Course Objective
• Understanding of SAP APO.
• Understand the underlying components of Demand Planning (DP) &
Supply Network Planning (SNP)
• Provide a high level understanding of the interfaces between DP, SNP
and other APO modules as well as SAP R/3.
OLTP
R/3 R/3LegacyOLTP
Non R\3OLTP
Non R\3OLTP
Application Link EnablingModel Generator, Mapping, Connectivity
BW
APOSolvers
APO
liveCacheliveCache
DemandPlanning
PP/DSTPVSSupplyNetworkPlanning
AvailableTo
Promise
SC Cockpit
SAP APO Architecture
R/3R/3 APOAPO
GlobalATP
GlobalATP
DeploymentDeployment
SAP-BW
HistoricalData
KeyPerform.
Indicators
External Data
(e.g. POS)
SAP-BW
HistoricalData
KeyPerform.
Indicators
External Data
(e.g. POS)
Demand PlanningDemand Planning
SalesOrders
ManufacturingExecution
InventoryManagement
ProductionPlanning anddetailedScheduling
SupplyNetworkPlanning
SupplyNetworkPlanning
APO Applications and Data Flow
Integration to APO
Advantages of APO
SAP AG 2001
Advantages of APO
High performance using liveCache technology
Global server: integrates multiple OLTP systems
Collaborative planning via the internet
Simultaneous material and finite capacity requirementsplanning
Cross-plant optimization of the resource load
Sequence and setup time optimization of orders
Transportation optimization with route planning
Evaluation and analysis of orders
Seamless integration between APO and R/3
Master Data versus Transaction Data
Master Data Transaction Data
What is it Static data used during planning
Data dynamically created through planning and execution
Examples Products, Production Lines, Locations
Forecasts, Sales orders
Used for Mapping organization to the system
Captured information flow
Where does it reside • Data shared between R/3 and SCM
• Is shared between SCM components - APO, ICH, EM
• Data created either in planning or execution systems. Planning relevant visible in APO.
Mapping of Master Data Objects
R/3 APO
Location
Product
Resource
Production process model
R/3 master data APO master data
Plant
Customer
Vendor
Material master
Work center
Routing and
Bill of material
Special Procurement Key
Transportation Lane
Mapping of Transaction Data Objects
R/3 APO
Order category
PchOrd (BF)
PurReqs (AG)
SalesOrder (BM)
PlOrd. (AI)
FC req. (FA)
Stock (CC )
R/3 transaction data APO transaction data
Purchase Orders
Purchase requisitions
Sales orders
Planned orders
Planned Ind. Reqmts.
Supplies
Production Orders Prod Ord (AJ)
…..
APO Master Data (model independent)
Planning Model 000- Master data assigned to model
Planning Model n- Master data assigned to model
Planning Version n
- version n dependent transactional data
-version n dependent master data
Non-IntegratedNon-Integrated
SNP What if outputSNP Output
Planning Version 000
- version 000 dependent transactional data
-version 000 dependent master data
IntegratedIntegrated
LegacyLegacyLegacyLegacy R/3R/3R/3R/3 OLTP Master Data
Models and Planning Versions
Planning Books and Data Views
APO master data
Model 000 Model 1
Version 000 Version A Version B
Planning areas
Planning books
Data views
APO - Supply Network Planning
SAP AG 2001
Supply Network Planning Scenario
SNP plans the material flow along the supply chain
Mid- to long-term, finite, cross-plant planning
Prioritization of demands; supply optimization
Result: Feasible plans
Demand Plan
Supplier Plant DC Customer
Supply PlanningSupply
PlanningOptimal
Supply PlanOptimal
Supply Plan
Demand• Forecast• Orders
Material Constraints• Material availability• Supplier lead times
Production Constraints• Lot sizing rules• Equipment capacity• Labor
Distribution Constraints• Distribution lead times
Supply Chain Cost Info• Production cost per location• Transportation costs
• Maximize order fill rates• Minimize inventory levels• Minimize costs
The supply plan specifies what to make/move, where to make/move it, how much to make/move and when to make/move it
Objective: To produce effective supply plans which simultaneously reduce costs/assets and improve customer service by dramatically improving the ability to process/incorporate all relevant supply chain information
Objective: To produce effective supply plans which simultaneously reduce costs/assets and improve customer service by dramatically improving the ability to process/incorporate all relevant supply chain information
Supply Planning
• A planning approach to create tactical plans and sourcing decisions that takes the complete supply network into consideration
• Model the entire supply network and related constraints
• Create rough quantity based, cross location production and distribution plan with individual rough bill of material (BOM) and routings
• Integrate purchasing, manufacturing, distribution and transportation in one consistent model
• Create feasible plans for purchasing, manufacturing, inventory and transportation
• Synchronize activities and plan material flow throughout the supply chain
APO - Supply Network Planning
SNP Process
Perform SNP Planning Run
Finalize SNP plan Run Alerts/Check planSolve problems
ReleaseSupply plan
SNP configuration
Release demandplan to SNP
Set up master data
Set up supply chain model
• Multi-site mid-term rough-cut planning
• Simultaneous material planning and finite capacity planning of production, storage and transportation resources
• Simultaneous production planning and distribution resource planning
• Planning of critical components on bottleneck resources
• Cross-plant optimization of the resource load
• Prioritization of demand and supply
• Collaborative procurement planning via the internet
Benefits of Supply Network Planning
SNP Planning Methods (Solvers)
• SNP Heuristics• Un-constrained• MRP Like• Capacity leveling
• Capable to Match (CTM) : Supply to Demand Match• Feasible solution• Matches demand to available supply via production capacity
and transportation capability check
• SNP Optimization: cost-based optimization• Feasible solutions• Optimization of production, transportation, and inventory costs
Supplier WH
ManufacturerDC
Customer DC
Production plant
Supplier plant
SNP Heuristics
• MRP II concept (planning against infinite capacity)• Rapid multi-site planning• Does not necessarily develop a feasible plan• Additional step required for capacity leveling
1. Day 2. Day 3. Day 4. Day 5. Day
Capacity load
100 %
200 %
SNP Optimizer
Sourcing Production &Purchasing
requirements,Inventory levels
Sourcing Production &Purchasing
requirements,Inventory levels
Flexible Constraint Definition capacity constraints material constraints transportation constraints ….
Optimization
Supply feedback toDemand Planning
Supply feedback toDemand Planning
$
Goal: Minimize costs
ForecastsCustomers orders
ForecastsCustomers orders
Control costsPenalty costs
•Production•Transportation•Procurement•Storage•Safety Stock•Non-Delivery•Delay
Costs
Capable to Match (CTM)
• CTM is a rules-based, multi-site planning method that takes finite considerations of production resources
• Extensive prioritization capabilities control the planning process
• Satisfies prioritized customer requirements with multi-site capacity leveling when there is a capacity overload
SNP Capable To Match (CTM)
• Simultaneous material and capacity planning• Categorization of demand and prioritization of supply • Considers costs
• Transportation• Production
• Considers priorities• Product• Location• Product/Location• Transportation Lane
• Considers Quotas • Rule definition possible
1. Day 2. Day 3. Day 4. Day 5. Day
Capacity load
100 %
CTM Planning Scenario
Integration of Supply Network Planning (SNP) with Demand Planning (DP) & Production Planning & Detailed Scheduling (PP/DS)
Sales History
Market Info
Demand Planning
(Batch & Interactive Forecastin
g)
ForecastSupply
Network Planning
(Reads Network Demand- feasible)
Sales Demand (OLTP)
Stocks
Constrained based SNP plan
Sales History
Market Info
Demand Planning
(Batch & Interactive Forecastin
g)
Forecast
Supply Network Planning
Sales Demand
(R3)
Stocks
Rough cut Location Production plan
Rough Cut Location Procuremnet plan
Constrained based SNP plan
Release to PP/DS