advant presentation ii

Upload: dhoobaby

Post on 14-Apr-2018

244 views

Category:

Documents


3 download

TRANSCRIPT

  • 7/27/2019 Advant Presentation II

    1/26

    1

    ADVANT NAVIS BUSINESS PARK

    www.advantindia.com 1

  • 7/27/2019 Advant Presentation II

    2/26

    Located on Left side of the Expressway for Easy access

    Only about 10 minutes non-stop drive from DND

    The most intelligent energy efficient Buildings LEED GOLD Certificate candidate for GREEN Buildings.

    Residential and Recreational facilities in the closevicinity

    1KM from proposed FNG highway, time from Faridabadand Ghaziabad to reduce to 10-15 minutes.

    Proposed Metro station right in the front

    Available options for immediate Possession

    Common facilities such as food court, gymnasium,

    conference halls, Plug & Play Business Center, etc.

    Ample Parking for up to 1200 cars inside and about2,500 cars outside.

    WHY ADVANT-NAVIS?

    www.advantindia.com 2

  • 7/27/2019 Advant Presentation II

    3/26

    LOCATION Plot # 7, Sector 142, Noida Expressway, Noida

    10 minutes non-stop drive from DND toll road.

    Easy & quick access on left side of the Expressway 30 minutes drive from Connaught Place

    60 minutes drive from International Airport.

    Proposed Metro rail link right in front of the Project.

    www.advantindia.com 3

  • 7/27/2019 Advant Presentation II

    4/26

    www.advantindia.com 4

    Connectivity

    Advant shuttle service to nearest Metro Station.

    Proposed Metro Station right in front of Advant. Close to proposed FNG highway connecting

    Faridabad, Noida, Ghaziabad.

  • 7/27/2019 Advant Presentation II

    5/26www.advantindia.com 5

    PROPOSED METRO PLAN

  • 7/27/2019 Advant Presentation II

    6/26

    Total Area: Tower A 450,000; Tower B 390,000 No. of Floors: Tower A - 15; Tower B 13 Tower A: Ready for Fit outs; Tower B : Under Construction

    Floor Plate size: 30,000 to 64,000 sq. ft. (approx.)

    Floor to Floor Height: 4.2 m Column to Column Distance: 8.4 m Slab Load Design: Live load 450 kg/sq m Designed for seismic zone V Car parking : 2 basements (300,000 sq ft) + Ground Level

    Power

    33KVA from a sub station connected to 220KVA National Grid Sanctioned Load: 6000 KVA against Peak Demand of 5725 KVA Power allocated: 5 watts/sq ft Power Backup: 6 DG sets of 1500 KVA each

    HVAC Number of Chillers/Make: 5 Nos. York

    Capacity of Chillers (in TR) 589 TR Number of AHU's per floor 2 (Zeco) Capacity of AHU's (in cfm) 23000 CFM & 18000 CFM

    PROJECT SPECIFICATIONS

    www.advantindia.com 6

  • 7/27/2019 Advant Presentation II

    7/26

    Business Center with fully furnished incubation services

    Ample, hassle free parking for up to 1,200 cars

    Elevators: 16 high speed (2.5m/s) elevators for 20 passenger each

    Integrated Building Management System (BMS)

    Telecom & Data Communication thru multiple service providers

    Fully automatic fire alarm, Access Control &Video Surveillance

    Conveniently placed services shafts

    Professional facilities management

    Zero discharge building with Sewage Treatment Plant (STP)

    Breathtaking landscaping amidst lush-green, pollution-free atmosphere

    PROJECT FEATURES

    www.advantindia.com 7

  • 7/27/2019 Advant Presentation II

    8/26

    GREEN BUILDING FEATURESDouble glazed, heat reflective external facade

    Highly efficient water-cooled chiller based HVAC system

    Energy monitoring, management and conservation Systems

    VSD Chilled Water Secondary Pumps

    VFD drive for AHUs

    LED lights for exterior and interior common areas

    Intelligent lighting controlled byLUX sensors,Dimmable ballasts &Occupancy sensors

    www.advantindia.com 8

  • 7/27/2019 Advant Presentation II

    9/26

    BMS SYSTEM

    Integrated Building Management System providesmonitoring and control of all the critical aspects related

    with infrastructure of the building. Complete controlsolution that easily interconnects with intelligent devicesand systems and covers automation of:

    HVAC (Heating, Ventilation and Air Conditioning)

    Plumbing system

    Sewage treatment plant

    Energy management system

    Access control

    Surveillance

    www.advantindia.com 9

  • 7/27/2019 Advant Presentation II

    10/26

    BMS BENEFITS

    Energy Saving

    Indoor Comfort

    Sustenance of green buildings

    Keeps the building young

    Integrated System better decision support

    system

    Lower maintenance and operational cost

    Automatic monitoring and adjustment of allsystems

    Improves efficiency

    www.advantindia.com 10

  • 7/27/2019 Advant Presentation II

    11/26

    COMMON LARGE CONFERENCE HALLLarge conference facilities available for up to 150-200 people to be available in the

    business center

    www.advantindia.com 11

  • 7/27/2019 Advant Presentation II

    12/26

    www.advantindia.com 12

    Business Center with fullyfurnished incubation services

    Elegant interiors

    Full administration &secretarial support

    Conferences & Meeting Rooms

    Courier & Postal mails

    Photocopying, Printing, Fax

    Customized Cabins & StorageSpace

    Fully Equipped Pantry, HouseKeeping, Maintenance & UtilityServices

    Business Center

    High performance Telecoms & Data Communication thrumultiple service providers

    Fully automatic fire alarm, Access Control &VideoSurveillance

    Conveniently placed services shafts

    Professional facilities management

  • 7/27/2019 Advant Presentation II

    13/26

    LIST OF SERVICES ALLOWED UNDER:

    Back Office Operations Call Centers Content Development or Animation Data Processing Engineering and Design Geographic Information System services Human Resource Services Insurance Claim Processing Legal Databases Medical Transcription Payroll

    Remote Maintenance Revenue Accounting Support Centers Web-site Services IT Software & Hardware Education

    o IT Training Instituteo Self Tutorialo Compute Aided Learningo Interactive Tutoringo Computer Aided Educational

    Software & related Database

    Telecom Serviceso Basic Telecom Serviceso VSATo Cellular Companieso Telecom Network Serviceso Internet Service Providerso Other Value Added Services

    IT Hardware and related Services

    Cyber Caf, Cyber Kiosk, Video ConferencingCenters

    Other Service Providers with the Intensiveuse of Computers.

    www.advantindia.com 13

    COST IN ADDITION TO BASIC SALE PRICE

  • 7/27/2019 Advant Presentation II

    14/26

    COST IN ADDITION TO BASIC SALE PRICE

    PLC (Prime Location Charges), if applicable

    PLC (units facing Expressway) Rs. 350 per sq. ft.

    PLC (units facing Lift Lobby) Rs. 150 per sq. ft.

    On Completion;

    Power Backup Rs. 100 per sq. ft.

    One time Noida Lease Rent & Govt. Fee will be extra .

    IFMS Deposit (Interest Free Maintenance Security) Rs.100 per sq. ft.

    Parking Price (optional)

    Covered Parking per car

    Rs. 3,00,000

    Ground Parking per car Rs. 3,00,000

    www.advantindia.com 14

    PAYMENT PLAN TOWER A

  • 7/27/2019 Advant Presentation II

    15/26

    15

    One Time Down Payment & No Return10% of the Basic Sale Price at the time of

    Registration.

    90% of the Basic Sale Price within 45 days of the

    Registration Date.

    Total payment within 45days of the booking & No Returns

    PAYMENT PLAN TOWER A

    www.advantindia.com 15

    PAYMENT PLAN TOWER-B ( UNDER CONSTRUCTION)

  • 7/27/2019 Advant Presentation II

    16/26

    Plan.1:- Assured Return Plan

    Assured Return by PDCs on BSP (Basic Sale

    Price)Returns till possession

    Payment Plan

    10% of the basic sale value at the time ofbooking

    85% of the basic amount within 45 days of theRegistration & applicable PLC, Parking Cost.

    5% of the basic sale value at the time ofpossession with Applicable IFMS, PowerCharges & all Govt. Fee.

    PAYMENT PLAN TOWER-B ( UNDER CONSTRUCTION)

    www.advantindia.com 16

    PAYMENT PLAN TOWER-B ( UNDER CONSTRUCTION)

  • 7/27/2019 Advant Presentation II

    17/26

    Plan.2:- Construction Linked Plan

    1st installment:- 15% of the allotment consideration at the time

    of booking.

    2nd installment:- 15% of the allotment consideration amount,PLC (if applicable) & Parking Charges within 45 days of the

    booking.

    3rd installment:- 10% of BSP on casting of basement

    4rd installment :- 10% of the allotment consideration oncasting of 1st Floor.

    5th

    installment:- 10% of the allotment consideration on castingof 3rd Floor.

    contd..2

    PAYMENT PLAN TOWER-B ( UNDER CONSTRUCTION)

    www.advantindia.com 17

    PAYMENT PLAN TOWER-B ( UNDER CONSTRUCTION)

  • 7/27/2019 Advant Presentation II

    18/26

    Plan.2:- Construction Linked

    www.advantindia.com 18

    PAYMENT PLAN TOWER B ( UNDER CONSTRUCTION)

    6th installment :- 10% of the allotment consideration on casting of 6th Floor.

    7th installment:- 10% of the allotment consideration on casting of 9th Floor.

    8th installment :- 10% of the allotment consideration on casting of 13th

    Floor.

    9th installment:- 10% of the allotment consideration along with otherstatutory liability as may be applicable, Registration Charges.

    FLOOR PLAN:- TOWER-A (READY FOR FITOUTS)

  • 7/27/2019 Advant Presentation II

    19/26

    Typical Floor Plan (Option-1)

    FLOOR PLAN: TOWER A (READY FOR FITOUTS)

    www.advantindia.com 19

    FLOOR PLAN:- TOWER-A (READY FOR FITOUTS)

  • 7/27/2019 Advant Presentation II

    20/26

    Typical Floor Plan (Option-2)

    OO O ( O OU S)

    www.advantindia.com 20

    FLOOR PLAN:- TOWER-A (READY FOR FITOUTS)

  • 7/27/2019 Advant Presentation II

    21/26

    Typical Floor Plan (Option-3)

    ( )

    www.advantindia.com 21

    FLOOR PLAN:- TOWER-A (READY FOR FITOUTS)

  • 7/27/2019 Advant Presentation II

    22/26

    Typical Floor Plan (Option-4)

    ( )

    www.advantindia.com 22

    FLOOR PLAN:- TOWER-B (UNDER CONSTRUCTION)

  • 7/27/2019 Advant Presentation II

    23/26

    Typical Floor Plan- (FLOORS 06TH,07TH & 08TH)

    ( )

    www.advantindia.com 23

    FLOOR PLAN:- TOWER-B (UNDER CONSTRUCTION)

  • 7/27/2019 Advant Presentation II

    24/26

    Typical Floor Plan- (FLOORS 10th & 11th)

    www.advantindia.com 24

    T t C ti it

  • 7/27/2019 Advant Presentation II

    25/26

    www.advantindia.com 25

    Transport Connectivity

    Advant Shuttle service to nearest Metro Station.

    About 10mins drive from DND toll, a great connectivity to Delhi.

    Proposed Metro station for the area close vicinity of Advant-Navis.

    Proposed FNG highway (Faridabad, Noida & Ghaziabad)

    CONTACT INFORMATIONS

  • 7/27/2019 Advant Presentation II

    26/26

    Address:- Advant-Navis Business Park ,

    7, Sector-142, Noida.

    Pin 201301 (U.P)

    Tel: - 0120 3303900 18

    Email:- [email protected]

    Mobile:- 9999940400, 9999941041,9711188829, 9810002900, 9810006768

    Please visit our website www.advantindia.com

    www.advantindia.com 26

    mailto:[email protected]:[email protected]