Salford City CollegeEccles Sixth Form CentreBTec Level 3Extended Diploma in Creative Media ProductionGames Design

FMP - Production Log

Name Sam Reynolds

Date: 03.02.14

Today I began to come up with my idea.

Date: 10.02.14

After deciding what I wanted to do I went on the internet and found some pictures id use as a mood board and did my audience research, all this was put in to my pitch.

Date: 17.02.14

After collecting some images and research I began to create some plans for what I was making so that I had something to go off.

Date: 24.02.14

Today I did my pitch, a little later than I would like but during the time I managed to make and get a really good idea of what I wanted to do.

Date: 03.03.14

Today I began to do some tests in side of unity so that I knew how it worked, I figured how the textures worked and how to import models from modeller that I have made.

Date: 10.03.14

After making some models and textures for them I have come across a problem where the textures won’t be applied to my models.

Date: 17.03.14

After being unable to figure out how to fix the problem with my textures I decided that I will leave the texture until the end of the project and if still unable to get them to work I will leave them out.

Date: 24.03.14

After my personal computer broke on the 19th I have been unable to work on my project at home, causing my progress to fall behind the times I set, I am working very hard to catch up to where I should be and will try to get the software I need on to my person laptop to do as much work on the unity side as I can and model as much as I can in college time.

Date: 31.03.14

Have got my personal computer fixed I can get back on track to where I wanted to be up to last week, there isn’t much that needs to be done now, just a couple more models and a little bit of coding. I have uploaded all my stuff on to the blog with the acspetion of my project, which I will upload as late as possible so I can flush out any bugs I am having.