ahmed emad ahmed mohammed.docx22

3
Ahmed Emad Ahmed Mohammed Mail:[email protected] Tel:+2189916840591 Objective: I hope to work in the company continuing global technical communications: General Manager and continue to provide the company's team about the new development . Work fields: _ Mobile telecom operators: _Company. ISP : Work Experience:: Company Name: SHABAKKT. SD Company Location: KH.SUDAN: Work time: from(2.2009) to (4.2010).. Work Description: _Maintenance (corrective and preventive )BTS 240XL.Replace FCU FDUAMCO. _ Maintenance Microwave (corrective and preventive ) SRALXD.SB1.SB2 (IN.OUT.DOOR Company Name: TEAM INVESTMENTCO.LTD. Company Location: KH.SUDAN: Work time: from(10.2010) to (11.2011) Work Description: -ZAIN .HUAWEI .2g.3g.swap project. -ZAIN .HUAWEI Microwave .swap project. -SUDANI.HUAWEI.PHASE.. (H). .project. TECHNICAL SITE SURVEY REPORT FOR RF. Company Name: RADIO.CO. Company Location: KH.SUDAN: Work time: from(1.2012) to (2.2013). Work Description:

Upload: ahmed-emad

Post on 15-Jul-2015

130 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Ahmed  Emad  Ahmed Mohammed.docx22

Ahmed Emad Ahmed Mohammed

Mail:[email protected]

Tel:+2189916840591

Objective:

I hope to work in the company continuing global technical communications:

General Manager and continue to provide the company's team about the new development .

Work fields:

_ Mobile telecom operators:

_Company. ISP :

Work Experience::

Company Name: SHABAKKT. SD

Company Location: KH.SUDAN:

Work time: from(2.2009) to (4.2010)..

Work Description:

_Maintenance (corrective and preventive )BTS 240XL.Replace FCU FDUAMCO.

_ Maintenance Microwave (corrective and preventive ) SRALXD.SB1.SB2 (IN.OUT.DOOR

Company Name: TEAM INVESTMENTCO.LTD.

Company Location: KH.SUDAN:

Work time: from(10.2010) to (11.2011)

Work Description:

-ZAIN .HUAWEI .2g.3g.swap project.

-ZAIN .HUAWEI Microwave .swap project.

-SUDANI.HUAWEI.PHASE.. (H). .project.

TECHNICAL SITE SURVEY REPORT FOR RF.

Company Name: RADIO.CO.

Company Location: KH.SUDAN:

Work time: from(1.2012) to (2.2013).

Work Description:

Page 2: Ahmed  Emad  Ahmed Mohammed.docx22

- installation AND Maintenance BTS 3900 HUAWEI INDOOR:

- installation AND Maintenance DBS HUAWEI OUT DOOR:

Installation . Antena 2g.and.3g and RRU.OUTDOOR.

Courses and Certifications:

-OPERTICON AND MAINTENANCE OF FIBER OPTIC CABLE..

Canducted by Sudatel Telecammicatans Academy (SUDACAD)

Has aucces fully Completed Training course fiber optic cable..

Time courses (2011)…

Work Experience:

Company Name :ICONA.CO.

Company Location: LIBYA FROM Tripoli:

TIME WORK: FROM (6 2013 ) TO UP TO DAY

Work Description:

_PROJECT:KA.BAND TWO-WAY SATELLITE SYSTEM:

Installation, configuration .and commissioning

Skyware98.180.tx.rx.satallite Dish. I Direct EVOLUTION (X1 AND X3)modem.

_PROJECT:FIER OPTIC (LIZ LINE Services Inter Net)

Installation, configuration .and commissioning

POINT TO POINT LINK WIRLESS ..

Installation .SPLICING TEXTEING FIBER CABLE (BSC. Tripoli.)..

_PROJECT :ADSL Services Inter Net ..

Installation cable ADSL DSLM AND RAK SYSTEM Equipment HUAWEI …

Installation. A to Z NET WORK CABLEING AND CABINT

Company Name: ALHADATHA TELECOM&INFORMATION.CO

Company Location ::LIBYA FROM MIUSRATA .

TIME WORK::(9.12.2014) TO ( 1.3.2015)

Work Description:

-PORJECT FIBER OPTICLS CABLE (Alkhlj electric station

Page 3: Ahmed  Emad  Ahmed Mohammed.docx22

TEXTING AND SPLICING CONECTION Communications Room

_PROJECT Covered by wireless Internet service:

Installation, ANTENA IN TOWES MICROTEK AND Customer .

Configuration ANTENA AND ROUTER PORT HOT SPOIT .

Internet flooring. Installation ADSL DSLM Equipment ZONE SYSTEM …

END..