MAINTENANCE MANAGEMENT TOP LEVEL BUSINESS PROCESSDoc. No.: 002
Project : Annual Surveys
Rev.: 00
Date : 27/04/2014Page 13 of 13
SECTION 2ANNUAL SURVEYS
DOCUMENT APPROVALPrepared ByChecked ByApproved ByDATE
Ardyas Wisnu Baskoro4211101022Ir Dwi Priyanta MSEIr Dwi Priyanta MSE
AuthorLecturerLecturer
Revision HistoryNoDateItemArranged by
CONTENTS4 1.1 PURPOSE41.2 SCOPES41.3 DEFINITIONS51.4 ABBREVIATIONS51.5 DESCRIPTION OF ANNUAL SURVEYS61.6 REFERENCES17
1 2 3 4 1.1 PURPOSEThe purpose of this document is to describe the Annual Surveys process and manage those process effectively and efficiently to be applied in Shark Line Company.1.2 SCOPES
The following activities are covered within this business process :1. Annual surveys2. Hull, equipment 3. Machinery 4. Fire extinguishing and fire alarm systems5. Bridge control stand
1.3 DEFINITIONSFor seagoing ship, annual surveys are to be conducted for the hull and the machinery, including the electrical plant, and where applicable, for special equipment classed, at intervals of 12 months, as from the date of commencement of the class period indicated in the certificate1.4 ABBAREVIATIONSAISAutomatic Identification System VDR Voyage Data Recorder
1.5 DESCRIPTION OF ANNUAL SURVEYS
Periodical SurveysNoType of SurveyScopeIntervalSurvey Period (time window)Condition of SurveyRemarksReference
1Annual Survey Hull, equipment Machinery Fire extinguishing and fire alarm systems Bridge control stand12 months3 months before to 3 months after due dateFor ship with accomodation for more than 12 passangers, the annual survey has to be carried out not later than the due date entered.1 part 03 B 1.13 C 1.1
Annual Surveys1. Hull, equipmentNoItemScopeCheck PointRemarksReference
1Main Structural Elements Cargo holds Engine room Random visual inspectionDepending on the ship type, age, and condition of the ship1 part 03 C 1.1.23 C 1.1.2.1
2Hatches, hatches covers Surveyed Surveyed at least once a year3 C 1.1.2.2
3Coamings
4Bulkhead doors
5Ramp
6Bow visiors, bow
7Stern door
8 Bow, inner, side shell, and ster door Inter alia Structural examination Measurement of clearances Examination of sealing and drainage arrangemet Function test (doors, indicator) Water leakage detection Tightness test NDT and thickness measurement For Ro-Ro and Ro-Pax ship Shell door should clear opening of less than 12m2
9Steering gearChecked3 C 1.1.2.3
10Anchor equipment
11Cargo holds ( discharge with grabs)These area Surveyed 3 C 1.1.2.4
12Ship equipped for carriage of container Condition of lashing/securingSurveyed Approved container stowage plan 3 C 1.1.2.5
Condition of container supportWelded into the ship`s structure or the hatch covers
13Ballast tanksSubstansial corrosion Surveyed 3 C 1.1.2.6
14Passanger vessel All closures on the water deck Watertight bulkheads All bow visiors Side and stern doors Fire doors and similar closures Escape Cross flooding arrangementsChecked checked every a year to the condition and operability3 C 1.1.2.7
2. Machinery NoItemScopeCheck PointRemarksReference
1Propulsion system
Intermediate shaft bearing, including thrust bearing Gearing Mechanical and flexible couplings Turning gear Main propulsion engineInspectionAt Machinery and Boiler room1 part 03 C 1.1.33 C 1.3.3.3
2Auxiliary engines
3Fire and explosion sources
4Emergency exitChecking
5Boilers, pressure vessels with their appliances, and safety devicesExternal inspection
6Remote control, quick-closing/stopping device of pumps, valves, ventilators, etc.Inspection and checking
7Remote control and automation equipmentRandom checking
8Main auxiliary steering gearIncluding their appliancesInspection and checking
9Communication system Between bridge and machinery Boiler and steering gear roomsChecking
10Bilge system Remote control actuators Bilge filling level monitorInspection
11Main and emergency power supply systemIncluding switch gear and other electrical installation Checking
12Explosion proof installationsSurvey
13Permanently installed installations to the surveyor`s discretion Cooling plant Air conditioning Incinerating plant Checking
14Class notation CM-PS Stern tube lubrication oil systemSurveyed
Temperature stern tube bearings Checking
3. Fire extinguishing and fire alarm systemsNoItemScopeCheck pointRemarkReference
1Fire mains system Hoses NozzlesInspection / testing 1 part 0 3 C 1.1.4
2Fixed fire extinguishing system
3Water spray system For cooling of cargoes
4Portable and mobile fire extinguishers Portable foam
5Fire detection and alarm systems
6Emergency stop Ventilation fans Boiler forced draft fans Fuel transfer pumps Fuel oil purifiers Thermal oil pumps
7Quick closing fuel valves
8Fire closures Fire dampers Engine room skylights
9Fire fighter outfits
10Fire fighting system With the class notation FF1, FF2, or FF3
Additional requirements
NoItemScopeCheck pointRemarkReference
1Fixed fire extinguishing systems Water spray system Isolating valve Nozzels Check Service by supplier every 2 years1 part 0 3 C 1.1.4.13 C 1.1.4.1.1
CO2 hoseInspection
2Pressure vessels Gas fire extinguishing system Checks Check at interval of 2 years ( 3 months), performed by ship`s staff 3 C 1.1.4.1.2
3Fixed foam fire extinguishing system TestNot later than 3 years after filling into system 3 C 1.1.4.1.3
4Portable foam applicator unitReplace Renewed every 5 years 3 C 1.1.4.1.4
5Portable and mobile fire extinguisher Portable fire extinguisher Mobile fire extinguisher Inspection Serviced (not exceeding one year)3 C 1.1.4.1.5
Tested At least one portable fire extinguisher of each type manufactured in the same year shall be tested discharged (every 5 year)
All portable fire extinguisher, with propellant catridges (if any)Tested Hydraulically tested (not exceedeing 10 years)
4. Bridge control stand NoItemScopeCheck pointRemarksReference
1Automatic Identification System (AIS) Testing SOLAS V/18.9
2Standard magnetic compassDetermination of magnetic compass error STCW Code/Sec. A-VIII/2.34.2
3Voyage Data Recorder (VDR)Certificate of Compliance and maintenancereport shall be retained on board the shipSOLAS V/18.8
Check listDOCUMENT : SM 1.1
Vessel : Company : Location :
Subject : Main EngineDate : Page : 1
Yes / No Condition / Leakages Protection Type / Serial
Manufacturer
Maintenance plan in place / follow up
L.O circulation tank capacity
L.O consumption