apac pbn update meetings seminars and...australian pbn experience •basic navigation regulations in...
TRANSCRIPT
Slide 1 of xx
APAC PBN UPDATE
Ian Mallett
Slide 2 of xx
FREE OFFERS!
• CASA Training DVDs
– GNSS
– ADS-B
• More available from CASA
– Safety Management System (SMS) Booklet
• CASA Shop Items
– www.casa.gov.au
Slide 3 of xx
2000 NM
Slide 4 of xx
Slide 5 of xx
Slide 6 of xx
Slide 7 of xx
Slide 8 of xx
Slide 9 of xx
1928 – NDB
1948 – VOR
1950 - ILS
1960 – Omega
1960s - INS
1995 - GPS
Slide 10 of xx
FIRST IFR GPS RECEIVER
Slide 11 of xx
TSO C145/6 RECEIVERS
•Approved for primary means IFR
Slide 12 of xx
GNSS APPROVALS
• 1995 primary means enroute
– 15 NM separation standard
• 1998 GPS non precision approaches
– 500+
• 2004 RNP 10
• 2006 RNP-AR approaches
• 2006 primary means GNSS
• 2007 GLS Sydney
• 2011 Baro-VNAV approaches
Slide 13 of xx
272 Aerodromes
500+ RNAV (GNSS)
Approaches
Slide 14 of xx
No ADF – GPS may be only aid
Slide 15 of xx
DOMESTIC RNAV
• Approved in 1981!
• Single Inertial/Omega Unit Required
• 14 NM Separation Standard
– 7 NM CEP now available
• “AUSEP”
• Available in Australia FIR
Slide 16 of xx
RNP RNAV
OPERATIONSB737 - 800
Slide 17 of xx
NG TECHNOLOGIES
Slide 18 of xx
SYDNEY GLS
Slide 19 of xx
• TSO C129 Receiver
• RAIM
• CDI Scaling
• PANS OPS Design
• Data Base
• OPS Policy - AIP
• Pilot training
• Integrated INS/GPS
• Uses RNP
• No Scaling
• TERPS RNP
• Company Specific
• To Be Determined
• None Mandated
B737- NG RNAV (GNSS)
Slide 20 of xx
• The area under the fog is Lake
Wakatipu, which after the fog
cleared looks like this..
Slide 21 of xx
Ultimate RNP approach to Queenstown Rwy 05
Slide 22 of xx
Slide 23 of xx
Slide 24 of xx
Slide 25 of xx
• Safety
– Runway aligned DA – almost anywhere
– Lateral & vertical guided approaches
– CFIT risks reduced
– Use of automatics
– Engine INOP solutions
• Operations
– Departure uplift
– Low minima
– Cost benefit
• Approval – individual airline via Instrument
RNP-AR BENEFITS
Slide 26 of xx
DATA CONTROL
• European study
– 1 bit in 1000 in error in modern a/c data base!!
– Puts PBN implementation at risk
• AIS Transition
• RNP-AR needs special data oversight
– Pilots cannot detect data base errors
– Airlines now apply to all the data bases
Slide 27 of xx
PBN at Work
High Noise
Medium Noise
Low Noise
Runway
Brisbane
City Centre
ILS Arrival/Approach
RNP Arrival/Approach
Slide 28 of xx
PBN SAVINGS
• 26 July 2007 through to 25 July 2009,
controllers recorded 16,390 Qantas RNP-
Special approach operations into Brisbane.
• 3,100 RNP approaches that resulted in track
miles/minutes saved
• Approximately 55,946 Nautical miles saved
• Approximately 699,325 kg fuel saved
• Over 2,237,840 kg CO2 not emitted
• 300,000+ PBN ops
Slide 29 of xx
APV REQUIREMENTS
• Aircraft certification (Baro-VNAV)
– Baro System
– FMC
– Data base
– Only 15% IFR aircraft are baro-VNAV capable
• Instrument Approach Design
– LNAV/VNAV - Pans Ops
• Provision of accurate baro – AWIS (BoM)
• Pilot training and rating
– Part 61
Slide 30 of xx
APV IMPLEMENTATION
• Baro-VNAV15% of Aircraft
– 11 approaches initially
– 150+• Funding???
– Considerable misunderstanding by crews • Vertical „advisories‟
• SBAS– 85% of aircraft
– Study by Dept of Infrastructure – funding??
– Other users
– Regional SBAS?
Slide 31 of xx
APV IMPLEMENTATION
• Trial Baro-VNAV Approaches
– 10-15 aerodromes
– Wagga design completed
• 200 other approaches
– $30 million!
• Survey
• Design and validation
• AWIB systems
Slide 32 of xx
Slide 33 of xx
Slide 34 of xx
ADS-B in
Australia
Slide 35 of xx
FL300
Slide 36 of xx
ADS-B MANDATE
• ADS-B mandate above F290
– 2103
– CAO published
• Low Level Project cancelled (ATLAS)
– Means Radars and Nav Aids to be replaced
– Other aids to be refurbished/replaced $200m+
– More costly adoption of APVs
• Should we mandate GNSS navigation?
Slide 37 of xx
PBN TRANSITION
• PBN Task Force concerns
– Cannot go directly to RNP-AR• Pressure by equipped operators
• Approval has taken 2-3 years in advanced States
• High levels of regulatory oversight
• Airlines have self-imposed restrictions
– Need basics first
• WGS-84
• Basic GNSS acceptance and use– Significant early benefits
• Data control
• Pilot, engineer, ATC training and endorsement
Slide 38 of xx
PBN IS NOT ATM
• PBN is a navigation standard
• Need the other elements
– Communications
– Surveillance
• Common PBN based separation standards
• Regional implementation
– Cannot be „State only‟
Slide 39 of xx
STATE RULE CONTENTS
• Aircraft airworthiness requirements
• Pilot, engineer and ATC training and
endorsement
• Instrument approach design standard
• ATC route design, separation standards
• Data control and regulation
• GNSS recording and reporting
Slide 40 of xx
2012 FLIGHT PLAN
• New Flight Plan Format – Nov 2012
– * = PBN/
– Item 18 annotation
• Acceptable to ATS?
– APAC Flight Plan Task Force
• No carriage but capable aircraft
– Aircraft PBN „overlay‟ approved
• Can do NDB approach but not ADF fitted
– How to flight plan?
Slide 41 of xx
APAC PBN WORK
• Regional PBN Plan
• Regional PBN Task Force Meetings– PBN Seminars
– Training Programs
• State Plans– Review by PBN Task Force
• Establishment of Flight Procedures Office (Beijing)
• Involvement in PBN Study Group
• Change of APV Resolution
Slide 42 of xx
DME/DME PBN
• DME/DME RNAV – defined in PBN
• Seen as primary or backup in US and Europe
• Significant implementation issues
– Impact of single DME unserviceability
– APAC infrastructure cannot support this
• Do we have a regional back up/
– Is it needed?
• Limit RNP to GNSS?
– Don‟t regulate for DME/DME PBN in APAC
Slide 43 of xx
A REGIONAL SBAS?
• APAC cannot meet ICAO APV resolution
– Limited number of Baro-VNAV aircraft
– Need 100% LPV = Need SBAS
• (or wait for enhanced constellations/equipment)
• How to progress a Regional SBAS
– PBN Task Force
– APEC GNSS Implementation Team (GIT)
• Successful SBAS trial
Slide 44 of xx
AUSTRALIAN PBN EXPERIENCE
• Basic Navigation Regulations in place
• Very high level of industry acceptance
• Significant safety and financial benefits
• Transition to GNSS expected by industry
• Significant work required
– Internal standards development
– ASTRA Industry Body
• Technology before the Regulations!
– eg B737 – 800 RNP
Slide 45 of xx
Slide 46 of xx
SATCOM VOICE
• ICAO - “Not for ATC Purposes”
– See AIC
• Issues
– No message delivery standards
– Human Factors of Voice
– No time stamp
– Aircraft integration including recorders
• Taken up with ICAO
– Allowed for one HF substitution in Nat Tracks
Slide 47 of xx
REGIONAL ISSUES
• Lack of State rules for GNSS
• WGS-84 not completed
• Lack of GNSS straight in approaches
– New ICAO Resolution on APV
• Safety issue going straight to RNP-AR
• Lack of instrument approach designers
• Need for APAC air-route review
Slide 48 of xx
ICAO global PBN navigation specifications
• Dual RNAV/RNP specifications
• Global specifications
• Performance based
• Prescribed performance requirements
• Single approval required – global
recognition between regulators
RNAV 5
RNAV 1 & 2
RNP 2
RNP 1
RNAV 10
RNP 4
RNAV 5
RNAV 1 & 2
RNP 2
RNP 1
RNAV 5
RNAV 1 & 2
RNP 2
RNP 1
RNAV 10
RNP 4
RNAV 10
RNP 4
RNAV 5
RNAV 1 & 2
RNP 2
RNP 1
RNAV 5
RNAV 1 & 2
RNP 2
RNP 1
RNAV 5
RNAV 1 & 2
RNP 2
RNP 1
Slide 49 of xx
PBN navigation specifications planned for
APAC*
RNAV 10
RNP 4
RNAV 10
RNP 4
RNAV 5
RNAV 2
RNAV 1
RNP 2
RNP 1
RNP APCH
RNP AR APCH
RNAV 10
RNP 4
*Based on PBN TF7 review of State plans
Slide 50 of xx
GNSS enabled RNP navigation specifications
• All RNP
specifications
RNAV 10
RNAV 5
RNAV 2
RNAV 1
RNAV 10
RNAV 5
RNAV 2
RNAV 1 • Seamless
interoperable
regional ATM
Slide 51 of xx
Proposed APAC regional RNP framework
PBN
RNAV RNP
RNAV 10
RNAV 5
RNAV 2
RNP 4
RNP 2
RNP 1
RNP 0.3
RNP APCH
RNP AR APCH
RNAV 1
Slide 52 of xx
ISSUES
• Education and training
– Skill shortages – instrument approach designers
• Variation in State capabilities
– State rule sets, pressure by operators
• Confusion over PBN Standards
– Ie RNP 0.3 is an enroute standard
– Advanced RNP? Exclusive airspace?
• Social issues – Noise vs Carbon!!
Slide 53 of xx
Slide 54 of xx
QUESTIONS
DISCUSSION
Slide 55 of xx
CONTACT
• Ian Mallett
– +61 2 6217 1736
– +61 2 6217 1700 fax
– +61 2 418 259 626 Mobile
Slide 56 of xx
Slide 57 of xx
ICAO 37th General Assembly Resolution A37/11 which
supersedes Resolution A36-23
“…a)States complete a PBN implementation plan as a matter of urgency to
achieve:…
2) implementation of approach procedures with vertical guidance (APV) (Baro-
VNAV and/or augmented GNSS), including LNAV only minima, for all
instrument runway ends, either as the primary approach or as a back-up for
precision approaches by 2016 with intermediate milestones as follows: 30
per cent by 2010, 70 per cent by 2014; and
3) implementation of straight-in LNAV only procedures, as an exception to 2)
above, for instrument runways at aerodromes where there is no local
altimeter setting available and where there are no aircraft suitably equipped
for APV operations with a maximum certificated take-off mass of 5 700 kg
or more;”