www.aoc.gov AOC Presentation to DBIA United States Capitol Complex Charles Iliff Director of Sustainability and Energy, AOC Anna Franz Director Planning and Project Management, AOC Insert Photo Here Insert Photo Here Insert Photo Here Insert Photo Here

Upload: rianne

Post on 23-Feb-2016

46 views

Category:

Documents


0 download

DESCRIPTION

AOC Presentation to DBIA. United States Capitol Complex. Insert Photo Here. Insert Photo Here. Insert Photo Here. Insert Photo Here. Charles Iliff Director of Sustainability and Energy, AOC Anna Franz Director Planning and Project Management, AOC. Agenda. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: AOC Presentation to DBIA

www.aoc.gov

AOC Presentation to DBIAUnited States Capitol Complex

Charles Iliff Director of Sustainability and Energy, AOC

Anna FranzDirector Planning and Project Management, AOC

Insert Photo HereInsert Photo Here

Insert Photo Here

Insert Photo Here

Page 2: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

About the Architect of the Capitol• AOC’s Campus & Mission

Design Build Projects:• E85 Refueling Station• Energy Savings Performance Contracts

• United States Capitol• House Office Buildings• Senate Office Buildings

• Cannon Renewal – Integrated Design Process• Senate Underground Garage – Potential future project• U.S. Capitol Dome Restoration

2www.aoc.gov

Agenda

Page 3: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

3www.aoc.gov

About the Architect of the CapitolAOC’s Campus & Mission

Page 4: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

4www.aoc.gov

About the Architect of the CapitolAOC’s Campus & Mission

Page 5: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

5www.aoc.gov

• 17.4 million square feet of facilities and 550 acres of historic buildings and grounds

• Includes U.S. Capitol, Senate and House Office Buildings, Library of Congress, Supreme Court, Botanic Garden, others

• Production and distribution of steam and chilled water to more than 25 buildings

• Assets entrusted to our care must continue to meet Legislative, Judicial, and public needs while maintaining historical preservation focus

“Serve Congress and the Supreme Court, preserve America’s Capitol and inspire memorable

experiences for our visitors”

About the Architect of the CapitolAOC’s Campus & Mission

Page 6: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

6www.aoc.gov

About the Architect of the CapitolAOC’s Campus & Mission

Page 7: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

Page 8: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

8www.aoc.gov

Design Build Projects:• Authority for Design Build projects – past 5 years• E85 Refueling Station• Energy Savings Performance Contracts

• United States Capitol• House Office Buildings• Senate Office Buildings

• Cannon Renewal – Integrated Design Process• Senate Underground Garage – Potential future project• U.S. Capitol Dome Restoration

Architect of the CapitolDesign Build and other Projects

Page 9: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

9www.aoc.gov

E85:• E85 Refueling Station 2008• AE-1 one month AECOM

(HSMM)• AE2 and construction 6

month ERM and Tanks Direct• $800,000 Renovation

existing AOC refueling facility

Architect of the CapitolDesign Build and other Projects

Page 10: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

10www.aoc.gov

Architect of the CapitolEnergy Savings Performance Contracts

Implemented 3 ESPCs in 14 buildings - $93 million in infrastructure upgrades

• United States Capitol– 29% annual energy reduction over a 10 year term– Partnered with Ameresco– Construction 2009-2012

• House Office Buildings– 23% annual energy reduction over a 16 year term– 32% annual water usage reduction– Partnered with Noresco, LLC– Construction 2009-2012

• Senate Office Buildings– 35% annual energy reduction over a 14 year term– Partnered with Ameresco– Construction 2009-2013

Page 11: AOC Presentation to DBIA

Challenges• Adapt 18th, 19th, and 20th

century facilities to 21st century standards of energy and sustainability

• Work in historic, emblematic facilities of national and worldwide significance

• Preservation of priceless artwork

• Uninterrupted legislative operations

• Minimize impacts to building occupants – be invisible

• High-volume public access

• Tight security 11www.aoc.gov

Implementing ESPCs in Historic BuildingsEnergy Savings Performance Contracts

Page 12: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

12www.aoc.gov

Implementing ESPCs in Historic BuildingsUnited States Capitol

Partnership Details• $14 million partnership with

Ameresco and Banc of America Leasing & Capital

• Detailed energy survey conducted in 2008-2009; contract award in 2009

• Four primary ECMs– HVAC Controls Upgrades– AHU 18 Replacement– Energy Efficient Lighting

Upgrades– Steam Trap Replacements

• Total savings goals– 29% reduction in energy usage

Page 13: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

Implementation Scope• 33 AHUs converted from pneumatic

to DDC• Wireless space temperature

feedback• Night/weekend control setbacks• Ongoing training program for BAS

operators to monitor/diagnose energy-related deficiencies

• AHU-18 HVAC system replacement with a variable-air volume (VAV) system to enhance humidity and temperature control

• 12,900 lamp/ballast efficiency upgrades

• 670 steam trap replacements

13www.aoc.gov

Implementing ESPCs in Historic BuildingsUnited States Capitol

Page 14: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

14www.aoc.gov

Partnership Details• $34 million partnership with

NORESCO, LLC and Bostonia Partners

• Detailed energy survey conducted in 2008; contract award in 2009

• Four primary ECMs– Energy Efficient Lighting

Upgrades– HVAC Controls Upgrades– Water Conservation Measures– Steam Trap Replacements

• Total savings goals– 23% reduction in energy usage– 32% reduction in water usage

Implementing ESPCs in Historic BuildingsHouse Office Buildings

Page 15: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

15www.aoc.gov

Implementing ESPCs in Historic BuildingsHouse Office Buildings

Implementation Scope• 34,200 lamp/ballast upgrades in 6

buildings• Occupancy sensors, daylight

harvesting, day/night scheduling & bi-level lighting in select areas

• Solar fiber optic accent lighting• 77 AHUs converted from pneumatic to

DDC• Wireless space temperature feedback• Night/weekend control setbacks• Duct sealing• Demand ventilation• 78 steam trap replacements• 2,700 low flow, automated plumbing

fixture upgrades• Green roof demonstration• Condensate harvesting for fountain

make-up water

Page 16: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

16www.aoc.gov

Implementing ESPCs in Historic BuildingsHouse Office Buildings

• Environmental stewardship & recycling a key contract component– All lamps/ballasts properly recycled with documented “death”

certificates– All metal debris recycled as much as possible– All packaging/shipping containers recycled or reused– All removed plumbing fixtures ground down and used as

aggregate for road construction

Page 17: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

17www.aoc.gov

Implementing ESPCs in Historic BuildingsSenate Office Buildings

Partnership Details• $42 million partnership with

Ameresco and Banc of America Leasing & Capital

• Detailed energy survey conducted in 2008-2009; contract award in 2009

• Five primary ECMs– HVAC Controls Upgrades– Lighting Retrofits and

Controls– Transformer Upgrades– HVAC Testing, Adjusting, and

Balancing– Removable Insulation Covers

• Total savings goals– 35% reduction in energy

usage

Page 18: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

Implementation Scope• 99 AHUs/EFUs converted from

pneumatic to DDC• Wireless and wired space temperature

feedback• Night/weekend and critical zone

control setbacks; optimized start/stop strategies

• 1,400 VAV box replacements• Cog belt replacements• Coil cleaning• Door seals & weather stripping• 44,300 lamp/ballast efficiency

upgrades• Large expansion of lighting control

system• 134 transformer upgrades• Removable insulation covers installed

on steam valves 18www.aoc.gov

Implementing ESPCs in Historic BuildingsSenate Office Buildings

Page 19: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

19www.aoc.gov

AOC Energy Reduction FY 2003-2015

Energy Savings HighlightsFY2013

Ene

rgy

Inte

nsity

Red

uctio

ns P

erce

ntag

e

-21.8

-25.2-27

-30

Page 20: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

20

AOC FY 2012 (22%)

Energy Savings HighlightsFY 2013

Page 21: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

21www.aoc.gov

$2.7 MillionDollars saved through new energy reductions

25% Energy reduction from FY 2003 baseline, exceeding the FY 2013 goal

20%Reduction in our greenhouse gas footprint from a FY 2008 baseline

Energy Savings HighlightsRecent Accomplishments

6 MillionSquare footage of buildings retro-commissioned

$14 MillionIn building energy improvements re-allocated from utility accounts

230Meters installed

85 MillionGallons of water saved from a FY 2007 baseline

Page 22: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

22www.aoc.gov

• Completed 1908

• Never had complete renewal

• 10 year project to renew entire building

• One wing every two years from 2015-2025

Cannon House Office Building Renewal

Page 23: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

23www.aoc.gov

SUG Renovations & Landscape Restoration Overview - Aerial

Area of construction

Page 24: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

SUG Renovations & Landscape RestorationTimeline

1932: Garage, upper plaza & fountain original construction

24

Page 25: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

SUG Renovations and Landscape Restoration Program Elements

Garage:• Senate Staff Parking – 187 spaces• Car Wash• Senate Fountain Mechanical Room• Capitol Grounds Offices & Shops• Pedestrian Tunnel to RSOB• C Street Tunnel and Associated Shops

Hardscape:• Upper Plaza and Senate Fountain• Cascading Wall Fountain• Infrastructure supporting fountains • Lower Plaza• Senate Reflecting Pool

25

Page 26: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

Proposed Schedule:

August 2012: Award AE-1 Design

May 2013: AE-1 Design Complete

2015: RFP for Design-Builder(Subject to authorization & appropriation)

2016: Construction Start (Subject to authorization & appropriation)

2017: Construction Complete

SUG Renovations & Landscape RestorationProposed Schedule

26

Page 27: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

27www.aoc.gov

• 150+ years old

• Cast iron from 1850s-1860s

• Last restored 1960

• Multi-year project underway will repair 1,000+ cracks

U.S. Capitol Dome Restoration

Page 28: AOC Presentation to DBIA

For Official Use OnlyPublic Law 108-447 Security Review Pending Do Not Disseminate as Document May Contain Security Sensitive Information

28www.aoc.gov

• Exterior envelope repair and restoration (stone)

• Energy Projects• Fort Meade Storage Modules

Upcoming Work