production schedule

Post on 12-Aug-2015

24 Views

Category:

Business

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Date of lesson/ filming day

What shots/scenes are being filmed

Where will filming take place

What crew and cast are needed

What props and costumes are needed

What equipment is needed

Wednesday 7th January after school

Shot 10-11 In the Forest The Actors (Sophie and Chester) and the camera

Casual costume dress

Camera, Tripod

Friday 9th January school time

Shot 16-19 In the bedroom Sophie, and camera

Bed and bedroom equipment, pyjamas

Camera, Tripod, Fake blood

Saturday 10th January out of school time

Shots 12-15 Kitchen and Front Garden

The Actors (Sophie and Chester) and the camera

knife and food for cooking, pyjama and casual dress

Camera and Tripod

Monday 12th January After school

Shots 6-9 Back Garden and Lounge

The Actors (Sophie and Chester) and the camera

Garden Tools, Lounge Equipment, Bowl of popcorn

Camera and Tripod

Saturday 17th January out of school time

Shots 1-5 Bournemouth Beach

The Actors (Sophie and Chester) and the camera

Winter wear costume.

Camera and Tripod

Monday 19th January

Voice Over Classroom at school

Sophie is needed Voice recorder

Date of lesson/ editing day

What shots/scenes are being edited

Wednesday 21st January in school time

I will be editing shot 1 where they are walking up the promenade and shots 2-3 where they are on the beach

Thursday 22nd January in school time

I will be editing shots 4-5 where they are on the beach

Wednesday 28th January in school time

I will be editing shots 6-8 from the lounge

Thursday 29th January in school time

I will be editing shots 9-11 where they are in the forest and in the back garden

Wednesday 4th February in school time

I will be editing shots 12-15 where they are in the kitchen and in the front garden

Thursday 5th February in school time

I will be editing shots 16-19 where Sophie is in the bedroom

Wednesday 11th February in school time

I will be adding the voice over and the music

Thursday 12th February in school time

I will be making sure that everything works well and runs smoothly and I will add the credits.

top related