advanced boiler control for biomass/solid fuel boilers

8
Advanced Boiler Control for Biomass/Solid Fuel Boilers Advanced Boiler Control for Biomass/Solid Fuel Boilers For improved boiler stability and safety, fuel cost efficiency, and environmental compliance, For improved boiler stability and safety, fuel cost efficiency, and environmental compliance, using Advanced Control and Optimization Strategies and implemented in existing DCSs. using Advanced Control and Optimization Strategies and implemented in existing DCSs. Simultaneously Reduces Fuel Costs and Emissions (Particulates, CO2). Advanced Control of Combustion Air and Gas, Steam Drum Level, and Header Pressure. Optimization for Multi-Fuel Firing, Air-Fuel Ratios, and Air Distribution. Combustion Rate Model. Boiler Master with Load Allocation and Comprehensive Constraint Control. Burner Management and Optimization. Chemical Recovery Boiler Throughput, Consumed Air, and Air Distribution Optimization. Active Control of the Solid Fuel Distribution on the Grate. Grate Cleaning and Restart Optimization. Advanced Boiler Control CIMExcel Software Inc. Slide 1 Woodfeeders Short-term Combustion Long-term Combustion 0 h 24 h

Upload: binh

Post on 10-Jan-2016

88 views

Category:

Documents


0 download

DESCRIPTION

Woodfeeders Short-term Combustion Long-term Combustion. 0 h. 24 h. Advanced Boiler Control for Biomass/Solid Fuel Boilers For improved boiler stability and safety, fuel cost efficiency, and environmental compliance, - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Advanced Boiler Control for Biomass/Solid Fuel Boilers

Advanced Boiler Control for Biomass/Solid Fuel BoilersAdvanced Boiler Control for Biomass/Solid Fuel Boilers

For improved boiler stability and safety, fuel cost efficiency, and environmental compliance,For improved boiler stability and safety, fuel cost efficiency, and environmental compliance,

using Advanced Control and Optimization Strategies and implemented in existing DCSs.using Advanced Control and Optimization Strategies and implemented in existing DCSs.

• Simultaneously Reduces Fuel Costs and Emissions (Particulates, CO2).

• Advanced Control of Combustion Air and Gas, Steam Drum Level, and Header Pressure.

• Optimization for Multi-Fuel Firing, Air-Fuel Ratios, and Air Distribution.

• Combustion Rate Model.

• Boiler Master with Load Allocation and Comprehensive Constraint Control.

• Burner Management and Optimization.

• Chemical Recovery Boiler Throughput, Consumed Air, and Air Distribution Optimization.

• Active Control of the Solid Fuel Distribution on the Grate.

• Grate Cleaning and Restart Optimization.

Advanced Boiler Control CIMExcel Software Inc. Slide 1

Woodfeeders Short-term Combustion Long-term Combustion0 h 24 h

Page 2: Advanced Boiler Control for Biomass/Solid Fuel Boilers

Advanced Boiler Control Advanced Boiler Control Harmac No.9 Power Boiler

Hog steam was increased by 60 kpph (180 -> 240 kpph, with a 450 kpph MCR, with hog fuel moisture of 57 %, resulting in a reduction of 15 barrels of oil per hour – from 35 barrels per hour)

Port Townsend Paper No.10 Power Boiler

During a manual trial, the ABC technology increased the hog steam by 70 kpph (140 -> 210 kpph, with a 250 kpph MCR, with hog fuel moisture of 56 %, resulting in the removal of all 17.5 barrels of oil per hour).

During another trial, the particulate matter emissions were reduced by 40% (from the permitted value) during the same hog fuel firing rate.

Port Angeles No.8 Power Boiler

During a manual trial, the ABC technology increased the hog steam by 30 kpph (70 -> 100 kpph, with a 120 kpph MCR, with hog fuel moisture of 60 %, resulting in the removal of all 8 barrels of oil per hour was removed).

Advanced Boiler Control CIMExcel Software Inc. Slide 2

Page 3: Advanced Boiler Control for Biomass/Solid Fuel Boilers

Multi-Fuel Boiler Model and SimulatorMulti-Fuel Boiler Model and Simulator

Advanced Boiler Control CIMExcel Software Inc. Slide 3

for off-line control strategy testing, tuning, checkout, optimization, and for operator trainingfor off-line control strategy testing, tuning, checkout, optimization, and for operator training

Page 4: Advanced Boiler Control for Biomass/Solid Fuel Boilers

Babcock & Wilcox Fig 4-12

0.08

0.10

0.12

0.14

0.16

0.18

0.20

0 500 1000 1500 2000 2500 3000

Tf, Gas Film Temperature (degF)

Fp

p,

Ph

ysic

al P

rop

erti

es F

acto

r -

Cro

ssfl

ow

Gas

0 %

5 %

10 %

15 %

20 %

hg vs Pressure

2.78

2.79

2.79

2.80

2.80

2.81

2.81

30 35 40 45 50 55 60

Pressure (bar)

hg

(G

J/T

)

ID Fan (U = 0.05, 0.10, 0.15,,,, 1.0)

(Uo = 1135 RPM, Po = 13.3 inH2O, Wo = 248 Tph)

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

1.1

1.2

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2

W/Wo

P/P

o

Boiler SGS Two Phase Flow

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4

Wr, Riser Mass Flow

SG

S R

ecir

cula

tio

n R

atio

Multi-Fuel Boiler Model and Simulator – First Principles and Empirical Data Model

Advanced Boiler Control CIMExcel Software Inc. Slide 4

Page 5: Advanced Boiler Control for Biomass/Solid Fuel Boilers

Advanced Boiler Control CIMExcel Software Inc. Slide 5

Biomass / Solid Waste - Fuel Boiler Control Loops

Superheater Steam

Temperature

Steam Drum Level

Furnace Pressure

FD SupplyPressure

AuxiliaryFuel Master

PrimaryFuel Master

AuxiliaryAir-Fuel

Ratio

Burner Management

and Optimization

AuxiliaryAir 1

Lead/Lag

AuxiliaryAir 2

Lead/Lag

Auxiliary Fuel

Mass Flow

Auxiliary Air 1

Mass Flow

Auxiliary Air 2

Mass Flow

PrimaryFuel Feeders

FeederProfiling

FeederDistributors

PrimaryAir-FuelRatio

Primary /SecondaryDistribution

Boiler Master / Load Allocation

CombustionRate Model

UG1/2Damper

Positioners

OF1/2Damper

Positioners

FeederSpeed

Controllers

Feeder Distributor

SpeedControllers

AA1Damper

Positioner

AA2Damper

Positioner

AuxiliaryFuel Valve

FeedwaterFlow Valve

FD FanSpeed

Controller

FD FanDamper

PositionerID FanSpeed

Controller

ID FanDamper

Positioner

AttemperatorFlow Valve

Auxiliary Fuel Burners

FDSPressureSetpoint

FurnacePressureSetpoint

Boiler Steam Temperature

Setpoint

Page 6: Advanced Boiler Control for Biomass/Solid Fuel Boilers

Advanced Boiler Control CIMExcel Software Inc. Slide 6

ABC Control System Response to a Load Change

Load Change: 3 minutes ramp down from 100% to 50%, remain at 50% for 5 minutes, ramp up to 100% in 3 minutes.

Steam Drum Level Control: Setpoint is load dependent (high/low level – high/low load).

Header Pressure Control: Setpoint is load dependent (low/high pressure – high/low load).

Page 7: Advanced Boiler Control for Biomass/Solid Fuel Boilers

Advanced Boiler Control CIMExcel Software Inc. Slide 7

Combustion Rate Model – Load Variation - Power Boiler Scenario - No Fuel Variation

CRM Inputs (18) and CRM Outputs (bottom right : Auxiliary Fuel Combustion, Primary Fuel Combustion).

All ABC Loops are active. Steam Drum Level Control and Header Pressure Control are load dependent .

CRM - Primary Fuel Combustion (bottom right) confirms that there is no Fuel Variation.

Page 8: Advanced Boiler Control for Biomass/Solid Fuel Boilers

Advanced Boiler Control CIMExcel Software Inc. Slide 8

Combustion Rate Model – Power Boiler Scenario - Load Variation and Fuel Variation

CRM Inputs (18) and CRM Outputs (bottom right : Auxiliary Fuel Combustion, Primary Fuel Combustion).

All ABC Loops are active. Steam Drum Level Control and Header Pressure Control are load dependent .

CRM - Primary Fuel Combustion (bottom right) confirms that there is Fuel Variation.