air force medical support agency (afmsa) health facilities … · 2018-08-21 · air force medical...

61
Ai r Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems Rev: 9.0 - 1 Nov 2017 Air Force Medical Support Agency (AFMSA) Health Facilities Division Quality Standards & Design Principles Applicable to the Repair, Replacement & Modernization of Air Force Medical Facility Infrastructure Systems & Assets Revision 9.0 1 Nov 2017 The Office of Primary Responsibility for this document is the Air Force Medical Support Agency (AFMSA), Health Facilities Division (HFD), Facilities Operations and Engineering Branch (AFMSA/SG8FE). For questions regarding authority or content, please contact AFMSA/SGS8F, Mr. Christiansen, at DSN 945-1027or Commercial (210) 925-1027. SUPERSEDED

Upload: others

Post on 08-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

Air Force Medical Support Agency (AFMSA)

Health Facilities Division

Quality Standards & Design Principles

Applicable to the Repair, Replacement & Modernization

of

Air Force Medical Facility Infrastructure Systems & Assets

Revision 9.0 1 Nov 2017

The Office of Primary Responsibility for this document is the Air Force Medical Support Agency (AFMSA), Health Facilities Division (HFD), Faci l i ties

Operations and Engineering Branch (AFMSA/SG8FE). For questions regarding authority or content, please contact AFMSA/SGS8F, Mr. Christiansen,

at DSN 945-1027or Commercia l (210) 925-1027.

SUPERSEDED

Page 2: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

Table of Contents

Section Chapter / Section Title Page

Section 1 Purpose and Introduction 3

Section 2 Mechanical Infrastructure Systems 3

Section 3 Testing and Balancing of HVAC Air & Hydronic Systems 15

Section 4 Commissioning of HVAC Systems 16

Section 5 Plumbing Systems (Including Medical Gas and Fire Protection) 18

Section 6 Electrical Infrastructure Systems 20

Section 7 Building Envelope & Roofing Systems 29

Section 8 General Requirements Applicable to all Disciplines 46

Section 9 Infection Control 49

Section 10 Drawings and Project Documentation 51

Section 11 Miscellaneous 54

SUPERSEDED

Page 3: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

1.0 Purpose & Introduction

This document provides guidance to designers, maintenance providers and contractors engaged in the repair,

renovation, construction and modernization of Air Force Medical Service (AFMS) properties worldwide.

1.1 Intent

This guide is not intended to serve as complete specification in and of itself, but rather compliment already published

industry standard practices, the Uniform Building Codes, the Unified Design Facilities Criteria (UFC 4-510-01),

applicable codes and requirements published by NFPA, AIA, NESC, NRCA, IBC, SMACNA, ASHRAE, ASPE, current

Engineering Technical Letters (ETLs) published by the Air Force Civil Engineering Center (AFCEC) and the Air Force

Medical Support Agency (AFMSA), local and regional codes, regulations and other pertinent publications. Where

existing publications are again mentioned or cited in this guide, it is done so to reiterate the significance of that

publication.

1.2 Exceeding Codified Minimums

The published codes and standards mentioned in paragraph 1.1 above establish the minimum requirements for

construction. It is the intent of this guide to establish criteria and require features that are above the minimum basic

requirements for construction and performance to provide a more efficient, reliable, maintainable, comfortable and

healing environment for patients and staff. In the event of conflict, the more stringent requirement shall govern.

1.3 Compliance

The designer is responsible for incorporating the engineering philosophies herein into any design solution being

proposed for application at an AFMS Medical Treatment Facility (MTF). Prior practice, precedent or design does NOT

release the designer/contractor from compliance with the content of this guide as published at time of proposal

offering. Where a contractor may desire to propose a design which is in deviation to this guide (but appears to meet

the intent of the guidance), the contractor shall describe in detail any deviation with a narrative proposal and design

drawings if an illustration will make the alteration more clear. The contractor will make the deviation a separate, clear

and notable exception in the proposal being submitted. Providing a notation of the exception (of the proposed

deviation) in the proposal does not automatically make it acceptable or accepted by the government. The request for

deviation must include a complete analysis of the deviation and reason for such. Include any supporting documents

such as calculations, equipment information, cost benefit to the government, etc.

1.4 Engineering Technical Letters (ETLs)

Headquarters Air Force Civil Engineering Center (AFCEC) Engineering Technical and Headquarters Air Force Medical

Support Agency (AFMSA) both publish ETLs. The Civil Engineer for the Air Force (HAF/CE) and the Chief of the Health

Facilities Division (AFMSA/SG8F) publish ETLs as interim guidance to Air Force Instructions (AFIs) and construction

code requirements. Compliance with ETLs cannot be waived without specific approval of the authority publishing the

ETL. Current ETLs published by the Air Force Civil Engineer are available on the Whole Building Design Guide and can

be viewed at WBDG.org.

SUPERSEDED

Page 4: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

2.0 Mechanical Infrastructure Systems

When making repairs, alterations or renovating existing mechanical infrastructure requiring major component or

equipment replacement, the designer/contractor shall NOT assume that a “like-for-like” replacement is acceptable.

The designer/contractor shall improve the system to better meet the existing and future load/service requirements

by reducing energy consumption and improving reliability, operability, and maintainability.

2.1 Basis and Theory of Design

All new construction, or major renovation projects (as defined by UFC 4-510-01) must provide at least a 14% energy

reduction below the current ASHRAE Standard 90.1 published baselines. The contractor shall submit ASHRAE 90.1

system analytical calculations and simulations. Energy efficiency improvements greater than the 14% required will be

heavily weighed against the type of equipment and overall reliability and life expectancy of the equipment.

2.1.1 Chilled and Condenser Water Systems 2.1.1.1 Chilled water system design for indoor mounted chillers shall include a piping arrangement that extends

to the exterior of the facility with valved and flanged connections for connection of a temporary chiller.

The pipe connections at the system shall be so designed that a temporary chiller can be connected

without requiring a temporary pump. Provide electric power and disconnect to the building exterior at

the point of temporary connection. Size piping and electric power to match the largest indoor chiller.

2.1.1.2 Select chillers that will provide modulation or unloading down to the 20% range and remain under stable

operation without surging with constant design entering condenser water temperature. Provide head

pressure control for chillers as required by manufacturer’s application guide.

2.1.1.3 Single chiller installations shall be at least dual compressor, dual circuit design sized with each circuit at

60% of peak cooling load (Sum of AHU capacities). Multiple chiller designs shall include same basis of

design in that the system will provide at least 60% of the peak cooling load with the failure of any one

circuit. At forty total system tons and greater, provide at least two chillers.

2.1.1.4 Any space requiring “special” environmental conditions that are less than 70oF and 50% relative

humidity shall require a dedicated cooling system.

2.1.1.5 The condenser water design shall provide freeze protection (both operating and idle) and control of

chiller condenser pressure.

2.1.1.6 Antifreeze shall be used NOT be used in chilled water systems in ASHRAE Climate Zone 4 or less.

Antifreeze may only be used with AFMSA/SG8F concurrence in ASHRAE Climate Zone 5.

2.1.2 Heating Water/Steam Systems 2.1.2.1 The basis of design for heating hot water systems shall include natural gas fired, high efficiency or

condensing, packaged, hot water, boilers.

2.1.2.2 Provide dilution accessory to prevent acidic effluent from entering sewer system.

2.1.2.3 Designer shall eliminate or minimize steam based systems – where economically feasible.

2.1.2.4 Boiler design shall include a dedicated constant volume boiler primary pump to ensure proper water

flow at boiler and secondary loop pumps with variable frequency drives. 2.1.2.5 Select pump motors with 120% of selected brake horsepower (HP) at the design condition up to 25 HP

and 110% of selected brake horsepower for motors over 25 HP.

2.1.3 Air Distribution Systems

2.1.3.1 Continuous cooling loads such as laboratories, pharmacies, and IT equipment areas with heat

SUPERSEDED

Page 5: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017 Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

generation equipment in the space shall be cooled utilizing building cooling systems when available but

operating independently when building system is not available.

2.1.3.2 Heat recovery systems shall be provided for all 100% Outside Air (O/A) systems; heat wheels shall NOT

be used.

2.1.3.3 In major renovation projects, the design team shall convert all constant volume or multi zone or dual

duct HVAC systems to Variable Air Volume Single Duct type. Convert 100% O/A systems to

accommodate as much return air as allowable by code.

2.1.3.4 The airflow design shall include a room by room ventilation analysis. If the cooling/heating load airflow

requirement is greater than the airflow required to meet minimum ventilation requirements, then that

load requirement shall dictate the ventilation of that space. When the airflow volume needed to meet

minimum ventilation requirements is greater than the thermal load requirement, then that airflow rate

shall dictate the design for that space. In NO circumstance shall the airflow volume design for any

space be less than 110% of the calculated minimum air exchange rates. This practice will apply to all

spaces in the clinic or hospital that have a published air exchange requirement. No diversity that

reduces airflow from design values shall be used. Follow UFC 4-510-01 for air change reduction in

unoccupied surgery suites.

2.1.3.5 When a space requires a pressure relationship to an adjacent space, the design of the suppl y and

exhaust air flow rates for the space requiring the pressure relationship shall utilize a minimum of 20%

differential between the two flow rates. The contractor shall be responsible for any corrections or

changes required for achieving space pressure differentials.

2.1.3.6 The room by room ventilation analysis shall be totalized to provide an overall minimum outside air

supply rate for the entire zone. Provide an airflow measuring station at the outside air intake of the

affected air handler to provide continuous monitoring and control of the outside air volume. The

designer shall not use a "worst case scenario" percentage of outside air for a single room in the zone to

base the total design flow rate of an air handler.

2.1.3.7 One Variable Air Volume (VAV) terminal shall not serve more than six (6) rooms or 2,000 square feet.

Designer shall not mix occupancies or exposures on a common VAV terminal. Each DIPC or CIPC room

shall be a dedicated zone.

2.1.3.8 Select all fans for not greater than 80% of the maximum fan RPM rating (at 110% of design load). Provide

all fan motors up to 25 horsepower with nameplate rating that is 120% of selected brake horsepower.

For fan motors above 25 horsepower provide motors with nameplate rating of 110% of selected brake

horsepower. Provide grounding rings on motors served by VFDs.

2.1.3.9 Field assembled systems with fan/s, coil/s, and filter/s constitute an air handling unit and shall

conform to Section 2.2.5 of this guide. Duct mounted cooling coils are not acceptable.

2.1.3.10 For air handlers designated with air side economizer cycles, the outside air duct must be sized to allow

full design airflow.

2.1.3.11 Exhaust fans serving critical or hazardous spaces shall not be interlocked with associated air-handling

units for automatic shutdown.

2.2 Equipment Physical Characteristics

2.2.1 Chillers

2.2.1.1 Select condenser tube water side surface with smooth bore or rifled tubes only. Condensers shall have

removable heads to allow brush cleaning of condenser tubes.

2.2.1.2 Provide a new refrigerant monitoring and alarm safety system having all features currently required by

ASHRAE Std. 15. Reuse of existing refrigerant safety systems in part or in full will be accepted if it can

SUPERSEDED

Page 6: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

be demonstrated that as a complete assembly, it meets or exceeds the minimum performance

standards and the contractor provides a full warranty.

2.2.1.3 Chillers located in coastal environments shall have copper fins and/or baked epoxy coating.

2.2.1.4 Furnish manufacturers louvered panels over the coil surface and the lower equipment enclosure areas

on air cooled chillers.

2.2.1.5 Open drive chillers shall not be used. Chillers utilizing scroll compressors may not exceed 60 tons total

capacity.

2.2.1.6 If a refrigerant compressor fails for any reason, the contractor shall perform an acid test and record

the results. Further clean up and repair shall be performed per the 2014 ASHRAE Refrigeration

Handbook Chapter 7 and new compressors shall be installed per the manufacturer’s

recommendations.

2.2.2 Boilers

2.2.2.1 Fully modulating boilers are required and must demonstrate stable operation without vibration or

excessive noise throughout the full range of modulation.

2.2.2.2 When new steam boilers MUST be used in a design, steam boilers shall have a minimum turn-down

ratio of 3:1. For steam boilers over 50 HP, turn-down ratio shall be a minimum of 4:1.

2.2.2.3 Steam boilers shall utilize flow control devices (e.g. orifices) to restrict flow to no more than designed

package capacity.

2.2.2.4 Utilize Lo-NOX boiler (or ultra-Lo-NOX, as required by local authorities) firing controls.

2.2.3 Pumps

2.2.3.1 Use only TEFC NEMA premium efficiency motors.

2.2.3.2 Where pump motors will be controlled by VFDs, they will be so designed for continuous use/duty with

VFDs. Provide grounding rings on motors served by VFDs.

2.2.3.3 Provide testing ports at suction and discharge side of all new pumps. The discharge pressure fitting

shall be at the discharge before any fitting or valve. On the suction side, the pressure port shall be no

closer than one foot from any fitting or elbow.

2.2.3.4 All pump bases shall be grouted with a self-leveling epoxy grout after alignment is complete. All pump

assemblies shall be laser aligned.

2.2.4 Cooling Towers

2.2.4.1 Towers shall have manufacturer’s access ladders, access platforms, interior walkways, and hand rails

around the top of the tower. The towers shall have stainless steel construction throughout, and PVC

fill.

2.2.4.2 Use Variable Frequency Drive (VFD) and motors designed specifically for use with VFDs on tower fans.

Provide grounding rings on motors served by VFDs.

2.2.4.3 Provide side filtration and a basin cleaning system to remove solids from the basin and condenser

water.

2.2.4.4 Provide automatic water make-up control with separate metering. Meter shall be of type that can

provide data to the Building Automation System (BAS). Meters shall be connected to BAS. High and

low water level alarms shall also be provided to the BAS.

2.2.4.5 Provide basin equalization piping on towers serving a common system.

2.2.4.6 Tower installation shall provide sufficient height for required condenser pump NPSH.

2.2.4.7 New cooling towers shall be of the induced draft cross flow design with TEFC (or TEAO) motors.

SUPERSEDED

Page 7: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

2.2.4.8 Design cooling towers according to ambient temperatures listed in UFC 4-510-01. Select towers for

not more than a 10o F approach temperature at design conditions.

2.2.4.9 Select pump motors and fan motors with 120% of selected brake horsepower at the design condition

up to 25 HP and 110% of selected BHP for motors over 25 HP.

2.2.4.10 Water Treatment system shall measure conductivity and pH and automatically apply chemicals by

requirement not time. System shall conform to UFGS Specification Section 23 25 00 – Chemical

Treatment of Water for Mechanical Systems. At a minimum, water conductivity and pH shall be

sensed and reported to the BAS.

2.2.5 Air Handlers

2.2.5.1 Drain pans in AHUs shall be stainless steel and constructed so there is no standing water in the pan.

Slope pans in two dimensions to the drain connection. Furnish drain pans under cooling coils, heating

coils and humidifier dispersion tubes.

2.2.5.2 Cooling coils (chilled water) shall be ARI listed for performance. Coils shall have no more than 12 fins

per inch and serrated fins are not acceptable. The minimum design entering water temperature shall

be 2o F above system chilled water supply temperature as documented in latest official project plans

with a water temperature differential across the coil of 12o F. Provide stainless steel coil casings and

intermittent supports. Aluminum coil fins shall be no less than 0.0075” thickness. Copper coil tubing

shall be of minimum tube wall thickness of .020” and 5/8” diameter. A single chilled water coil shall

be no more than 8 rows. Where coil capacity requirements dictate more than 8 rows in depth, the coil

shall be split into two separate coils with minimum of 12 inches between them. Maximum cooling coil

face velocity shall be no higher than 500 FPM at the AHU design capacity.

2.2.5.3 Heating coils (hot water or steam) shall be ARI listed for performance. Coils shall have no more than

12 fins per inch and serrated fins are not acceptable. Aluminum coil fins shall be of 0.0075” minimum

thickness. Copper coil tubing shall be of minimum tube wall thickness of .020” and 5/8” diameter.

AHUs in ASHRAE climate zone 3 or higher shall be provided with preheat coils of s The use of steam

coils should be minimized and shall NOT be used for outside air preheat applications.

2.2.5.4 Provide 200,000 hour (L10) rated bearings on shafts and motors 5 HP and larger. Provide TEFC (Totally

Enclosed, Fan Cooled and NEMA premium efficiency) motors for fans. Provide grounding rings on

motors served by VFDs.

2.2.5.5 Provide laser alignment and belt tensioning of supply and return fans upon installation. Laser

alignment and belt tensioning tool, as well as user training, shall be provided to local FM staff upon

completion of project.

2.2.5.6 Air handlers shall have access doors in all modules except coil modules. Doors must be hinged at one

side and with latches on one side that take no tool to operate. Doors shall provide full swing or have

pin and sleeve hinge for removal. Each module shall have a vision panel and interior lighting with

switching at exterior of AHU. Doors shall swing into the space with higher pressure or doors shall be

equipped with latches that prevent violent opening due to pressure.

2.2.5.7 AHU casings shall be designed and rated for 2” water column greater pressure than the fan’s total rated

static pressure at maximum RPM. Provide gasketed panels and grommets on pipe and tubing

penetrations of the exterior casing to eliminate air leakage.

2.2.5.8 All air handlers shall be double wall with interior insulation but no insulation exposed to the airstream.

Galvanized smooth metal interior panels are required with no perforated panels acceptable.

2.2.5.9 Provide a thermal break between casing interior and exterior on all outdoor units and on those located

within unconditioned interior spaces. “Sandwich” panel construction, consisting of closed cell foam

SUPERSEDED

Page 8: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017 Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

that is injected between the outer and inner sheet metal panels shall be used.

2.2.5.10 Air dampers in air handlers or in ducts shall be airfoil type with opposed blade design, low leakage type

with a neoprene seal at blade edge. All rotating shafts shall be chrome plated steel and bushings shall

be stainless steel sleeve bearings. Provide extended shafts for attachment of damper actuators at the

exterior of ducts and air handlers.

2.2.5.11 Provide a dedicated casing section with moisture eliminators for humidifier dispersion tubes. See UFC

4-510-01 for more additional requirements relating to humidification.

2.2.5.12 Air handlers and filter compartments shall have filter racks with spacers and gaskets necessary to

prevent ANY air bypass around filters. Size the racks for max filter face velocity of 500 fpm. Design the

filter racks to utilize only filter sizes that are Industry Standard and readily available as a Commercial

off the Shelf (COTS) product. Filter Boxes shall conform to the UFGS 23 73 13.

2.2.5.13 Refer to latest edition of UFC 4-510-01 for proper filter selection. The default filter arrangement is a

pre-filter; located upstream of all coils, velocity sensing devices or other devices requiring protection

from particulate accumulation, and an intermediate filter; located downstream of the supply fan or

cooling coil, whichever is last. The pre-filter shall be a 4 inch thick (minimum thickness) disposable

cartridge filter with pleated media and a Minimum Efficiency Reporting Value (MERV) rating of MERV-

8. The intermediate filter (when required by UFC 4-510-01) shall be rated as MERV-14. Do NOT design

or install systems which incorporate the use of bag or roll filters. Filters in O/A streams shall be

moisture resistant type. See paragraphs 7-8.4 and 7-11.1 in UFC 4-510-01 for more instruction on air

filters, their location and their protection.

2.2.5.14 For AHU retrofit projects, dimensional conflict between standard equipment dimension and limited

available space does not exempt the designer or contractor from adhering to the aforementioned air

filter requirements. Deviations offered in a proposal will be evaluated for adequacy of filtration and

filter location.

2.2.5.15 Furnish manufacturer’s continuous base rails on indoor AHUs. Provide reinforced concrete

housekeeping pad (4” minimum) in combination with the base rail to provide overall height for proper

condensate trap construction. Contractor shall provide trap design detail to show that trap is designed

for a trap depth minimum 1” greater than total fan static pressure. Trap design shall be specific to

draw through and blow through coil designs.

2.2.5.16 Air handlers with multiple supply fans in a “fan wall” configuration shall include dedicated VFD for each

fan and each fan shall have a backdraft damper at the discharge to allow operation of the AHU with a

single operable fan in the failed mode. The loss of any single fan shall not reduce AHU CFM below 60%

of design airflow.

2.2.6 Variable Air Volume Terminals

2.2.6.1 All Variable Air Volume (VAV) terminal boxes shall be pressure independent type.

2.2.6.2 Heating water coils in VAV terminals serving exterior zones in heating dominant climates shall be two

row design.

2.2.6.3 VAV terminals shall be double wall with insulation between panels so not to be exposed to airstream.

Provide terminals with double-walled insulated manufacturer’s access panel at an easily accessible

area for all interior components. Install VAV boxes to provide unhindered access to the access panel

and controls.

2.2.6.4 Flex connector from medium pressure ductwork to VAV box inlet shall not exceed six (6) inches in

length.

SUPERSEDED

Page 9: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017 Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

2.2.7 Piping Systems, Duct Systems and Miscellaneous General Requirements

2.2.7.1 All motors controlled by Variable Frequency Drives (VFD) shall be of the design that reduces or

eliminates inducted transient rotor voltage. This can be either motors fitted with grounding rotor

brushes, ceramic bearings or other AFMSA approved technology.

2.2.7.2 Stencil or label all finished pipe surfaces to clearly label content and normal flow direction pursuant

with ANSI/ASME A13.1. Provide identification at a maximum 20 ft. interval.

2.2.7.3 For roof top mounted equipment, the curb, base anchoring point and/or manufacturer equipment

stand shall be securely anchored to the underlying structural members and meet the requirements for

wind loading and uplift for the geographical area. Curbs shall be installed per NRCA recommendations

unless otherwise designed by a professional structural engineer as needed to meet special unique

requirements specific to the site or region. Treated wooden skids, timbers and similar materials used

for curbs and mounting platforms shall be coated, covered and flashed as necessary to eliminate

exposure to UV and the elements; and shall present a seamless matching appearance consistent with

the roof system. Minimize the use of roof mounted equipment.

2.2.7.4 When using existing concrete housekeeping pad for mechanical equipment, the contractor must verify

the pad size to determine adequate clearance beyond the equipment. Contractor must completely

remove the old pad down to solid foundation and construct a new house keeping pad. See section

8.0.6 Equipment Mounts and Foundations, for further guidance.

2.2.7.5 Isolation valves, flow measuring ports and balance valves shall be installed on all coils and all

components requiring Test, Adjust & Balance (TAB). Strainers required ahead of all control valves and

pumps.

2.2.7.6 ProPress or equal cold compression type fittings are acceptable in ¾ inch copper lines and smaller.

When copper Press fittings are used, the copper pipe fitting installation systems shall use modern cold

press connection technology. Fittings shall utilize an EPDM sealing element to provide permanent leak-

proof connections. Copper press fittings shall be installed using the proper tool, actuator, jaws and

rings as instructed by the press fitting manufacturer. The installation of copper tubing for hot and cold

water distribution systems shall conform to the requirements of the ICC International Plumbing Code

or IAPMO Uniform Plumbing Code. Installed fittings shall have Operating Pressure: 200 PSI, maximum

Test Pressure: 600 PSI, maximum Operating Temperature: 0°F to 250°F. Fittings shall carry a 50-year

warranty against defects in material and workmanship.

2.2.7.7 Above ceiling spaces shall not be used as return air plenum (See Attachment 1).

2.2.7.8 Where ducts must be located outside the building, provide dimpled metal jacketing with an anodized

finish in the color selected to best harmonize architecturally with the building.

2.2.7.9 Provide all stainless steel (SS) duct construction, with seamless welded joints; (to include all

accessories) downstream from trim humidifiers or high efficiency final filters serving surgical procedure

spaces. Provide drain nipple with plug in SS duct (i.e., Operating Rooms, Dental Surgery, Labor &

Delivery, etc.). See UFC 4-510-01 Section 7-11.5.1 for additional details.

2.2.7.10 Flex duct connecting terminal boxes to supply air devices shall not exceed five (5) feet in length. Do not

use flex duct for return or exhaust duct systems. Where the facility is undergoing a renovation

involving complete replacement of ceilings and ceiling mounted air devices throughout a large

contiguous space, the contractor shall replace all old / existing flex duct with new. This includes all flex

duct on systems serving the area and those flex ducts that only pass through the area.

2.2.7.11 Ductwork design shall use long radius elbows.

2.2.7.12 Supply, return and outdoor air ductwork shall be sealed with water based mastic at all joints and

externally insulated. Test all new ductwork per SMACNA standard.

2.2.7.13 All branch ducts shall have manual balancing dampers. This includes branch ducts on various floor

SUPERSEDED

Page 10: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017 Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

levels connected to a vertical riser.

2.2.7.14 During a major renovation project including duct modifications the contractor shall not reuse existing

duct if the duct (or a section thereof within the space) is internally insulated, damaged, not properly

sized, or more than 25 years old. Duct cleaning is NOT an option.

2.2.7.15 Duct cleaning shall only be considered on exhaust and return air distribution systems. Cleaning supply

air distribution ducts and components that are downstream of the final filter bank shall require special

exemption and prior approval by AFMSA/SG8FE; who shall provide detailed guidance on the specific

methods to be employed during the cleaning and post cleaning start of air distribution systems.

2.2.7.16 Where exhaust and return air duct system must be cleaned, the duct cleaning process must follow

procedures pursuant to guidelines established and published by ASHRAE and the National Air Duct

Cleaners Association (NADCA).

2.2.7.17 All outside air (OA) duct in coastal locations shall be 316 or better stainless steel to the AHU inlet.

2.2.7.18 All pipe and duct insulation shall meet or exceed ASHRAE 90.1 and National Insulation Association (NIA)

guidelines as prescribed by Whole Building Design Guide and “Federal High Performance & Sustainable

Buildings.”

2.2.7.19 All chilled water pipes shall be insulated with cellular glass material. Mineral fiber or unicellular

insulation is not acceptable.

2.2.7.20 All indoor piping insulation in mechanical rooms or where exposed shall be covered with PVC jacketing

with a thickness of that least 30 mil. PVC shall match local fluid color schemes or if no color scheme,

may be white. Painting is not a substitute for PVC jacketing, nor will PVC be painted unless specified by

code. Provide stenciling or labeling of the finished exterior pipe covering to show contents and

direction of flow per ANSI/NFPA requirements. Provide identification at intervals not exceeding twenty

feet. Insulate all piping specialties per UFGS 23.07.00.

2.2.7.21 All outdoor mechanical insulation shall utilize metallic jacketing to protect such insulation from

exposure and elements.

2.2.7.22 All supply, return, and outside air ductwork shall be insulated. Exhaust duct shall be insulated from

the exterior penetration to the backdraft damper.

2.2.7.23 In areas of known or anticipated “climbing” on/over of the insulated component by personnel, grated

steel walkways or catwalks shall be installed. In areas where the installation of a walkway is not

possible due to dimensional clearance constraints, the appropriate rigid durable insulation materials

shall be used: Calcite (or approved alternate) for steam / heating / domestic hot water, cellular glass

(or approved alternate) for chilled water. Heavy sheet metal jacket or protective cover shall be

installed by the contractor to protect the insulation.

2.2.7.24 Leave no insulation exposed to the air stream in any ductwork or equipment.

2.2.7.25 Contractor shall make all repair/replacements as to maintain any in-place manufacturer's or

contractor's warranties. In the event that the item removed leaves a penetration/hole in the exterior

cladding and/or structure framing of the assembly, the Contractor shall properly reconstruct the

assembly (both substrate and cladding) to match the surrounding construction and finish. Structural

capacity, weather-tightness and aesthetics shall all be essential elements of the work. An engineer

shall be utilized to design the structure for in-filled load-bearing systems on openings larger than 24”

in any dimension.

2.2.7.26 All chilled water lines shall utilize a compartmentalized vapor seal. Vapor seals shall be no more than

four (4) insulation joints in length.

2.2.7.27 Insulating materials containing polyisocyanurate with a smoke index greater than 50 shall NOT be

utilized in AFMS facilities.

SUPERSEDED

Page 11: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

2.2.7.28 For closed loop hydronic systems provide weld-o-lets, feeders and other devices to accommodate

chemical treatment. Include corrosion test coupon assembly.

2.2.7.29 For systems without glycol, include water meter with pulse counter contactor on make-up water line,

and connect to the BAS. For systems with glycol provide a glycol feed pump, pre-mix glycol tank,

pressure feed contact, and low glycol level alarm on the glycol makeup system. Glycol systems shall

not have domestic water makeup connections to closed loop. Connect glycol feed system to BAS.

2.2.7.30 For condenser water systems, provide a high quality controller for controlling bleed, inhibitor feed and

biocide feed. The controller is to have multiple modes for configuring the timer for the scale and

corrosion inhibitor but its default mode is to control chemical feed proportional to make-up water.

2.2.7.31 Include two (2) biocide timers with the capability to lock-out the bleed following a biocide addition.

Use a pre-bleed timer in conjunction with the bleed lock-out.

2.2.7.32 Install corrosion test coupon assembly on the cooling tower circulation loop.

2.2.7.33 Water Treatment System shall conform to UFGS Specification Section 23 25 00 - Chemical Treatment of Water for Mechanical Systems. Non-chemical based systems (such as ozone or magnets) are not acceptable.

2.2.7.34 All isolation valves 1/2" through 3” shall be full port ball valves.

2.2.7.35 IT room designs shall be based on a room temperature of 75°F. Cooling equipment shall not be sized for more than the existing connected load in the space. The cooling system shall be capable of cooling and controlling humidity in the space without reheat under the existing load conditions.

2.2.7.36 The failure of any single component shall not prevent the lag equipment (pumps, boilers, water heaters, etc.) from being enabled under manual (hand) control . No wiring, programming or other changes will be allowed to enable the lag equipment.

2.2.7.37 When chillers are equally sized, chillers shall be piped so that any chilled water pump or condenser water pump can serve any chiller.

2.3 HVAC Controls

2.3.1 Building Automation Systems (BAS) and Energy Management System (EMS) are used synonymously and refer

to the digital, programmable, computer based electronic automated control system.

2.3.1.1 Projects shall remove existing pneumatic HVAC control systems and replace them with direct digital

programmable control systems.

2.3.1.2 When a control system is replaced, no existing control components are to be re-utilized unless approved prior to contract award. If the contractor reuses any component (even those noted to be reused), the contractor shall warranty parts and labor on the reused items as if they were new. All firmware and software being proposed for projects in AFMSA properties must be compliant with

UFC 4-010-06. The software must be most recent version at time of proposal, with a remaining

application life and compatibility with future systems for at least five (5) years. If a new version is

released and approved for use on AF networks within 12 months of system commissioning, the

contractor shall provide, install and commission an update to the most recent version without

additional cost to the Government. For renovation or expansion projects, the contractor shall

provide a software update to the most current version for the entire control system.

2.3.1.3 Include a desk top computer with the latest operating system and 21 inch flat screen monitor

(minimum), and an ink jet printer. 2.3.1.3.1 The BAS graphical user interface (GUI) shall be user friendly, incorporate high-definition 3D

animated illustrations of all major equipment to depict piping flow and indicate status of

SUPERSEDED

Page 12: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

operation. The access and update time between screen displays shall not be greater than 2

seconds following initiation of change. The GUI shall at minimum include animated

illustrations, but not limited to the following displays:

2.3.1.3.2 Floor plans with room numbers, temperature sensors, terminal boxes and AHU’s accurately

located.

2.3.1.3.3 VAV boxes with CFM (feedback), damper position (percentage), space temperature

(feedback), space temperature set point, discharge air temperature (feedback) and reheat

valve position (percentage).

2.3.1.3.4 AHU depicting fan operation (feedback), fan speeds, duct static pressure (feedback),

preheat mode, cooling modes, control valve status (percentage), CHW and HW coil leaving

air temperatures (feedback), return and mix air temperatures (feedback), damper positions

(percentage), total supply air CFM (feedback), outside air temperature (feedback), outside

air CFM (feedback), chilled and hot water leaving temperatures (feedback), filter pressure

drop (feedback).

2.3.1.3.5 Where the BAS is going to be installed in a foreign location, maintained and operated by

local foreign nationals, the BAS shall be so equipped to easily toggle the graphical interface

and text to be displayed in both the local native language and modern English; and the

system measurements can be toggled between SAE and metric units.

2.3.1.3.6 Chilled water/condenser water/heating water systems: On the graphic of each system show

all temperatures, fan speeds, pump speed, valve positions, percent equipment load, firing

rate, along with all set points. On all components which have moving elements (e.g. fan

blades, pump impellers, etc.), animation will be provided to depict said movement/flow

whether on or stopped.

2.3.1.3.7 All control systems (such as but not limited to steam boilers, boiler feed water systems, air

compressors, vacuum pumps, med gas systems, generators, automatic transfer switches,

load control systems, domestic hot water heaters, VFDs, etc.) shall report to the BAS via a

native BACnet card (shall be used when available) or a translator (black box) to BACnet at

the individual equipment.

2.3.1.4 The installer/contractor shall train maintenance personnel in the use of the building control system to

the level where they can independently control room set points, adjust operating schedules, recognize

abnormal performance, acknowledge alarms, utilize the event log and generate trend logs. Operators

must demonstrate their proficiency in these skills at final commissioning and before acceptance of the

system.

2.3.1.5 The installing contractor shall establish user specific access password protection that is specific to each

authorized operator and that will not allow any operator to access functions for which they have not

demonstrated competency. Generic passwords, such as “Operator”, are not acceptable and must be

removed at time of acceptance. BAS system security protocols and passwords must comply with

UFC 4-010-06. 2.3.1.6 Provide a BACnet Object List that includes the hardware (input/output) points and also includes

software points such as set points, trends and alarms. Identify points in language that is understandable to maintenance personnel. Generic, computer generated, point designators are not acceptable.

2.3.1.7 Provide detailed written Sequences of Operation for all controlled systems that describes how the system is designed to function under an array of anticipated conditions. Night set-back and Antiterrorist

Force Protection (ATFP) emergency shutdown must be included in control sequences. Spaces that

SUPERSEDED

Page 13: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017 Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

have temperature and/or humidity ranges specified in UFC 4-510 shall not have night set backs outside

of those requirements. Sequences of Operation must be submitted with the 65% design submittal and

accepted by AFMSA/SG8FE.

2.3.1.8 Provide Control Schematics for all controlled equipment and systems. Identify control points with the

same designator used above in the BACnet Object List.

2.3.1.9 All new systems shall utilize a BACnet/IP “backbone” for connection to system level panels and

computer access terminals, as a minimum.

2.3.1.9.1 As a minimum, use BACnet communications protocol at the system level and provide for

data access and sharing with other BACnet compatible vendors.

2.3.1.9.2 All devices below the system level (end device unit controllers) shall communicate in open

(non-proprietary) protocol

2.3.1.10 Leave the project in a state that with the approval of the government, other vendors can be permitted

to tie in and access for future alteration and expansion.

2.3.1.11 Provide lightning and transient voltage protection for system level panels.

2.3.1.12 Provide auto archiving/back-up software program for routine back-up of the programs, including

historical trending.

2.3.1.13 Provide one hour minimum UPS for system level programmable controllers mounted securely off of

the floor.

2.3.1.14 All controllers are to utilize non-volatile memory.

2.3.1.15 When an emergency power source is available at a facility, all BAS components serving critical areas,

including all actuators, shall be connected to the “essential equipment” bus of the emergency power

system. All other BAS components shall be connected to the “essential equipment” bus if sufficient

generator capacity exists or the BAS components shall fail to an appropriate position to minimize

impact to the facility operations. All new HVAC control systems shall be native BACnet type that can

communicate in an auto-recognizable (plug-n-play) manner with other installed systems and do so

without the need for intermediary translation device or “gateway.” Systems shall be BACnet compliant

down to the end device without need for intermediary translation device or “gateway.”

2.3.1.16 All points shall be trended. Analog points shall be trended at a maximum interval of 15 minutes. Binary

point shall record change of state. BAS shall be capable of storing all trends for a minimum of 1 year.

2.3.1.17 A complete set of trend logs of system operation shall be submitted to the government 10 business days

prior to functional performance testing and final commissioning to demonstrate system

performance. One purpose of the trend log(s) is to determine the stability of the system at the

device level in automatic mode and without human intervention. These trend logs are to be

recorded after the control system is in automatic mode, all global set points and limits removed,

all control loop tuning and the TAB is complete. The trend logs must contain at minimum seven (7)

consecutive days of trends two of which are weekends or holiday. AHU trend logs shall be submitted

in spreadsheet and graphical form and shall include the following:

2.3.1.17.1 Outside Air Temperature

2.3.1.17.2 Return Air Temperature

2.3.1.17.3 Mixed Air Temperature

2.3.1.17.4 Supply Air Temperature

2.3.1.17.5 Mixed Air Damper Position

2.3.1.17.6 Chilled Water Coil Valve Position

2.3.1.17.7 Fan Speeds

2.3.1.17.8 Supply, Return, and Exhaust Duct Static Pressure

SUPERSEDED

Page 14: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017 Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

2.3.1.17.9 Preheat Coil Valve Position

2.3.1.17.10 Reheat Coil Valve Position

2.3.1.17.11 Space Relative Humidity

2.3.1.17.12 Outside Air CFM

2.3.1.17.13 For VAV boxes the trend log shall include:

2.3.1.17.14 Inlet Air Temperature

2.3.1.17.15 Discharge Air Temperature,

2.3.1.17.16 Reheat Valve Position

2.3.1.17.17 Air Damper Position

2.3.1.17.18 Air Volume

2.3.1.18 During Unoccupied Periods (period of non-use for procedures or when vacant), operating room air

volume shall be reduced to 6 air changes per hour, while maintaining a positive pressure in the surgery

room of 0.02” minimum (documented air balance). The control for the Occupied/Un-Occupied modes

shall be automated through the use of room occupancy sensors that will initiate a switch to Un-

Occupied mode once a 15 to 30 minute (User adjustable) timed delay expires after the room has been

vacated; and it will switch back to Occupied mode following a 3 minute delay once occupancy has been

sensed. An illuminated visual indicator of HVAC Mode (Occupied / Un-Occupied) shall be provided

within the surgery room.

2.3.1.19 Utilize occupancy sensors in common areas (e.g. meeting rooms, corridors, janitor closets, public

restrooms, etc.) to reset thermostats to unoccupied status and to turn lights off (see Electrical section

6.16.2 for additional information for lighting control).

2.3.1.20 Unless otherwise specified, all VAV static pressure (through supply fan VFD) shall be controlled utilizing

critical zone reset (aka critical zone loading). Static pressure set point is continually adjusted (reset) so

that at least one terminal unit in the system is 90% open. The static-pressure controller monitors the

position of each terminal unit and resets the duct-static-pressure set point based on the critical zone

terminal position.

2.3.1.21 Provide open protocol BACnet access to the chiller and boiler local controls. Written site specific

exemptions for LonTalk may be requested from AFMSA/SG8FE.

2.3.1.22 Control valves shall be two-way modulating type that will vary the water flow properly through each

coil to meet the building load. Valves are to have a shut off pressure rating adequate to close off

against pump maximum discharge pressure. No three-way valves are allowed. If a bypass is required

to maintain a minimum flow, a two-way valve shall be utilized and shall only open at minimum flow

rates.

2.3.1.23 Design systems to maintain water flow through coils, heat exchangers, towers, pumps, piping, exposed

to temperatures below 320 F. Provide thermostatically controlled heat trace or other freeze protection

for exposed utilities as required.

2.3.1.24 Heating water system supply temperature set point shall utilize an outside air reset schedule to

maximize efficiency. Refer to ASHRAE 90.1.

2.3.1.25 Hydronic systems shall reset differential pressure setpoint based on valve positions. Refer to ASRAE

90.1.

2.3.1.26 When an AHU is renovated or replaced, provide outside air (OA) flow measuring stations to control

and monitor OA flows. Return air duct mounted CO2 sensors shall NOT be used for OA controls. Provide

OA flow stations that are not subject to clogging.

2.3.1.27 For spaces where relative humidity requirements are not specifically prescribed under UFC 4-510-01

Appendix A, humidity control shall be designed to maintain an envelope of 30% to 60% RH during

SUPERSEDED

Page 15: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

normally occupied periods. The design engineer shall determine the interior RH based on the outside

air condition and interior latent loads. Humidifiers shall be provided if the analysis indicates that RH

will drop below 20% during periods of occupancy. In this case, it is acceptable to provide a humidifier

at the outside air make up unit (if available) or in the AHU's to improve general indoor RH condition.

2.3.1.28 All humidifiers shall have duct mounted high limit humidity sensors to prevent relative humidity above

80% in the supply air duct.

2.3.1.29 All exhaust fans shall be controlled and monitored by BAS.

2.3.1.30 All VFD drives will report KW back to the BAS system and be recorded. Chiller plant shall also report

kW/Ton.

2.3.1.31 If the outside air levels are reduced below the minimums required in order to protect the system

from freezing conditions but to keep the system operational, a audible and visual alarm shall be

provided separate from the BAS alarm indicating the system is operating outside of design

conditions. The alarm shall not be able to be silenced.

3.0 Testing Adjusting and Balancing of Air and Water Systems

3.0.1 All new or renovated HVAC systems shall be tested and balanced pursuant to National Environmental Balancing

Bureau (NEBB) standards.

3.0.2 Balancing tolerance shall be +10% to -0%, rather than +/- 5% (per UFC 3-410-01)

3.1 Experience and Knowledge of the TAB professional(s) and/or TAB firm

3.1.1 The qualifications, experience and knowledge of the TAB professional and TAB firm shall be identified, within

the proposal. TAB professional shall have at least 5 years healthcare experience and be certified by NEBB.

3.2 TAB Definitions

3.2.1 For purposes of clarification, the word “Owner” is synonymous with Medical Group Facility Manager. The term

“Government” is synonymous with AFMS.

3.3 TAB Requirements

3.3.1 TAB shall be accomplished for any system downstream of the equipment modified.

3.3.2 All phases of the TAB work including preplanning, execution of field work, and reporting requirements shall be

in strict accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards for testing.

All TAB work shall be executed and reported according to the NEBB.

3.3.3 The ASHRAE Applications Text, Chapter 38 – Testing, Adjusting, and Balancing, 2015 Edition is the reference

document for development of all Performance Work Statements (PWS).

3.4 TAB Submittals and Approvals

3.4.1 During the submittal phase of the project, and before the TAB firm provides any billable work on the project, a

statement of qualifications must be submitted and approved. The submittal will be provided through the typical

submittal process and be reviewed and approved by the Contractor. Upon approval of the contractor, the

submittal must be forwarded to the Design Engineer of Record (DoR) for review and approval. Upon DoR

approval, the TAB qualification submittal shall be forwarded to the AFMSA/SG8FE engineer for review and

approval. Only after such submittal and approval is complete shall the TAB agent start work and provide services

on a project.

3.4.2 The submittal shall follow NEBB standards.

SUPERSEDED

Page 16: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

3.5 TAB Preplanning Requirements

3.5.1 For projects that include renovation or modification of an existing HVAC (air and/or hydronic) system, the TAB

agent MUST obtain engineering performance and design data for the current existing system BEFORE the

proposed/current project modifications. The system operating design values must be obtained by the TAB

agent.

3.5.2 The DoR and AFMSA/SG8FE representative will review the TAB Agent’s preplanning documentation and project

preparation before field work is started.

3.6 TAB Reporting Requirements

3.6.1 The TAB agent shall communicate with the contractor and DOR on progress toward work complete and report

and address problems as encountered on the project. The TAB agent shall communicate the system deficiencies

to the contractor in written form and may provide recommendations for resolving such items.

3.6.2 The final TAB report with summaries, explanations, and notes, with the AABC or NEBB professional’s stamp and

signature shall be submitted to the contractor and DoR for review and approval. Upon that review and approval,

the report shall be submitted to the AFMSA/SG8FE representative for review. The signatures of the TAB agent,

Contractor, and DOR shall be on the report before it is submitted to the AFMSA/SG8FE representative.

4.0 Commissioning of HVAC Systems

4.0.1 The functional testing (also referred to as “Commissioning” or “Cx”) shall be performed in accordance with

ASHRAE Standard 202.

4.1 Functional Performance Testing Prerequisites

4.1.1 The contractor shall provide to the accepting government representative at time of request for the scheduling

of the final government acceptance functional test and no sooner than 10 business days in advance of the

actual test date. If the completion of a task or availability of any document or component is questionable, the

final government acceptance test must be postponed and rescheduled.

4.1.2 The FINAL Test and Balance (TAB) report with design engineer’s written review and approval (including seal).

4.1.3 The final construction documents. This includes the final drawings, specifications, SOW, and “Best and Final”

accepted proposal.

4.1.4 The written controls sequence of operation. This document must be clear and include the sequence of

operation for each and every system component including: fan speeds, duct pressure, valve modulation,

damper modulation, alarms, special cycles, lead/lag, air temperature, overrides, occupied/unoccupied, and all

other sequences.

4.1.5 A minimum of seven (7) days of trend logs for each system modified or installed in the contract shall be

provided. The seven days must include a weekend. All overrides and global set points must have been

released and the systems in full automatic operation during the trend log data sampling. For each air handler

trend logs must include: outside air temperature, return air temperature, return air humidity (or space

humidity), mixed air temperature, leaving coil(s) air temperature, supply air temperature, heating valve(s)

position, chilled water valve position, return fan speed, supply fan speed, supply duct static pressure, return

air damper position, outside air damper position, and set points for supply air temperature, supply duct

static pressure, and mixed air temperature. The sample shall be each five (5) minutes. For a minimum of

five (5) VAV boxes per individual system trend logs shall include: inlet air temperature, discharge air

temperature, heat valve position, air damper position, space temperature, and space temperature set point.

For water cooled chillers the points shall include: CHW entering and leaving temperature, CDW entering and

leaving temperature, percent load (compressor amperes), cooling tower fan speed, cooling tower bypass

valve position. For other systems, consult the accepting government representative prior to setting up

SUPERSEDED

Page 17: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017 Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

trends.

4.1.6 A written summary document defining each part of the project that the final system deviated from the original

design, intent, or “best and final” proposal

4.1.7 A written statement signed by the controls contractor that all controls have been calibrated, completely

programmed per the approved sequence of operation, and graphics complete and installed for use during

Commissioning.

4.1.8 Owner Training documents to include written Training Agenda and sign-in sheets for each system for which

training was provided. All training shall be recorded in video format.

4.1.9 Operation and Maintenance manuals.

4.1.10 Final As-Built drawings.

4.1.11 All required third party testing and certification documents. This includes fire alarm/detection system, fire

sprinkler system, and certification of air exchanges and pressure relationships of patient care areas including

operating rooms, isolation rooms, and others as required by AIA and ASHRAE.

4.2 Other Requirements of Functional Testing

4.2.1 During Commissioning, the General Contractor, Mechanical Contractor, Controls Contractor and TAB agent

must be present. The design engineer of record shall also be present. The Controls Contractor must be the

same individual who actually wrote and installed the sequence of operation programming.

4.2.2 If the manipulation of the digital control system will be on a laptop, an external monitor of at least 22” must

be provided during the government acceptance functional test process for group viewing of the system

commissioning.

4.3 Functional Testing On-Site Review Steps

4.3.1 The first day will include the review of documentation described above.

4.3.2 The second step of the acceptance testing process will be the site inspection of the systems and

equipment modified and installed in the project scope. The government accepting representative will

perform physical inspection of the installation and equipment condition to determine any part that does

not meet the design intent, construction drawings, code requirements, is incomplete, has not been

properly tagged/identified, or not installed in a “workmanlike” manner.

4.3.3 The third step of the testing process will be the validation of the TAB report. The government accepting

representative will randomly select a sample of the TAB readings from the final TAB report for this function.

4.3.4 The fourth and final step of the government acceptance process will be the verification of the programmed

sequence of operation and manipulation of the controls sequence of operation. This is a dynamic process and

may not follow an exact predetermined plan. As system inputs are changed and the system reacts, deficiencies

are manifested that may not be expected. Therefore, the controls are verified through a dynamic and flexible

process directed by the government accepting representative.

4.3.5 Items found to be deficient during this process will be documented and included in a government acceptance

report for correction. Items determined deficient can be the contractor, engineer, owner, or TAB agent’s

responsibility to correct. Upon completion of all corrections, the contractor shall forward a written response

describing the corrective action, date corrected, and person making correction to the government

acceptance representative for review and approval. During Commissioning, if the majority of deficiencies are

adjusted and corrected on site, then the process may continue and be acceptable. However, if the proper

paperwork is not on site, is found to be inaccurate, cannot be verified, control of the systems is not per design

intent, sequence of operation is not as approved in design, systems cannot maintain design set points,

and/or the proper contractor functions are not present to perform testing, then the Commissioning process

may be declared a failure and rescheduled. This rescheduling will not be cause for justifiable contract extension

SUPERSEDED

Page 18: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

to complete the project.

4.3.6 The BAS system, while in automated mode, shall perform all control functions without human intervention.

Should a discrepancy that requires programming or alteration in the control programming be experienced, the

test of the BAS must be completely re-accomplished to demonstrate the discrepancy did not affect other

elements of the system previously tested.

5.0 Plumbing Systems (Including Medical Gas and Fire Protection)

5.1 Waste and Supply Piping

5.1.1 General.

5.1.1.1 Plumbing systems shall comply with ASHRAE Standard 188.

5.1.1.2 Sanitary sewer piping handling high temperature effluent shall be cast iron.

5.1.1.3 Supply piping shall be Type L Copper.

5.1.1.4 Designs shall not create (and in renovations shall eliminate) "deadlegs" in the domestic hot water

system. . Non-recirculating domestic hot water supply pipes shall not exceed six feet (6 ft.) from the

circulating main pipe.E. Domestic hot water systems shall include a recirculation piping and pump

system to continuously circulate hot water in the system. The time taken for the Domestic hot water

to reach a minimum 5°F temperature rise at any fixture outlet shall be no more than 10 seconds. 5.1.1.5 Design shall eliminate domestic hot water storage, tube and shell heat exchangers, and steam to water

converters as much as possible. Multiple parallel, condensing, high efficiency, rapid recovery water

heaters shall be the basis of design.

5.1.1.6 Design purified water systems with polyethylene or schedule 80 PVC pipe and fittings. No glass pipe is

allowed.

5.1.1.7 Natural gas piping shall be schedule 40 steel.

5.1.1.8 All new water and gas meters shall communicate with energy monitoring system and are subject to

AFMSA/SG8FE approval.

5.1.1.9 Connect domestic water heaters and pumps to the BAS. Provide firing rate for heaters, supply water

temperature, return water temperature, status of recirculating pump, and control of auto isolation

valves.

5.1.1.10 Provide thermostatic mixing valves for each separate hot water temperature supply system. Monitor

supply water at discharge of mixing valve with BAS connection.

5.1.1.11 Plumbing supply pipe shall be insulated with preformed fiberglass pipe insulation with FSK jacket. Label

all pipe as described in section 2.

5.1.1.12 All new buildings shall provide separate condensate hub drains and separate piping system for future

condensate collection system. Whenever practical for renovation projects, collect cooling coil

condensing water for non-potable water applications such as irrigation or cooling tower makeup.

5.1.2 Fixtures

5.1.2.1 Waterless urinals are NOT allowed.

5.1.2.2 All flush valves shall have a mechanical manual override flush function.

5.2 Medical Gas Systems

5.2.1 General

5.2.1.1 Design, install, test, and certify medical gas systems per latest edition of NFPA 99.

5.2.1.2 Provide zone valve boxes with a minimum of one spare space for future gas pipe and valve.

5.2.1.3 Provide area alarm panels with a minimum of one spare space for future gas alarm.

SUPERSEDED

Page 19: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

5.2.1.4 Main piping shall be sized one pipe size larger than calculated requirement.

5.2.1.5 Basis of design for medical air compressors shall be assemblies with multiple oil-less scroll compressors.

No reciprocating or oil sump air compressors are allowed.

5.2.1.6 Basis of design for medical vacuum pumps shall be rotary oil-less type.

5.2.1.7 Connect medical gas source equipment to the BAS to show status of equipment, motors, compressors,

as well as supply pressure of the system at the source equipment.

5.3 Fire Protection Systems

5.3.1 General

5.3.1.1 Fire protection systems shall conform to all current versions of NFPA and UFC standards.

5.3.1.2 Wet pipe sprinkler piping shall be schedule 40 steel for all threaded pipe and schedule 10 steel for all

grooved pipe. Preaction and dry pipe systems shall be schedule 40 steel for all piping. No plastic pipe

is allowed.

5.3.1.3 Flexible stainless steel braided pipe may be used for connection to the fire sprinklers. Installation shall

follow manufacturer installation requirements. The flexible pipe cannot be kinked.

5.3.1.4 Install new or modified sprinkler system sprinklers in the center of ceiling tiles +/- .5”. Align sprinklers

in the same row of ceiling tiles in corridors. .

5.3.1.5 The sprinkler piping shall not be installed directly above of the ceiling. Provide a minimum of 3”

between the top of the ceiling and bottom of sprinkler piping.

5.3.1.6 All sprinkler piping installation shall be coordinated with the general contractor, mechanical contractor,

electrical contractor and the project engineer before any pipe is installed.

6.0 Electrical Infrastructure Systems 6.1 General Requirements

6.1.1 LED lighting shall conform to the requirements of UFC 3 530 01, dated 1 June 2016. LED lighting shall only be

limited to the areas identified in UFC 4-510-01, para 11.6.1.3 dated 1 May 2016.

6.1.2 Interior Electrical Distribution (600 volts or less). Interior lighting and power loads shall be served at the highest

voltage available.

6.1.3 Light Fixture Type - Fluorescent lighting shall be T-5 or T-8, (T-8 lamps shall be limited to 28 watt) electronic

ballast and supplied with 277/480 volt system. Exemption: Electronic ballast with RFI filters shall be used in

operating rooms, delivery rooms, laboratories, special procedure rooms, MRI areas, medical equipment repair

and test areas.

6.1.4 T-5 High Output (HO) fluorescent lighting will be used in high ceiling areas (over 20’) and mechanical machine

rooms and warehouse areas in lieu of HID.

6.1.5 Dry type transformers shall be utilized to provide 120/208 volt power for 120 volt lighting, receptacle and small

equipment loads. All dry type transformers shall be NEMA TP-1 compliant; K-rated based on non-linear load

content and shall be wired and grounded as a separately derived system. NOTE; A separately derived dry type

transformer shall be connected to a grounding electrode system located as near as practicable to and preferably

in the same area as the transformer. The grounding electrode shall be comprised of the metal cold water pipe

serving the area and grounded structural steel.

6.1.6 Switchgear and switchboards shall be listed as an assembly. NOTE: in OCONUS locations equipment shall comply

with all local host-nation standards.

6.1.7 Medical hospital switchgear shall be configured incorporating a “Main/Tie/Main” configuration. Main and Bus

Tie circuit breakers shall be electrically operated, of draw out design, with solid state overcurrent, time delay,

instantaneous and ground fault adjustable trip devices (if required). Feeder circuit breakers are not required to

be electrically operated but shall be of draw out design with solid state overcurrent, time delay, instantaneous

SUPERSEDED

Page 20: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

and ground fault (if required) adjustable trip devices.

6.1.8 All branch circuit distribution panel boards shall be of the “bolt-on” circuit breaker type and equipped with a

main breaker for multi-story buildings only. Load center type power panels with snap in type circuit breakers

are not allowed.

6.1.9 Protective device coordination shall be coordinated for selective overload, short-circuit and ground fault

protection.

6.1.10 Bus-in switchboards, panel boards and transformer windings shall be copper. Aluminum bus are not allowed.

6.1.11 New electrical meters shall have "Modbus RTU Communication" capability for future energy consumption

monitoring applications.

6.1.12 In addition to UFC required panelboard labeling, all panelboards will be labeled with incoming panelboard

source name/location all of the way upstream to building service entrance panelboard

6.1.13 All conduit and electrical equipment within the electrical distribution system will be installed in accordance

with the good workmanship definition in NFPA 70 and NECA-1, 2015 edition.

6.2 Location and Space Requirements

6.2.1 Electrical equipment rooms shall be located at or near the building exterior to facilitate initial installation,

maintenance and when necessary the replacement of large equipment or defective equipment. Equipment

physical dimension, aisle ways and doorways within the electrical and mechanical equipment rooms shall be so

sized, spaced and arranged to permit the movement of physical plant major equipment assemblies without

having to completely disassemble said apparatus. Pipes and other equipment foreign to the electrical

equipment shall not be located in, enter, or pass through such spaces or rooms. At all times the provisions and

requirements for clear working space as stated in NFPA 70 must be met.

6.3 Wire, Conduit, and Cable Tray.

6.3.1 All wiring shall be insulated copper in conduits and installed per NFPA 70 and UFC 4-510-01. Copper metal

enclosed feeders, plug-in bus-ways or surface metal raceway may be used.

6.3.2 All wiring should be loomed neatly in vertical or horizontal trays or bundles on the perimeters and center aisles of panel.

6.3.3 In addition to the grounded conductor (Neutral) being white (or grey) in color, the grounding conductor is to

be green. The contractor must use Black/Red/Blue for 120/208 VAC three-phase, Brown/Orange/Yellow for

277/480 VAC. **NOTE: Conductors larger than #6AWG can be taped to meet requirement. ***NOTE: The

voltages listed are only for CONUS locations and the following OCONUS locations: Republic of Korea and

Kadena AB, JP. All other locations shall conform to local requirements.

6.3.4 All conductor phasing shall be labeled and identified on the incoming service equipment distribution feeder

panel or switchboard, each subsequent distribution panels; and maintain consistency throughout the system.

6.3.5 Conduit fittings for Electrical Metallic Tubing (EMT) shall be compression steel type. 6.3.6 Conduits 1-1/4” trade size and larger shall have grounding bushings. All others shall have plastic or fiber

bushings. 6.3.7 All conduits and other wall penetrations shall be sleeved and fire stopped. 6.3.8 All conduits terminating at vibrating equipment shall utilize water-tight flexible metal conduit, the flexible

metal water-tight conduit shall not exceed 36”.

6.3.9 All Emergency Essential Supply System (EPSS) conduit will be color coded to coincide with the circuits within. Life Safety circuits will be installed in orange conduit, critical care circuits will be installed in yellow conduit and equipment branch circuits in green conduit.

6.3.10 Any splicing of wire size #4 AWG and above for circuits of 600 volts or less, shall be compression type splices and insulated with both; 125-mil thick, premium grade Vinyl Mastic Pads that are self-fusing, pre-cut pad

SUPERSEDED

Page 21: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

insulates, sealing out moisture for connections up to 600 volts, with Polyvinyl backing, rated for 0°F ( -18°C) to 100°F (38°C) and RoHS 2011/65/EU Compliant and a 7-mil thick, premium grade vinyl-insulating tape that is resistant to abrasion, moisture, alkalies, acids, corrosion and varying weather conditions (including ultraviolet exposure). Also have a combination of elastic backing and aggressive adhesive that provides moisture-tight electrical and mechanical protection with minimum bulk while able to perform continuously in ambient temperatures rated from 0°F (-18°C) to 220°F(105°C), UL listed, Canadian Standards Association (CSA) certified.

6.3.11 All exterior conduit installed outdoors in substations, electrical yards, etc. shall be installed underground in accordance with this design guide. All conduit terminations that pass through the metal cabinet roof of any electrical panel, switchgear, etc. shall be installed utilizing a threaded watertight and gasketed hub; no screw-tight or non-water tight compression box connector fittings shall be allowed to terminate conduit into the enclosure.

6.3.12 Contractor shall make all repair/replacements as to maintain any in-place manufacturer's or contractor's warranties. In the event that the item removed leaves a penetration/hole in the exterior cladding and/or structure framing of the assembly, the Contractor shall properly reconstruct the assembly (both substrate and cladding) to match the surrounding construction and finish. Structural capacity, weather-tightness and aesthetics shall all be essential elements of the work. An engineer shall be utilized to design the structure for in-filled load-bearing systems on openings larger than 24” in any dimension.

6.4 Grounding Conductors

6.4.1 A green insulated copper ground conductor shall be run with all branch circuits. A clearly marked and

identified grounding conductor shall be installed with each feeder.

6.5 Critical Care Panel-boards

6.5.1 Branch circuit panels serving critical care areas shall be located in the close proximity of their loads served. Under no circumstances shall a panel-board be placed in a hallway.

6.6 Critical Care Wiring

6.6.1 Wiring in all patient care areas, the Life Safety branch and Critical Care branch circuits of the essential

electrical system shall consist of insulated conductors installed in a separate metallic raceway. Open cable

trays are not be used in the main switchgear room or generator room. Conductors installed to furnish

emergency power shall not be installed in the same raceway with normal power conductors. All normal

and emergency power junction boxes pull boxes and similar parts shall be readily accessible with clearly

identified access panels for proper maintenance and operation of the electrical distribution system.

6.7 Hospital Grade Receptacles 6.7.1 Hospital grade receptacles shall be tamper resistant and provided in the following areas and annotated as

“HG” receptacles on the final as-built drawings: 6.7.1.1 General care patient bed locations. 6.7.1.2 Critical care patient bed locations. 6.7.1.3 Any location where a patient bed or patient care service console is located. 6.7.1.4 Anesthetizing locations, operating rooms, delivery rooms, oral surgery, cystoscopy, cardiac catheterization lab, angiography, CT scanning room, MRI scanning room, medical maintenance, intensive care, emergency trauma rooms, fluoroscopy rooms, endoscopy rooms, pulmonary/respiratory therapy, and nuclear medicine.

6.8 Ground Fault Circuit Interrupters (GFCI)

6.8.1 Hospital grade Class A GFCI receptacle protection shall be provided at locations required by NFPA 70 and

SUPERSEDED

Page 22: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

“WET” locations. GFCI are NOT to be installed on circuits serving critical life support equipment.

6.9 Wet Locations

6.9.1 GFCI receptacles shall be used in the following locations: Hydrotherapy, Therapeutic Pool Areas, and toilet

areas with showers, Staff lockers with toilet areas, patient toilet bathrooms, showers, staff lounge with

kitchen facilities, outdoor receptacles, receptacles accessible from a building roof, and crawl spaces. Sub-

sterile and scrub areas to Surgery and Delivery are classified as “DAMP” areas and GFCI receptacles are not

required.

6.10 Operating Room and Delivery Room Receptacles & Power Requirements

NOTE: Operating and Delivery Rooms shall be considered as “wet procedure locations” and require the utilization

of Isolation Panels unless a complete risk assessment is completed in accordance with NFPA 99.

6.10.1 Surgery, Operating and Delivery rooms shall be provided with at least thirty-six (36) each simplex or duplex

receptacles. Twelve (12) receptacles shall be located in each service column with six on each wall mounted 3

feet above the floor. These receptacles shall be 20-ampere, 125-volt, 2-pole, 3-wire, straight blade, grounded

type.

6.10.2 Each Surgery, Operating and Delivery room shall also be provided with at least one (1) each 60-ampere, 250-

volt, 2-pole, 3-wire, twist lock, ground-type flush mounted receptacle for mobile fluoroscopy unit or laser photo

coagulator.

6.10.3 Each Surgery, Operating and Delivery room shall be provided with two (2) each three phase panel-boards

located within the respective room. These panels shall be fed from a separate critical branch subpanel and

whenever practical from separate critical branch automatic transfer switches. Panel phases shall be connected

in the same phase arrangement.

6.10.4 Patient Care Area Grounding. General care areas and critical care areas including all anesthetizing locations

shall be provided with a grounding system as required by, NFPA 70 and NFPA 99. Grounding system design and

initial testing shall be included in the contract documents.

6.11 Medium Voltage Apparatus (Above 600 Volts)

6.11.1 All exterior medium voltage switchgear, transformers, cable junction pedestals and vacuum switches shall

match and meet the published requirements, including color, manufacturer and construction type of the local

base.

6.11.2 All medium voltage switchgear enclosures shall have site glasses installed that provide visibility of switch

contact positions and operable connections. Switchgear enclosures shall also be equipped with removable

panels and inspection ports that provide an easy and safe view and infrared thermal inspection of critical

connection points.

6.11.3 Switchgear, transformers and other similar apparatus that is to be positioned outside on grade, shall be

provided a permanent foundation with substantial footing on compacted soil to support the apparatus. Pre-

formed concrete pads are not acceptable.

6.11.4 Transformers shall be:

6.11.4.1 Fused protected on the primary (H) side of the coils

6.11.4.2 Equipped with a load break on/off switch

6.11.4.3 Non-PCB, mineral oil or silicone oil filled

6.11.4.4 Loop feed-through load-break elbow connected with parking stands and arresters.

6.11.4.5 Equipped with no-load tap changers with two +2.5% taps and two -2.5% taps.

6.11.4.6 Newly installed cable junction pedestals and/or "sectionalizers" shall match any published standards

SUPERSEDED

Page 23: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017 Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

for the existing base. The cable pedestals shall contain sections for both 600 amp and 200 amp

connections. Cable junction pedestals shall not be placed on a pre-formed concrete pads.

6.11.5 Medium voltage electrical cable shall be 133% BIL insulation, Type MV-105, EPR, ribbon shielded unless

otherwise directed by base requirements.

6.11.6 Medium voltage underground conduit shall be schedule 40 PVC, except for 900 elbows, which shall be long

radius rigid conduit or Kevlar reinforced fiberglass. Four (4) inch trade size minimum and shall comply with

any local base standards.

6.11.7 All underground conduits shall be installed in a minimum depth of 3’ and encased in a minimum of 3” of red

concrete and shall have a traceable “buried cable” marking tape placed not less than 12” above the concrete

encasement which marks the hazard. NOTE: All 600 volt and below underground conduits shall be installed

at a minimum depth of 24” and encased in concrete and shall have a traceable “buried cable” marking tape

placed not less than 12” above the concrete encasement which marks the hazard. All underground conduit

shall be schedule 40 PVC, except for 90 degree elbows, which shall be radius rigid conduit or Kevlar reinforced

fiberglass. The conduit trade size shall comply with published standards and any local base requirements.

6.11.8 All conduits emerging from grade shall be rigid metal conduit (RMC) or intermediate metallic conduit (IMC) shall protrude a minimum of 12” (309 mm) from grade/floor; and either corrosion wrapped or PVC coated.

6.11.9 All conduit terminated at the concrete pad shall have a grounded bushing installed.

6.11.10 Grounding electrodes (rods) shall be copper clad and a minimum 5/8” diameter and at minimum of eight (8)

feet in length or longer as necessary to achieve an adequate ground path. Ground wire shall be a minimum

2/0 AWG stranded bare annealed copper wire and all connections must be either exothermic weld or

irreversible compression fittings. Ground field resistance shall not exceed 25 ohms.

6.12 Hospital Electrical Utility Main Service Entrances

6.12.1 Hospitals shall require more than one (1) utility feeder (from different utility sources at the military Installation

service point) and Main-Tie-Main, best-source, auto-throw over switchgear.

6.12.2 Hospital low voltage main service entrance switchgear

6.12.2.1 Shall be listed as an assembly and contain two (2) main breakers and a bus tie breaker. The “A” Bus

and “B” bus breakers shall share equal loads during normal operation, which is with the “TIE” breaker

in the open position. These breakers shall be electrically controlled, electrically interlocked and with

closing coils or operators powered from a DC control power battery bank or stored energy as necessary

for an “Automatic Throw-over” in the event power is lost at either the “A” Main breaker or the “B”

Main breaker. Load shall initially be distributed such that neither side supports more than 60% of the

total load.

6.12.3 “Best Source Select” Controls

6.12.3.1 If power is lost at the “A” Main breaker, the “TIE” breaker shall close electrically, the “B” Main breaker

remains closed and the “A” Main breaker remains open. In the event either A or B breakers opens and

the Tie closes, and audible or visual alarm device shall be initiated. Once power is restored to the “A”

Main breaker, the switchgear shall be user selected automatic or manual return back to the normal

configuration with both the “A” and “B” breaker closed and the “TIE” breaker open. User selected

manual return allows for switching back to normal at a time when minimum disruption to the facility

will occur. The switchgear shall also provide a digital display for both “A” and “B” bus which consists

of voltage phase to neutral, phase to phase, amperage for all three phases, neutral current, KVA, KWH,

and complete history.

6.12.4 Status Display

SUPERSEDED

Page 24: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017 Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

6.12.4.1 A graphical display shall be provided on the main panel door(s) which illustrate the current

configuration and display the voltage phase to neutral, phase to phase, amperage for all three phases,

neutral current, KVA, KWH, and complete history of all primary input feeders and breakers. The

switchgear shall be controlled electrically by a non-proprietary Programmable Logic Controller (PLC).

6.12.4.2 All circuit breakers shall be electrically operated, draw out type with digital or electronic trip modules.

6.12.4.3 Load bank Connection - The generator switchgear shall be equipped with a breaker protected cubicle

with suitable quick connect stabs for the connection of an external load bank.

6.12.4.4 Service Entrance Grounding - Each hospital main electrical room shall have a ground counterpoise

system installed and connected to building steel and the main water supply with a minimum 4/0 AWG

stranded copper conductor and shall provide a reading of less than 25 ohms. Ground reading locations

shall be marked and visible to the maintenance provider. All electrical equipment in the electrical room

shall be connected to the counterpoise system by utilizing either exothermic weld connection or

compression connections. Where more than one service is provided, each service ground system shall

be bonded together at a common point to equalize the ground potential.

6.13 Main Utility Room, Generator and EES Room Lighting.

6.13.1 Lighting in the main electrical switchgear rooms shall be T-5 HO fluorescent lights with battery ballasts, to

facilitate ease of switching and repairs. Lighting shall meet the requirements for ASHRAE lighting power density

and controls.

6.14 Essential Electrical Systems for Healthcare Occupancies

6.14.1 The essential electrical system shall consist of at least two (2) (N +1) diesel engine generator sets; automatic

transfer switches with maintenance bypass capability (for essential loads), user selectable priority load

management control systems and paralleling switchgear. Paralleling switchgear shall have vertical separation

for the Life Safety, Critical Care, Equipment and Optional loads.

6.14.2 The essential electrical system shall not be equipped with ground fault protections devices. The generator

circuit breaker and essential electrical main distribution board circuit breaker will be provided with ground

fault detection features to indicate a ground fault and sound an audible alarm but not trip the breaker.

6.15 Diesel Engine Generator Sets.

6.15.1 Generator sets and auxiliaries shall be sized and approved in accordance with AFI 32-1062, 14 June 2017

and positioned as close as possible in proximity to the hospital to minimize line losses and prevent excessive

cable runs. Service entrance transformers and other equipment not supporting the essential emergency

system shall not be installed in the same room as the engine generator sets. When configured as a pair (2

generators), each generator sets shall be individually sized N+1 and capable for carrying 120% of the Life Safety,

Critical Care and Essential Equipment loads continuously for at least 72 hours. When configured in a three (3)

generator plant, each generator shall be sized such that any one generator can carry the Life Safety and

Critical Care load; and two generators can carry 120% of the Life Safety, Critical Care and Essential

Equipment loads continuously for 72 hours. The alternators shall be brushless, 60 Hertz, 277/480 volts,

except in overseas areas where local conditions will dictate different system voltages and frequencies.

6.15.1.1 Standby generator emissions shall meet the minimum requirements of Tier II requirements unless local

published standards are more stringent.

6.15.1.2 Generator diesel muffler/silencers shall be rated for “residential” attenuation. Recommend critical

grade silencers and total system noise attenuation performance to be measured at 70dB weighted “A”

scale at 50’0” from openings at grade.

6.15.1.3 Fuel supply in the day tank shall be sized to provide 4 hours run time. The main tank shall be sized to

SUPERSEDED

Page 25: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017 Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

provide a minimum 96 hour run time for the plant at full rated load pursuant AFI 32-1062, dated 14

June 2017.

6.15.1.4 All raceways/conduits within the generator room shall be Intermediate Metallic Conduit (IMC) or Rigid

Metallic Conduit (RMC). Transitions for terminations shall be water-tight flexible metal conduit and of

lengths no greater than 24 “ (610 mm).

6.15.1.5 The generators shall be electric start, contain jacket water heaters and pre-lube pumps as necessary

to provide fast and reliable start response.

6.15.1.6 The radiators can be either skid mounted or remote mounted, however if the radiators are skid

mounted, a metal shroud shall be installed to direct the air intake.

6.15.1.7 The generator room shall be equipped with ventilation exhaust fans that run upon generator start up,

and maintain the interior environment while operating at rated load on an ASHRAE design day.

6.15.1.8 Where engine generator assemblies are being totally replaced, it is the contractor’s responsibility to

initiate and obtain the appropriate air quality permit for the respective location of installation.

6.15.2 Generator Paralleling Switchgear

6.15.2.1 Generator switchgear shall be listed and tested by Underwriters Laboratory (UL) as a complete

assembly and controlled by a non-proprietary Programmable Logic Controller (PLC). In OCONUS

locations, electrical apparatus shall be listed, tested and certified by European Committee for

Electrotechnical Standardization in addition to the UL listing. The PLC circuitry shall be powered

by an uninterruptible power supply (UPS) and part of the Life Safety branch. The generator switchgear

shall also provide for temporary generator connection, these connections shall be in a separate

enclosure and terminations shall be in accordance with UFC 3-540-01.

6.15.2.2 The control board shall provide individual flat screen illuminated color graphical displays for each

generator panel door and similar flat screen color graphical display on master control cabinet door

that illustrates the entire EES system. The graphical displays shall incorporate animation graphics

which simulate operations, movements, position changes and flows consistent with the actual

functions.

6.15.2.3 PLC Alarm and Event History/Log - The PLC will have a non-volatile memory and user friendly report

generator that can display and generate an alarm, systems operations, fault/failure, test and event

chronological log/record/report. The PLC memory shall be capable of storing at least 20,000 critical

events that cannot be purged or erased from memory, and 100 gigabytes worth of memory for non-

critical data where the oldest non-critical events can be downloaded and/or erased when no longer

required.

6.15.2.4 Priority Load Management – Healthcare essential electrical loads are divided into three categories:

Life Safety, Critical Care, and Essential Equipment Loads. In some locations, a fourth (4th) priority is

established for critical “mission” loads such as the Medical Command Center and communications.

All other loads are considered “non-essential” must be sacrificed (shed) to salvage the higher priority

loads should the system become overloaded. Sensing shall be accomplished through the use of a

watt-transducer and as the system approaches capacity (80% of the available generator rating), load

management will be initiated and shedding of lesser priority loads shall commence until at or below

70% of the available generator capacity, or added generators are brought on-line to accept and/or

reduce bus load. The order for shedding loads is in reverse order of importance. The first load to be

shed is all non-essential loads, followed by the essential equipment load (with the exception of the

Fire Pump and Fire Pump Controls), then the critical care load. The Life Safety load is never shed and

the EES will run to failure to protect this vital load.

SUPERSEDED

Page 26: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

6.15.3 Automatic Transfer Switches (ATS)

6.15.3.1 All ATS shall be double-throw, 4 poles with draw-out design/construction and grounded as a

separately derived system. All ATS shall be listed as an assembly and shall be factory assembled (to

include the ATS enclosure). ATSs shall have indicator lights to identify Normal Power (green in color)

and Emergency Power (red in color). Where multiple ATSs are employed, the physical arrangement,

lights and indicators shall be arranged alike as to not confuse the operator when visually scanning all

systems.

6.15.3.2 All Life Safety and Critical Care loads shall have ATS equipped with a no load break by-pass isolation

switch and must be initiated with not more than two movements of the hand to either position

regardless of the position or condition of the ATS to maintain normal or emergency power while the

ATS is being repaired or maintained.

6.15.3.3 Load by-pass must be achieved with no load interruption.

6.15.3.4 ATSs feeding high efficiency motors rated 25 horsepower or larger shall be provided with an in-phase

monitor to prevent an out of phase transfer. The in-phase transfer shall be achieved without control

of the frequency of either power source to prevent excessive motor in-rush current. Closed transition

switches shall not be utilized. By-pass isolation switch for the ATS serving non-essential loads are

optional.

6.15.3.5 Each ATS shall be equipped with a manual “TEST” switch. Each “TEST” switch shall simulate a normal

power source failure and automatically cause the engine generator set to start, attain rated frequency

and voltage, and transfer associated electrical system loads from the normal source to the emergency

source.

6.15.3.6 Depending upon the number of ATSs a group of switches may be installed at a centralized location in

order for the operator to conduct the test at a single point. These switches shall be wired in series

with its corresponding ATS.

6.15.3.7 Pre-Transfer Signals for Sensitive Loads-Every transfer switch serving elevator loads, shall be equipped

with Pre-Transfer Signal controls with delays to notify each elevator bank master controller(s) of

pending transfer of power.

6.15.4 EES Remote Alarm Annunciation Panel.

6.15.4.1 A remote alarm annunciation panel that is storage battery powered shall be provided in a location

readily observed by facility management personnel at a regular work station. The annunciation panel

shall indicate alarm conditions of the alternate power source and shall include as a minimum the

following:

6.15.4.1.1 Battery and battery charger malfunction.

6.15.4.1.2 Engine generator run status.

6.15.4.1.3 Engine generator warnings and alarms.

6.15.4.1.4 Fuel levels, less than 4 hours supply in the day tank and less than 96 hours supply in the

main storage tank. A separate audible and visual derangement signal shall be provided

within the hospital at a location that is continuously monitored such as a nurse station. The

alarm signal shall be appropriately labeled but need not display individual alarm conditions.

6.15.5 General Emergency Electrical Systems Requirements

6.15.5.1 When converting a inpatient hospital into an outpatient clinic, the existing emergency power system

(generators, switchboard and transfer switches) shall be modified to only one emergency generator

and one emergency power circuit to feed egress lighting, certain mechanical loads (to be determined)

SUPERSEDED

Page 27: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

to preserve the building in the event of an extended power outage, fire alarm and security panels, the

server room, the laboratory and immunizations. No other loads are authorized and the generator and

transfer equipment shall be sized to the mentioned loads. Any new emergency power generator

must first be requested and authorized pursuant to AFI 32-1062, 14 June 2017. The emergency

electrical load shall be installed into two (2) separate automatic transfer switches, one switch shall be

sized for the Life Safety circuit load without a diversity factor and designated as the Life Safety

branch, and the other switch shall be sized (without diversity factors) for the other authorized loads

and be designated as the Required branch.

6.15.5.2 When the facility renovation (typically Level II and Level III) drives the replacement or redistribution

of building electrical power distribution systems in the building an opportunity for the removal of the

Emergency Power generator will be leveraged. When removing the generator and redistributing

generator power the following features shall be provided:

6.15.5.2.1 Battery operated egress lights and Exit lights shall be installed in accordance to NFPA

101 Life Safety Code in office spaces, corridors and stairwells.

6.15.5.2.2 A four pole manual generator power transfer switch and generator twist-lock quick

connect box (disconnecting means) properly sized to support the refrigeration loads

discussed in Para 4.15.4.1.3 plus 20% shall be installed in an exterior location where a

portable generator can be easily connected to the twist-lock quick connect junction box.

The manual transfer switch can be located in an electrical closet, electrical room or

mechanical room. If the manual transfer switch is to be located on the exterior of the

building, it shall be at minimum NEMA 3R. In lieu of a manual transfer switch, a circuit

breaker assembly with kirk-key interlocks will be acceptable. If the circuit breaker

assembly is utilized a permanent, complete set of written instructions for kirk-key

operation and circuit breaker operation must be attached to the assembly or enclosure.

6.15.5.2.3 An electrical distribution panel board properly sized to serve mission critical

refrigeration equipment power outlets that are required in the following sections, no

other loads are authorized.

6.15.5.2.3.1 Pharmacy refrigeration equipment. 6.15.5.2.3.2 Laboratory (mission critical) refrigeration equipment. 6.15.5.2.3.3 Immunizations clinic refrigeration equipment.

6.15.5.2.3.4 Logistic (war reserve material) refrigeration equipment. 6.15.5.2.3.5 These loads will all be served by a centrally located panel board, which

is to be connected to the load side of the manual portable generator transfer switch.

6.16 Energy Conservation and Sustainable Requirements.

6.16.1 Do not exceed 80 percent of the lighting power densities for exterior areas and 50 percent for building facades

and landscape features as defined by ASHRAE/IESNA Standard 90.1-2013. Lighting controls shall be utilized to

reduce energy consumption.

6.16.2 Lighting controls systems shall be provided to turnoff lights automatically when the space is not in use. Provide

duel technology occupancy sensors in non-occupied spaces (corridors, class rooms, conference rooms and

break rooms etc.) and other common areas (building entrances, lobby areas, waiting areas and cafeteria etc.).

Provide daylight controls to automatically turn off certain lights while day light is sufficient. Lighting in office

areas and outpatient clinic spaces shall be scheduled off during off hours or controlled by motion sensors.

Consider using day lighting technology in design, such as light shelves, to bring light further inside of the

building and reduce glare. Provide task lighting where appropriate. In patient rooms, for an example, task

SUPERSEDED

Page 28: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

lighting facilitates exams and can be turned off so patients rest in lower ambient light level.

6.16.3 Motor Efficiency. Motors shall be high-energy efficient type. Minimum motor efficiencies shall be either

Energy Star or in accordance with DOE Buying Energy Efficient Products Recommendations (reference to

www.eren.doe.gov/femp/procurement for recommended efficiencies).

6.16.4 All equipment and systems selected for this project shall be energy efficient. The goal is to reduce 30% from

the consumption levels calculated under ASHRAE Standard 90.1-2013 standard.

6.16.5 Building Lightning Protection Systems shall be required and installed in areas pursuant UFC 3-575-01 and NFPA

780. UFC 3-575-01 prescribes that unless lightning frequency at the project site averages five or less

thunderstorms per year, lightning protection will be provided for buildings and structures as follows:

6.16.5.1 Buildings of up to four floors having elevator or stairwell penthouses or other similar projections above

roof.

6.16.5.2 Buildings of five floors or more with or without projections above roof.

6.16.5.3 Structures such as steel towers, aluminum and reinforced concrete towers, and flagpoles without

inherent grounding, and smoke-stacks and steeples of 50-foot elevation or more above lowest point

of contact with finished grade.

6.16.6 Surge Protective Devices shall be installed pursuant to UFC 3-520-01, Interior Electrical Systems, dated 6

October 2015. The number, type of surge protective devices or determination if surge protective devices are

required shall be made during design.

6.17 Fire Alarm System

6.17.1 The fire alarms system shall be designed by a registered professional Fire Protection Engineer (or NICET III/IV

certified designer) approved by the Authority Having Jurisdiction (AHJ) and AFMSA prior to commencement

of installation. All drawings must be approved and stamped by a registered professional Fire Protection

Engineer prior to installation.

6.17.2 Reporting system as a means for automatically and manually reporting fires to base fire departments. Fire

alarm system must meet the requirements of UFC 3-600-01, dated 28 Nov 2016.6.17.3 The Fire Alarm System Installer shall be a qualified and licensed fire protection technician.

6.17.4 The signaling devices shall be installed in accordance with UFC 3-600-01, dated 28 Nov 2016.

6.17.5 Pull stations shall conform to ADA height and location requirements.

6.17.6 Prior to reutilizing any existing fire alarm conduits, the full length of the conduits and condulets must be

inspected for damage, loose connections and loose straps

6.17.7 All existing but unused or abandoned wiring and raceways within the space where work is being done must

be removed, regardless if the abandoned wiring is part of the project or not. Demolition and removal of

wiring and conduit shall be to the nearest wall or partition where the wiring or raceway can be properly

terminated in a condulet or box with cover. Any additional conduits attached to the existing conduit run

must conform to this design guide section 4.3 Conduit, Cable Tray and Wire.

6.17.8 All conduit, paneling, associated equipment with system and subsystem will be red. Any additional conduits

attached to the existing conduit run must conform to this design guide section 4.3 Conduit, Cable Tray and

Wire.

6.17.9 All new Fire Alarm systems will required an integrated Mass Notification System that will be a combined

system integrated with the building fire alarm control panel to form one system that performs both

functions as outlined in UFC 4-021-01 and NFPA 72.

6.18 Metering 6.18.1 All Automatic Transfer Switches (ATS) require voltage and current metering on the load side of the switch

and connectivity to the building control automation system (BCAS) to capture/share historical trend analysis.

SUPERSEDED

Page 29: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

7.0 Building Envelope/ Roofing Systems

7.1 General Requirements

7.1.1 The contractor shall protect the interior of facility from asphalt, smoke, chemicals, adhesive odors, paints,

dust, debris, water damage and/or any other construction activity that would cause damage to the

facility, its contents, building structure, building components or its occupants.

7.1.2 Project submittals shall contain a letter of transmittal, all technical product data sheets for all materials, project

schedule, shop drawings, MSDS sheets, and samples of all materials. The submittal shall also contain a Letter

of Acceptance from the manufacturer stating their product is acceptable for this applied system, design uplift

calculations and other structural loads, 3rd party lab testing certificates for the system, copy of warranties, color

charts, installation specifications, and certifications for kettle tenders, welders, and documentation of

contractor’s experience for product application.

7.1.3 Set up work site to minimize damage to the buildings and grounds. Protect sidewalks, grass, and all other

building and site components. Restore the site to preconstruction conditions, unless specified for enhancement

in the contract. Damaged materials and equipment must be replaced and repaired by professional skilled

trade-persons of that field/discipline (electrical, mechanical, plumbing, concrete and framing, etc.). Final

inspection and acceptance shall be accomplished by the contracting officer’s technical representative.

7.1.4 Repair all components and associated defects in direct connection with areas to be repaired or replaced.

7.1.5 Prior to beginning work activities, provide for the safety of all construction workers, building occupants and

passersbys. Suitable protection and security must be provided during all phases of construction process, both

during and after normal duty (business) periods.

7.1.6 Complete daily cleanup of site to include all construction debris.

7.1.7 Ensure employees are trained and certified to operate all equipment. When operating equipment, all

employees must have proper documentation to demonstrate their qualifications to safely operate the

particular equipment/tools being used. All operators of asphalt kettles, aerial lifts, forklifts, construction

elevators or other equipment must be able to communicate with building personnel, fire and safety personnel,

and other interested parties.

7.1.8 The design engineer shall conduct a vapor drive analysis for all building envelope systems scheduled to be

replaced or renovated.

7.1.9 Ensure all building system components that penetrate the building envelope system are properly sealed and

flashed to prevent moisture infiltration into the building (e.g. mechanical penetrations, roof flashings, window

sealants, metal soffits, gutters, through-wall flashings, door sealants, terminations and transitions and all other

components.) Materials not previously approved for use through the submittal process shall not be used and

should not be on the site.

7.1.10 Only new materials shall be installed and shall have matching lot/batch numbers.

7.1.11 Wet and damaged materials must be discarded and removed from the site immediately. Wet or damaged

materials found on the site staged for installation will be an issue of concern reported to the Contracting Officer

(KO).

7.1.12 After leaks have occurred, the contractor shall replace all wet materials as necessary to restore the integrity of

the building system and maintain a warrantable status by the manufacturer.

7.1.13 No new products or systems shall be installed over decayed, rotten, unsound, corroded or wet building

materials.

7.1.14 The Contractor Superintendent must acquire site data and maintain a typed daily log of the ambient

conditions experienced at the jobsite. Readings shall be taken a minimum of three times during a normal

construction day. If nighttime work takes place, additional readings shall be taken and recorded at the same

frequency as daytime work. The daily log shall be considered a live project record and shall be accessible to

SUPERSEDED

Page 30: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

AFMSA/SG8FE, USACE and Facility Management at all times.

7.1.15 The contractor shall be responsible for the removal and disposal of all obsolete penetrations and equipment

including but not limited to roof curbs, vents, HVAC equipment, conduits, satellite dishes, antennas and cables,

unless prior written variance from AFMSA/SG8FE is acquired by the contractor.

7.1.16 All repairs/replacements of building envelope system shall match the surrounding structure and building

envelope components from an aesthetics standpoint. Contractor shall make their best effort to blend the

repair area's appearance to match surroundings.

7.1.17 Contractor shall make all repair/replacements as to maintain any in-place manufacturer's or contractor's

warranties. In the event that the item removed leaves a penetration/hole in the exterior cladding and/or

structure framing of the assembly, the Contractor shall properly reconstruct the assembly (both substrate and

cladding) to match the surrounding construction and finish. Structural capacity, weather-tightness and

aesthetics shall all be essential elements of the work. An engineer shall be utilized to design the structure for

in-filled load-bearing systems on openings larger than 24” in any dimension.

7.1.18 Building system components and cladding shall be designed to withstand 1.25 times the wind forces as

calculated using the current version of ASCE-7 at the time of award. All Medical Facilities shall be considered

as a Category IV Facility for design purposes.

7.1.19 Do not use cleaning materials or processes which could change the character of the exposed finishes. If

unknown, always test the products in an inconspicuous location to determine results.

7.1.20 All cleaning practices and product used shall be in accordance with cleaning products manufacturer's printed

instructions.

7.1.21 The use of non-metallic tools in cleaning operations is recommended when possible.

7.1.22 Depending on the wall construction and its ability to withstand such, use of a paint scraper, wire brush,

sandpaper, power washer and eco-friendly cleaning chemicals are allowed to remove all surface

contamination, such as oil, grease, loose paint, dirt, foreign matter, rust, mold, mildew, mortar and

efflorescence.

7.1.23 A manufacturer’s technical representative shall perform a minimum of two quality assurance inspections

during the construction phase plus a final inspection. This requirement is for all major roof, exterior wall,

air/moisture barrier, and waterproofing systems.

7.1.24 Drainage saddles and crickets shall have a minimum of a 3:1 length to width ratio for adequate slope in the

valleys.

7.1.25 The use of rotary saws and abrasive wheels shall not be used to cut ferrous metal of any kind which will be

exposed to the exterior. Only shear-type cutting tools are allowed.

7.2 Structural Decks

7.2.0.1 All decks shall be inspected and repaired to accept the new roofing system. Repairs shall not affect the slope or

drainage of the new system. Use 2% of the square footage of the deck surface for all deck systems (excluding

structural concrete) for a replacement allowance in the base price unless a different amount is specified in the

proposed work scope. Provide unit pricing (cost/sq) for any repairs after the 2% allowance.

7.2.0.2 Ensure all decks have been thoroughly inspected and tested for defects. Fastener pull tests shall be performed

per the ANSI/SPRI FX-1-2011 requirements for all concrete, lightweight concrete, wood, cementitious wood

fiber, gypsum and metal decks when using mechanical fasteners to attach the new roof system to the deck.

For mechanically attached building components, documented pull test data must be provided at 35% design.

7.2.0.3 All decks must be clean and dry before the application and installation of new materials. If it is necessary to

protect building and begin work prior to drying, additional venting must be provided and protection sheets

added as needed.

SUPERSEDED

Page 31: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

7.2.0.4 Replacement of damaged or deteriorated decking shall be of like type, material, thickness and profile. Deck

attachment shall meet all applicable structural load requirements including live load, dead load and current

uplift requirements. Document repairs to decks with photos. Plywood shall not be used to patch or cover holes

in non-wood structural decks.

7.2.1 Concrete Decks

7.2.1.1 Concrete deck damage is considered but not limited to: thermal cracks, settling cracks, spalling,

corrosion cracking, swelling, d-cracking, crazing, and deflection. All repairs shall be made to ensure

proper adhesion, application and drainage of roof system.

7.2.1.2 Provide documentation of moisture content (by moisture meter) or Standard Test Method for Indicating

Moisture in Concrete by the Plastic Sheet Method ASTM D4263 - 83(2012), prior to installing materials.

Document the testing procedures with photos.

7.2.1.3 Cast in place and structural concrete decks must be dry and free from dust and debris. Prior to priming,

all loose and deteriorated materials from the existing system must be removed from the deck in order

to establish a clean and stable surface acceptable to the manufacturer of the roof system to be installed.

All surfaces shall be fully primed. Primer shall be applied per the manufacturer’s recommendations.

7.2.2 Metal Decks

7.2.2.1 Metal deck damage is considered but not limited to; scaled, corroded, blistered and un-adhered paints

and finishes, unattached metal panels, bent or buckled metal panels, excessive deflection, and areas

that would prevent proper attachment and drainage of the roof system.

7.2.2.2 Rust repair shall include wire brushing, sanding, scraping, sand blasting and preparing for proper

application of rust inhibiting paints and/or coatings. Apply a minimum of two coats of corrosion

inhibiting finishes per manufacturer’s recommendations.

7.2.2.3 Insure all metal decks are fastened securely to building structure. Visually inspect all welds and

fasteners for weaknesses, rust, corrosion and cracks. Replace deteriorated deck fasteners and clips with

new.

7.2.3 Lightweight Concrete/Poured Gypsum Decks

7.2.3.1 Lightweight concrete and Gypsum decks shall be completely removed and replaced in areas found to

be saturated (moisture levels over 25% by weight) or deteriorated to a point where fastener pullout

values do not meet minimum requirements. Moisture survey results must be provided at 35% design

submittals.

7.2.3.2 Lightweight concrete and Gypsum decks must be vented per roofing system manufacturer’s

specifications for a medical facility.

7.2.4 Wood Decks

7.2.4.1 Plywood

7.2.4.1.1 Plywood sheathing shall be CDX grade, minimum 4 ply, and not less than 15/32 inch (12 mm)

thick. 7.2.4.2 Plank / Heavy Timber

7.2.4.2.1 Wood boards shall be at least 1 inch (25 mm) nominal thickness and have a nominal width of

4 feet - 6 inches (1372 mm).

7.2.4.2.2 All boards shall have a bearing on rafters at each end and be securely attached.

7.2.4.2.3 Cover knotholes or cracks in excess of 1/4 inch (6 mm) with securely nailed flat sheet metal.

SUPERSEDED

Page 32: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

7.2.5 Cementitious Wood Fiber and Gypsum Plank

7.2.5.1 Decks shall be protected from the weather during storage and application; any wet or deformed decking

shall be removed and replaced.

7.2.5.2 Anchor all panels against uplift and lateral movement.

7.2.5.3 Install the deck flat at the proper slope/fall. Any deflection, irregularities, or otherwise damaged

panels must be corrected or replaced.

7.3 Vapor Barrier

7.3.1 Moisture movement through the building envelope systems shall be controlled by a continuous vapor barrier

when needed. The location of the vapor barrier shall be determined by the vapor drive analysis as described in

section general requirements.

7.3.2 Obtain vapor barrier components from a single manufacturer; a single-source manufacturer’s warranty is

required.

7.3.3 Provide products which comply with all state and local regulations controlling the use of volatile organic

compounds (VOC's).

7.4 Wood Nailers/Blocking

7.4.1 Wood nailers must be at least 3-1/2 inches (89 mm) wide or 1 inch (25 mm) wider than adjacent metal flange.

Thickness must equal that of insulation but not less than 3/4 inch (18 mm) thickness.

7.4.2 Contractor shall utilize Borate treated wood for wood blocking and nailers that are encapsulated within the

building envelope system (not exposed to the exterior).

7.5 Roof Insulation & Cover Boards

7.5.1 All insulations must be checked for moisture upon delivery, unwrapped and stored according to manufacturer’s

recommendations and approved industry standards. Store products on pallet supports in areas where no

water will pond underneath the product, come in contact with and/or wick up into the materials. Re-wrap

materials with approved breathable covers for optimal protection from water, sun and physical damage.

Moisture content shall be checked before application on the day of application. Wet or damaged; (damaged

being warped, bent, cracked and wet), boards must be discarded and removed from the site immediately.

7.5.2 Uneven decks and obstructions must be removed and or repaired prior to installing base insulation.

7.5.3 For insulation system designs, ensure against fastening methods that will provide a thermal bridge through the

roofing system.

7.5.4 Insure all subsequent layers are properly bonded before proceeding to the next layer.

7.5.5 Rigid insulation board shall be installed in multiple layers, if thickness is greater than two (2) inches, with joints

staggered in both directions. Joints shall be staggered minimum of twelve (12) inches. When installing with

hot asphalt, or foam adhesive, no pieces larger than 4’ by 4’ shall be used. When mechanically attached, 4’ by

8’ sheets may be utilized. No pieces smaller than four (4) square feet shall be installed. Provide for insulation

stagger at all nighttime dry-in and cut offs.

7.5.6 All insulation and cover boards shall fit tight to each other with no gaps over a 1/8 inch; larger gaps cannot be

filled and must be cut out to accommodate the minimum insulation board size

7.5.7 Install crickets at all equipment, chimneys, penthouses and other roof top penetrations wider than 12 inches.

Insure all crickets provide sufficient slope to maintain positive drainage.

7.5.8 Crickets are also required to provide sufficient slope to maintain positive drainage to internal drains and wall

scuppers. Crickets shall be installed between wall and slope change interfaces or any other areas that may

SUPERSEDED

Page 33: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

pond water.

7.5.9 All tapered insulation shall be installed to maintain a minimum of ¼ inch per foot slope. Provide an engineered

or digitally designed layout for each roof area. Less than ¼ inch slope will need written approval from roofing

manufacturer and AFMSA/SG8FE.

7.5.10 Roof insulation “R” values shall be a minimum of R-30. Any deviations from this requirement must be approved

by AFMSA/SG8FE.

7.5.11 Miter and fill the edges of the insulation boards at ridges, valleys and other changes in plane to prevent open

joints or irregular surfaces. Avoid breaking or crushing of the insulation at the corners.

7.5.12 Only use cover boards specifically approved and tested in the roof system manufacturer’s assembly.

7.5.13 At roof access areas such as roof hatches, fixed ladders and penthouse access doors, the landing area

immediately adjacent to the access point shall incorporate a minimum area of 4’ x 4’ “fire rated” plywood cover

board to provide additional rigidity in that area for pounding foot traffic and heavy tools and equipment.

Thickness of plywood shall match the roof system cover board.

7.6 Types of Insulation and Cover Board

7.6.1 Polyisocyanurate

7.6.1.1 Rigid board with fiber reinforced facers on both sides, meeting or exceeding the requirements of ASTM

C 1289

7.6.1.2 Compressive Strength (Polyisocyanurate): minimum 20 psi; minimum 25 psi if a high-density

coverboard is not used in the system.

7.6.1.3 Polyisocyanurate insulation with a smoke index greater than 50 shall not be utilized in AFMS facilities.

7.6.2 EPS (Expanded Polystyrene)

7.6.2.1 Rigid, closed cell foam insulation meeting ASTM C 578.

7.6.2.2 Density: 1.25 Lb. min

7.6.3 Extruded Polystyrene

7.6.3.1 Rigid, closed-cell recovery board meeting ASTM C 578

7.6.3.2 Compressive Strength - 25 psi (1.75 kg/sq.cm.) minimum

7.6.4 Perlite

7.6.4.1 The use of perlite insulation within insulated assemblies is not permitted, with the exception of perlite

cant strips.

7.6.5 High Density Wood Fiber Board

7.6.5.1 Wood Fiber: Cellulose fiber board meeting the requirements of ASTM C 208

7.6.5.2 Compressive Strength: min 35 psi (241.5 kPa).

7.6.5.3 Shall be coated and sealed on all six sides.

7.6.6 Gypsum-based Roof Cover Boards

7.6.6.1 Meeting mold-resistance standard ASTM D3273

7.6.6.2 Class A fire rating in accordance with UL 790

7.6.6.3 Prime as necessary according to manufacturer’s requirements and testing assembly certs

7.7 Low-sloped Membrane Assemblies - General

7.7.1.1 All membrane flashing heights shall be a minimum of eight (8) inches in height as measured from the

bottom of the right angle, to the top of flashing membrane

7.7.1.2 Membrane flashing material shall be applied tight to the wall and be totally free from wrinkles, air

pockets and blisters.

7.7.1.3 Membrane sheets are to be installed wrinkle free and with no “eyebrows,” “fish mouths,” blisters, voids,

or lifted edges at corners.

SUPERSEDED

Page 34: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

7.7.1.4 Membrane flashing shall be terminated with a continuous termination bar separate from the sheet

metal counter flashing, and the term bar shall be installed at the edge of the membrane at both the

horizontal and vertical exposed edges.

7.7.1.5 The membrane flashing shall extend a minimum of five (5) inches above top of any cant strip or change

in slope or direction. Deviations of this requirement must be approved by AFMSA/SG8FE and the

manufacturer of the roofing system.

7.7.1.6 Install all penetrations, nailers and curbs prior to installing membrane roofing materials.

7.7.1.7 Low sloped roofs shall require plies be installed so that the flow of water runoff will not be against (or

in the direction of) the laps. “Strapping” maybe used on slopes of higher pitch or incline with

AFMSA/SG8FE approval.

7.7.1.8 All booted pipe flashings shall incorporate stainless steel clamping rings and an umbrella rain collar

counter flashing.

7.7.1.9 Contractor shall verify with the Government that load certifications are available prior to submitting a

proposal if the use of existing structural tie-off points / anchors are to be utilized during any phase of

the work. If the tie-off points do not have a current load certification, the Contractor is responsible for

certifying the load points prior to using them.

7.7.1 Modified Bitumen

7.7.1.1 All modified bitumen membrane roof systems should incorporate 2 layers of smooth surfaced

membrane and a granular surfaced cap sheet for a 3-ply modified bitumen system.

7.7.1.2 Cap sheets mid-ply, and base sheets shall be unrolled, cut into appropriate lengths and laid flat to allow

for relaxation of the sheet for a minimum of one (1) hour; or longer, as necessary to insure it has relaxed

to a point where there is no visual undulations in the surface and/or material memory roll.

7.7.1.3 Proper bitumen temperature (per written manufacturer’s recommendations) shall be maintained to

insure thorough, uniform and consistent lamination of all plies.

7.7.1.4 Asphalt temperatures shall be monitored and recorded throughout the day and discussed with

Superintendent and QA representative. Care shall be taken to watch all conditions that may require a

change in EVT range.

7.7.1.5 All base, inter-ply and cap sheets shall be broomed or rolled into place immediately following

application of asphalt and sheet goods to ensure full adhesion.

7.7.1.6 Defects will be removed/cut out. A new layer(s) installed a minimum of twelve (12) inches past all

affected areas in four directions (areas that were cut).

7.7.1.7 Install base sheets under all drip edges, gravel stops and flashings unless provided differently through

manufacturer’s written specifications.

7.7.1.8 Membrane wall flashings shall be separate from the cap sheet; continuous cap membrane running up

the wall is unacceptable.

7.7.1.9 Low sloped roofs shall require plies be installed so that the flow of water runoff will not be against (or

in the direction of) the laps. “Strapping” may be used on slopes of higher pitch or incline with

AMFSA/SG8FE approval.

7.7.1.10 Penetration flashings shall be installed such that they are included within the manufacturer’s roof

system warranty.

7.7.2 Built Up Roof (BUR), with Gravel Surfacing

7.7.2.1 Gravel must be installed at minimum 90% embedment. After curing, un-adhered excess gravel must be

vacuumed, swept and removed from the roof.

SUPERSEDED

Page 35: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

7.7.2.2 Pea gravel shall be applied at a rate of 300 lbs. per 100 sq. ft.

7.7.2.3 Minimum gravel size shall be ½” round pea gravel. Chipped and sharp edged “fines” will not be

acceptable. Gravel must meet ASTM 1863 as minimum. Samples and testing may be performed to verify

compliance as a prerequisite to final acceptance of the delivered roof system.

7.7.2.4 Gravel stops must be of sufficient height to prevent water and wind “flushing” the gravel over the edges.

This is particularly important when there are entrance doors, equipment, vehicles and other roofs that

may be damaged.

7.7.2.5 Install walk-pads prior to installing gravel. Insure they are installed above the gravel height.

7.7.3 Thermoplastic Membrane

7.7.3.1 PVC/Elvaloy Blends

7.7.3.1.1 Approved Membrane Attachment: Mechanically Attached or Fully Adhered.

7.7.3.1.2 Membrane Thickness: 60 mil nominal.

7.7.3.1.3 Seam Spicing: Hot-air weld.

7.7.3.1.4 Overlay all splice intersections with T-Joint Covers.

7.7.3.2 TPO Membrane

7.7.3.2.1 Approved Membrane Attachment: Mechanically Attached or Fully Adhered.

7.7.3.2.2 Membrane Thickness: 72 mil nominal. Minimum.

7.7.3.2.3 Seam Spicing. Hot-air weld.

7.7.3.2.4 Overlay all splice intersections with T-Joint Covers.

7.7.4 Thermoset Membranes

7.7.4.1 EPDM

7.7.4.1.1 Approved Membrane Attachment: Fully adhered.

7.7.4.1.2 Membrane Minimum Thickness: 90 mil. 7.7.4.1.3 Tape splicing is the only acceptable splice method.

7.8 Steep Slope Roofing

7.8.1 Metal Roofing

7.8.1.1 All metal panels and accessories to be installed in such a fashion that they are free from wrinkles, splits,

buckles and oil canning. Where such conditions exist following installation, item(s) installed is

considered to have failed, or damaged and must be replaced as required before acceptance (or as a

warranty repair) if already accepted.

7.8.1.2 Erect metal roofing straight and true with plumb vertical lines correctly lapped and secured in

accordance with the manufacturer's written instructions. Horizontal lines must not vary more than .64

cm in 12.2 m 1/4 inch in 40 feet.

7.8.1.3 Scratches, abrasions, and minor surface defects of finish may be repaired with the specified repair

materials and as recommended by the metal roof panel manufacturer. Immediately repair all scratches

and cut edges in metal panels. Prolonged rusting on panels will warrant the need to replace the

affected panel.

7.8.1.4 Finished repaired surfaces must be uniform and free from variations of color and surface texture.

Repaired metal surfaces that are not acceptable to the project requirements are to be immediately

removed and replaced with the new material.

7.8.1.5 Metal panels with scratches in excess of 24” in length and penetrate the protective coating shall be

replaced.

7.8.1.6 Panels that indicate color changes, fading, or surface degradation, determined by visual examination,

must be removed and replaced with new panels at no expense to the Government.

SUPERSEDED

Page 36: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

7.8.1.7 Metal roof system shall incorporate a “hidden fastening system” with components that allow for

expansion and contraction. The pinned location shall be identified on the as-built drawings. Pin

location shall be at the ridge or eave, not in the field of the roof.

7.8.1.8 Metal roofs shall not be designed or installed on slopes less than 3:12 without prior approval in advance

of AFMSA/SG8FE.

7.8.1.9 All metal roof systems installed over solid decking shall utilize a high-temperature, self-sealing fully

adhered waterproofing underlayment.

7.8.1.10 Design and install metal roof systems to approved industry standards which eliminate or reduce the

opportunity for “oil canning” and/or damages due to thermal stress.

7.8.1.11 Manufactured steel panels shall not be less than 22 gauge, 16 inches wide with a 2 inch double lock

seam. Manufacturer aluminum panels shall not be less than .032” thick.

7.8.1.12 Insure that all openings are of sufficient size to allow for movement around all pipes, fixtures and

penetrations.

7.8.1.13 Maximum spacing of retrofit purlins, hat channels and supports for metal roofing shall be forty-eight

(48) inches or less, regardless of type of metal being used (structural or architectural).

7.8.1.14 Whereas it is always preferable that the full panel be mechanically crimped, hand crimping will be

allowed in order to complete the ends or otherwise inaccessible areas.

7.8.1.15 Snow retention systems must be of rail type. Minimum of two complete rails with a clamp installed at

every seam.

7.8.1.16 All roof curbs over 12 inches in width shall have integral metal crickets and be mechanically seamed

into the metal roof panel system in compliance NRCA detail STM-19 (2012) and be covered under the

metal roof panel manufacturer’s warranty. The cricket will have a minimum slope of two times the

slope of the roof system to insure proper drainage and be covered under the metal roof panel

manufacturer’s warranty.

7.8.2 Shingle Roofing

7.8.2.1 Must use self-adhering bituminous membrane that is capable of sealing around fasteners which

penetrate the membrane self-sealing underlayment. Shall be dimensional architectural style shingles.

No three tab shingles allowed

7.8.2.2 Fasteners: Standard round wire shingle type, zinc-coated steel; 12 gauge (2.657mm), ring shank, with

heads 3/8 inch (9.5 mm) in diameter minimum.

7.8.2.3 All shingles shall have a minimum of six fasteners per shingle.

7.8.2.4 All fasteners shall be installed by hand with hammers, no pneumatic nail guns are allowed.

7.8.3 Tile Roofing

7.8.3.1 Two layers of underlayment are required to be installed under tile system. All tile roof systems

installed over solid decking shall utilize a high-temperature, self-sealing fully adhered waterproofing

underlayment.

7.8.3.2 Valleys and drip edges will require an additional layer of self-adhering underlayment installed.

7.8.3.3 Roofing tile materials and installation shall conform to the requirements of [ICBO Report No. 3523] –

Clay Roofing Tiles.

7.8.3.4 Prefabricated Rake and Ridge tiles: Match tile profile and color.

7.8.3.5 Fasteners: Fasteners shall penetrate deck a minimum ¾ inch (19mm).

7.8.3.6 In high velocity wind zones or where design pressures exceed 40 psf, foam adhesive shall be used for

attachment.

SUPERSEDED

Page 37: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

7.9 Elastomeric Coatings

7.9.1 Roof coatings will be installed and neatly applied to all edges, terminations and transitions to ensure a neat and

clean appearance. Avoid contaminating nearby equipment and building components.

7.9.2 New coating shall be installed with a minimum of two coats, base coat and top coat or as recommended by

manufacturer or whichever is more stringent. Base coat to be tinted different color from top coat to help insure

full coverage of top coat. Prime substrate as required by manufacture prior to installation.

7.9.3 Coating systems shall incorporate integrated reinforcement mesh at all flashings, penetrations and areas that

experience expansion and contraction.

7.9.4 Designated walkways shall be a contrasting color to the field of the roof.

7.9.5 New coating shall at minimum have a reflective value of .81 and a solar index of 98. Reflective roof coatings shall be algae-resistant. At drain sump areas and any other roof area where water may collect and pond for 24 hours, a urethane or silicone coating shall be installed in lieu of water-based acrylic coating.

7.10 Sheet Metal Flashing and Trim

7.10.1 Metal flashings will be of like materials. If dissimilar materials are in contact with one another from existing or

previous work, then special protection procedures must be taken to eliminate corrosion and/or the effects of

non-uniform thermal expansion and contraction

7.10.2 Sheet metal flashing shall be installed over the waterproofing membrane at all roofs to wall intersections, at

gutters, eaves, expansion joints and wherever there is a changed in roof slope or direction. The sheet metal

shall be corrosion resistant with a minimum thickness of 22-guage for galvanized painted steel, 24-guage

stainless steel, 050-aluminum or copper at 1 Lb. per square foot. Cleats shall be 18-gauge for steel, .063 for

aluminum and 22-guage for stainless steel, but no less than the thickness determined by design loads.

7.10.3 Counter flashings shall be fabricated and installed to extend and minimum of three (3) inches below the lowest

fastener or top edge of base flashing material.

7.10.4 Flashing material must be either stainless steel, factory coil-coated steel or aluminum with Kynar 500 or Hylar

5000 finish. Contractor shall obtain an approval in writing from AFMSA/SG8FE for any other flashing materials.

7.10.5 Coping and metal roof edge flashing shall be installed with a concealed cleat.

7.10.6 Roof edge flashing, coping, gutters, etc., shall be comprised of lengths necessary to avoid widespread use of

small pieces (“small” is defined as less than 48 inches in length).

7.10.7 Expansion joints in the roof system shall be metal and conform to NRCA and SMACNA standard details and

guidelines.

7.10.8 Clean exposed sheet metal work at completion of installation. Remove metal shavings, filings, nails, bolts, and

wires from roofs. Remove grease and oil films, excess sealants, handling marks, contamination from steel wool,

fittings and drilling debris and scrub the work clean. Exposed metal surfaces must be free of dents, creases,

waves, scratch marks, solder or weld marks, oil canning, and damage to the finish coating.

7.11 Drainage

7.11.1 When recovering and/or re-roofing, do not diminish the size, nor reduce in the number of the drains, scuppers

or outlets. All size changes must be carefully designed to provide ample drainage and flow based on local

rainfall rates and applicable plumbing codes.

7.11.2 Verify that quantity of overflow drain or scupper as well as their heights and size are adequate and meet

appropriate building code, and are not functioning as a main drainage point.

7.12 Roof Drains

7.12.1 Drains must remain functional throughout the construction process or provide alternative method of draining

water in the event of rain.

SUPERSEDED

Page 38: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

7.12.2 Protect all drains from construction debris and clogging. Cover all drains prior to beginning tear off. Verify all

drains are open, functioning and free of debris before work commences. Contractor will be responsible for all

plugged and inoperable drains at the completion and testing of drains for final commissioning.

7.12.3 Replace all broken drain bolts with a stainless steel bolt.

7.12.4 Replace all damaged rings: damaged rings noted as cracked, broken, and heavily rusted to prevent water tight

seal. Repaint all rings prior to reinstalling. Replace all damaged and missing drain bowl covers. Repaint the

remainder of drain covers with two coats of rust inhibitive industrial enamel paint.

7.13 Gutters and Downspouts

7.13.1 No fasteners shall penetrate the inside of gutters or downspouts more than ¼ inch. Ensure fasteners are sized

appropriately.

7.14 Scuppers

7.14.1 All collector heads shall have overflow capabilities.

7.15 Roof Accessories/Features

7.15.0.1 Do not install condensate lines or gutter discharges within one foot of roof flashing details. Where

existing lines and penetrations are too close to the flashing, relocate the line as necessary to meet the

twelve (12) inch separation requirement.

7.15.0.2 All roof mounted equipment devices (roof mounted HVAC units, pipes and pipe supports and other

equipment) associated with roof assembly shall be designed, installed, and fastened securely to meet

wind loading set forth by the most current ASCE-7 guidelines.

7.15.0.3 If roof vents, pipes and flashings are not replaced, they must be painted and resealed to appear and

perform as a new and warranted product.

7.15.0.4 All roof top equipment must be installed per the equipment manufacturer’s recommendation. The

curb, base anchoring point and/or manufacturer equipment stand shall be securely anchored to the

underlying structural members and meet the requirements for wind loading and uplift for the

geographical area. Curbs should be installed per NRCA recommendations unless otherwise designed

by a professional structural engineer as needed to meet special unique requirements specific to the

site or region. Treated wooden skids, timbers and similar materials used for curbs and mounting

platforms shall be coated, covered and flashed as necessary to eliminate exposure to UV and the

elements, and shall present a seamless matching appearance consistent with the roof system.

7.15.0.5 All roof mounted equipment devices (roof mounted HVAC units, pipes and pipe supports and other

equipment) shall be designed, installed, and fastened securely to meet wind loading set forth by the

most current ASCE-7 guidelines.

7.15.0.6 New and existing roof hatches shall be primed and painted with two coats of rust inhibitive industrial

enamel paint, painted to match exterior sheet metal.

7.15.1 Skylights

7.15.1.1 Consult with AFMSA/SG8FE on skylight work specific to an existing facility.

7.15.2 Lightning Protection

7.15.2.1 See Electrical Section 6.

7.15.3 Walk-pads/Walkways

7.15.3.1 For all membrane systems, pre-manufactured walk-pads shall be used to establish protective walkways

SUPERSEDED

Page 39: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

on the roof.

7.15.3.2 An additional layer of 36” membrane or other protective walking surface shall be installed for

designated walkways across selected roof areas to connect roof hatch and ladder access locations to

and around equipment. The walkways shall be a contrasting color to the field of the finished roof.

Adhere walkway-pads to the membrane in accordance with the manufacturer’s current

application guidelines leaving space between pads for drainage.

7.15.4 Fixed Access Ladders

7.15.4.1 Ladder will have landings installed at top in compliance with OSHA 1910.27.

7.15.4.2 Ladders will have walk-through section at top with fixed handrails 42” above landing.

7.15.4.3 Ladders runs exceeding 15’ in height shall be of caged ladder construction.

7.15.4.4 All fixed ladders with ground level access points shall contain components to limit unauthorized access.

7.15.4.5 Ladder runs exceeding 15’ in height construction shall have a minimum load rating of 300 lbs.

7.15.4.6 Attachment points and underlying structure shall be evaluated by a structural engineer licensed in

state or country for capability to meet load requirements.

7.15.6 Solar Panels

7.15.6.1 Solar panels shall not be installed or reinstalled on roof systems without written endorsement from

AFMSA/SG8FE.

7.16 Exterior Wall Systems and Components

7.16.0.1 A structural engineer shall verify that the existing structure will be adequate to support the loading

and accept the new blast loads imposed upon it with the installation of new or the replacement of

existing building components. All wall substrates shall be inspected and repaired to accept the new

waterproofing and cladding system.

7.16.1 Structural Framing and Sheathing

7.16.1.1 The structural framing components of new exterior walls shall be metal framing with a minimum stud

width of 3-1/2 inches and a minimum thickness of .0329 inches (20 gauge), spaced no more than 24

inches apart. No wood framing is allowed.

7.16.1.2 Exterior wall sheathing shall be either fiberglass faced gypsum sheathing or APA rated plywood but

shall depend on the established fire rating of the wall. No Oriented Strand Board (OSB) sheathing is

allowed.

7.16.2 Wall Insulation

7.16.2.1 New exterior wall assemblies around conditioned interior spaces shall be insulated to achieve a minimum R-19 thermal resistance value unless greater values are required by project.

7.16.3 Through-wall Flashing

7.16.3.1 Clean surface of substrate from projections, which might puncture membrane flashing material.

7.16.3.2 Lap membrane flashing a minimum of 6 inches at end laps (150mm).

7.16.3.3 Leave membrane flashing projecting from face of wall approximately 1 inch (25mm). Flashing shall be

cut back to the face of the wall after inspection.

7.16.3.4 Aluminum flashings shall not be used as an in-wall embedded flashing in masonry/concrete walls

except as approved by AFMSA/HFD Engineering in writing. Approved uses of aluminum flashing will

always include the use of a bituminous layer and/or separating material that protects the flashing from

contaminants of the masonry corrosive alkaline and acids.

SUPERSEDED

Page 40: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

7.16.4 Masonry Walls

7.16.4.1 Maintain masonry courses to uniform dimension. Form bed and head joints of uniform thickness.

7.16.4.2 Lay masonry with fully buttered (mortar) head and bed joints.

7.16.4.3 Provide weep holes in head joints of the first brick course immediately above the through-wall

flashing by placing weeps no more than 24 inches (610 mm) on center horizontally.

7.16.4.4 Where fresh mortar joins partially set mortar, remove loose masonry and mortar, and lightly wet

exposed surface of set masonry.

7.16.4.5 When adjustment is necessary to be made after mortar begins to harden, remove hardened

mortar and replace with fresh mortar.

7.16.4.6 Joint Profile: Tool mortar joints to a concave appearance. Unless otherwise specified in the PWS or

Base Architectural Design Guide.

7.16.4.7 Tool exposed joints when "thumb-print" hard.

7.16.4.8 Keep the drainage cavity free from mortar. Install mortar netting at the through-wall flashing to

prevent the blockage of drainage within the wall cavity.

7.16.4.9 Flush cut all joints that are not tooled.

7.16.4.10 Mortar

7.16.4.10.1 Masonry Cement: Complying with ASTM C91: Type S.

7.16.4.10.2 Portland Cement: Complying with ASTM C150: Type I.

7.16.4.10.3 Mortar Aggregate: Complying with ASTM C144, standard masonry type. For joints

narrower than ¼ inch (6mm), use aggregate graded with 100 percent passing the No. 8

sieve and 95 percent with the No. 16 sieve.

7.16.4.10.4 Do not use anti-freeze compounds to lower freezing point of mortar.

7.16.4.10.5 Mix mortar ingredients in accordance with ASTM C270. Mix only in quantities needed for

immediate use.

7.16.4.11 Existing weep holes shall be cleaned out and made functional during all exterior wall

restoration/renovation projects.

7.16.4.12 When re-pointing, rake mortar joints to a depth of not less than ½ inch (12mm). Fill solidly with

pointing mortar in ¼ inch layers. Tool joints.

7.16.4.13 When tuck pointing joints, cut out all defective mortar joints and holes in masonry and repoint with

new mortar. Remove excess mortar smears as work progresses.

7.16.4.14 Water-repellant Coatings

7.16.4.14.1 The applicator shall be approved by the manufacturer to install the product. 7.16.4.14.2 Do not install new products over decayed, rotten, unsound, degraded, damaged or wet

building materials. 7.16.4.14.3 Existing substrates shall be pre-tested with RILEM tube to determine the current absorption

rates in random areas, in which minimum application rates will be established for the project. A minimum of three (3) tests or one (1) per 1000 sf of surface type, whichever is greater. Post-testing at the same frequency is also required to assure proper coverage.

7.16.5 Stucco

7.16.5.1 Three-coat stucco systems shall be used over sheathed construction, masonry and concrete

SUPERSEDED

Page 41: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

substrates: (1) scratch coat, (2) brown coat, (3) finish coat.

7.16.5.2 Self-furring metal lath shall be used for the attachment of the base coat to the moisture barrier and

substrate.

7.16.5.3 Plastic or non-corrosive metal trim and accessories shall be incorporated into the system, as

acceptable to the manufacturer.

7.16.5.4 The total thickness of the base coat (scratch and brown) shall be ¾ inch to 7/8 inch thick. The base

coat mix shall contain ½ inch long, alkali resistant fibers to improve cohesiveness and provide crack

and impact-resistant qualities to the system.

7.16.5.5 The first (scratch) coat shall be moist cured for a minimum of 48 hours before application of the

second (brown) coat. Assure that the scratch coat is still moist (not saturated) just prior to the

application of the brown coat. Trowel float the brown coat surface uniformly.

7.16.5.6 Allow entire base coat to cure for a minimum of seven (7) days prior to starting finish coat application.

7.16.5.7 Tolerances for levelness of the stucco plaster shall be ¼ inch in 10 feet for flat surfaces.

7.16.5.8 The finish coat shall be 1/8 inch thick and applied to a moist base coat. Textured and colored finishes

shall be as selected by the Government.

7.16.6 EIFS

7.16.6.1 All new or replacement EIFS designs shall incorporate water managing and drainage capabilities within

the system.

7.16.6.2 Exterior gypsum sheeting boards shall be used as the substrate on all metal and wood framed

substrates, with a fiberglass facer on both sides for mold and moisture resistance and with a minimum

thickness of ½ inch. Use fire-rated material when applicable. Sheathing shall be installed with

stainless steel screws. Stagger board joints; fit ends and edges tightly together.

7.16.6.3 Fluid-applied, flexible, seamless waterproofing coating shall be used to form the moisture/vapor

barrier system on the exterior of the sheathing or masonry substrate. All penetrations through the

substrate shall be properly flashed and incorporated into the barrier system. The waterproofing

material shall be approved by the manufacturer of the EIFS or stucco system, as well as the exterior

sheathing manufacturer if applicable.

7.16.6.4 A high-impact resistant, drainable system is required for all EIFS systems.

7.16.6.5 Insulation used in the EIFS system shall have a minimum thickness of 1” for buffering differential

movement between the substrate and the EIFS lamina (surface). Total insulation thickness shall be

determined by the desired R-value for the exterior wall assembly on a per project basis.

7.16.6.6 Plastic or non-corrosive metal trim and accessories shall be incorporated into the system, as acceptable to the manufacturer.

7.16.6.7 The finish coat shall not be applied until the base coat has cured for 24 hours or per manufacturer’s

requirements, whichever is longer. Apply finish coat without cold joints and protect from the

elements for 24 hours until fully cured. Textured and colored finishes shall be as selected by the

Government.

7.16.7 Metal Wall Panels

7.16.7.1 All metal panels and accessories to be installed in such a fashion that they are free from wrinkles,

splits, buckles and oil canning. Where such conditions exist following installation, item(s) installed is

considered to have failed or damaged and must be replaced as required before acceptance (or as a

warranty repair) if already accepted.

7.16.7.2 Scratches, abrasions, and minor surface defects of finish may be repaired with the specified repair

materials and as recommended by the metal roof panel manufacturer. Immediately re pair all

SUPERSEDED

Page 42: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

scratches and cut edges in metal panel. Prolonged rusting on panels will warrant the need to replace

the affected panel.

7.16.7.3 Finished repaired surfaces must be uniform and free from variations of color and surface texture.

Repaired metal surfaces that are not acceptable to the project requirements are to be immediately

removed and replaced with the new material.

7.16.7.4 Metal panels with scratches in excess of 24” in length and penetrate the protective coating shall be

replaced.

7.16.7.5 Panels that indicate color changes, fading, or surface degradation, determined by visual examination,

must be removed and replaced with new panels at no expense to the Government.

7.16.7.6 Design and install metal wall panels to approved industry standards which eliminate or reduce the

opportunity for “oil canning” and/or damages due to thermal stress. Ensure that all openings are of

sufficient size to allow for movement around all pipes, fixtures and fenestrations.

7.16.8 Glass Curtain Walls and Storefronts

7.16.8.1 Design consultant with expertise in custom curtain wall systems should be hired for projects that

incorporate these systems.

7.16.8.2 Special consideration shall be given to design and the specifications to achieve, at minimum: (a)

Durability; (b) Moisture Protection and condensation; (c) Thermal Performance; (d) Acoustics .

7.17 Joints Sealants

7.17.1 Thoroughly clean all surfaces of the joint. Joints must be sound, clean, dry, and free from oils and all loose

aggregates. Ensure compatibility of sealant with the proposed application considering size of joint, building

movement and designed expansion and contraction. Joint preparation is paramount in successful application

and shall be photographed. Prime substrate when necessary.

7.17.2 A minimum of three (3) adhesion tests or one (1) per 150 lf of joint for each surface type shall be performed,

whichever is greater. Tests shall be performed per ASTM C1521.

7.17.3 Avoid air entrapment in sealants by using proven industry standards of application.

7.17.4 Joint size shall allow maximum expansion and contraction. Proper joint design of: 2:1 width to depth ratio.

7.17.5 Install backing system to properly control depth of sealants and prevent three sided adhesion. Use only

manufacturer approved backing materials. Ensure proper joint shape and design. Secondary backer system

shall be used on all deep joints or problematic joints with proper depth.

7.17.6 For joints larger than 1” in width, gun-grade sealant is not permitted. Designs shall incorporate pre-molded

materials.

7.17.7 The use of in-organic silicone sealant material is required for all exterior building joints and wet-glazing unless

a necessary design issue requires the use of polyurethane or other material.

7.17.8 All items within this section shall be applicable to sealant joints around wall fenestrations.

7.18 Fenestrations

7.18.1 General

7.18.1.1 All exterior wall fenestrations shall be compliant with ATFP UFC 4.010.01 protocols (see General

Exterior Wall comments).

7.18.1.2 A blast engineer or consultant must do a report based upon the threat level and determine the blast

loads that will be imposed upon the components of the building.

7.18.2 Windows

7.18.2.1 All new window and glazing shall meet AT/FP standard and below is the minimum glazing performance

SUPERSEDED

Page 43: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

requirement:

7.18.2.1.1 The double-pane laminated glass

7.18.2.1.2 SHGC = min. 0.27

7.18.2.1.3 U = min. 0.35

7.18.2.1.4 Low e-coating on number 2 surface in the glass pane. Low e-coating shall be exposed to the

air space between glazings.

7.18.2.2 Independent stainless steel window sill pans shall be incorporated into all window installation projects.

The sill pan profile shall incorporate fully welded end-dam and rear flange joints. Flange height shall

be determined by the window size and capacity design, but no less than 1”. Sill pans shall be flashed

into the exterior water-resistant barrier at the jambs and sill.

7.18.3 Doors

7.18.3.1 For future use

7.18.4 Louvers /Vents

7.18.4.1 All new louvers and vents that are installed on the exterior shall have bird/insect screens installed on

the interior side of the openings.

7.19 Warranties

7.19.1 Roof warranties are to be for full replacement and to have a 20 year No Dollar Limit (NDL) from date of final

inspection/acceptance by the Government. Protective roof coatings shall carry a manufacturer’s ten year

material warranty. No proration (NDL) warranties permitted. All manufacturer warranties shall cover

material and labor defects regardless if such defect has or has not caused a leak.

7.19.2 The installing roofing contractor shall warranty the roof application for a period of five (5) years to be leak

free. This coverage shall include both leaks and defects. Air blisters 1 sq. ft. or larger will be considered a

defect in the attachment of the membrane, and shall be repaired regardless of size. If the number of

blisters exceeds 5 in a 100 continuous sq. ft. area, all blister defects shall be investigated and repaired.

7.19.3 All building envelope systems must be inspected by a manufacturers technical representative (MTR) and the

designer of record (DOR) to certify that the new system is installed per the manufacturers recommendations

and that it is adherence with the new the system design. The MTR shall certify that the system was

installed pursuant the manufacturer’s design requirements and approved installation practices, and that the

system is warrantable.

7.19.4 Warranty repair coverage to include replacement of all wet substrate materials. The contractor shall cut back

into at least six (6) inches of dry substrate in all directions on the repair perimeter to ensure that the transition

of the new substrate is affixed to an acceptably dry existing substrate.

7.19.5 No disclaimer for ponding water is acceptable. All systems must be designed for positive drainage.

7.19.6 Installing contractor shall provide written manufacturer’s warranties on all building envelope components

including roofing, coatings, water proofing, sealants, paints, and masonry sealants. Installing contractor shall

warranty the installation of all materials for minimum of five years.

7.20 Building Envelope Commissioning

7.20.1 Ensure that the MDG Facility Manager and maintenance provider have been fully trained in maintenance care

and maintenance procedures. Provide inspection frequencies to the DMLSS Clerk for input into the DMLSS

maintenance program.

7.20.2 Provide all project support documentation (warranties, warranty service contact numbers, as-built, red lines

drawings and O&M manuals etc.) are provided to the Facility Manager.

SUPERSEDED

Page 44: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

7.20.3 Performance testing of drains shall be required on all new and repaired drains at final commissioning. The

test method shall be to plug the drains with air expandable test ball and flood roof areas around drains, visually

inspect the underside of the drains, and then observe the flow and evacuation of the water when the plug is

removed. Any leaks experienced around the drain, may require the total replacement of the drain assembly.

7.20.4 Water test all problematic areas identified as suspect during the initial pre-construction site visit and building

history, prior to submission for final acceptance by the government. The water testing shall follow AAMA

501.2, and AAMA 502 or ASTM E 1105 if necessary.

8.0 GENERAL REQUIREMENTS APPLICABLE TO ALL DISCIPLINES

8.0.1 Metering – All metering devices capable of storing and/or sharing data will be connected to the building

controller automation system (BCAS).

8.0.2 Removal of Abandoned Infrastructure (Mechanical, Electrical and Structural) – The AFMS desires to leverage

any opportunity to clean it’s physical plants of abandoned infrastructure which includes but is not limited to old

wiring, conduits, pneumatic control tubing, junction boxes, pipes, flues, housekeeping pads, supports and

hangers, etc.). Where a contractor is to perform work in a mechanical space (Mechanical Room, Utility Plant,

Air Hander Room, Electrical Closet, etc.) that contractor shall include as a separate feature the removal and

disposal of ALL abandoned equipment, piping, ductwork, electrical wiring and pneumatic lines or devices within

the spaces where work takes place under the proposed contract. This is to include the removal and disposal of

all abandoned infrastructure that is found within the spaces prior to the start of work. Typically, the conduit,

race, tubing or wiring shall be removed back to either the first usable junction box or point where it enters the

space.

8.0.3 Junction Boxes and Control Panel Boxes - Old large pneumatic control panels or large inappropriately sized

junction boxes are to be removed and either not used as junction boxes or “right sized” to a smaller boxes more

suited for the requirements going forward. Large EP control boxes that have been abandoned shall be removed

and not used as a feed-through pull box for control wiring. Where wiring passes through such a panel, the panel

is to be replaced with an appropriately sized electrical junction box, conduit extended to connect said junction

box and the wiring re-pulled through the junction box.

8.0.4 Electrical Infrastructure - Old electrical raceways and bus work where the circuits are/were no longer required

following your work and thus de-energized shall be removed back to the most upstream point. (discipline

determine verbiage) At this point, the conductors shall be terminated in an approved method, the termination

box shall be made safe and provide suitable protection and the terminated circuits shall be marked as de-

energized both at the point of termination and at the service point (breaker, fused disconnect, or switch feeding

the circuit). Wire ends shall be terminated as to present a neat and safe appearance without hanging strands or

insulation.

8.0.5 Pneumatic Control Infrastructure - Old pneumatic control, mechanical utility infrastructure piping (CHW, HW,

Steam, etc.) and plumbing which are/were no longer required following your work and thus drained and

disconnected, shall be removed back to the most upstream point of disconnect within the room or space. The

PVC and copper control tubing shall be cut in an approved manner within 6" of where it enters the mechanical

room or space and the ends of the tubing shall be plugged or capped with a rubber plug or cap, marked

appropriately and secured neatly in a in an approved professional appearing manner. Similarly, all ferrous metal

piping that is no longer required as a result of work performed shall terminated back to within 12" of the wall

or partition where it enters the mechanical space, cut and sealed in an approved manner. On pipes 1" or smaller,

the ends will be cut, threaded and an approved pipe cap installed (exception is PVC where a glued slip-on cap

will be accepted). On pipes 1 1/4" or larger, the ends of the pipe shall be cut smooth and either a blind flange

or a solid metal pipe cap shall be welded onto the end of the pipe. All weldments shall be painted as required

SUPERSEDED

Page 45: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

to provide corrosion control. The pipes shall be marked at the point of termination and point of service to

indicate that the pipe is abandoned and the location of the opposite end.

8.0.6 Structural Supports - Old hangers, brackets, all-thread suspension and saddles for all infrastructure systems

removed by the contractor shall also be removed back to the point of anchor. Any damage (damage is

considered but not limited to; holes, divots, cracks, voids, water infiltration) to the structure must be repaired

to match existing and surrounding materials in size, texture and color.

8.0.7 Equipment Mounts and Foundations - Old housekeeping pads, floor mounts, catch trays/basins and raised

isolation blocks for equipment removed by the contractor shall be removed to the original floor surface grade.

If time restraints do not allow removal and installation of a new housekeeping pad, old pads can be extended but

shall be at least2 times large than the height of the existing pad and must be epoxy dialed in. Once housekeeping

pad is cure, must epoxy coat the entire housekeeping pad. New housekeeping pads shall be 3 1/2 inches high as

a minimum concrete housekeeping pads and equipment bases for the following: outdoor equipment on grade,

indoor floor mounted equipment in mechanical rooms and penthouse equipment rooms. Housekeeping pads

shall extend a minimum 6 inches beyond the equipment or supported member in all directions. Provide pads

with one-inch chamfer on all exposed edges, placed and finished smooth and level to ensure proper and

continuous support for the bearing surfaces of equipment. If a piece of equipment must be replaced during a

period of time from shutdown to start up that is less than 80 hours or three working days, that the contractor

may utilize steel equipment supports rather than installing a new concrete equipment pad. The steel support

structure must be constructed of steel that is welded together, must be cleaned and primed with a rush inhibitor

spray, and must include continuous equipment support along the entire length of the equipment as well as

along the entire width of the unit at every section or module as well as at the manufacturer's recommended

support points. The steel members shall be I beam or similar material. The total height of an existing

housekeeping pad with steel supports for air handling equipment shall be sufficient to provide required

condensate trap depth. (Covered by UFC/AFI)

8.1 Corrosion Control of Exterior Mounted Packaged Assemblies and Enclosures

8.1.1 General Finishes - All exposed exterior metal surfaces on mechanical, electrical equipment and structural

systems / assemblies shall be UV resilient anodized, factory electrostatic applied thermally set powder coat

painted or hot-dipped galvanized. Finishes shall be either matte or semi-gloss. Color shall be light and unless

concealed by visual barrier, it shall match or compliment the aesthetics of the nearby building primary or trim

color.

8.1.2 Corrosion Control of Exterior Exposed Heat Transfer Coils (Air cooled chillers and roof-top unit condensers,

generator radiators, etc.) - Where the MDG is located within 50 nautical miles of an ocean or industrial area

where the air is laden with corrosive vapors, all exterior located heat transfer system coils (aluminum, copper,

brass) shall be coated with manufacturer applied baked-phenolic (or approved equivalent) corrosion-

preventative coating as necessary to extend the life of the coils and protect against advance deterioration due

to salt spray or other corrosives in the local air.

8.1.3 Field applied sprayed/brushed paint and/or cold application galvanize is not acceptable and only authorized on

pipe weldments and threaded connections that could not be pre-assembled at the factory. All weldments shall

be cleaned, primed and painted with a finished color that either matches the main assembly, or of the

appropriate color where required by local statute or safety code. All assembly bolts and hardware (unless

factory painted during assembly) shall be either zinc plated or hot dip galvanized. In exterior applications, use

only stainless steel assembly bolts and hardware.

8.2 Warranty

SUPERSEDED

Page 46: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Rev: 9.0 - 1 Nov 2017Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

8.2.1 Equipment & Materials: All materials and equipment shall carry a 24 month full-service warrantee from the

contractor for manufacturer defect, failure to perform in terms of reliability, efficiency, safe operation by

classification (continuous or intermittent use), and its ability to maintain steady-state performance at a

sustained load level as prescribed in the system design, and/or as prescribed by the equipment manufacturer.

8.2.2 Workmanship: The contractor shall provide a 12 month full service warranty for defect due to poor

workmanship from the date of acceptance. The definition of poor workmanship is: “Any work performed in

part or in full by the contractor or sub-contractor installers, trades personnel or general employees that does

not meet acceptable trade standards or applicable codes in terms of appearance, performance, reliability,

strength and durability as determined by the COR and validated through a review and endorsement by the

COTR. Early acceptance for beneficial use does not apply to workmanship warranties which are to commence

on the date of acceptance of the fully completed project.

8.2.3 Warranty Response: Where equipment, materials or roof systems are part of a system that supports a facility

that has Critical Care, Surgical operation or is bedded, the contractor shall provide emergency warranty service

response having qualified technicians ON SITE within two (2) hours of notification by the Facility Manager.

Where a system or component failure has a direct impact on the sustainment of a critical mission, the contractor

will remain engaged until such time as the system is repaired and on-line, or until the contractor has provided

interim temporary service as needed to sustain the mission until permanent repairs can be made and service

restored permanently.

8.2.4 Acceptance for Beneficial Use: The contractor may submit equipment and sub-systems to the government for

acceptance as ready for Beneficial Use. Where such equipment and sub-systems are to be submitted for

acceptance prior to the completion of the total project, the contractor shall identify said equipment as a critical

milestone on their project schedule and provide a commissioning and functional test plan for that piece of

equipment to the HFD at least 60 days prior to the proposed functional test and Beneficial Use acceptance date.

A piece of equipment or component of a sub-system that is not capable of production of a utility on its own may

not be submitted for acceptance as ready for Beneficial Use. (Example: a pump, a motor, or a motor starter

may be a component of a chilled water system but without a serviceable chiller connected and available for use

by the facility, it is not capable of delivering a product, therefore is not considered capable of production.)

8.2.5 Equipment: The contractor may submit certain large and high cost pieces of equipment to the Government for

acceptance for beneficial use and initiation of the equipment’s warranty period once said piece of equipment is

fully installed, made fully operational and capable of production at full rated capacity, and is capable of being

operated by maintenance personnel without limitations or special instructions that are outside the normal

scope of operations. Contractor must provide O&M manuals, documented training and product specific

information to the DMLSS Clerk for upload into DMLSS to allow the maintenance provider to begin preventive

maintenance at time of beneficial use. When the aforementioned conditions are met, the contractor will submit

a DD Form 250 Request for Government Acceptance stating the specific components with product serial

numbers that are being submitted for acceptance. Whereas the warranty period of a specific piece of

equipment may be started prior to the completion of the commissioning of the full system design and

subsequent final acceptance of the project, at no time shall the warranty of that piece of equipment be less

than 14 months following the completion and final acceptance of the project.

8.2.6 Acceptance of Automated System Controls: Early acceptance for beneficial use does NOT apply to warranties

for any automated system controls (for mechanical and electrical, and power generation systems) which employ

programmable automated logic, software, firmware, computerized networking systems, or sophisticated

electronic controls which possess ladder or electronic logic that is established by the installer to meet the

requirements of a system sequence of operation uniquely prescribed by the designer for system control. Such

systems are only to be tested and considered ready for acceptance once all sub-systems and down-stream

controlled have been commissioned, proven to be fully functional and accepted by the government. Should it

SUPERSEDED

Page 47: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

be necessary for the installer to perform a modification to the system logic (regardless of the size and scope of

the modification) to overcome a deficiency in the control logic or sequence of operation during the testing of

the system automation, the system shall undergo a complete re-test (the testing shall not be allowed to

commence from the point in which the discrepancy was noted) as to assure that any change to the program

does not pose an adverse impact to already tested system functionality.

9.0 Infection Control

9.1 Interim Infection Control Measures (IICM) Contractors shall protect indoor air, absorbent materials, and mechanical systems from contamination in accordance with ASHRAE-62.1-2016 and local medical group infection control operating instructions.

10.0 Drawings and Project Documentation

10.1 For the purpose of this document “Drawings” are defined as diagrams, schematics, one-lines, and other graphic

presentations used to provide additional details of a project.

10.2 Standard Naming Convention: All drawing file names shall conform to the following convention:

10.2.1 A-93-TRAV-01776-FP-F1-A2.13.dwg*

10.2.1.1 - A is discipline designator

10.2.1.2 - 93 is the modification year

10.2.1.3 - TRAV is the installation name - denotes Travis AFB

10.2.1.4 - Use the first four letters of the base name

10.2.1.5 - 01776 is the building number

10.2.1.6 - FP is the model type - FP denotes floorplan

10.2.1.7 - F1 is the floor level – or designator for Mezzanine, Penthouse, Basement or Pad

10.2.1.8 - Sheet number

*See attachment 6 AFMSA/SG8F Drawing File Name Convention Guide

10.3 The contractor shall provide completed project modifiable DWGs (designer As Builts) and Signed PDF with

Designer of Record (DOR) seal for each discipline.

10.3.1 Along with the deliverable .dwg’s and BIM Models, the contractor shall include all Xref, TIFF, JPEG, and pdf

files associated with the drawings.

10.3.2 The contractor shall provide a drawing index of the deliverable drawings, i.e., a line item list.

10.3.3 The contractor will use if available the Engineering Project DWG provided by the government to establish a

new baseline DWG to reflect updates as a result of project completion.

10.3.4 On the base line DWG, the contractor shall HIGHLIGHT areas modified with what, who, and when e.g. using

a bubble blowup/callout.

10.3.5 In the case of BIM Model deliverables *See attachment 7, Advanced Modeling Requirements on USACE

projects.

10.3.6 In the case the contractor does not deliver complete BIM model, the contractor shall extract, convert and

rename all BIM/Revit drawing files into AutoCad .dwg format using the standard naming convention.

10.4 The contractor must provide updated and complete system riser diagrams for the related MEP system(s) altered.

These diagrams shall include but are not limited to electrical one-line diagrams, heating and cooling piping riser

diagrams, steam and water distribution lines, plumbing system piping, fire detection, fire protection, smoke exhaust

/evacuation /purging systems, EMS one-line diagram, schematics etc.

10.5 The contractor must provide complete updated fire damper and smoke damper schedules.

SUPERSEDED

Page 48: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

10.6 The contractor shall prepare Real Property Acceptance Documentation. All real-property acceptances shall be

performed on a DD Form 1354. The DD Form 1354 is used by government agencies responsible for the acceptance,

life-cycle through disposal to record the capitalization and disposition of all Real Property and Real Property Installed

Equipment (RPIE). The DD Form 1354 shall be completed in accordance with UFC 1-300-08, dated 21 Aug 2015 or

later. The contractor shall provide the completed DD 1354 to the contracting agent e.g. the Corps of Engineers and

AFMSA/SG8F engineering project manager an example of a completed 1354 is provided as an Attachment 5.

10.7 The Prime/General Contractor is responsible for keeping track of all RPIE items removed, replaced or installed new

on Infrastructure Repair Projects. The RPIE items removed and/or replaced will be documented on a DD Form 1354.

10.7.1 Prior to removal of RPIE:

10.7.1.1 The contractor shall obtain from the Government a Defense Medical Logistics Standard Support

(DMLSS) RPIE report to determine equipment on record being removed or replaced

10.7.1.2 The contractor shall document the RPIE ID of the equipment being removed or replaced found on the

DMLSS RPIE report

10.7.2 Installation of RPIE

10.7.2.1 The contractor shall provide a list to the Government of all RPIE being installed to include the

following data elements:

1. Manufacturer

2. Model Number

3. Serial Number

4. Capacity

5. Specifications

6. Date of installation

7. Room number

8. Rooms supported

10.7.2.2 The contractor shall obtain from the Government the RPIE ID and place a label on all newly install RPIE

10.7.2.3 All equipment shall be labeled with a self-adhesive, white label and black font. All labels shall reflect

the Index number as facility number, nomenclature acronym, unique item identifier, and location

identifier (i.e., floor number, room number or zone). For small items such as fire alarm system (pull

stations, heat detectors, etc.), exit lights, emergency lights, etc., ½” tape should be used and shall

include a QR Code containing the RPIE ID, Manufacturer, Model and Serial numbers. For everything

else, 1” tape should be used and include a QR Code containing RPIE ID, Manufacturer, Model and

Serial number, Capacity, and Specifications. The Contractor shall not use a company name or logo on

the labels. Labels shall be placed in a neat and uniform manner across RPIE Systems i.e. left corner

outside fire cabinet for fire extinguishers. All labels shall be placed directly on the equipment;

exception shall be approved by AFMSA/SG8F and the FM. Equipment located above the ceiling grid,

a label shall be placed on the equipment and on the ceil ing grid directly below the equipment. The

contractor shall remove all previous versions of DMLSS labels identifying the RPIE ite m. All labels shall

match the format provided in example 1.1.

Example 1.1

10.7.3 BIM - Where there are BIM Model deliverables and additional BIM requirement information, refer to the

DMLSS RPIE ID

01234-AHU-001-1

SUPERSEDED

Page 49: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

USACE Engineering and Construction Bulletin (ECB) 2016-03 Advanced Modeling Requirements for USACE projects. This

ECB is applicable for AFMS projects.

10.8 The following are the pertinent blocks of the DD Form 1354 that need particular attention. Refer to Attachment 5

for clarification.

10.8.1 Corp of Engineers Address

10.8.2 Date prepared

10.8.3 Project #

10.8.4 for multiple items leave this section blank

10.8.5 Civil Engineering Address if known

10.8.6 Installation Name

10.8.7 AFMSA contract #

10.8.8 Date Item was placed in service (for multiple items, date system was placed in service)

10.8.9 Number of the item(s)

10.8.10 Facility #

10.8.11 Identify the part, include part 3 if available

10.8.12 P=permanent , S=semi-permanent, T= temporary

10.8.13 Unit of measure

10.8.14 Quantity

10.9 The contractor shall provide bi-weekly Risk Reports for Infrastructure Repair Projects with the following

information

10.9.1 Name of Contractor

10.9.2 Installation

10.9.3 Task Order #

10.9.4 RFP #

10.9.5 Project Title

10.9.6 Project Description

10.9.7 Status Milestone

10.9.8 Estimated Completion date

10.9.9 Green, Yellow, Red indicator

10.9.10 General Concerns

10.9.11 Items removed

11.1 Miscellaneous

11.2 Project Execution & Avoidance of Disruption to Mission during Construction

11.2.1 All designs, system modifications and installation of new equipment and materials must improve operations,

reduce costs, increase reliability, provide for ease of maintenance, and extend the operational life of the

system. Design and construction shall be in compliance with this guide. Under no circumstances shall any

design modification diminish in any respect the functionality and/or quality of service being provided prior to

the application of the design. It is the responsibility of the engineer of record to investigate to the fullest extent

the existing conditions and requirements associated with healthcare system requirements and assure that any

planned modifications can meet and/or exceed these requirements with a comfortable margin of

excess/redundant capacity. The recommendation(s) for each module must include conceptual drawing(s),

narrative(s) of the proposed solution(s), estimate(s) of the execution timeline of the work (estimated phasing

schedule, time of construction, etc.) and a plan to minimize the adverse impact of the work on the occupants

and their operation. Additionally, designs and proposed solutions shall to the greatest extent possible

SUPERSEDED

Page 50: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

incorporate features that are in line with and/or comply with LEED Silver qualification and Energy Star

certification (where applicable).

11.3 Avoidance of Adverse Mission Impact.

11.3.1 Construction and work that requires complete shutdown of operations or mission shall be performed on

weekends, facility training days, during night time facility off-hours or recognized holidays. Temporary

entrance shall be provided to mission critical equipment, laboratories, pharmacy, critical refrigeration

equipment, security/alarm system, and any other identified critical areas during all construction disruptions to

maintain mission integrity. All day time construction features shall be performed around facility activities and

not interfere with the daily operations of the facility personnel or infrastructure. The contractor shall strategize

with AFMSA, medical group leadership, Facility Management staff and others as appropriate to minimize

impact and coordinate construction activities throughout the project.

11.3.2 For Roofing Projects: When working on roofs or the building envelope, the contractor will install temporary

closures, covers, etc., at the conclusion of each day’s work to ensure that water cannot penetrate to the interior

of the building in the event of an overnight or evening rain or storm.

11.3.3 Maintenance of Fire/Smoke Barriers during Construction: Contractors working inside the building shall

ensure that all penetrations of fire/smoke barriers are either sealed permanently with the appropriate fire

stop, or a UL listed temporary fire stop if the penetration is to be reopened later during the execution of the

construction.

11.3.4 Securing of Electrical Systems during Construction: At end of day and before departure, the electrical

contractor shall make safe any electrical component, apparatus, enclosure or exposed energized conductors

by reinstalling shields, covers, doors or installing appropriate temporary covers the eliminate the possibility of

electrical shock or fire hazard. Similarly, if work is being performed on the aforementioned electrical systems

where any energized components are exposed, it shall not be left unattended by the qualified technician even

for very brief periods without replacing all covers restoring dead-front / arc-flash protection features and

making it safe.

SUPERSEDED

Page 51: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

ATTACHMENTS

Attachment 1 – Return Air HVAC Ducts

Attachment 2 – Emergency HVAC shutdown

Attachment 3 – Roof Insulation Zone Chart

Attachment 4 - SG8F Drawing File Name Convention

Attachment 5 – Sample DD Form 1354

Attachment 6 - SG8F Drawing File Name Convention Guide

Attachment 7 - Advanced Modeling Requirements on USACE Projects

SUPERSEDED

Page 52: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

Attachment 1 –Return Air HVAC Ducts

SUPERSEDED

Page 53: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

SUPERSEDED

Page 54: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

Attachment 2 –Emergency HVAC shutdown

SUPERSEDED

Page 55: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

SUPERSEDED

Page 56: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

SUPERSEDED

Page 57: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

Attachment 3 - Roof Insulation Zone Chart

SUPERSEDED

Page 58: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

Attachment 4 – SG8F Drawing File Name

SUPERSEDED

Page 59: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

Attachment 5 – Sample DD Form 1354

SUPERSEDED

Page 60: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

Attachment 6 – SG8F Drawing File Name Convention Guide

MODEL FILE TYPES

TABLE 2.2 - Model File TypesDiscipline Code Definition

Plumbing

PL Plumbing Plan3D Isometric/3DDG DiagramDT Detail PlanEL ElevationEP Enlarged PlanLG LegendPP Piping PlanSH ScheduleXD Existing/Demolition PlanSY Symbols & AbbreviationDR Drainage System PlanMG Medical Gas Plan

Mechanical

3D Isometric/3DDG DiagramDT Detail PlanEL ElevationEP Enlarged PlanHP HVAC PlanAH Air Handling PlanHT HTCW/Utilities PlanLG Legend & SymbolsME Mechanical Equipment PlanMH Mechanical HVACQP Equipment PlanSC SectionSH ScheduleMP Mechanical FloorplanVP Ventilation PlanSP Specification PlanHP Heating PlanRP Roof PlanPP Piping PlanXD Existing/Demolition PlanAD Air Ductwork Plan

TABLE 2.2 - Model File TypesDiscipline Code Definition

Civil

WM W ater Main PlanIP Irrigation PlanXD Existing/Demolition PlanAF Airfield PlanBR Beach Renourishment PlanDT Detail PlanEL ElevationER Eco-Restoration PlanFC Flood Control PlanGP Grading PlanIP Installation Plan/Base MapJP Joint Layout PlanKP Staking PlanGN General NotesSW Sidewalk Layout PlanLG Legend/General NotesNG Navigation/Dredging PlanPL Project Location PlanPR Profile PlanSC Section ViewSH ScheduleSP Site PlanTS Transportation Site PlanUP Utilities PlanWD W ater Distribution PlanLO Point LoadsXD Existing/Demolition Plan

Structural

3D Isometric/3DBP Bridge PlanCP Column PlanCW Misc. Small Civil Works StructuresDT DetailEL Elevation PlanEP Enlarged PlanGP General PlanNT General NotesLP Load PlanFP Foundation PlanRP Roofing Plan

TABLE 2.1 - DISCIPLINE DESIGNATORArchitectural AGeotechnical BCivil CProcess DElectrical EFire Protection FGeneral GHazardous Materials HInteriors ILandscape LMechanical MOperations OPlumbing PEquipment QResource RStructural STelecommunications RUnknown USurvey/Mapping VDistributed Energy WOther Disciplines XLife Safety YContractor/Shop Drawing Z

TABLE 2.2 - Model File TypesDiscipline Code Definition

Structural

FC Flood Control StructuresFP Framing PlanLD Locks & Dams PlanLG LegendNP Foundation PlanSC SectionSH ScheduleXD Existing/Demolition Plan

Architectural

LS Life Safety PlanSN Signage PlanSP Signal PlanCN Connector PlanFU Furniture Plan3D Isometric/3DAC Area Calculations/Occupancy PlanCP Reflected Ceiling PlanDT DetailEL ElevationEP Enlarged PlanFP Floor PlanLG Legend, Notes and SymbolsQP Equipment PlanRP Roof PlanSC SectionMD Modular Furniture Floor PlanSH SchuduleCD Construction Dimension PlanXD Existing/Demolition/New W ork Plan

Fire Protection

HR Hose Rack PlanDG DiagramDT Detail PlanFA Fire Alarm/Detection PlanFP Fire Suppression PlanLG Legend and NotesSA Safety PlanST Site PlanSP Stand Pipe PlanCL Connecting LinkMN Mass Notification/Fire Alarm PlanSL SLC Device Location PlanCP Control PlanSV Section ViewDL Device Layout PlanFS Fire Sprinkler PlanC0 Co2 Systems PlanLP Life Safety PlanSH SchuduleXD Existing/Demolition Plan

TABLE 2.2 - Model File TypesDiscipline Code Definition

Electrical

SB Switch Board PlanAP Auxiliary Power PlanCP Exterior Communication Systems PlanDG Systems DiagramDT Detail PlanEU Electrical UtilitiesPlanGP Grounding System PlanLG Legend/General NotesLP Lighting/Control PlanPP Power & Signal PlanPS Panel ScheduleSH ScheduleSS Special Systems PlanXD Existing/Demolition PlanSP Signal PlanPD Power Distribution PlanDD Distribution DetailEP Electrical PlanRD Riser DetailSL Systems LayoutEL ElevationSY Enlarged PlanFE Floor PlanEN Legend, Notes and SymbolsSV Equipment PlanRB Roof PlanES Electrical Site Plan

General

SP Site PlanLP Landscape PlanLD Landscape Detail PlanZP Zoning PlanNO General Notes & Project DescriptionIS Index SheetTB Title BlockEX Fire and Exiting PlanCS Cover SheetHR Handrail Plan

Life Safety

AC Access ControlCC CCTV Device PlanLG Legends & General NotesLS Life Safety PlanSE Smoke Exhaust PlanFZ Fire Zone PlanNC Nurses Call Details & SymbolsSD Nurses Call System DiagramFP Floor PlanDT Detail PlanMG Medical Gas PlanPA PA Device Plan

SUPERSEDED

Page 61: Air Force Medical Support Agency (AFMSA) Health Facilities … · 2018-08-21 · Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards

Air Force Medical Support Agency Health Facilities Division Quality Design & Construction Standards for AFMS Infrastructure Systems

Rev: 9.0 - 1 Nov 2017

Attachment 7 –Advanced Modeling Requirements on USACE projects

SUPERSEDED