 23 30

    Soils - - - 30 21 - - -

    Wood & Organic - - - 1 4 - - -

    Others 0.0 1.2 4.6 4 7 - - -

    City Santo Andr So Paulo Salvador Ribeiro Preto

    6.3 Variability and recycling

    The high variability of the composition is in itself a major problem when recycling, even when considering its use as road base aggregate.

  • Angulo and John (2002) compared the aggregates characteristics (mortar + ceramic

    maximum content, maximum water absorption, density, maximum content of contaminants and filler content) with those specified in the RILEM recommendations and the Dutch Standard (Rilem Recommendation, 1994; Hendriks, 2000). None of the 36 samples studied

    complied with the standards for use in structural concrete. And only 10 samples did comply with the Dutch rules for demolished masonry aggregate, suitable for use in non-structural concrete applications. The major reasons for non-compliance with non-structural applications

    were filler content and the presence of contaminants as well as mortar plus ceramic maximum content. The contaminants most frequently detected were asphalt, glass and wood. No evaluation for sulphate control was made.

    Zordan (1997) investigated the effect of the variation of the composition of the CDW in concrete. It was found that compressive strength is reduced 30% for 1:3 (cement/aggregates

    proportion) and w/c (water/cement) relation of 0.5 when the composition varies (see Table 3). Miranda (2000) studied the influence of CDW composition variability on performance

    rendering mortar. Laboratory produced waste was analysed to determine what influence the content of concrete blocks, ceramic blocks and mortars have in the properties of fresh and hardened mortar samples. An increase in mortar content generated a higher incidence of

    cracking on rendering caused by higher water/cement relation. So, at present, road base aggregate seems to be the only market for recycled CDW aggregates.

    However, in most cities, the municipal consumption of road base aggregate is not enough to consume the total available waste (Pinto, 1999).

    Consequently, long-term development of a market big enough to recycle all CDW will demand new and more valuable applications. To achieve this goal it will be necessary to (a) introduce changes in CDW management for construction, demolition and transportation, (b)

    to significantly improve the recycling plants. 6.4 Improving Brazilian recycling plants

    One possibility for improving CDW recycling plants is the adoption of equipment to classify the waste based on its specific gravity, like jig (Jungmann; Quindt, 1999; Ancia et al., 1999). This kind of technology allows separating the densest aggregates that can be, potentially,

    recycled in more valuable applications, like concrete production. Results from Angulo (2000) confirm that this technology can be very useful in the Brazilian market (Figure 5).

  • y = -9,81x + 26,89

    R2 = 0,55

    y = -15,63x + 40,74

    R2 = 0,85

    y = -24,50x + 61,36

    R2 = 0,66

    0

    5

    10

    15

    20

    25

    30

    0,5 1,0 1,5 2,0 2,5 3,0

    Specific gravity (kg/dm?)

    Wa

    ter

    ab

    so

    rpti

    on

    - 2

    4 h

    (%

    )

    ceramic

    rock

    concrete_mortar

    Figure 5 Water absorption x specific gravity of different CDW aggregate phases

    (Angulo, 2000) Another option is the adoption of homogenisation piles, especially when combined with jigs,

    because they drastically reduce the variability of composition, density and water absorption. Simulations with the data from Angulo et al (2001) show that piles , which were accumulated during 3 or more weeks of production presented stable compositions, water absorption and

    specific gravity. Considering the typical production of a recycling plant to be above 300 ton/day, the homogenisation pile would require a relatively large storage area, which would reduce the recycling site options and increase the site cost. Combining the homogenisation

    technique with jig classification can reduce the time necessary to get a stable composition Developing a fast and cheap methodology to control the quality of recycled aggregates is also

    vital to the development of more sophisticated markets for the aggregates. Such techniques must be precise enough to allow certification of the composition and other quality relevant requirements of the generated aggregate.

    7 CONCLUSIONS

    C&D Waste is a relevant problem in Brazilian society. The generation rate is high, being

    around 500 kg/year per capita. Illegal dumping is a current practice, with considerable social and environmental impact. Nevertheless, CDW management is a prosperous business in most cities.

    At present, the amount of recycled waste is very small and the resulting product is used as road base. The technology of the recycling plants is very simple. There is no systematic

    quality control of the resulting product. It results in aggregates with high variable compositions and with a high content of ceramic and mortar materials. A small fraction of the resulting aggregate is suitable for more valuable applications like producing concrete and

    concrete components. The ongoing changes within the institutional framework, especially the national regulation on

    CDW, technical standards and the development of municipal policies will greatly increase the demand for recycling in the near future.

  • In order to increase recyclability and attract private investments to the recycling market, both

    waste management practices and recycling technology must be improved. Homogenisation piles combined with density based classification systems (jig) are interesting options for the technical improvement of recycling plants.

    8 ACKNOWLEDGEMENTS

    This research is supported by FINEP (Fundo Verde e Amarelo), CNPQ (doctoral scholarship)

    e FAPESP (doctoral scholarship). 9 REFERENCES

    P. Ancia. et al. 1999. The use of mineral processing techniques for the improvement of the building rubble characteristics. In: Global Symposium on Recycling, Waste Treatment and Clean Technology. p. 583-596. Spain.

    A. Andrade et al. 2001. Estimation of construction waste in new building sites. In: Sustainable development and recycling in civil construction. p. 65-74. So Paulo. Brazil. (in Portuguese)

    S.C. Angulo. 2000. Variability of coarse recycled aggregates from construction and demolition waste. Escola Politcnica, So Paulo University. 155p. So Paulo, Brazil. (in Portuguese)

    S.C. Angulo, L.F.R. Miranda, S. M. S. Selmo and V.M. John. 2001. Homogenisation piles for control of fine recycled aggregates from construction and demolition waste. In: Construction

    2001. p.713-720. Lisbon, Portugal. (in Portuguese). S.C. Angulo and V.M. John. 2002. Normalisation of coarse recycled aggregates from

    construction and demolition waste for concrete and variability. In: IX National Meeting of Construction Techynology. Foz do Iguau, Brazil. (in Portuguese).

    J.A. Brito. City versus construction waste. 1999. In: Seminar of development sustainable and recycling in civil construction. p.56-67. So Paulo, Brazil. (in Portuguese).

    B.A.G. Bossink and H.J.H. Brouwers 1996. Construction waste: quantification and source evaluation. Journal of Construction Engineering and Management. p.55-60.

    A.P. Carneiro et al. 2001. CDW recycling for production of construction materials. 312 p. Salvador, Brazil. (in Portuguese)

    EU (European Union). 1999. Construction and demolition waste management practices and their economic impacts. Report to DGXI European Comission. 83p.

    A.S. Grigoli. 2000. Management in the production and utilization of the waste material in the construction site. In: Construction and Environment: theory into practice (CIB Symposium). So Paulo. Brazil.

    C.F. Hendriks. 2000. The building cycle. 231 p. Aeneas. Netherlands.

    V.M. John and V. Agopyan. 2000. Sustainable development and recycling waste for civil construction. In: National Seminar about recycling of solid waste. So Paulo, CETESB. (In Portuguese).

  • A. Jungmann and J. Quindt. 1999. alljig - Technology for separation of building rubble and

    other secondary raw materials. In: Global Symposium on Recycling, Waste Treatment and Clean Technology. p. 367-379. Spain.

    K.E. Lauritzen. 1994. RILEM Buletin International RILEM Symposium on demolition and reuse of concrete and masonry. Materials and Structures. n.27, p.307-330.

    Peng et al. 1997. Strategies for successful construction and demolition waste recycling operations. Construction, Management and Economics. n.15. p. 49-58.

    L.F.R. Miranda. 2000. Study of factors influencing cracking in recycled plaster form construction and demolition waste. Escola Politcnica, So Paulo University. So Paulo. 172p. So Paulo, Brazil. (in Portuguese).

    T.P. Pinto. 1999. Methodology for management of urban construction solid waste. Escola Politcnica, So Paulo University. 189p. So Paulo, Brazil. (in Portuguese).

    Rilem Recommendation. 1994. Specification for concrete with recycled aggregates. Materials and Structures. n.27, p.557-559.

    U.E.L. Souza et al. 1999. Wastage of materials in new building sites. In: National symposium Wastage of materials in new building sites. 48p. So Paulo, Brazil. (in Portuguese).

    S.E. Zordan. 1997. Utilization of construction and demolition waste as recycled aggregate in concrete production. Faculdade de Engenharia Civil, UNICAMP. 140p. Campinas, Brazil. (in

    Portuguese). D. M. Schneider. 2002. Transport of construction and demolition waste in So Paulo city.

    Faculdade de Sade Pblica. So Paulo University. So Paulo. 22p.

    /ColorImageDict > /JPEG2000ColorACSImageDict > /JPEG2000ColorImageDict > /AntiAliasGrayImages false /CropGrayImages true /GrayImageMinResolution 150 /GrayImageMinResolutionPolicy /OK /DownsampleGrayImages true /GrayImageDownsampleType /Bicubic /GrayImageResolution 300 /GrayImageDepth -1 /GrayImageMinDownsampleDepth 2 /GrayImageDownsampleThreshold 1.50000 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict > /GrayImageDict > /JPEG2000GrayACSImageDict > /JPEG2000GrayImageDict > /AntiAliasMonoImages false /CropMonoImages true /MonoImageMinResolution 1200 /MonoImageMinResolutionPolicy /OK /DownsampleMonoImages true /MonoImageDownsampleType /Bicubic /MonoImageResolution 1200 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.50000 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict > /AllowPSXObjects false /CheckCompliance [ /None ] /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly false /PDFXNoTrimBoxError true /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXOutputIntentProfile () /PDFXOutputConditionIdentifier () /PDFXOutputCondition () /PDFXRegistryName (http://www.color.org) /PDFXTrapped /Unknown