Page 1: API Spec 16A - Specification for Drill-through Equipmentmycommittees.api.org/standards/techinterp/epequip/Shared Document… · 8.5.8.7.2 16A-I-03/08 Background: Section 8.5.8.7.2

Standard Edition Section Inquiry # Question Reply

16A 3rd Edition

June 2004

5.5.2 16A-I-01/08 Background: Section 5.5.2 calls out the design verification testing

requirements for blowout preventers. It only points to Section 5.7. i.e., it

excludes the temperature testing section. Only 5.5.4 and 5.5.5, the

sections dealing with annular packing units and ram block seals, call out

Section 5.8, Design Temperature Verification Testing.

Question 1: Does Section 5.8 apply only to the design and manufacture

of ramblocks rubbers and annular packing units?

Question 2: Are off-the-shelf equipment, such as o-rings, subject to the

testing in 5.8?

Reply 1: Yes. Section 5.8.1 states the intent of the testing is to

verify the performance of non-metallic pressure-

retaining/controlling parts.

Reply 2: No. Section 5.5.1 excludes ring gaskets from design

verification testing.

16A 3rd Edition

June 2004

6.3.4.2 16A-I-02/08 Background: Section 6.3.4.2 in API 16A requires impact testing to be

performed in accordance ASTM A370. Section 6.3.4.1 requires tensile

testing to be completed as per ISO 6892. In several other places, ISO

standards are also referenced as the test requirement.

Question 1: Since ASTM A370 covers a series of mechanical tests

(including impact testing), can this standard be used for all applicable

mechanical tests in 16A?

Question 2: Is it mandatory to use the ISO standards?

Reply 1: Annex H provides a list of ASTM standards that may be

substituted for ISO standards cited in 16A. These standards can

be used in the context of the requirement for which the ISO

Standard is cited in the text.

Reply 2: See Reply 1.

16A 3rd Edition

June 2004

8.5.8.7.2 16A-I-03/08 Background: Section 8.5.8.7.2 of API 16A states: “Annular packing units

shall be tested in two stages. The stage one test shall require pressure

testing on the appropriate size drill pipe in accordance with Table 27. The

Stage two test shall require pressure testing without drill pipe in the

preventer, i.e. on the open hole. The high pressure test for this stage

shall be as specified in 8.5.8.7.1.3, except as a minimum it shall be

performed at 50 % of the rated working pressure of the preventer.”

Question: Does it matter in which order the two stages are conducted

in?

No.

API Spec 16A - Specification for Drill-through EquipmentLast update: February, 13, 2009

Page 1 of 2

Page 2: API Spec 16A - Specification for Drill-through Equipmentmycommittees.api.org/standards/techinterp/epequip/Shared Document… · 8.5.8.7.2 16A-I-03/08 Background: Section 8.5.8.7.2

Last update: February, 13, 2009

Page 2 of 2