Page 1: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

C)

File: 18G* ~~~~~~~~~~~~~~~~~~~~~~~~~D. B.

Aret of

PRELIMINARYSITE ASSESSMENT

DOCUMENTS

VEHICLE MAINTENANCE BUILDING

ETELSON AIR FORCE BASELa, ALA-SK.k

MARCH 22, 1991

Prepared by

CKMHILL2550 Denali Street 8th Floor

Anchorage, Alaska 99503

Page 2: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

M1EM OR AND UM OQAHILL 0TO: Lt. Dave Walter

COPIES: Jacques Gusmano/CH2M HILLCapt. Brad Gerkin, Elmendorf AFBPete Mellinger, Battelle EMO

FROM: Susan M. Schrader

DATE: MVIarch 25, 1991

SUBJECT: Preconstruction Documents for Vehicle Maintenance BuildingEielson Air Force Base, Alaska

PROJECT: ANC30768.DO.60

Please find attached the following documents pertaining to the ongoing assessment ofthe construction site adjacent to the Vehicle Maintenance Building:

Attachment 1 Table of analytical data obtained by CH22M HILL duringthe field activities of January 23 through January 301, 1991.

Attachment 2 Graphic presentations of results obtained by the Corps ofEngineers in 1989 and by CH2M HILL in 1991.

Attachment 3 Boring logs from field activities conducted by CH-"MHILL in January 1991.

Attachment 4 TCLP results for soils collected in January 1991.

As the graphic presentations indicate, the results obtained this year by CH2M HILLdo not correlate with the results obtained1 by the Corps of Engineers (COE) 2 year-sarko. Subsequently, CH2M I-{TL does not agree with the COB recommendationmade in 1989 for soil excavation at the construction site. Based on the infcrmationreviewed or obtained by CH2M HILL, construction wrill no: impact ongoing or futureinvestigation or remnediation at the Vehicle Maintenance Building.

The information presented in the attachments will be necessary for the contractorswho receive the RFP for construction to prepare an adequate Health alnd Safe--v Planfor site work. Additionally, the contractors who submit bids to the Air Force fo r thisawork must provide the plans and related costs for storage, analysis, and disposal ofVsoil excavated for construrtio;, purposes. If dewatering is necessarx durinz construc-tion, a plan for water manLgement should also be provided to the Air Force. Thisplan should include storage, analysis, and disposal. The requirements for the

sed:corrZ

Page 3: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

MlEMIOR AND UM. ~~Page 2March 2-5, 1991ANC30768.DO.60

contractor's Heaith and Safety Plan and soil/water management plans must be incor-porated into the specifications within the bidding documents to be sent out onApril 1, 1991, by the Air Force.

Page 4: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

Attachment 1ANALYTICAL DATA

Page 5: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

2' -

_ C

C0*

�N C -t rjN tO

- "4

S.. ID

-C C>C C C 0 0 0

IC to r- C 010 0 0 0 C C21 - ' t'* + - N (N C - -off NCflflflntt� --

- -*Wrr'

- -0;an

.� .-,

Zr -

NC

'CI4J�

- to

.CN -)

CUJ

CI

CCc�.u N -0 0

o-'-S -

0 -� :

"4"4

a,C S

- UP'C C -

� .5

I C C to Co = C-n* -I It* �, N r. --

C - a SC Cr-

' �S �

EJ� '�

j

C C

to torn

L. a, 0' 0,S

(0 �0� �i 11

-tCO - - I� 2 2 d r.- - - C0 d� - N N N ("1W 00 It N N N C C 00I T 1 LII.

Page 6: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

Attachment 2GRAPHIC PRESENTATION OF RESULTS

COE 1989CH21M HILL 1991

Page 7: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

z

-z 5

0<<7.L

I~~~~~~~~~~~~~~~~~~~~~~~~~~~~ I

_________ <~~~~~~~~~~~~~~~~~~W <t

(01~~~~~~~. %< 0~~~~~~~~~<

- BN3AVI lV~N3tf

in~n

'~~~~~~~~~~~~~~~~~1% ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1

- S~~~~~~~~~~~~~~~~~~~~~~~~t

a~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ o%9 ..- c~~~~~~~~r,.'k~ ~ ~ ~ ~ ~~~

w - -z~~~~~~~~~~~~~~~~~~~12

0~~wCr)~~~~~~~~~I

=~~~o ~

Page 8: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

- ~~0

C~~~~~~~~~~~~~~~~

C >~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~C

-0~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-

> m--~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-

> 0~~~~~ ~ .

o~~r.~cow

0~~~

Page 9: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

Attachment 3

0 ~~~~~BORING LOGSCH2M HIDLL 1991

Page 10: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

- F ~~~~~~~~PROJE01 14jMBEP BORING NUMBER

IF'r-Aff ~ ~I ANC30768.DO.60 EVIvVSE-l SHEET I or 1

saiiii" ~~~~~SOIL BORING LOG

'ROJECT Elelson AFB LOCATION Vehicle Mvainte'-• -,ceELEVATION ________________ DRILLING CONTRACTOR Shannon & WilsonDRILLING METHOD AND EQUIPMENT 2.5' IDSS Spi~t Sooon & HSA 300 LB Hammer Mobile B-55 Drill RioHATER LEVEL AND DATE 13.5- BGS 1/23/91 START 1/23/91 1315 FINISH 1/23/91 1405 LOGGER A.R. Wagner

,I ~ SAMPLE STANDARD SOIL DESCRIPTION COMMENTScc TET REULTS SOIL NAME, COLOR, MOISTURE CONTENT, p2 D~y~F-:N CASING

< W ~~~~~TELATIVE DENSrTY OR CONSISTENCY. SOIL DRLIGFLI OSSTRUCTURE, MINERALOGY. USCS GROUPTESAN

Z (N) SYMBOL~~~~~~~ IN~~~~~~~~~~~~~~~~1STRUMENTATION

0 ~~~~~~~Asphnit 2', and sandy gQravel Description from augerw/somne .gray, molst ((9hF) "'tcuttings

'S-1 0.9 103/6' Sandy gravel, brownish gray, moisti Description from augervery aense. (GP) cuttings

5-Sandy gravel, dark gray, moist. Soil frozen to 7.0'(GP)

Silty gravel w/organics. dark brown, Description from auger

35-2 1.3 5-7-8 Sand rave?, (8.5-9.0'), tan brown,10- ~~~~15 Ti,1o7(GP)

Silt @ 9.0'. drk gray, moist, loose(MvL)

13.5- __ _ __ _

SS-3 0.6 t.4-10-16 Coorse gravel, white tc gray, wet, Headspace 0.0 ppm1511 ~~~ ~~26 very loose to loose, (GP) HNU Bg. Bz, DH 0.4

TED0015.0'

Page 11: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

POETNUMBER BORING NUMBERPROJECT ANC33768.DO.60 EIVlv-SB-2 SHEE' 1 OF 1

rip = hISOIL BORING LOG

AFB LOCATION Ve~~~~~~hicle MaintenanceELEVATION _______________DRILLING CONTRACTOR Shonnon & WilsonDRILLING METHOD AND EQUIPMENT 2.5' ID SS Solit Spoon & HSA 300 LB Hammer Mobile B-55 Drill RigWATER LEVEL AND DATE 13.6' BGS 1/24/91 START 1/24/91 0950 FINISH 1/24/91 10.45 LOGGER A.R. Wagner

3,E SAPL STANDAR- SOIL DESCRIPTION COMMENTS

w -~~~ZC T EST RESULTS SOIL NAME. COLORL MOISTURE CONTENT, 2DEPTHIN OR ASIN,a .~~ Z5 TELAT[VE DENsrr-v OR CONSISTENCY. SOIL 0DRILL ING RATELSS

Co 0 LC6 STRUCTURE, MINERALOGY. USCS GROUP DRWGFUI OSTM a MTESTS ANDM (N YBLINSTRUMENTATION

0 Z~~~~~~shalt 2', and sandy gravel descnption from augerWiildarlc gray to brown, moist cuttings

(GP)

Sandy ravel gray and dry', dense.44 55SS1 0.8. 2550/t- some dark staining C 3.5-3.6' little

5- ~~~~~~~ice Interlayered (GP)frozen soil to 7.5'

- ~~~~~~~~~~~~~~~~~description from auger

________ ~~~~~~~~~~~cuttingsSitygravel @ 7.0'

55-21.21 6-13-60 Sandy gravel (8.5-8.7), gray, moist,73 loose to med.. (GP) Sijjy sand

- - -. ~~~~~inteulayered (8.7-9.1l, gray moist,Stif, (SM Snd Gavel (9.1'-10.0)gray, moist, very' dense (GP)

13.5 _ _ __

41 S5-3 0.9 12-14-7 Sandy -grovel w/some s5iV and . .4[ ________ ~~~organics, dark gray, wet :(G-M)

TD @ 15.0'

Page 12: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

-M {1 PROUEZT NUMBEF BORING NUMBER

- ~~~~~~~~~~~~~~~AN03076-8.DC'.30I ER'M-SE-3 SHEET I O;C 1

SOIL BORING LOG

ROJECT EBelson AFB LOCATION Vehicle Maintenonce:1-EVATION I________________ (RILLING CONTRACTOR Shannon & Wilson))RILLING METHOD AND EOUIPMENT 2.5' ID SS Split Spoon & HSA 300 LE3 Hammer Mobile B-55 Drill Rcg/ATER LEVEL AND DATE 14A3W BGS 1/23191 START 112411 1330 FINISH 1/24/91 1430 LOGGER A.R. Wagner

SAMPLE ~~~~~STANDARD SOIL DESCRI 0TION .S.CMET

. EST RSULT SOIL NAME, COLOR MOISTURE CONTENT, CRLIN ASIN,C. ~~~~~~~~~~~TELATIVE DENSITY OR CONSISTENCY. SOIL o RLLN FLUIDOS

6..6' ~STRUCTURE, MINERALOGY. USOS GROUP DRLIGFLI OS0~~~ (N) SYMBOL ~~~~~~~~~~MTESTS AND

ow ~ ~ ________ INSTRUMENTATION

0 As~~~~~~~phalg 2'. and sandy gravel w/si~t. , Description torn augerdark gicy to brown, moist (GP) :S~ycuttings

3.5 _ _ _

55-1 0.9 ion/6 Sandy gravel, gray, dry, verydense, (-GP)

5

Silty gravel @ 7.0' Description from__ _ __ __ cuttings

55 1 3 5-7-8 Sa nd aravel, (V') brown, moist, Soll frozen to 8.2 a15 se(qzPand interlayered si~tv

sand, dark gray, moist, very stiff (M)-

Sandy aravel. brown to gray, moist, Dcriptionfrmauemedium, (GP) ctig

13.5 _ _ __ _

-~ 55-31 0.6 IL-10-16 Sandy gravel, brown to gray, moist26 to wet, loose, (Gp)

TD @ 15.0'

Page 13: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

PROJECT NUMBER BORING NUMBER- ~~~~~~~~~~~~~~~AN303766.DO0.60I ElVM-SB-L SHEET 1 OF 1

SOIL BORING LOG

AFB LOCATION Ve~~~~~~hicle MaintenanceELEVATION ________________DRILLNG CONTRACTOR Shannon & WilsonDRILLING METHOD AND EQUIPMENT 2.5' ID 53 Split Sooon & HSA 300 LB Hammer Mobile B-55 Drill PigWATER LEVEL SAND DATE 14,65' BGS 1/25/91 START 1/25/91 0945 FINISH 1/25/91 1045 LOGGER A.R. Wagner

3. ~ SAMPLE STANDARD SOIL DESCRIPTION o COMME14TSSE - PENETRATION0 ic- TST RESULTS SOIL NAME, COLOR, MOISTURE CONTENT DEPTH OF CASING,

V ~~ <W > TELATIVE DENSITY OR CONSISTENCY. SOIL DRIWNG FLUDTE, Sr, W~~ g 6'V STRUCTURE, MINERALOGY. USCS GROUP rnDWNFLILOS

L D =' , ff (N) SYMTSOLca U) SYMBLctoINSTRUMENTATIONA

Asphalt 2', and sandy aravel w/silt, Description from augerdaiW-gay to broTn? mist (GP) ** cuff'i1,gs

3.5 -_ _ _ _

I S- 0.8 32-50/1.5' Sandy gravel, gray, dry, dense. 111CGP)

8.5 ~ ~ ~ ~~~~~~Slt ravel @ 7.' ::Description from

33-2 1.3 8-10-12 Sandy sldrgrymottifthnSoii frozen to 8.2'22 l<14- sidlenS 0 9.0'. some oxide

0- -.-~~~~~~ (7) staining @ 8.5' (ML)

San~~~~ygmveI ~~~Description from auger

cutlings

-- I ~~Sandy gravel, brown and gray,SS-3 0.7 11-1 1-12 moist, wet (bottorn 4'), medium

density, (GP)

TD @15.0'

Page 14: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

PROJECT NJMBER BORING N'JM3ER- ~~~~~~~~~~~~ANC30768.1D0.60 EIVN'-SB-5 SHEET I OF 1

SOIL BORING LOG

ROJECT EBelson AFB LOCATION Vehicle MaintenanceLEVATION _______________ DRILLING CONTRACTOR Shannon & WVilson-RILLING METHOD AND EQUIPMENT 2.5' ID SS Spitf spoor) & HSA 300 LB Hammer M.obile B-5,5 DM1I RiplATER L.EVEL AND DATE 13.75' E SS 1/25/91 START 1/25/91 113'C FINISH 1125/91 1400 LOGGER A.R. Wagner

SAMPLE ___STANDARD SOIL DESCRIPTiON COMMENTSC LA- PENETRATION DET F AIG

W~~~j T~EST RESULTS SO:: NAME. COLOR MOISTURE CONTENTDPHO AIGS) rWrcTELAT'IVE DENSITY OR CONSISTENCY, SOIL 0DILN LI OS

W0 STRUCTURE, MINERALOGY. USCS GROUPTESAN00 a: ~~(N SMBLINSTRUMENTATION

0 As~~~~~~phalt, 2', and sndy grave:lz; Description from augerw/siff. cork brown/g-ay. moist (GP) cuttings

.3 S107_1-04 Sandy gravel, dart, brown/gray,____ ________ ~~moist (top 0.2') dry (bottom 0.5),

5- ~~~~~~medium to very dense, (GP)

9.9 - .Silty gravel @ 7.01

8.s - -

53S-2 1.8 6-7-9-6 Sandy silt Interlayered (8.5'-9.9) Description from auger16 gray and brown mixed, moist curlttngs

10 (frozen) firm (ML) and Sand (0.4).- - -. ~~~~~brown, moist, loose, (SP)

13.5 _ _ __ _

SS-3 1.0 18-11-16 Sand. (0.2). brown, moist, loose. (SP)27 Sandy silt, (0.4) dark gray, moist, stiff,isI (ML)

I ~~~~~~Smndy gravel. (0C4) brown & gray,51 ~~~~~~weT, medium, (GeP) -H

TD @ 16.0'Augered from 15.0' -16.0'

Page 15: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

PROJECT NUMBER BORING NUMBZR

- ~~~~~~~~~~~~~~ANC30768.DO.30 EIVM~-SB-6 SHE=-T 1 0e 1

- ~~~~~~~~SOIL BORING LOG

APE LOCATION__Ve~~~~~~~hcle Manr:enancc-ELEVATION ________________DRILLING CON'TRACTOR Shannon & WilsonDRILLING METHOD AND EOUIPMENT 2.5' ID SS Solit Spoon &' HSA 300 LB Hammer Mobile B-55 Drilb RigWATER LEVEL AND DATE 13.75' BGS 1/25/91 START 1/25?91 1300 FINISH 1/25/91 1400 LOGGER A.R. Wagner

~~r SAMPLE STANDARD SOL DESCRIPTION . COMMENTSo~~ PENETRAT~~~~ION --s ~~~~ EST RESULTS ~~~~~~~~~ SOIL NAME, COLOR MOISTURE CONTENT, DPHO AIG< Z >t TEIATIVE DENS' VOR CONSISTENCY. SOIL 5 RLIN AE<w >SRCUEMNEAOYUO RU DRILLING FLUID LOSS,

0- ~~ w W~O STUTRMNRLG.UC RU TESTS AND00 cc ~~~~(N) SYMBOL wINS1RUMEiTATION

0 ............................... ASphal 2', and sad ravel w/silt, :: Description from augeraark gray to brown, moist (GP) :Y cuttings

3.5 -_ _ _ _ '-Af

4.3 - SS-1 0.7 j17-50/4C Sandy Qravel. brown, dry to slightly___ -- - _______ moist, medium to very dense, (GP)

5Sandy gravel Descdriplon from auger

cuttings

35S-2 10.0 750/5V No recovery

Soil frozen to 10.0'

Sandy ravel w/some silt, dark5r-own Description from auger

13.51 ~~~~~~~~~~~~~~~~~~~cutlings

I ~~25 aray and brown mixed, moist to1 ?~~~~~~~~4.0., wet 14.0'-15.0', loose to mediudensity, (~)

TD [email protected]' -

Page 16: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

PROJECT NUMBER BORING NUMBER- ~~~~~~~~~~~~~ANC30768.1DCX60 EIVM-SB-7 SHEETI OF 1

__ ~~~~~~~SOIL BORING LOGp

ROJEST Elelson AFB LOCATION Vehicle Maintenance

LEVATION ______________ DRILUN,. CONTRACTOR Shannon & Wilson

RIWLNG METHOD AND EOUIPMAENT 2.5' ID SS Split Sr~oon & HSA 3DO LB Hamnmer Mobile B-55 DrP Rig

MTER LEVEL AND DATE 12.0- BGS 1/26/91 START 1/26/91 1200 FINISH 1/26/91 1300 LOGGER A.R. Wagner

3. ~SAMPLE STANDARD SOIL DESCRIPTION 8COIMMENTS- - - ~~~PENETRATK3N DEPTH OF CASING,

w -J 0 ~E TST RESULTS SOIL NAME. COLOR MOISTURE CONTENT, S DR;'-ING RATE,TELATIVE DENSITY OR CONSISTENCY, SOIL DRLN LI OS

w ~~~~~~~~STRUCTURE, MINERALOGY. UISCS GROUP TESTS AND('0 S~~~~~~~~~CL ~~~~INSTRUMENTATION

0 ~~~~~~~Asphatt 1/2'. and sandy gravel Description from augerw/some silt , brown to gray, moist., cuttings

(GP)3.5 __ _ _ _ _ 1tt

4.2 55S-1 0.7 12-50/2' Sandy gravel, light brown, dry.4.2 - - loose to very dense, (GP)

5Silty gravel @ 5.0' Description from auger

cuttings

Sand @ 7.0 Soil frozen to 7.0'8.5-

- S- 1.2 6-1-13 Sandy shfs(0A'). ay moist firm,55-2 6-1 ~~frozn,)M d ilt

24 froen.(MarkI (gray,10- ~~~moist, firm. (ML) Sand. (0.6') brown,I ~~~~~~~~~moist. stiff, (SP)

SS-3 1.2 7-12-14 Scid, (0.4') dark gray, wet, firm (SP),- -. ~~26 Sad arove! (0.8'). brown & gray,

TD @ 15.0'

Page 17: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

PROJECT NUMBER BORING NUMBER1- ~~~~~~~~~~~~ANC30768.DO.60 I El VM-SB-8 SHEET 1 OF 1

SOIL BORING LOG

AFE LOCATION Ve~~~~~~ole MaintenanceELEVATION _______________DRILLING CONTRACTOR Shannon & WilsonDRILLING METHOD AND EQUIPMEN 2.'I 3Su oo S tLB Hammer Mobile B-55 Drill r~ipWATER LEVEL AND DATE 12.8' BGS 1/28/91 START 1128/191 0930 FINISH 1128/1 1020 LOGGER A.R. Wagner

3. ~ SAMPLE__ STANDARD SOIL DESCRIPTION COMMENTS= a ~~~~~TST RESULTS SOIL NAME, COLOR MOISTURE CONTENT, S2 DEPTH OF CASING.

TELATIVE DENSITY OR CONSISTENCY, SOIL DP0N AEi2 g r--s STRUCTURE, MINERALOGY. USCS GROUP TEDRIUJNGFUDLOSDU (N)SYBO INSTRUMENTATION

Asphalt 1'. and f~ggew'It 5 Description from augergray & brown, moiw G)~ cuttings

3.5.t.t4.1 ss-i 0.5 115-50/2' Sa~ndy ravael, gray, dry, medium to

___ - -. ~~~~~~very dense, (GP)

Sandy gravel Description from auger

cuttings

SS-2 2.0 13-19-18-9 Sandy gravel. (0.1) brown/gray.37 dry, medium (GP) & Organic slit,

(1.9'), w/somne gravel dark to black,- ~~~~~slightly moist (frozen), very stiff (OL)

13.5 _ _ __ _

5S-3 1.4 2-18-19-11 Žit w/Some gravel, (0.6'). dart ,brown-37 moist, soft to very stiff, litile organic~s

15-- ~______ (ML), and S§ndv go;vel, (0.8). graybrown, wet, med~ium density, (GP)TD @ 15.5'

Page 18: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

PROJECT NUMBER BORING NUMBER

- ANC30766.DO.60 EIVM-SB-9 SHEET 1 OF

_____ ~~~~~~SOIL BORING LOGp

'ROJECT EBelson AFB LOCATION Vehzl3e MaintenanceI-LEVATION _______________ DRILLING CONTRACTOR Shannor & Wilson)RILLNG METHOD AND EQUIPMENT 2.5' ID S$ ouDlt Spoon & HSA 300 LB Hammer Mobile E'* 55 DriIl r~iVATER LEVELAND DATE 12.0' BGS 1/28/91 START 1/2&91 1248 FINISH 1/28/191 1315 LOGGER A.R. Wagner

~~r SAMPL STANDARD SOL DESCRIPTION CCOMMENTSPENETRATION DET2F AIGTrEST RESUL-TS SOIL NAME, CO.OR, MOISTURE CONTENT, DETHO CSIGM ~~~~~~~~~TELATIVE DENSITY OR CONSISTENCY, SOIL DRLIG AErc6-r%6 STRUCTURE, MINERALOGY. USCS GROUP DRLIGFLI OSCLM W Mo TESTS AND

D O__ cc_ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ INSTRUMENTATION0 As~haft C.1' and sady e Dcscription from auger

w/some silt, gray, mitG7 cuttings

3.5 -'.

4.3 - S-i 0. 12-50/4' Sandy gravel, brown to gray, dry,AL - medium to ver~~~~y dense, (GP)5-

Silly gravel @ 7.0'

SS-2 0..3 3-4-5-4 Sand avel. (0.23 brown to gray, Desctiption from augerdry m iur overy dense,(Pctig

1 and §J~tk(03 1dark brown, moist, uligsoft (IVI)

13.5 _ _ __ _

I 53-3 1.8 4-12-1 1-15 SIlt (0.5). dark brown, moist, soft, (ML)-I ~~~~~~and Sand garvel, (1.3') brown &1 ~~~~~~~gray, wet medium density, (GP)

TD @ 15.5'

Page 19: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

PROJECT NUMBER -- BORING NUMBE7R- ~~~~~~~~~~~~AN030768.1D0.60 I EIVM-SB-1C SHIEE 1 OF

SOIL BORING LOG

AFB LOCATION Veh~~~~~~icle MaintenanceELEVATION _______________DRILLING CONTRACTOR Shannon & WvIlsonDRILLNG METHOD AND EQUIPMENT 2.5' ID SS Solit Spoon & NSA 300 LB Hammer Mobile B-55 Dril! RiUWATER LEVEL AND DATE 11.9- BGS 1/29/91 START 1/29)91 0930 FINISH 1)29/91 1035 LOGGER A.R. Wagner

SAPL STANDARD SOIL DESCRIPTION a COMMENTS9 - - - ~~~PENETRATION 0S2DILIG AE: TEST RESULTS SOIL NAME, COLOR, MOISTURE CONTENT, DEPTH OF CASING,

L) Z !~~~'-t.6TELATIVE DENSITY OR CONSISTENCY, SOIL DILN AE< 0 6'-S'.6' 0 ~~~~~~~~~~~~~~~~~~~DRILLING FLUID LOSS,I~~it 3STRUCTURE, MINERALOGY. USCS GROUP TESTt ANDOLD cc I ~N) YMOLINST1RUMENTATION

0 ~~~~~~~Asphalt it. and sandy gravel .-- C Description from augerw/some slilt, gray to brown, moist, cuttings(GP):fft

35 -a -

SS-2 0.3 10-5-5-4 Sandy organic silt, dark brown, dryutig10 to moist, stiff to firm, (OL) .. Soil frozen to 9.5'

13.5 _ _ _ _ _

55S-3 1.8 7-12-13-13 Coars sad dark gray, wet, stiff,25 (SP) w/sandy gravel @ 15.0., 2' wide

TD @ 15.5'

Page 20: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

r~~~~~~~ ~PROJECT NUMBER BORING NUMBERAN030768.D0.63j EIVM-SB-1 1 SHEET I OF 1

SOIL BORING LOG

ROJIECT EBelson AFB LOCATION Vehicle MaintenanceLEVATION _______________ DRILLING CONTRACTOR Shannon & Wilson

!RILLIING METHOD AND EQUIPMENT 2VI SS~ oo S O LB Hammer Mobile B-55 Drill RiplATER LEVEL AND DATE 12.2' BGS 1/29/9-, START 1129/S91 1415 FINISH 1/29/91 1515 LOGGER, A.R. Wagner

SAMPLE STANDARD SOIL DESCRIPTION (9COMMENTS- - PNTRTON-

w a ~~~~TST RESULTS SOIL NAME, COLOR MOISTURE CONTET DEPTH OF CA.SING,o TLAN DRILLING RATE,r TELTFV DENSflY OR CONSISTENCY, SOIL o RLIGFLI OS0 r1-r1-e STRUCTURE, MINERALOGY. USCS GROUP DRLIGFLI OS- ~~ ~ ~~(N) SYMBOL TSSN

Z CCc INSTRUMENTATION

0 ~~~~~~~Asphatt, <2', and sanndy grovel W~IDescrpfion from augerw/sOme silt, brown to gray. moist. ,... cuttings(GP)

3.5 -_ _ __ _

Sadygravel, gray & brown, dry,551 06 2-0/4' medium density. (GP)

5- - ~~~~~~Silt- qrcvel @ 5.0' Descrition from auger

8.5d_ _ _ _ _

SS-2 2.0 4-7-7-7 Slt (0.5') dark gray, moIst (frozen)SS-2 2.0 14 firm, (ML) and Sand. (1.5') darkc Soil frozen to 9.0'

1D gray, moist, firm (SP)..

13.5-55S-3 1.7 9-12-16-19 Sand dar-kgray, wet. stff tovery stiff-...

1 ~~~ ~~~~28 (SP) trace gravel

TD @ 15.5'

Page 21: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

PROJECT NUMBER BORING NUMBER- ~~~~~~~~~~~~ANC30768.DOi.60I ElVM-SB- 1i2 SHEET 1 OF 1

Sfl2J ~~~~~~SOIL BORING LOG

nAFB LOCATION Vehicle MaintenanceELEVATION _______________DRILLING CONTRACTOR Shannon & WilsonDRILLING METHOD AND EQUIPMENT 2.5' ID SS SiIlt Spoon & HSA 300 LB Hammer Mobile B-55 Drill RipWATER LEVEL AND DATE 12.2' BGS 1/31/91 START 1/31/91 1135 FINISH 1/31/911235 LOGGER A.R. Wagner

SAMPL STANDARD SOIL DESCRIPTION CMET~PENETRATION 2CMET

0 E TES'T RESULTS SOIL NAME, COLOR MOISTURE CONTENT. DEPTH OF CASING.gnu ziJ55 GOU DRILLING RATE.X < W ~~~~~~~TELATIVE DENSITY OR CONSISTENCY, SOIL DRILLING FLUID LOSS,Lcc R QQ SYBOLTESTS AND

WO W SYMBOL J,7___ _ __ __ _ __ __ __ _ __ __ _ INSTRUMENTATION

0 Asphalt 1'. and son ravel Description from augerw/some silt, brown oray .molst :tf cuttings(GP)

3.5 _ _ _ _

43 ~ iSS-] 0.7 10-5(3/V Sandy gravel, brown & gray, loose,4.3 (~__ __ GP)

5 Silty gravel 0 5.0 Description from augercuttings

8.5-ISS-2 1.8 -11-14-18 MOITt! g rael(0.3) dark gray,

m~ststf(( ) andsa~nnc (1.5),10- 25 ~~~~~dark brown, moist. w/some oxide

- - - ~~~~~~staining 0 9.8 (SP)

13.5 _ _ __ _

55-31.9 8-11-14-18 Sandy aravel dark brown, wet, very :.Jr SS-3 1.9 ~ 25 stffl, some large (2') gravel mixed in K

1*~~~~~~~sno (P

iT 0 15.5'

Page 22: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

Attachment 4TCLP RESULTS

CH2M HILL, JANUARY 1991

0

Page 23: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

EngineersPlonners

- * ~EconomistsScienist! ORGANIC TCLP ANALYSIS DATA SHEET. atory Name: CH2M HILL/LRD Concentration: LOW Date Extracted:

* ample ID: METHOD-BLANK Sample Matrix: SOIL Date Analyzed: 02/21/91C'lient Sample ID: VBLKS1 Percent Moisture: Dilution Factor: 1.0

VOLATILE COMPOUNDS

GAS Number ug/L CAS Number ug/L75-01-4 Vinyl Chloride. .. ........ 10 U75-35-4 1,1-Dichloroethene .S U67-66-3 Chloroform .. .... ......... 5 U107-06-2 1,2-Dichloroethane .... 5 U78-93-3 2-Butanone (MEK) .. ........ 10 U-56-23-5 Carbon Tetrachloride ... 5 U79-01-6 Trichioroethene. .... ..... 5 U71-43-2 Benzene .. ....... . ........ U127-18-4 Tetrachloroethene .... 5 U108-90-7 Chlorobenzene. ...... ..... 5 U

Toluene-d8 - 5. .... .....101,4-Bromofluorobenzene -SS 1001,2-Dichloroethane-d4 -SS 100

U - Compound analyzed for but not detected.B - Compound was detected in QC blank.7- Reported value less than quantitation limit.* -Surrogate Standard reported as percent recovery.

Form I

CH2A4 HLL Recaing QuollrvAnCIACCI LaOOCorrres 509C Z-oterviflor Root. Rezdc~ng, Cobtforrvo 96003 916.244 5227

Page 24: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

LrncieersTho'nnersEConzm'nsrs

e)nis's ORGANIC TCLP ANALYSIS DATA SHEETa

aboratory Name: CH2M. HILL/LRD Concentration: LOW Date Extracted: 02/08/Sab Sample ID: TCLP BLANK Sample Matrix: SOIL Date Analyzed: 02/21/910lient Sample ID: TCLPrBLANK Percent Moisture: Dilution Factor: 1.0

VOLATILE COMPOUNDS

AS Number ug/L CAS Number ug/L5-01-4 Vinyl Chloride. .. ........ 72 U5-35-4 1,1- Dichloroethene .. ......76 U7-66-3 Chloroform. .. ............ 10 BJ07-06-2 1,2-Dichloroethane .... 26 U8-93-3 2-Butanone (MEK) . .... 130 B6-23-5 Carbon Tetrachloride ... 27 U9-01-6 Trichloroethene .. ........ 18 U1-43-2 Benzene .. ................23 U27-18-4 Tetrachloroethene .... 27 U08-90)-7 Chlorobenzene .. .......... 26 U

Toluene-d8 - SS. .... ..... 991,4-Bromofluorobenzene -SS 1001,2-Dichloroethane-d4- SS 100

U - Compound analyzed for but not detected.B - Compound was cetected in QC blank.J - Re~orted value less than quantitation limit.

SS - Surrogate Standaro reported as percent recovery.

Form I

0 00025CH2AA HILL Reading Quch rv Anolytzo! Latoororones 50900Ccrerodicr Roca. Readding, Cob fomia 960C03 916,244.5227

A,

Page 25: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

Engineersm~~~lanr- * ~Economists

Scientists ORGANIC TCLP ANALYSIS DATA SHEET

a torv Name: CH2M H-ILL/LRD Concentration: LOW D~.te Eytracted: 02/14/91M ample ID: TCLP BLANK Sample Matrix: SOIL Date Analyzed: 03/06/91

:lient Sample ID: TCLPrBLANK Percent Moisture: Dilution Factor: 1.0

SEMIVOLATILE COMPOUNDS

'AS Number ug/L GAS Number ug/L106-46-7 1,4-Oichlorobenzene ... 72 U

AS0-48-7 2-Methylphenol. .. ........57 U106-44-5 4-Methyiphenol. .. ........56 U.67-72-1 Hexachloroethane. .. ......71 U98-95-3 Nitrobenzene. .. ..........60 U

-37-68-3 Hexachiorobutadiene ... 66 U38-06-2 2 4,6-Trichiorophenol . 57 U05-95-4 2,4,5-Trichiorophenol . 270 U121-]4-2 2,4-Dinitrotoluene.. . . 54 U118-74-1 Hexachlorobenzene . . . . 52 U37-86-5 Pentachiorophenol . . . . 270 U110-86-1 Pyridine .. .... ..........430 U

Nitrobenzene-d5 -S . . 732-Fluorobiphenyl -SS . 82Terphenyl-dI4 - SS. . 100Phenol-d5 - SS .. .... ....1002-Fluorophenol - SS . . . 882,4,6-Tribromophenol - SS 82

U - Compound analyzed for but not detected.B - Compound was detected in QC blank.J - Reported value less than ouantitation limit.

SS - Surrogate Standard reported as percent recovery.

** 4-Methylphenol and 3-Methylphenol coelute and arereported as a total of the individual isomers.

Form I

CH2M H-ILL Redding Quot-ty Ano~lytol Lazororones 5090 Corerpilior Roca, Reading, California 96003 916.244.5227

A'I

Page 26: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

* - ~~nptneers

:normisk S ~Sc~ennlsrs ORGANIC TCLP ANALYSIS DATA SHEETa

iboratory Name: CH2M HILL/LRD Concentration: LOW Date Extracted: 02/08/9Wib Sample ID: 2E7'20r] Samole Matrix: SOIL Date Analyzed: 02/21/91iient Sample ID: EIVM-SB2 A Peraent Moisture: Dilution Factor: 1.0

VOLATILE COMPOUNDS

AS Number ug/L GAS Number ug/L5-01-4 Vinyl Chloride. .. ........ 72 U5-35-4 1,1-Dichloroethene .... 76 LI7-66-3 Chloroform .. ........ ..... 6 EJ37-06<: 1,2-Dichioroethane .... 26 U5-93-3 2-Butanone (MEK) .. ........ 25 U6-23-5 Carbon Tetrachloride . 27 U9-01-6 Trichloroethene. .......... 18 U1- 43-2 Benzene .. ................23 U27-18-4 Tetrachioroethene .... 27 U38-90-7 Chlorobenzene .. ..........26 U

Toluene-d8 - S 5.. ........981,4-Bromnofluorobenz.,ne- SS 991,2-Dichloroethane-d4 -SS ]00

U - Compound analyzed for but not detected.B - Compound was detected in QC blank.J - Reported value less than quantitation limit.

SS - Surrogate Standard reported as percent recovery.

Form I

0H2'A HILL Pon Quoiltv /norvccw .=orarores 5090 Coterp:;ior Rcood. Redoing, Cctz,,o~ 9,6X3 916.244 5227

Page 27: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

Engineers

E~JIIE-EcnomistScientists ORGANIC TCLP ANALYSIS DATA SHEET

* atory Name: CH2M HILL/LRO Concentration: LOW Date Extracted: 02/08/911Wtample ID: 28772004 Sample Matrix: SOIL Date Analyzed: 02/21/91Client Sample ID: EIVM-SB12C Percent Moisture: Dilution Factor: 1.0

VOLATILE COMPOUNDS

CAS Number ug/L CAS Number u g/ L75-01-4 Vinyl Chloride.. .. ...... 72 U75-35-4 1,1-Dichloroethene... . 76 U67-66-3 Chloroform .. .. ..........9 B0107-06-2 1,2-Dichloroethane.. . . 26 U78-93-3 2-Butanone (MEK). .. ......25 U

-56-23-5 Carbon Tetrachloride ... 27 U79-01-6 Trichloroethene. .. ......18 U71-43-2 Benzene .. ...... ........23 U127-18-4 Tetrachloroethene ... . 27 U108-90-7 Chlorobenzene. .... ...... 26 U

Toluene-dB - SS. .. ......961,4-Bromofluorobenzene- SS 981,2-Cichloroethdne-d4 SS5 100

U- Compound analyzed for but not detected.B-Compound was detected in QC blank.-Reported value less than quantitatiorn limit.

- Surrogate Standard reported as percent recovery.

Form I

0 00 02 2

CH2M HILL Redding Qualify Anozyticol Lotorotornes 5090 Caterpillar Rood. Redding, Co/if ornia 96003 916.244 5227

Page 28: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

- ~~E'pigneersPionners

ES~flhIEconomistsScientists

ORGANIC TCLP ANAILYSIS DATA SHEETa

boratory Name: CH2M HILL/ILRD Concentration: LOW Date Extracted: 02/] 4/9 1 W:b Sample ID: 28772Z00 Samrnle Matrix: SOIL Date Analyzed: 03/03/91jent Sample ID: E.IVM-SB2_A Percent Moisture: Dilution Factor: 1.0

5.~ SEMI VOLATILE COMPOUNDS

,S Number ug/L GAS Number ug/L16-46-7 1,4-Dichlorobenzene ... 72 Ui-48-7 2-Methylphenol .. .......... 57 U)6-44-S 4-Methy iphenol .. .......... 56 U17-72-1 Hexachi oroethane .. ........ 71 U3-95-3 Nitrobenzene. .. .......... 60 U7-68-3 Hexachlorobutadiene .6 6 U3-06-2 2,4,6-Trichlorophenol 57 U3-95-4 2,4,5-Trichiorophenol 270 U271-14-2 2,4-Dinitrotoluene .. ...... 54 U18-74-1 Hexachflo-obenzene .... 52 U7-86-S Pentachiorophenol . ... 270 U10-86-] Pyridine .. ...... ........430 U

Nitrobenzene-d5 -SS ... 802-Fluorobiphenyl -SS . 76Terphenyl-d]4 - SS . ... 92Phenol -d5 - SS. .. ........ 782-Fluorophenol - SS . . . 642,t,6-Tribromophenol - SS 69

U - Compound analyzed for but not detected.B - CornDound was detected in QZ. b,2nk.J - Reported value less than quantitation limit.

SS - Surr; :ate Standard reported as percent recovery.

** 4-Methy''phenol and 3-Methyiphenol coelute and arereported as a total of the individual isomers.

Form I

0CHM H-ILL Reading Quality Anal 4cco! Lotorotc'jes 5090 Caterpillar Road, Redding. California 96033 916.244.5227

Page 29: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

EngireernPlannersEconorr isrsScientists ORGANIC TCLP ANALYSIS DATA SHEET

Ld tory Name: CH2M HILL/LRD Concentration: LOW Date Extracted: 02/14/91.raniple 10: 28772004 Sample Matrix: SOIL Date Analyzed: 03/06/91:lient Sample ID: EIVM-SB12C Percent Moisture: Dilution 'Factor: 1.0

SEMIVOLIATILE COMPOUNDS

:AS Number ug/L CAS Number ug/ L106-46-7 ],4-Dichlorobenzene ... 72U

...95-48-7 2-Methyl phenol. .. ........57 U.106-44-5 4-Methylphenol. .. ........56 U37-72-1 Hexachloroethane. .. ...... 71 U98-95-3 Nitrobenzene. .. ..........60 U

-9B7-68-3 Hexachiorobutadiene ... 66 U38-06-2 2,4,6-Trichlorophenol 57 U)5-95-4 2,4,5-Trichlorophenol 270 U121-14-2 2,4-Dinitrotoluene .... 54 U118-74-1 Hexachlorobenzene .... 52 U37-86-5 Pentachlorophenol . ... 270 UflO-86-1 Pyridine .. .... ..........430 U

Nitrobenzene-d5 -SS ... 552-Fluorobiphenyl -SS . 66Terphenyl-d14 - SS.5 . 98Fnenol -d5 - 5. .. ........ 842-Fluorophenol - SS . . . 76

2,4,6-Tribromophenol - SS 81

0U - Compound analyzed for but not detected.B - Compound was detected in QC blank.J - Reported value less than quantitation limit.

- urrogate Standard reported as percent recovery.

w* 4-Methylphenol and 3-Methylphenol coelute and arereported as a total of the individual isomers.

Form I

000061iCH2A4 HILL Reddng Quo'Iry Anal ytcl LCabotroroeS 5090 CcierpikWor Rood. Readinc Colitornic 96003 916.244.5227

Page 30: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

METHOD: EPA EOBEngmneers TCLP Pesticicies- ~~Planners

fEhlirl Economisms~~ Scientists Reference No: Method Blank

Sample Matrix: Watt r-TCLP extractDiluti.on Factor: 1 Date ExtracteC-: 02-14-91

Date Analyzed: 03-02-91

MethodReporting Blank

Compounds Limit Result Units

g-BHC 0.2 < 0.2 ug/LEndrin 2.5 < 2.5 ug/LHeptachlor & Heptachlor EpoXide 1.0 < 1.0 ug/L4,41-Methoxycnlor 1.3 < 1.3 UV/LToxaphene 25 < 25 ug/LTechnical Chlordane 25 < 25 ug/L

Surrogate (SS) 107 % Rec.

(SS) - Surrogate Standard recorted as percent recovery.Dibutyl Chlcrendat-r used as surrogate standard.

Commrents:

ArroedBy: (jEst

002113CH214 HIL Redding Qulitty Ano~ivfCl tocorarones 5090 Caterpillar Roo--, Redding. Colif ornia 96023 916.244.5227

Page 31: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

METHOD: EPA 608Enpine-7 TCLP Pesticides

LE~hihhIEconomnis',scientists

Reference No: TCLP BlankSample Matrix: Soil-TCLP extractDilution Factor: 2. Date Extracted: 02-14-91

Date Analyzed: 03-02-91

MethodReporting Blank

Compounds Limit Result Units

g-BHC 0.18 < 0.18 ug/LEndrin 3.5 < 3.5 ug/LHeptachior & Heptachlor Epoxide 1.4 < 1.4 ug/L4,4'-Methoxych~lor 1.4 < 1.4 ug/LToxaphene 28 < 28 ug/LTechnical Chlordane 28 < 28 ug/L

Surrogate (SS) 118% Rec.

(SS) - Surrogate Standard reported as percent recovery.Dibutyl Chlorendat-e used as surrogate standard.

Comments:

Approved By:44

CH2MV HILL Redding Quality Ano-,tAcol Loboralornes 5090 Cot erpihoar Rood. Redding. Colhfornic 96W3 916.244.5227

Page 32: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

EnpineersPICi)NEa METHOD: EPA 608

£ENJXNEconomitsr TCLP Pest-icidesscientists

Client: EIELS01N A.F.B. Reference No: 28772-4Client Sample ID: EIVM-SB12C

Date Sampled: 01/24/91Date Received: 02/08/91

Sample Matrix: Soil-TCLP Extract Date Extracted: 02/14/91Dilution Factor: 1 Date Analyzed: 03/03/91

Reporting SampleCompounds Limit Result Unitcs

g-BHC 0.18 < 0.18 ug/LEndrin 3.5 < 3.5 ug/LEeptachlor & Heptachlor Epoxide 1.4 < 1.4 ug/L4,4'-Methoxychlor 1.4 < 1.4 ug/LToxaphene 28 < 28 ug/LTechnical Chlordane 28 < Z8a ug/L

Surrogate (SS) 106% Rec.

(SS) - Surrogate Standard reported as percent recovery.Dibutyl Chlocrendate used as surrogate standard.

Comments:

Approcved Dy: _ _ _ _ _ _ _ _

6 iJ~~~~~~~~~~~~~~

CH2M HILL Recong Qualitv Anziyticc' Laboratones 5090 Caterpillar Road. Pedding. California 96003 916.244.5227

Page 33: Aret PRELIMINARY SITE ASSESSMENT DOCUMENTSalaskacollection.library.uaf.edu/eafbsc/cd1/AR85-1.pdf · preliminary site assessment documents vehicle maintenance building etelson air

Planners METHOD: EPA60Lfl~uIE Econmisrs TCLP Pesticides-S W ~~Scientists

Client: EIELSON A.F.B. Reference No: 28772-1

Client ample D: EIV~~.b2½/Date Sampled: 01/24/91

Date Received: 02/08/91Sample Matrix: Soil-TCLP Extract Date Extracted: 02/14/91Dilution Factor: 1 Date Analyzed: 03/02/91

Reporting SampleCompounds Limit Result Units

cr-BHC 0.18 < 0.18 ug/LEndrin 3.5 < 3.5 ug/LHeptachlor & Heptachlor Epoxide 1.4 < 1.4 ug/L-4,4'-Methoxychlor 1.4 < 1.4 ug/LToxaphene 28 < 28 ug/LTechnical Chlordane 28 < 28 ug/L

Surrogate (SS) 101% Rec.

(SS) - Surrogate Standard reported as percent recovery.Dibutyl Chlorendate used as surrogate standard.

Comments:

Approved By: ~7

CH2MV HILL Reading Quality Anal tica) Laboartonies 5090 Caterpillor Road, Reaping. California 96003 916.244.5227