FACADES+ CONFERENCE April 24-25 th New York, NY ADAPTING PROCUREMENT for RESILIENT DESIGN Ana Bertuna Related Companies Vice President of Design & Construction

Upload: the-architects-newspaper

Post on 07-Mar-2016

215 views

Category:

Documents


0 download

DESCRIPTION

Adapting Procurement for Resilient Design by Ana Bertuna of Related - Facades+ NYC Conference 2014

TRANSCRIPT

Page 1: Adapting Procurement for Resilient Design Presentation

FACADES+ CONFERENCE

April 24-25th New York, NY

ADAPTING PROCUREMENT for RESILIENT DESIGN

Ana Bertuna Related Companies Vice President of Design & Construction

Page 2: Adapting Procurement for Resilient Design Presentation

ADAPTING PROCUREMENT FOR RESILIENT DESIGN

§  Design challenges §  Rapidly evolving advanced technology and its influence on procurement approach §  Influence of an active construction market vs. a slow construction market §  How to create a competitive procurement package §  How schedule influences the process §  Impact of budget §  Outcome of procurement

§  Not always as expected §  Adapt quickly to revisions

§  Workshops with subcontractors

Page 3: Adapting Procurement for Resilient Design Presentation

PROJECTS

•  ABINGTON HOUSE ROBERT A.M. STERN – ARTEX PRECAST/PIONEER WINDOWS

•  MIMA ARQUITECTONICA – W&W/SOTA SYSTEM

•  10 HUDSON YARDS KOHN PEDERSEN FOX – ENCLOSE

•  15 HUDSON YARDS DILLER SCOFIDIO + RENFO & ROCKWELL GROUP

•  520 WEST 28TH ST ZAHA HADID – M. COHEN & SONS / STAHLBAU PICHLER

Page 4: Adapting Procurement for Resilient Design Presentation

THE VENETO

Page 5: Adapting Procurement for Resilient Design Presentation

SUPERIOR INK

Page 6: Adapting Procurement for Resilient Design Presentation

CALEDONIA

Page 7: Adapting Procurement for Resilient Design Presentation

CALEDONIA

Page 8: Adapting Procurement for Resilient Design Presentation

ABINGTON HOUSE

Page 9: Adapting Procurement for Resilient Design Presentation

ABINGTON HOUSE

Page 10: Adapting Procurement for Resilient Design Presentation
Page 11: Adapting Procurement for Resilient Design Presentation

MIMA

Page 12: Adapting Procurement for Resilient Design Presentation
Page 13: Adapting Procurement for Resilient Design Presentation
Page 14: Adapting Procurement for Resilient Design Presentation
Page 15: Adapting Procurement for Resilient Design Presentation
Page 16: Adapting Procurement for Resilient Design Presentation

HUDSON YARDS

Page 17: Adapting Procurement for Resilient Design Presentation

10 HUDSON YARDS

Page 18: Adapting Procurement for Resilient Design Presentation
Page 19: Adapting Procurement for Resilient Design Presentation
Page 20: Adapting Procurement for Resilient Design Presentation
Page 21: Adapting Procurement for Resilient Design Presentation
Page 22: Adapting Procurement for Resilient Design Presentation
Page 23: Adapting Procurement for Resilient Design Presentation

THERMAL U-VALUE - .33 - .34

Page 24: Adapting Procurement for Resilient Design Presentation
Page 25: Adapting Procurement for Resilient Design Presentation
Page 26: Adapting Procurement for Resilient Design Presentation
Page 27: Adapting Procurement for Resilient Design Presentation
Page 28: Adapting Procurement for Resilient Design Presentation
Page 29: Adapting Procurement for Resilient Design Presentation
Page 30: Adapting Procurement for Resilient Design Presentation
Page 31: Adapting Procurement for Resilient Design Presentation
Page 32: Adapting Procurement for Resilient Design Presentation

15 HUDSON YARDS

§ Tower Design §  Height approximately 910 ft §  70 stories §  Total Gross Area 960,000 Square Feet §  Floor plate range:

•  Low Rise Typical floor plates – 14,625 SF •  High Rise Typical floor plates – 13,310 SF

§  Façade Challenge §  Complex geometry §  Integrate orthogonal base with upper tower consisting of four-curved towers at corners §  Multiple glass types within the corset

§  Cold warped and cold warped with operable windows §  Trapezoidal flat and curved glass §  Conical and curved glass §  Kinked with irregular shaped glass

§  Workshops with subcontractors

Page 33: Adapting Procurement for Resilient Design Presentation

15 HUDSON YARDS

Page 34: Adapting Procurement for Resilient Design Presentation
Page 35: Adapting Procurement for Resilient Design Presentation
Page 36: Adapting Procurement for Resilient Design Presentation
Page 37: Adapting Procurement for Resilient Design Presentation
Page 38: Adapting Procurement for Resilient Design Presentation
Page 39: Adapting Procurement for Resilient Design Presentation
Page 40: Adapting Procurement for Resilient Design Presentation
Page 41: Adapting Procurement for Resilient Design Presentation
Page 42: Adapting Procurement for Resilient Design Presentation
Page 43: Adapting Procurement for Resilient Design Presentation
Page 44: Adapting Procurement for Resilient Design Presentation
Page 45: Adapting Procurement for Resilient Design Presentation
Page 46: Adapting Procurement for Resilient Design Presentation

520 WEST 28TH STREET

§ Design Architect: Zaha Hadid Architects § 36 luxury condominium residential apartments § Floor plates : 11,000 – 14,000 square feet § Zoning and lot restrictions created 5 foot split levels § 21 stories includes all split levels § Highline Frontage § Design assist with sub-contractors

Page 47: Adapting Procurement for Resilient Design Presentation
Page 48: Adapting Procurement for Resilient Design Presentation
Page 49: Adapting Procurement for Resilient Design Presentation
Page 50: Adapting Procurement for Resilient Design Presentation

520 WEST 28TH STREET

§ Design Challenges §  Unique façade expression to unify split levels §  Chevron is comprised of two metal types §  Study of various metal types and colors §  Metal component of façade includes double curvatures §  3 D modeling to design and detail interior and exterior §  “C” components embrace balconies and are expressed on façade §  Achieve a lightness to the façade design §  Architectural design incorporating pure lines require vigilant

detailing and coordination §  Façade maintenance

Page 51: Adapting Procurement for Resilient Design Presentation
Page 52: Adapting Procurement for Resilient Design Presentation
Page 53: Adapting Procurement for Resilient Design Presentation
Page 54: Adapting Procurement for Resilient Design Presentation
Page 55: Adapting Procurement for Resilient Design Presentation
Page 56: Adapting Procurement for Resilient Design Presentation
Page 57: Adapting Procurement for Resilient Design Presentation

28TH STREET MOCK UP

Page 58: Adapting Procurement for Resilient Design Presentation

§  Respect the design – reason we hire the architect §  Each project is unique

§  Schedule constraints §  Budget constraints §  Market constraints

§  Identify and mitigate risk by thorough due diligence §  Use the subcontractors and vendors to help find solutions (most

experienced) §  Be prepared for the unforeseen and be quick to change paths –

nothing is set in stone §  Keep an open mind, listen to everyone but draw your own

conclusions §  Great talent – seek it out and pull together a collaborative team to

move the project forward