Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial Hygiene LLC [email protected] 425-269-1488

Upload: nguyendien

Post on 01-Aug-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

Achieving Contractor Compliance with ICRA Requirements

AIHCE 2006, Chicago, ILMay 2006

Laurence Lee, CIHPacific Industrial Hygiene LLC

[email protected]

Page 2: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

Achieving ICRA ComplianceConstruction compliance tools

• Specifications• Contract• Payment• Construction meetings• Life Safety meetings• Yelling, screaming, and threats

Page 3: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

Achieving ICRA ComplianceUnderstanding of risk

• Contractor not aware of the infection control and indoor air quality issues involved with healthcare construction

• Providing education and training can make the contractor a partner, resource, and driver for infection control improvements hospital wide.

Page 4: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#1. Construction can kill

• Fatal outbreaks of aspergillosis have been associated with construction worldwide

• Construction disrupts air flow patterns and generates dust that can be fatal to some of our patients

Page 5: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#2. Dust can kill

All construction generates dust

Assume all dust contains Aspergillus mold spores

Aspergillus spores in dust can kill immune compromised patients

These patients are in hospital

Page 6: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#3. Dust moves

Page 7: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#4. Negative air flow

saves lives

• Move air from clean to dirty• Stay within excess HVAC

system capacity (not too negative)

• Maintain 0.1” to 0.001”• HEPA filter• Exhaust outdoors

Page 8: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#5. Open ducts can kill• Isolate and seal all open construction area ducts

Page 9: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics

#6. Barriers save lives

• Construct physical barriers to keep dust in and people out

• Gypsum wallboard, melamine panels, and plastic sheeting

Page 10: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#6. Barriers save lives• Seal above ceiling spaces

Page 11: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#7. Vibration impacts beyond the work area

Page 12: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#7. Vibration impacts beyond the work area

Page 13: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#8. Mold can killContractors will find mold wherever there is water

Page 14: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#8 Mold can kill

• Mold discovered during renovation of wet lab

Page 15: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#8 Mold can kill• Mold in building envelope during stucco reclad

Page 16: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#9. Protect building products from the elements

Page 17: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#10. Have a water

response plan

• Know how to shut off the water

• Secure a qualified drying contractor

• Track down all leaks

Page 18: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics• #11. Anticipate water problems

Page 19: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics• #11. Anticipate water problems

Page 20: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics• #11. Anticipate water problems

Page 21: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics• #12. Wipe your feet

Page 22: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#13. Eat someplace else• Clean up after yourself

Page 23: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#14. Be readily identifiable• In terms of ICRA performance the contractor can

be thought of as guilty until proven guilty

• Other vendors and facilities services are not as “visible” but may be the guilty party

Page 24: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics• #14. Be readily

identifiable

• Contractor?• Cable vendor?• Telephone vendor?• Network vendor• Facilities?• Maintenance?

Page 25: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

ICRA Training Basics#15. Be a resource

• Contractor performance can motivate other hospital departments to improve their ICRA performance

• Aspergillosis rates reduced during 3 year gut and renovation of 4 floors of the Pacific Tower at the UWMC

Larson, EB. Academic Medicine. 2002 Oct;77(10):993-1000

Page 26: Achieving Contractor Compliance with ICRA Requirements · Achieving Contractor Compliance with ICRA Requirements AIHCE 2006, Chicago, IL May 2006 Laurence Lee, CIH Pacific Industrial

Thank you

Larry Lee, CIHPacific Industrial Hygiene LLC

5520 106th Avenue NEKirkland, WA 98033

[email protected]