ACUSHNET SAW MILL ECOLOGICAL RESTORATION
1
PUBLIC MEETING JANUARY 9, 2013
AGENDA
2
• INTRODUCTIONS by Buzzards Bay Coalition
• PROPOSED CONCEPT PLAN by Consultant Team (EA and Bioengineering Group)
• COMMENTS AND QUESTIONS
ACUSHNET SAW MILLECOLOGICAL RESTORATION
Prepared by: The Bioengineering Group, Inc.SCHEMATIC DESIGN PLAN
Field Stone Wall
Canoe Launch and Fishing Access
Upland Meadow
Upland Meadow
Stabilized Aggregate
Multi-Use Path
Educational Display and
Site for Future Visitor Center
Shoreline Stabilization
Emergent Marsh
Stone Amphitheater
Timber Boardwalk
Timber Overlook
Red Maple Swamp
MILL POND
ACUS
HNET
RIV
ER
Stabilized Aggregate Walking Path
ACUSHNET SAW MILL: EXISTING VIEW FROM MILL ROAD
ACUSHNET SAW MILL ENTRY: AFTER
ACUSHNET RIVER STREAMBANK: EXISTING CONDITIONS
ACUSHNET RIVER STREAMBANK RESTORATION: AFTER 5 YEARS