ABBOTTABADABBOTTABAD

Earthquake Reconstruction & Rehabilitation Authority

Government of Pakistan

Provincial Earthquake Reconstruction & Rehabilitation Agency

Government of NWFP

DISTRICT PROFILE

ABBOTTABAD

District Profile - Abbottabad

Earthquake Reconstruction and Rehabilitation Authority

Prime Minister’s Secretariat, Islamabad

Website: http://www.erra.gov.pk

Published: July 2007

For official use only

Copyright © Earthquake Reconstruction and Rehabilitation Authority and Affiliates

Compiled by: District Reconstruction Unit (DRU) – Abbottabad

Consolidated and Designed by: ERRA Knowledge Management Cell (KMC)

Printed by: Kamran Printers, Blue Area, Islamabad. Tel: +92-51-2872765

i

P R E F A C E

The Reconstruction and Rehabilitation Programme implementation took off in April

2006. By that time, ERRA had already gained momentum in the planning and strategy

development and started devolving responsibilities with due focus on building capacity of

its affiliates, SERRA/PERRA and DRUs.

The enormity, complexity and diversity of reconstruction and rehabilitation programme

afforded unparallel experiences that opened new avenues for learning to people within

the organization, as well as to stakeholders, development practitioners, planners and

managers, academic institutions and international community. One such avenue led to

the development of District Profiles of the nine earthquake affected districts.

The impediments faced in collecting accurate data for damage assessment of the

earthquake and for planning reconstruction strategies was a sufficient indicator for ERRA

to address the deficiency timely and pragmatically to ensure that such a situation would

not be repeated in the future.

Therefore, ERRA, together with its affiliates SERRA/PERRA and DRUs, initiated

compilation of available district specific data/information on relevant socio-economic

and physical indicators in the form of District Profile to serve as a baseline and a

reference point for planning and monitoring progress of work.

The first District Profile has been completed in July 2007. It will be updated regularly

with information received from the field through MIS reporting mechanism on the

progress of each programme sector with necessary analysis.

The document, it is hoped, will become a useful source of information on district’s

progressive development under the reconstruction and rehabilitation programme.

I avail this opportunity to thank ERRA team and its affiliates for dedicating their time

and efforts to prepare the document, and our development partners for their

encouragement and support in the process.

Altaf M. Saleem

Chairman

ii

ACKNOWLEDGEMENTS

The Earthquake Reconstruction and Rehabilitation Authority (ERRA) is grateful

to the Government of Azad Jammu and Kashmir (AJK) and the Government of

the North West Frontier Province (NWFP), State/Provincial Reconstruction and

Rehabilitation Agencies (SERRA/PERRA), District Reconstruction Units (DRUs)

and line departments for their cooperation and practical assistance in the

collection, verification and consolidation of information for the District Profile.

ERRA is also thankful to UN-WFP and NESPAK for jointly providing useful maps

for the districts, which are part of the profile.

Contributions and support by various Wings and Cells within ERRA to

Knowledge Management Team in the process, is duly acknowledged.

Finally, it was a collective effort by the larger ERRA family that had received

tremendous support from its partners in development, the G-7 group of donors.

ERRA fully acknowledges their support.

Lt. Gen. Nadeem Ahmed

Deputy Chairman

Khadija Khan

Chief

ERRA Knowledge Management

iii

CONTENTS Page

Preface i

Acknowledgements ii

Contents iii

List of Tables and Figures iv

Acronyms v

Executive Summary vii

Chapter 1 Introduction 1

1.1 The Landscape and Physical Features of the Area 1

1.2 Industry, Trade and Commerce 2

1.3 The People 2

1.4 Roads 2

1.5 Telecommunication 2

1.6 Power 21.7 Administration 3

1.8 Important Places 3

Chapter 2 Pre Earthquake Socio-Economic and Physical

Indicators - Baseline District Census Report– 1998

with Update on Selected Indicators

5

2.1 Overview 5

2.2 Sector-Specific Information 5

Chapter 3 Extent of Damages due to Earthquake and

Sector-wise / Year-wise Reconstruction Plan

9

3.1 Housing Sector 9

3.2 Livelihood 10

3.3 Education 13

3.4 Health 143.5 Water and Sanitation 16

3.6 Governance (Administrative Infrastructure) 17

3.7 Power (Electricity) 17

3.8 Transport Sector 18

3.9 Telecommunication 19

3.10 Social Protection 19

3.11 Environment 20

3.12 Tourism and Industry 21

A. Annual Work Plan; List of Projects/Schemes 25

B. List of Union Councils 75

C. Key Responsible Agencies and Contacts in the

Abbottabad District

79Annexes

D. Map of Abbottabad District -

iv

TABLES

Sr. No Title of Tables Page No.

1 Area and Population 5

2 Land Use Pattern 6

3 Major Crops 6

4 Live Stock 6

5 Health Facilities 7

6 Educational Institutions 7

7 Damages in Housing Sector 9

8 Damages in Livelihood Sector ( NWFP) 10

9 Year-Wise Financial Phasing in Livelihood Sector 12

10 Extent of Damages in Education Sector 13

11 Extent of Damage in Health Sector 14

12 Year- Wise Reconstruction and Repair of Health Outlets 15

13 Year-Wise Reconstruction Plan - Health Sector 15

14 Extent of Damages in Watsan Sector 16

15 Budget Allocated for Reconstruction -WATSAN 16

16

Year-Wise Budget Allocated for Reconstruction in

Governance Sector

17

17 Governance (Buildings) Reconstruction Plan 17

18 Extent of Damages in Road Sector 18

19 Year-Wise Reconstruction Plan in Road sector 19

20 Extent of Damages in Forest Sector 20

21

Extent of Damages to Forest Departments and

Recnstruction Plan

21

22

Land Slides Caused By Earthquake 2005 in District

Abbottabad

21

v

ACRONYMS

ADB Asian Development Bank

AWP Annual Work Plan

BHU Basic Health Unit

CD Completely Damaged

CDWP Central Development Working Party

DFID Department for International Development

DHQ District Headquarters

DRAC District Reconstruction Advisory Committee

D&SC Donor and Sponsor Cell

EDO Executive District Officer

ERRA Earthquake Reconstruction & Rehabilitation

Authority

EST Estimated

FY Financial Year

GOVT. Government

GPTI Government Poly Technical Institute

GTVC (W) Government Technical Vocational Centre for

Women

KM Kilometer

LHV Lady Health Visitor

LSDD Live Stock And Dairy Department

MCH Maternity Child Health

NADRA National Database Registration Authority

ND Negligible Damage

NESPAK National Engineering Services Pakistan (PVT)

Limited

NGO Non Governmental Organization

NIHD National Institute for Human Development

NWFP North West Frontier Province

PC-I Planning Commission Form

PD Partially Damaged

PDWP Provincial Development Working Party

PERRA Provincial Earthquake Reconstruction &

Rehabilitation Agency

PHED Public Health Engineering Department

PRC Provincial Reserve Centre

PTA Parent Teacher Association

RHC Rural Health Centre

RWSSP Rural Water Supply & Sanitation Project

vi

S&L Schools & Literacy

STG Secondary Transmission and Grid

THQ Tehsil Headquarters

TMA Tehsil Municipal Administration

UC Union Council

UNICEF United nations Children’s Fund

W&S Works & Services

WATSAN Water Supply & Sanitation

WB World Bank

WSS Water Supply Scheme

EXECUTIVE SUMMARY

District Profile Abbottabad serves as a complete account of state and situation of development

reflected in pre and post earthquake socio-economic and physical indicators, earthquake

damages and reconstruction plans. The baseline Abbottabad comprises of information given in

the Census Report of 1998 and updated information as cited along with source.

The district is divided into two Tehsils Abbottabad and Havelian and fifty-one Union

Councils. Area-wise, District Abbottabad is 1967 sq. km, with a population of 881000 and an

average annual growth rate of 1.82%. The average household size is calculated as 6,4 persons.

Some 83.12% population lives in rural areas. The sex ratio in rural and urban areas of the

District is 94.96 and 128.08 respectively, indicating that male proportion is much higher in

urban areas compared to the rural areas. The total literacy rate is 37.26% in which 58.66 is

recorded in urban and 32.51% in the rural area. The literacy rate among male and

female was 52.82% and 21.14% respectively which is analogous to the number of existing

educational institutions i.e. 1086 for boys and 528 for girls. A total of 1031 educational

facilities have been affected by the earthquake of October, 2005. The damage assessment made in

the Education Sector shows that there must have been a sizable growth in the Education Sector

stretched over the last decade.

The total labour force participation rate is 27.92 which is higher in urban areas i.e. 33.38 % as

compared to 26.63% in rural areas. There lies a major difference in the participation rates

between male and female labour at 55.21% for male compared to 1.25% for female . Un-

employment rate is recorded as 31.14%. Regarding access to safe drinking water, 79% of urban

population avail the facility of piped water whereas the respective figure for rural population is

23.83%. Some 34.31% households have separate latrines. Regarding community/public health

facilities, 108 health outlets are calculated in the district according to Census Report 1998

which have increased to 118 in 2005 as cites in Report of Bureau of Statistics,

NWFP, 2005.The additions are in Civil Hospitals and Basic Health Units. A total of 23 Health

Outlets got affected in the earthquake.

The earthquake caused loss to human, socioeconomic and environmental capital and

affected both the physical and psychological aspects of life. The affected areas in Abbottabad

District can be classified into the highly affected nine Union Councils namely Dalola, Boi,

Bakote, Pattan Kalan, Namal, Berote, Kukmong, Pluck and Beerangali located across River

Jehlum & river Kunhar and Randomly affected areas.

The Earthquake Reconstruction and Rehabilitation Authority (ERRA) in close collaboration

with Provincial Reconstruction and Rehabilitation Agency (PERRA), District Reconstruction

Unit (DRU), line departments and development partners has launched a comprehensive

reconstruction programme consisting of 12 major sectors which will be completed over the

period of three years.

vii

1

DISTRICT PROFILE -ABBOTTABAD

Chapter 1

Introduction1

The quality of information plays a vital role in better development planning. It becomes more

important for the areas affected by disaster. After the earthquake of October 2005 in Pakistan

the damage assessment in the nine affected districts became a cumbersome exercise due to lack

of information at district level and disaggregated data on key socioeconomic aspects.

However, Earthquake Rehabilitation and Reconstruction Authority (ERRA) used the

Preliminary Damage Assessment done by the Asian Development Bank and the World Bank in

collaboration with the Government departments, for planning its huge programme

encompassing 12 major sectors. ERRA further complemented it with re-assessment where

required e.g. in the Housing Sector.

The above experience necessitated compiling a specific document that could provide district

specific information to serve as a baseline to track down progress in the future. Hence, the

District Profile document was compiled.

1.1 The Landscape and Physical Features of District Abbottabad

District Abbottabad is located in the North West Frontier Province (NWFP) of Pakistan and is

spread over an area of 1,967 sq miles. Abbottabad is bordered by Mansehra District in the North,

Muzaffarabad District in the East, Rawalpindi District in the South and the Haripur District in

the West.

Predominantly mountainous and rugged, the district’s mean maximum and minimum

temperatures are 23oC and 11

oC respectively and its climate varies with altitude, which ranges

from 600 meters to 2,800 meters. During the winter season, snowfall takes place above 900

meters i.e. Abbottabad city, surrounding mountains and area above Changlagali and Barian in

1 1998 District Census Report of Abbottabad

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

DISTRICT PROFILE -ABBOTTABAD

2

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

the Galliat. Monsoon rains usually start in the month of July lasting till September. This is

followed by a dry spell lasting for about two months.

The significant streams of the Abbottabad District are Harro, Dor and Siran. River Kunhar

flows along the North Eastern boundary of the District and joins the Jehlum in the East. The

Siran River and the Dor River have innumerable tributaries including the permanent flowing

(Kathas) and the scant flowing (Kassies).

Abbottabad is the principal city of the District Abbottabad in the NWFP of Pakistan. It is 4120

feet (1256 m) above sea level, and is located (101 km) from Rawalpindi, 217 km from

Peshawar and 84 km from Kohala Bridge. Abbottabad, a city of British times was the

headquarters of Hazara district (later a Division) and was named after its founder, Major James

Abbott who settled this district in 1853 after the annexation of the Punjab, and became its first

Deputy Commissioner. It remained an important military cantonment and sanatorium, being

the headquarters of a brigade in the second division of the Northern Army Corps.

1.2 Industry, Trade and Commerce

According to census report of 1988 only few elementary level industries exist in District

Abbottabad. A small industrial estate lies at Mandian 5 km away from Abbottabad city, where

cement, wood work, PVC pipes, wires and cement pipes are prepared. Employment in

government offices, Army as well as overseas employment is quite common. District

Abbottabad is rich in soap stone, magnasite and phosphate.

1.3 The People

Abbottabad is home to settlers from all across Pakistan, Kashmiris pushed out by Dogra rulers,

refugees from Delhi displaced after 1857’s upheaval, and the Afghans. A well-established

extended family of the Bohra community has also settled in Abbottabad. Besides, it has a

sizable Christian community.

1.4 Roads

District Abbottabad because of its hilly and mountainous terrain lacks a first-rate road network.

However, the main city and towns are linked with metalled and rail communication that exists

only upto Hawalian and is connected with Rawalpindi, (through Taxila). As per statistical report

by the Bureau of Statistics Peshawar, total road network as on 2003-04 is 1443.44 km.

1.5 Telecommunication

District Abbottabad is connected with the outer world via modern digital telephone exchange.

One radio station established at Jhangi is serving the people of this area. Cellular phone

services, with considerable coverage in all major towns are also available. As per statistical

report 2005 by the Bureau of Statistics Peshawar, total telephone connections are 32,007.

1.6 Power

Abbottabad is linked with Pakistan’s National grid system. The distribution network within the

city and rest of the district is the responsibility of PESCO. Most of the villages and towns are

quite well serviced in terms of electricity. Census Report Abbottabad 1998 reports 124,733 total

electricity connections.

3

DISTRICT PROFILE -ABBOTTABAD

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

1.7 Administration

Similar to the other districts of the Province, District Nazim is the head of the district

administration, who is elected for a period of three years. Most of the departments have been

devolved and are headed by the Executive District Officer (EDO) working under the

supervision of District Coordination Officer (DCO). Devolved departments include Education,

Health, Finance & Planning, Industries, Social Welfare, Agriculture and Works and Services.

Un-devolved department like Forestry, Wildlife, Irrigation and Food also have their district set

up in Abbottabad.

One circuit branch of Peshawar high court sits in the district while the District and Session

Judge, Additional Session Judge and Senior Civil Judge deal with the judicial cases at their

own offices. Revenue system is well established under the Revenue Officer. The district is

divided into six Kanungo and 78 Patwar Circles. It is divided into two Tehsils/

viz; Havelian (16 UCs) and Abbottabad (35 UCs). The Police Department is headed by the

Superintendent Police and is supported by Sub Divisional Police Officers, Station House

Officers and a number of police personnel.

1.8 Important Places

Abbottabad is a transit city for the tourists and is a junction from where one can go to places

like Hunza, Gilgit, Skardu and Gizar of the Karakoram Range and Swat, Dir and Chitral of the

Hindukush Range, and Naran, Saif-ul-Muluk, Shogran, Babusar Pass of the Himalayan

Range. Neelum, Lipa and Jhelum Valleys of beautiful Azad Kashmir are also connected

through Abbottabad. Tourist attractions include Nathiagali, Dongagali, thandiani, Ayubia,

Shimla Hills and Ilyasi Masjid. The Cantonment area of Abbottabad is a reflection of the

colonial past. The European bungalows, the club, the church and cemetery are still there.

Abbottabad is an hour's drive from Nathia Gali (the summer capital of the North West Frontier

Province) and is connected through a 34 km of road dropping steeply through the beautiful

valleys with few trees to the river bed.

DISTRICT PROFILE -ABBOTTABAD

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

Chapter 2

Pre-Earthquake Socio-Economic and Physical Indicators

Baseline District Census Report 1998 with Updates on Selected Indicators

2.1 Overview

According to the 1998 Census, Abbottabad District had a population of 881,000 with an

average annual growth rate of 1.82%. The average household size is 6.4 persons. Some

83.12% population lives in rural areas. The sex ratio in rural and urban areas of the district

is reported as 94.96 and 128.08 respectively, indicating that male proportion is much

higher in urban areas compared to the rural areas. The disabled persons constitute 1.83% of

the total population. The literacy rate among male and female is 52.82% and 21.14%

respectively. The total literacy rate is 37.26% in which 58.66 is recorded as among urban and

32.51% in the rural sector. The total labour force participation rate is 27.92 also higher in

urban areas i.e. 33.38 % as compared to 26.63% in rural areas. Out of the total population

above the age of 18, 73.64% held National I/D cards. The rate is 84.41% for male and

63.44% for female.

According to 1998 Census report; there are 136,000 housing units in district Abbottabad;

114000 (83.82%) in rural areas and 22,000 (16.18%) in urban areas. As far the type of

construction, 63.19% rural and 87.24% urban housing units are build with baked bricks,

blocks or stones whereas 34.80 rural and 11.75 urban housing units are build with un-backed

bricks.

2.2 Sector-Specific Information

The information given in the following tables to establish a pre-earthquake baseline has been

taken from District Census Report on Abbottabad -1998.

Table 1

Area and PopulationSocial Indicators Total Rural Urban Male Female

Population 1998 (in thousand

No.s)881 723 158 441 440

Estimated Population 2004-

20056 (in

thousand No.s)

996 804 192 499 498

Household Size (in No.s 1998)6.4

Persons

Annual Growth Rate % 1.82

Literacy Rate % 37.26 32.51 58.66 52.82 21.14

Enrolment Ratio % 48.18 45.89 58.82 56.02 40.11

Labour Force Participation % 27.92 26.63 33.38 55.21 1.25

Economically Active Population

%19.99 18.78 25.52 39.03 0.91

Disabled Population % 1.83 1.19 0.64

Area in sq. km 1967 (2.64 % of NWFP)

Source: Census Report of District Abbottabad 1998

5

DISTRICT PROFILE -ABBOTTABAD

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

Table 3

Major Crops In Abbottabad DistrictS.No. Name of crops Area in hectare Production in M/T

on

Per Acre Yield in

kg.

1 Wheat 156.38 19,591 1253

2 Maize 35,278 39,372 1116

3 Rice 23 28.7 1248

4 Jawar 39 34 872

5 Bajra 6 3 500

6 Barley 679 605 891

Source: Census Report of District Abbottabad 1998

Table 4

Live-Stock

S. No. Livestock population Number

1 Cattle 115,805

2 Buffalo 133,463

3 Sheep 32,217

4 Goat 222,472

5 Camel 24

6 Horse 8,661

7 Mule 11,991

8 Donkey 37,378

9 Domestic poultry 622,649

Source: Census Report of District Abbottabad 1998

Table 2

Land Use PatternUtilization Status Area in Acres

Total area 178,401

Cultivate area 63,372

Net sown area 52,472

Current fallow 10,900

Cropped area 61,396

Area sown more than once 8,924

Un-cultivated area 115,029

Waste area 12,586

Forest area 83,201

Not available for

cultivation

19,242

Source: Census Report District Abbottabad 98

6

DISTRICT PROFILE -ABBOTTABAD

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

Table 5

Health Facilities

S.

No

Health centre Number

1 Civil hospital. Male & female 6

2 Rural health centres 4

3 Basic health centres 49

4 Civil dispensaries 32

5 Maternity care health centre 1

6 Sub health centre 1

7 District headquarter hospital 1

8 Women & children hospital 1

9 Ayub medical complex 1

10 Cantonment hospital 1

11 T.B. Hospital 1

12 Nawaz Sharif dispensaries 10

Source: Census Report of District Abbottabad 1998

Table 6

Educational InstitutionsS. No. Educational institution Boys Girls Co-

education

1 Ayub medical college 0 0 1

2 Govt. Post Graduate college 1 0 0

3 Colleges 5 1 0

4 Higher secondary schools 7 3 0

5 High schools 62 24 0

6 Middle schools 68 40 0

7 Primary schools 523 455 0

8 Mosque schools 405 0 0

9 Maktab schools 14 0 0

10 JICA model schools 1 1 0

11 Community model schools 0 4 0

Source: Census Report of District Abbottabad 1998

7

Statement for prior clarification

The Third Chapter comprises of figures and statistics on Extent of Damages and

Reconstruction Plans which have been taken from the Preliminary Damage Assessment Report

by ADB/WB, ERRA’s Sectoral Strategy Documents and input from the respective DRU.

Moreover, figures of 2nd assessment carried out in Housing Sector have been incorporated.

Data regarding power sector has been taken from PESCO. The exercise for specific need-base

re-assessments and reconciliation of project level planning is underway. Any new project

identified and agreed upon by ERRA will be incorporated in the strategies in due course of

time.

Chapter 3

Extent of Damages due to Earthquake

and Sector-Wise/Year-Wise Reconstruction Plan

The earthquake adversely affected Abbottabad District; leaving hundreds of people dead;

hundreds injured besides destroying thousands of houses; causing substantial damage to

Government buildings and inflicting tremendous loss to the physical infrastructure including

roads, bridges, water supply & sanitation and destruction of eco system and agro fields. This

enormous loss to human, socio-economic and environmental capital affected both the physical

and psychological aspects of life and created a great resource gap. The affected areas in

Abbottabad District can be classified into the following two types:

i. Highly affected areas; these include nine Union Councils namely Dalola, Boi, Bakote,

Pattan Kalan, Namal, Berote, Kukmong, Pluck and Beerangali located across River Jehlum

and River Kunhar.

ii. Randomly affected areas of Abbottabad District

3.1 Housing Sector

i. Extent of Damages

Under the initial survey by the District Government, a total 49,745 families were provided with

compensation of Rs. 25000/- for immediate shelter. Second phase of survey was done by Pak

Army (in 48 Union Councils and Cantonment Area) and PPAF (in 3 Union Councils) for

release of second installment to the affected for reconstruction of houses. The surveys indicate

the following:-

Table 7

Extent of Damages in Housing SectorCompletely Destroyed Partially Damaged Negligible Damaged

ERRA PPAF ERRA PPAF ERRA PPAF

13182 7871 15793 3593 19707 1281

Total CD =21053 Total PD=19386 Total ND=20988

Grand Total CD+PD+ND=61427

Source: Internal source of ERRA, Housing Sector

ii. Reconstruction Plan

During the relief phase financial assistance amounting to Rs. 25,000 was given for immediate

shelter to all affected whose houses were identified as fully or partially (un-livable) damaged.

For progressive disbursement of financial assistance for reconstruction of private housing,

partner organizations were selected for damage assessment survey. For 49 union councils

and cantonment area of district Abbottabad, the Partner Organization is Pak Army whereas

PPAF conducted a door-to-door assessment in union councils Boi, Kukmong and Dalola. For

fully collapsed houses an amount of Rs. 175,000 per house is provided in three tranches viz;

25,000 already paid, Rs. 75,000 mobilization, Rs. 25,000 plinth and Rs 50,000 lintel/roof

11

DISTRICT PROFILE -ABBOTTABAD

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

DISTRICT PROFILE -ABBOTTABAD

12

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

levels. For retrofitable damaged houses Rs. 75,000 are being paid including 25,000 already

paid. To ensure reconstruction of private houses as per approved designs of ERRA, Housing

Resource Centers have been established besides selecting partner organizations to impart

training to artisans and awareness to beneficiaries.

3.2 Livelihood

i. Extent of Damages

According to preliminary survey conducted by ADB and WB in November 2005, total

estimated loss in employment or livelihood in NWFP was assessed as 34,278 people which

were 25% of the total employed population (above age 10). The highest job losses were in

agriculture, trade (small business, shops) and the construction sector. The details are given in the

Sector

Pre earthquake

employment %age % loss

Employment

loss

Agriculture, Forestry 26249 19.14 32 8400

Mining 29 0.02 39 11

Manufacturing 4496 3.28 34 1529

Utility 1877 1.37 32 601

Construction 23704 17.29 32 7585

Trade 19297 14.07 34 6561

Transport etc 13635 9.94 27 3681

Finance and business 1572 1.15 33 519

Services & Public

administration 41004 29.91 3 1230

Others 5247 3.83 31 1627

Total 137110 100 25 34278

Source: Preliminary Damage Assessment Report, ADB and WB in November 2005

For District Abbottabad, the employment patterns by occupational categories are broadly

consistent with the sectoral compositions. Paid employment in private and public sector is the

largest occupation followed by self employed individuals; largely comprising owner cultivators

and shop owners/ small traders and employment in construction, agriculture and forestry

sectors. Paid employment in private and public sector dominates employment in urban area

whereas agriculture and livestock rearing is the main occupation in rural area which is on the

decrease on account of division of agricultural land, low productivity and lack of marketing

opportunities, resulting in migration of manpower to urban areas.

given in the following table:

Table 8

Extent of Damages in Livelihood Sector(NWFP)

13

DISTRICT PROFILE -ABBOTTABAD

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

Given the profile of livelihood outlined above, the ADB/ WB report indicated the most severe

impacts on livelihoods through loss of livestock and other agriculture inputs, including land

and losses to private assets suffered by traders and small business. The significant damages to

public infrastructure, on the other hand may not have led to direct losses in employment

amongst paid employees. The shock to infrastructure as well as institutional capacity of the

local government is however, likely to have additional impact on the ability of markets,

business and rehabilitation efforts to function effectively.

The above rough estimates of losses may not be accurate for the entire district but these

assessments seem to be very correct in the case of highly affected nine Union Councils of

District Abbottabad namely Dalola, Boi, Bakote, Pattan Kalan, Namal, Berote, Kukmong,

Pluck and Beerangali located across the two rivers Jehlum and Kunhar.

Increased pressure of immigrants on Abbottabad city from rural areas and lack of livelihood

opportunities in these areas are the most alarming issues to be addressed through a

sustainable livelihood programme for enhancing livelihood opportunities particularly for

women in the worst affected union councils of District Abbottabad.

ii. Rehabilitation Plan

a. Livelihood Cash Grants Programme

Under Livelihood Cash Grants Programme, a fixed amount of Rs. 3000 per month is being

disbursed to the vulnerable families for six months. This programme targets households who

have lost their capacity to earn livelihood, temporarily or permanently. Identification of

beneficiaries was based on eligibility criteria and facilitated by community level participation.

Under the enrollment and targeting process a total of 38301 vulnerable families were selected

in seven worst affected union councils namely: Boi, Dalola, Kukmong, Pattan Kalan, Naml,

Birote and Bakote. Due to availability of limited number of cash grants only 12,521 vulnerable

families were selected as eligible for the programme. According to latest reports Rs. 205,378

million has been disbursed by May 2007 2.

2 Internal source of ERRA, Housing Sector

DISTRICT PROFILE -ABBOTTABAD

14

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

b. Livelihood Core Programme

The significance of relief, rehabilitation and reconstruction after a major catastrophe is an

established fact. All these are however, one time activities. On completion, people are bound

to revert to their old tradition ridden vocations which by no stretch of imagination are ideal,

since they will continue to be caught in “low income equilibrium trap” or the vicious circle of

poverty as before viz: low productivity, low income, low expenditure and virtually no savings.

This circle is destined to continue unless extra efforts are applied to move the communities at

higher income level by creating sustainable livelihood means.

Under the guidelines of ERRA, a three years multi sectoral programme of 20 schemes/

projects for the nine worst affected union councils has been formulated by the District

Reconstruction Unit Abbottabad to be implemented at a total cost of Rs. 739.042 million.

Table 9

Year-Wise Financial Phasing in Livelihood Sector

Financial PhasingS.No. Sector/Sub-Sector Estd. Cost

(m) FY-I FY-II FY-III

A. Agriculture, Livestock & Dairy Development

iAgriculture Extension, Water Management & Skill

Developing 139.930 52.239 46.514 41.177

ii Livestock and Dairy Development 61.630 26.000 32.630 3.000

Total 201.560 78.239 79.144 44.177

%age of The Sectoral Total 27.273 38.817 39.266 21.918

B. Forestry, Wildlife & Fisheries Sector

i Forestry 145.453 55.477 47.114 42.862

iiSericulture/NTFP Sub-Sector 43.941 23.963 15.074 4.904

iiiWildlife Sub-Sector 307.535 98.667 122.305 86.563

iv Fisheries 18.000 7.038 5.475 5.487

Total 514.929 185.145 189.968 139.816

%age of The Sectoral Total 69.68 35.955 36.892 27.152

C. Industries (Vocational Training)

i

Establishment of Vocational Training Centers/Income

Generating Programme 22.553 6.553 8.000 8.000

Total 22.553 6.553 8.000 8.000

%age of The Sectoral Total 3.05 29.056 35.472 35.472

G-Total 739.042 269.937 277.112 191.993

Total % 100.00 36.525 37.496 25.979

Source: AWP 2007-8 Abbottabad

15

DISTRICT PROFILE -ABBOTTABAD

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

The reported damages to buildings in the Livelihood Sector include:

Office of the EDO Agriculture and 9 Veterinary Institutions

Damages in residential colony of irrigation department

Schemes for development of model orchards and demo plots, soil conservation, reconstruction

of water courses have been covered under Livelihood Programme as the AWP was

restricted to the building components and civil work.

3.3. Education

i. Extent of Damages:

Education sector was one of the worst affected sectors in District Abbottabad. A total of 872

government educational institutions were damaged partially or completely by the earthquake as

recorded in the preliminary damage report by ADB and World Bank.

Table 10

Extent of Damages in Education SectorRural Urban TotalKind of damage

Boys Girls Total Boys Girls Private Total

Fully damaged 133 76 209 7 3 76 86 295

Partially damaged 332 190 522 18 8 118 214 736

Grand total 1031

Source: Preliminary Damage and Need Assessment Report by ADB and World Bank Nov.2005

ii. Reconstruction Plan

Education was hard hit by the catastrophic earthquake of October 2005 in terms of physical

infrastructure and human life. The sector was therefore accorded a high priority with a view

not only to restore and rebuild but also to “build back better” with an eye on the future with

extended facilities in all aspects of education.

DISTRICT PROFILE -ABBOTTABAD

16

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

3Other health facilities include first aid posts, MCH Centers, TB Centers etc.

The ERRA’s strategy for education sector has a provision of Rs. 3.033 billion for

reconstruction of schools in District Abbottabad over a period of three years. Reconstruction of

27 schools of the total portfolio was allocated to donors. The AWP for the year 2006-07 was

therefore, formulated for 25% of the total government portfolio comprising 196 schools and

six colleges.

All the educational institutions started functioning immediately after the earthquake. Tents

were provided by the government and relief organizations to ensure continuity of education

process. To bring the enrollment back to pre earthquake level, UNICEF launched a project in

six worst effected union councils viz; Boi, Dalola, Kukmong, Pattan Kalan, Namal and Bakote.

some 271 primary schools were provided school supplies, furniture and winterized tents. Parent

Teachers Associations (PTAs) were mobilized and welcome to school campaigns were

launched. Due importance is being given to improve the quality of education through software

component of ‘Teacher’s Training. With the assistance of UNICEF, need assessment for

teacher training is being work out.

3.4 Health

i Extent of Damages

The damage caused by the earthquake to health infrastructure was severe as it disrupted the

health services for the general population. The Health Sector portfolio of earthquake

damaged health outlets comprised 25 health institutions as per break up given below:-

Table 11

Extent of Damages in Health Sector

Health facilitiesDistrict Union Council

Type Total Fully damage Partially damage

BHU 53 8 7

CD 42 3 2

RHC 4 0 0

CH 6 0 3

THQH 1 0 0

DHQH 1 0 0

Teaching 1 0 1

Abbottabad 51

Others3 1 1 0

Total affected 25

Source: ERRA Health Strategy Paper 2006

17

DISTRICT PROFILE -ABBOTTABAD

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

ii. Reconstruction Plan

The ERRA’s strategy for Health Sector provides an amount of Rs. 755.000 million for

reconstruction of 26 health outlets.

Table 12

Year -Wise Reconstruction and Repair of Health Outlets

Year Phase 2006-2007 2007-2008 2008-2009 Total

Refferal Hospital 0 1 0 0 0 0 1

RHC/CH 2 1 0 0 0 0 3

BHU/CD 0 7 8 0 3 2 20

Other Health Facilities 0 0 1 0 0 0 1

Other Health OutLets 1 0 0 0 0 0 1

Total 3 9 9 0 3 2 26

Source: ERRA Health Strategy Paper 2006

Table 13

Year-Wise Budget for Reconstruction of Health SectorYear Phase 2006-07 2007-08 2008-09 2009-10 Total RS 2006-2010 (million)

Reconstruction 60.000 175.000 130.000 15.000 380.000

Repair/upgradation 201.500 163.500 7.000 3.000 375.000

Total 261.500 338.500 137.000 18.000 755.000

Source: ERRA Health Strategy Paper 2006

DISTRICT PROFILE -ABBOTTABAD

18

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

3.5 Water and Sanitation

i. Extent of Damages

A total of 280 WATSAN Schemes have been damaged by the earthquake in the district.

Table 14

Extent of Damages in Watsan Sector

Kind of Schemes No. of Schemes

Gravity Based WSS 137

Tube Well Based WSS 38

Hand Pumps WSS 105

Total W&S Schemes 280

Source: ERRA WATSAN Strategy Paper 2006

ii. Reconstruction Plan

UNICEF has pledged for rehabilitation of 25 rural water supply schemes (18 of PHED and

7 of TMA Abbottabad) whereas the DFID assisted RWSSP has been allocated 66

schemes (63 WSS and 3 Sanitation) of TMA Abbottabad. The remaining 104 schemes are

included in the AWP 2006-07 to be carried forward to the AWP 2007-08 as ongoing schemes

if not completed in the financial year 2006-07.

Table 15

Watsan Budget Allocation for ReconstructionOwned Agency No.of schemes Budget

(million)

No of PHED owned Schemes

92 171.1

No of TMA owned Schemes 188 174.93

Total Schemes 290 346.03

Source: ERRA WATSAN Strategy Paper 2006

19

DISTRICT PROFILE -ABBOTTABAD

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

3.6 Governance (Administrative Infrastructure)

i. Extent of Damages

A total of 145 buildings are reported in ERRA Governance Strategy 2006 as damaged by

earthquake with an estimated reconstruction cost of Rs. 477.6624 million.

Table 16

Year -Wise Budget Allocation to Governance Sector

Buildings to be

Reconstructed

Buildings to be Repaired Year Wise Budget Allocation (million)

2006-07 2007-08 2008-963 82

157.6285 238.8312 81.20261

Source: ERRA Strategy Paper Governance 2006

ii. Reconstruction Plan

As covered in the ERRA strategy for Government Buildings, reconstruction of damaged

buildings of district administration, Judiciary, Police, Food and official residences have been

included under Governance Sector of the AWP 2006-07. Rehabilitation of damage building of

Forestry and Agriculture has been covered under the Environment and Livelihood Strategies of

ERRA.

Table 17

Governance (Buildings) Reconstruction Plan - Abbottabad

Buildings to be

Reconstructed

Buildings to

be repaired

Area in sq. ft. Reconstruction

& Repair cost

Consultancy/equi

pment cost(20%

of the cost)

Total cost

in million

63 82 213640 398.052 79.6104 477.6624

Source: ERRA Strategy Paper Governance 2006

3.7 Power (Electricity)

The World Bank/ ADB report on damage assessment indicates extensive damage to

Distribution system and STG network in five districts of NWFP but district wise break up is

not available. At district level, the PESCO was consulted at the time of preparation of AWP

2006-07. An amount of 97.734 million has been allocated as reconstruction and rehabilitation

of power system in District Abbottabad.

(Source: PESCO)

DISTRICT PROFILE -ABBOTTABAD

20

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

3.8 Transport Sector

i. Extent of Damages

The ERRA Strategy for Transport Sector indicates a total of 264 roads and 23 bridges/

culverts damaged by earthquake in District Abbottabad, as per break up given below:-

Table 18

Extent of Damages in Road SectorDistrict roads damaged

length in km

Tehsil roads damaged length in km Number of

structures

Budget estimates

Shingled Black

top

Total Shingled/katcha Black

top

Total Bridges Culverts Agency Cost in

million

484 236 720 229.5 109.25 338.75 13 44 W&S 2761.77

TMA 507.3

Source: ERRA strategy paper 2006.transport

21

DISTRICT PROFILE -ABBOTTABAD

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

ii. Reconstruction Plan

The Asian Development bank has committed for financing 50 roads with a tentative cost of Rs.

1033 million. All these were included in the AWP 2006-07. Sixteen Roads are planned to be

financed of German Debt Swap and are included in the proposed AWP for the year 2007-08 at

a cost of Rs. 400.000 million. Year wise phasing of the reconstruction of road sector is given

below:-

Table 19

Year-Wise Reconstruction Plan in Road sector

No of Schemes Year-I

2006-07

Year 2

2007-08

Year 3

208-09

287 91 120 76

Source: AWP 2007-8 Abbottabad

With the assistance of Asian Development Bank a unit in the W&S Department has been

established in each district to deal with reconstruction of earthquake damages. Tendering of

Category–I roads is the responsibility of this cell coupled with the reconstruction and

rehabilitation of the roads to their original specification. For category 2 roads involving up

gradation and realignment, consultants would be hired.

3.9 Telecommunication

No damages in District Abbottabad under this sector were reported.

3.10 Social Protection

i. Extent of Damages

The District wise disaggregated data is not available in this sector. Social protection focuses on

the poorest and most vulnerable groups in a society and aims to increase income, resources and

opportunity to these groups. Though all earthquake affected people are vulnerable, the Social

Protection Strategy focuses specifically on the groups which are at greater risk; and includes

pre and post-earthquake cases. These include children both unaccompanied and orphaned,

women (Including widows and female-headed households), disabled, elderly (Above 60 years.

without adult caretaker/support) and landless due to earthquake.

DISTRICT PROFILE -ABBOTTABAD

22

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

ii. Reconstruction Plan

To facilitate the vulnerable groups in earthquake affected areas, ERRA has devised a

strategy for Social Protection Sector and for its implementation, Social Protection Cells have

been established in all the affected districts accordingly. Following are the proposed

interventions for the vulnerable groups:-

Orphans

Community-based care options and Institutional arrangements like SOS Villages

Cash grant

Establishment of child friendly spaces by NGOs

Monitoring through district level Child Protection Committee

Widows

Housing reconstruction (exception to “owner driven strategy”), (widow/orphan

homes)

Cash grant (Rs 3,000 per month)

Craft Development, Micro-credit and interest-free loan schemes, Job employment,

Free access to health care/medicines with NADRA issued special ID cards

Establishment of women friendly spaces by NGOs

Disabled

Institutional Strengthening (NIHD and 6 DHQ’s and THQ’s in the affecteddistricts)

Establishment of Rehabilitation Center at Abbottabad

Community based Rehabilitation (Community level, District level, Central level)

Elderly

Develop linkage with Bait-ul Mal system for support

Free access to health care/medicines with NADRA issued special ID cards

Landless

Key actors working for implementation of the social protection in district Abbottabad are Govt.

Line Departments, Social Welfare Dept., Zakat Office, Bait-ul mal Office, District office

Budget and Finance/ component Manager Livelihood Cash Grant, 479 Brig Battalion,

UNICEF, Omer Asghar Khan Development Foundation, CARITAS, YAHR, and Sawera.

3.11 Environment

i. Extent of Damages

The ERRA’s Strategy for Environment sector indicates damages to the buildings of

Forest and Wildlife departments.

Table 20

Extent of Damages in Forest SectorType of Area Area in

Acres

Damaged area in acres

Government forest area 135,574 1528

Source: ERRA Strategy Paper 2006.Environment

23

DISTRICT PROFILE -ABBOTTABAD

EARTHQUAKE RECONSTRUCTION AND REHABILITATION AUTHORITY - ERRA

ii. Reconstruction Plan

Provision was therefore made in the AWP for reconstruction and repair to the earthquake

damaged buildings of Forest and Wildlife Department. PC-Is have accordingly been approved

by DRAC. Other projects under green sector projects of the Environmental Strategy of ERRA

have been integrated into the Livelihood Programme. Community based interventions like

social forestry; watershed management and land stabilization under the Livelihood programme

are the main projects to be implemented through Forest Department.

Environmental checklist for all developmental and reconstruction activities has been

designed by ERRA to know environmental aspects and ensure mitigatory measures if required.

The environmental checklist is a part of the PC-Is of all sectors to be submitted to ERRA for

funding.

Table 21

Extend of Damages to Forest Department and Reconstruction Plan

Name of forest entity /

division

No.of main

office

buildings

No.of field

office

buildings

Residential

buildings

Other

buildings

Reconstruction

cost in million

Galies forest division 8 3 13 0 32.368

Daur watershed division 4 0 7 4 4.394

Sarhad forest school 2 1 4 5 9.120

Total cost 45.882

Source: ERRA Strategy Paper 2006.Environment

Table 22

Landslides Caused By Earthquake

No.of landslides Total area under landslides sq. km. District area under land slide %

16 0.235 0.01

Source: SUPARCO-Pakistan Earthquake October 2005 Draft Damage Assessment and Analyst Region

3.12 Tourism and Industry

With little industrial base and that too in private sector, the Programme is confined to the

reconstruction and repairs of 5 damaged polytechnic institutes at a cost of Rs. 77.080 million,

amongst these, one was GTVC(W) Abbottabad which was destroyed and the rest were partially

damaged as reported by the department. For Reconstruction and Rehabilitation of Polytechnic

and Commerce Iinstitutes, fund mobilization is underway by the D&SC of ERRA. For eco-

tourism and establishment of vocational centers to promote and exploit the local traditional

skills in embroidery, two schemes have been included under the Livelihood Programme.

ANNEXES

A. ANNUAL WORK PLAN

B. LIST OF UNION COUNCILS

C. KEY RESPONSIBLE AGENCIES AND

CONTACTS IN THE DISTRICT

D. MAP OF ABBOTTABAD DISTRICT

Secto

r:E

ducati

on

Dis

tric

tR

econst

ructi

on

Unit

:A

bbott

abad

Reconst

ructi

on

Agency

:W

&S

(PE

RR

A)

Cap

ital

Reven

ue

To

tal

A.O

nG

oin

gP

roje

cts

Pa

ck

ag

e1

of

ed

uca

tio

n

61

56

6G

GP

SB

ak

ot

Bak

ote

7/8

/20

06

2.8

03

0.1

53

2.9

56

0.8

41

2.1

15

61568

GG

PS

San

gal

Bak

ote

7/8

/20

06

2.1

12

0.1

53

2.2

65

0.6

34

1.6

31

61713

GG

MS

Ali

Ab

ad

Bak

ote

7/8

/20

06

3.7

63

0.4

80

4.2

43

1.1

29

3.1

14

61623

GP

SS

an

gal

Bak

ote

7/8

/20

06

2.1

12

0.0

00

2.1

12

0.6

34

1.4

78

61719

GM

SA

liA

bad

Bak

ote

7/8

/20

06

3.7

63

0.6

75

4.4

38

1.1

29

3.3

09

61618

GP

SL

eera

nS

yd

an

Bak

ote

7/8

/20

06

2.1

12

0.1

64

2.2

76

0.6

34

1.6

42

61616

GP

SA

liA

bad

Bak

ote

7/8

/20

06

2.1

12

0.1

77

2.2

89

0.6

34

1.6

55

61569

GG

PS

Sari

Kh

an

Kala

nB

ak

ote

7/8

/20

06

2.8

03

0.1

64

2.9

67

0.8

41

2.1

26

61620

GP

SS

ara

nd

aB

ak

ote

7/8

/20

06

2.1

12

0.1

64

2.2

76

0.6

34

1.6

42

To

tal

23.6

92

2.1

30

25.8

22

7.1

08

18.7

14

Pa

ck

ag

e2

of

ed

uca

tio

n0.0

00

61751

GH

SS

Dalo

laP

rop

er

Do

lala

7/8

/20

06

29

.15

01

.60

030.7

50

7.7

68

22.9

82

61645

GP

SD

alo

laD

ola

la7

/8/2

00

64

.24

00

.17

74.4

17

1.1

30

3.2

87

61650

GP

SC

hah

Do

lala

7/8

/20

06

2.6

70

0.0

00

2.6

70

0.7

12

1.9

58

62251

GG

PS

Nara

Dalo

laD

ola

la7

/8/2

00

62

.67

00

.15

32.8

23

0.7

12

2.1

11

62253

GP

SP

ala

rwai

Do

lala

7/8

/20

06

2.6

70

0.1

53

2.8

23

0.7

12

2.1

11

62252

GP

SN

aro

ka

Do

lala

7/8

/20

06

2.6

70

0.0

00

2.6

70

0.7

12

1.9

58

61587

GG

PS

Naro

ka

Do

lala

7/8

/20

06

3.4

50

0.1

64

3.6

14

0.9

19

2.6

95

61714

GG

MS

Naro

ka

Do

lala

7/8

/20

06

4.6

40

0.6

75

5.3

15

1.2

37

4.0

78

To

tal

52

.16

02

.92

25

5.0

82

13

.90

04

1.1

82

Pa

ck

ag

e3

of

Ed

uca

tio

n0.0

00

61746

GH

SN

o.2

Ab

bo

ttab

ad

Atd

Cit

y7

/8/2

00

61

2.4

50

0.0

00

12.4

50

6.2

25

61748

GG

HS

No

.1A

bb

ott

ab

ad

Atd

Cit

y7

/8/2

00

61

2.4

50

0.0

00

12.4

50

6.2

25

61730

GH

SN

o.1

Ab

bo

ttab

ad

A.A

bad

7/8

/20

06

12

.45

01

.25

013.7

00

6.8

50

61728

GG

HS

No

2.A

bb

ott

ab

ad

A/A

bad

Urb

an

7/8

/20

06

6.7

70

1.2

50

8.0

20

4.2

74

61729

GG

CH

SS

Ab

bo

ttab

ad

A/A

bad

Urb

an

7/8

/20

06

19

.22

02

.52

021.7

40

10.8

70

Esti

mate

dC

ost

Allo

cati

on

2007-0

8

An

nu

al

Work

Pla

n2007-0

8

Esti

mate

d

Exp

en

dit

ure

up

toJu

ne,2007

Ap

pro

valD

ate

Un

ion

Co

un

cil

Nam

eo

fP

roje

ct

&L

ocati

on

S.N

o

27

Annex

A

Secto

r:E

ducati

on

Dis

tric

tR

econst

ructi

on

Unit

:A

bbott

abad

Reconst

ructi

on

Agency

:W

&S

(PE

RR

A)

Cap

ital

Reven

ue

To

tal

Esti

mate

dC

ost

Allo

cati

on

2007-0

8

Esti

mate

d

Exp

en

dit

ure

up

toJu

ne,2007

Ap

pro

valD

ate

Un

ion

Co

un

cil

Nam

eo

fP

roje

ct

&L

ocati

on

S.N

o

To

tal

63

.34

05

.02

06

8.3

60

0.0

00

34

.44

4

Pa

ck

ag

e4

of

Ed

ua

tio

n0.0

00

61715

GG

MS

Darw

aza

M-I

Plu

ck

7/8

/20

06

4.3

94

0.5

30

4.9

24

1.3

82

3.5

42

61701

GG

PS

Mo

oli

aB

ak

ote

7/8

/20

06

1.8

00

0.0

00

1.8

00

0.5

66

1.2

34

61567

GG

PS

Bh

an

P-I

IB

ak

ote

7/8

/20

06

3.3

09

0.2

03

3.5

12

1.0

41

2.4

71

61617

GP

SD

ak

han

Mo

oli

aP

-VB

ak

ote

7/8

/20

06

9.3

74

0.2

40

9.6

14

2.9

48

6.6

66

61619

GP

SM

arr

iP

-III

Bak

ote

7/8

/20

06

4.0

57

0.2

14

4.2

71

1.2

76

2.9

95

61621

GP

SD

ak

han

Kh

an

Kala

nP

-IV

Bak

ote

7/8

/20

06

6.4

36

0.2

27

6.6

63

2.0

24

4.6

39

61622

GP

SL

un

di

Mu

nd

riP

-III

Bak

ote

7/8

/20

06

4.0

57

0.2

14

4.2

71

1.2

76

2.9

95

61733

GH

SB

ak

ote

H-I

IB

ak

ote

7/8

/20

06

26

.98

21

.30

028.2

82

8.4

86

19.7

96

61735

GH

SM

oo

lia

H-I

IB

ak

ote

7/8

/20

06

26

.98

21

.30

028.2

82

8.4

86

19.7

96

Su

bT

ota

l8

7.3

91

4.2

28

91

.61

92

7.4

86

64

.13

3

Pa

ck

ag

e5

of

Ed

uca

tio

n0.0

00

61625

GP

SL

am

ian

Larr

an

P-I

IB

ero

te2

3/1

1/2

00

63

.30

90

.21

03.5

19

1.0

45

2.4

74

61627

GP

SD

eh

raP

-III

Bero

te2

3/1

1/2

00

64

.05

70

.22

14.2

78

1.2

81

2.9

97

61624

GP

SB

ass

ian

P-I

IIB

ero

te2

3/1

1/2

00

64

.05

70

.22

14.2

78

1.2

81

2.9

97

61626

GP

SB

an

di

Sy

den

P-I

Bero

te2

3/1

1/2

00

62

.56

00

.15

62.7

16

0.8

09

1.9

08

61571

GG

PS

San

gra

ryP

-II

Bero

te2

3/1

1/2

00

63

.30

90

.21

03.5

19

1.0

45

2.4

74

61570

GG

PS

Lah

oo

rK

uss

P-I

Bero

te2

3/1

1/2

00

62

.56

00

.15

62.7

16

0.8

09

1.9

08

61573

GG

PS

Jula

ial

P-I

IIB

ero

te2

3/1

1/2

00

64

.05

70

.22

14.2

78

1.2

81

2.9

97

61572

GG

PS

Hil

lB

ero

teP

-IB

ero

te2

3/1

1/2

00

62

.56

00

.00

02.5

60

0.8

09

1.7

51

Su

bT

ota

l2

6.4

69

1.3

96

27

.86

58

.36

01

9.5

05

Pa

ck

ag

e6

of

Ed

uca

tio

n

61597

GG

PS

Ban

dia

nP

-IN

am

al

23

/11

/20

06

2.5

60

0.1

66

2.7

26

0.7

94

1.9

31

61598

GG

PS

Garr

iP

-IN

am

al

23

/11

/20

06

2.5

60

0.0

00

2.5

60

0.7

94

1.7

66

61599

GG

PS

Lo

wer

Ku

rli

P-I

Nam

al

23

/11

/20

06

2.5

60

0.1

66

2.7

26

0.7

94

1.9

31

61600

GG

PS

Tarr

ach

P-I

Nam

al

23

/11

/20

06

2.5

60

0.1

66

2.7

26

0.7

94

1.9

31

61677

GP

SN

am

al

P-I

IN

am

al

23

/11

/20

06

3.3

09

0.0

00

3.3

09

1.0

27

2.2

82

61743

GH

SN

am

al

H-I

IN

am

al

23

/11

/20

06

26

.98

21

.31

728.2

99

8.3

71

19.9

28

28

Secto

r:E

ducati

on

Dis

tric

tR

econst

ructi

on

Unit

:A

bbott

abad

Reconst

ructi

on

Agency

:W

&S

(PE

RR

A)

Cap

ital

Reven

ue

To

tal

Esti

mate

dC

ost

Allo

cati

on

2007-0

8

Esti

mate

d

Exp

en

dit

ure

up

toJu

ne,2007

Ap

pro

valD

ate

Un

ion

Co

un

cil

Nam

eo

fP

roje

ct

&L

ocati

on

S.N

o

61601

GG

PS

Up

er

Ku

rli

P-I

IIN

am

al

23

/11

/20

06

4.0

57

0.2

31

4.2

88

1.2

59

3.0

29

61676

GP

SC

hale

esi

an

P-I

IN

am

al

23

/11

/20

06

3.3

09

0.0

00

3.3

09

1.0

27

2.2

82

61678

GP

SN

ara

P-I

Nam

al

23

/11

/20

06

2.5

60

0.0

00

2.5

60

0.7

94

1.7

66

61679

GP

ST

arr

ach

P-I

IN

am

al

23

/11

/20

06

3.3

09

0.0

00

3.3

09

1.0

27

2.2

82

61680

GP

SM

aju

han

P-I

VN

am

al

23

/11

/20

06

6.4

36

0.0

00

6.4

36

1.9

97

4.4

39

61744

GH

SM

aju

han

H-I

Nam

al

23

/11

/20

06

20

.71

60

.71

721.4

33

6.4

27

15.0

06

Su

bT

ota

l80.9

18

2.7

61

83.6

79

25.1

04

58.5

75

Pa

ck

ag

e7

of

Ed

uca

tio

n

61604

GG

PS

Bu

gla

P-I

IP

att

an

Kala

n2

3/1

1/2

00

63

.30

90

.18

23.4

91

1.7

45

61605

GG

PS

Ban

ota

P-I

Patt

an

Kala

n2

3/1

1/2

00

62

.56

00

.12

82.6

88

1.3

44

61606

GG

PS

Basi

an

Barw

ala

P-I

IP

att

an

Kala

n2

3/1

1/2

00

63

.30

90

.18

23.4

91

1.7

45

61607

GG

PS

Ku

kh

riala

P-I

Patt

an

Kala

n2

3/1

1/2

00

62

.56

00

.12

82.6

88

1.3

44

61608

GG

PS

Lari

Ban

ota

P-I

Patt

an

Kala

n2

3/1

1/2

00

62

.56

00

.12

82.6

88

1.3

44

61609

GG

PS

Patt

an

Kala

nP

-II

Patt

an

Kala

n2

3/1

1/2

00

63

.30

90

.18

23.4

91

1.7

45

61610

GG

PS

Tarl

aK

hait

her

P-I

IP

att

an

Kala

n2

3/1

1/2

00

63

.30

90

.18

23.4

91

1.7

45

61611

GG

PS

Ch

am

iali

P-I

Patt

an

Kala

n2

3/1

1/2

00

62

.56

00

.12

82.6

88

1.3

44

61716

GG

MS

Ban

di

Ch

am

iali

M-I

Patt

an

Kala

n2

3/1

1/2

00

64

.39

40

.50

94.9

03

2.4

51

61684

GP

SP

att

an

Kala

nP

-IV

Patt

an

Kala

n2

3/1

1/2

00

66

.43

60

.00

06.4

36

3.2

18

61685

GP

SD

rair

P-I

IP

att

an

Kala

n2

3/1

1/2

00

63

.30

90

.18

23.4

91

1.7

45

61686

GP

SK

uk

hri

ala

P-I

IP

att

an

Kala

n2

3/1

1/2

00

63

.30

90

.18

23.4

91

1.7

45

61687

GP

SM

ase

en

aK

ala

nP

-IV

Patt

an

Kala

n2

3/1

1/2

00

66

.43

60

.20

66.6

42

3.3

21

61688

GP

ST

arl

aK

hait

her

P-I

Patt

an

Kala

n2

3/1

1/2

00

62

.56

00

.12

82.6

88

1.3

44

61689

GP

SD

aw

att

aP

-IP

att

an

Kala

n2

3/1

1/2

00

62

.56

00

.00

02.5

60

1.2

80

61612

GG

PS

P.K

Kh

an

P-I

IIP

ind

Karg

o

Kh

an

23

/11

/20

06

4.0

57

0.1

93

4.2

50

2.1

25

61727

GM

SP

att

an

Kala

nP

att

an

Kala

n2

3/1

1/2

00

63

.50

00

.00

03.5

00

1.7

50

Su

bT

ota

l6

0.0

37

2.6

34

62

.67

10

.00

03

1.3

36

Pa

ck

ag

e8

of

Ed

uca

tio

n0.0

00

61574

GG

PS

Bo

iP

-IB

oi

23

/11

/20

06

2.5

60

0.1

39

2.6

99

1.3

50

29

Secto

r:E

ducati

on

Dis

tric

tR

econst

ructi

on

Unit

:A

bbott

abad

Reconst

ructi

on

Agency

:W

&S

(PE

RR

A)

Cap

ital

Reven

ue

To

tal

Esti

mate

dC

ost

Allo

cati

on

2007-0

8

Esti

mate

d

Exp

en

dit

ure

up

toJu

ne,2007

Ap

pro

valD

ate

Un

ion

Co

un

cil

Nam

eo

fP

roje

ct

&L

ocati

on

S.N

o

61575

GG

PS

Nakka

P-I

Boi

23/1

1/2

006

2.5

60

0.1

39

2.6

99

1.3

50

61576

GG

PS

Barb

een

P-I

Boi

23/1

1/2

006

2.5

60

0.1

39

2.6

99

1.3

50

61577

GG

PS

Mohri

P-I

Boi

23/1

1/2

006

2.5

60

0.1

39

2.6

99

1.3

50

61578

GG

PS

Tori

Shari

fP

-IB

oi

23/1

1/2

006

2.5

60

0.1

39

2.6

99

1.3

50

61634

GP

ST

ori

Share

ef

P-I

Boi

23/1

1/2

006

2.5

60

0.1

39

2.6

99

1.3

50

61635

GP

SB

ata

ngi

P-I

Boi

23/1

1/2

006

2.5

60

0.1

39

2.6

99

1.3

50

61579

GG

PS

Sarh

an

P-I

Boi

23/1

1/2

006

2.5

60

0.1

39

2.6

99

1.3

50

61580

GG

PS

Makre

ela

P-I

Boi

23/1

1/2

006

2.5

60

0.1

39

2.6

99

1.3

50

61631

GP

SD

hani

P-I

IIB

oi

23/1

1/2

006

4.0

57

0.0

00

4.0

57

2.0

29

61632

GP

SN

akka

P-I

IB

oi

23/1

1/2

006

3.3

09

0.0

00

3.3

09

1.6

55

61633

GP

SM

ohri

P-I

Boi

23/1

1/2

006

2.5

60

0.1

39

2.6

99

1.3

50

Su

bT

ota

l32.9

69

1.3

90

34.3

59

0.0

00

17.1

79

Pack

age

9of

Ed

ucati

on

0.0

00

61629

GP

SB

oi

P-I

Boi

23/1

1/2

006

2.5

60

0.1

32

2.6

93

1.3

46

61636

GP

SB

andi

Sam

ad

P-I

IB

oi

23/1

1/2

006

3.3

09

0.1

86

3.4

95

1.7

48

61638

GP

SB

ogra

nP

-IB

oi

23/1

1/2

006

2.5

60

0.1

32

2.6

92

1.3

46

61639

GP

SB

andi

Pahar

P-I

Boi

23/1

1/2

006

2.5

60

0.1

32

2.6

92

1.3

46

61640

GP

SS

arh

an

P-I

IB

oi

23/1

1/2

006

3.3

09

0.1

86

3.4

95

1.7

48

61637

GP

SC

hack

P-I

Boi

23/1

1/2

006

2.5

60

0.1

32

2.6

93

1.3

46

61641

GP

SR

ankote

P-I

IIB

oi

23/1

1/2

006

4.0

57

0.1

97

4.2

54

2.1

27

61718

GM

SR

ankot

M-I

Boi

23/1

1/2

006

4.3

94

0.5

13

4.9

07

2.4

54

61717

GM

ST

ori

Share

ef

M-I

Boi

23/1

1/2

006

4.3

94

0.5

13

4.9

07

2.4

54

61630

GP

SG

ali

Meera

nP

-IB

oi

23/1

1/2

006

2.5

60

0.1

32

2.6

93

1.3

46

61732

GH

SS

arh

an

H-I

Boi

23/1

1/2

006

20.7

16

0.6

83

21.3

99

10.7

00

61750

GH

SS

Boi

HS

-IB

oi

23/1

1/2

006

27.7

31

1.6

33

29.3

64

14.6

82

Su

bT

ota

l80.7

11

4.5

75

85.2

86

0.0

00

42.6

43

30

Secto

r:E

ducati

on

Dis

tric

tR

econst

ructi

on

Unit

:A

bbott

abad

Reconst

ructi

on

Agency

:W

&S

(PE

RR

A)

Cap

ital

Reven

ue

To

tal

Esti

mate

dC

os

tA

llo

ca

tio

n

20

07

-08

Es

tim

ate

d

Ex

pe

nd

itu

reu

p

toJ

un

e,

20

07

Ap

pro

val

Date

Un

ion

Co

un

cil

Nam

eo

fP

roje

ct

&L

ocati

on

S.N

o

Pack

age

10

of

Ed

ucati

on

0.0

00

61584

GG

PS

Dalo

laN

o.1

P-I

ID

alo

la23/1

1/2

006

3.3

09

0.1

78

3.4

87

1.7

44

61585

GG

PS

Dalo

laN

o.2

P-I

ID

alo

la23/1

1/2

006

3.3

09

0.1

78

3.4

87

1.7

44

61586

GG

PS

Hadora

Bandi

P-I

Dalo

la23/1

1/2

006

2.5

60

0.1

24

2.6

84

1.3

42

61588

GG

PS

Gru

ng

P-I

Dalo

la23/1

1/2

006

2.5

60

0.1

24

2.6

84

1.3

42

61589

GG

PS

Darr

aP

-ID

alo

la23/1

1/2

006

2.5

60

0.1

24

2.6

84

1.3

42

61590

GG

PS

Hadora

Khas

P-I

ID

alo

la23/1

1/2

006

3.3

09

0.1

78

3.4

87

1.7

44

61643

GP

SC

hengli

P-I

Dalo

la23/1

1/2

006

2.5

60

0.1

24

2.6

84

1.3

42

61644

GP

SD

aban

P-I

IID

alo

la23/1

1/2

006

4.0

57

0.1

89

4.2

46

2.1

23

61646

GP

ST

ark

ote

P-I

IID

alo

la23/1

1/2

006

4.0

57

0.1

89

4.2

46

2.1

23

61647

GP

SP

lahir

Bandi

P-I

Dalo

la23/1

1/2

006

2.5

60

0.1

24

2.6

84

1.3

42

61648

GP

SS

eri

Dalo

laP

-II

Dalo

la23/1

1/2

006

3.3

09

0.1

78

3.4

87

1.7

44

61649

GP

SD

eedal

P-I

VD

alo

la23/1

1/2

006

6.4

36

0.0

00

6.4

36

3.2

18

61651

GP

SS

ehali

P-I

VD

alo

la23/1

1/2

006

6.4

36

0.2

02

6.6

38

3.3

19

61652

GP

SD

arr

aP

-III

Dalo

la23/1

1/2

006

4.0

57

0.1

89

4.2

46

2.1

23

61653

GP

SS

irla

P-I

VD

alo

la23/1

1/2

006

6.4

36

0.2

02

6.6

38

3.3

19

61654

GP

SH

adora

P-I

IID

alo

la23/1

1/2

006

4.0

57

0.1

89

4.2

46

2.1

23

61731

GH

SH

adora

Bandi

H-I

Dalo

la23/1

1/2

006

20.7

16

0.6

75

21

.39

11

0.6

96

Su

bT

ota

l82.2

88

3.1

67

85

.45

50

.00

04

2.7

28

Pack

age

11

of

Ed

ucati

on

61592

GG

PS

Kunth

ali

P-I

Kukm

ung

23/1

1/2

006

2.5

60

0.1

32

2.6

93

1.3

46

61593

GG

PS

Kukm

ar

P-I

Kukm

ung

23/1

1/2

006

2.5

60

0.1

32

2.6

93

1.3

46

61657

GP

SP

lair

P-I

IK

ukm

ung

23/1

1/2

006

3.3

09

0.1

86

3.4

95

1.7

48

61658

GP

SK

unth

ali

P-I

Kukm

ung

23/1

1/2

006

2.5

60

0.0

00

2.5

60

1.2

80

61659

GP

SG

undia

laP

-IK

ukm

ung

23/1

1/2

006

2.5

60

0.0

00

2.5

60

1.2

80

61660

GP

SS

anja

P-I

Kukm

ung

23/1

1/2

006

2.5

60

0.0

00

2.5

60

1.2

80

61661

GP

SD

eveli

Bandi

P-I

Kukm

ung

23/1

1/2

006

2.5

60

0.1

32

2.6

92

1.3

46

61662

GP

SN

ary

at

P-I

IIK

ukm

ung

23/1

1/2

006

4.0

57

0.1

97

4.2

54

2.1

27

61663

GP

SK

ukm

ar

P-I

IK

ukm

ung

23/1

1/2

006

3.3

09

0.1

86

3.4

95

1.7

48

31

Secto

r:E

ducati

on

Dis

tric

tR

econst

ructi

on

Unit

:A

bbott

abad

Reconst

ructi

on

Agency

:W

&S

(PE

RR

A)

Cap

ital

Reven

ue

To

tal

Esti

mate

dC

os

tA

llo

ca

tio

n

20

07

-08

Es

tim

ate

d

Ex

pe

nd

itu

reu

p

toJ

un

e,

20

07

Ap

pro

val

Date

Un

ion

Co

un

cil

Nam

eo

fP

roje

ct

&L

ocati

on

S.N

o

61664

GP

SJa

ndar

Dhaki

P-I

Kukm

ung

23/1

1/2

006

2.5

60

0.1

32

2.6

92

1.3

46

61665

GP

SM

ara

isP

-IK

ukm

ung

23/1

1/2

006

2.5

60

0.1

32

2.6

92

1.3

46

61666

GP

SK

unth

ali

Low

er

P-I

Kukm

ung

23/1

1/2

006

2.5

60

0.1

32

2.6

92

1.3

46

61667

GP

SD

ogri

an

P-I

Kukm

ung

23/1

1/2

006

2.5

60

0.0

00

2.5

60

1.2

80

61741

GH

SK

unth

ali

H-I

IK

ukm

ung

23/1

1/2

006

26.9

82

1.2

83

28

.26

51

4.1

33

61668

GP

SP

ath

er

Gali

P-I

Kukm

ung

23/1

1/2

006

2.5

60

0.1

32

2.6

92

1.3

46

62332

GG

PS

Kukm

ong

P-I

Kukm

ung

23/1

1/2

006

2.5

60

0.1

32

2.6

92

1.3

46

Su

bT

ota

l68.3

77

2.9

12

71

.28

90

.00

03

5.6

45

Pack

age

12

of

Ed

ucati

on

61581

GG

PS

Sari

Bagnota

rP

-IB

agnota

r23/1

1/2

006

2.5

60

0.2

32

2.7

92

1.3

96

61614

GP

SC

hehan

P-I

IIB

agnota

r23/1

1/2

006

4.0

57

0.0

00

4.0

57

2.0

29

61615

GP

SG

ula

ga

P-I

Bagnota

r23/1

1/2

006

2.5

60

0.0

00

2.5

60

1.2

80

61596

GG

PS

Noor

Mung

P-I

IN

am

liM

ara

23/1

1/2

006

3.3

09

0.2

86

3.5

95

1.7

98

61742

GH

SN

am

liM

ara

H-I

IN

am

liM

ara

23/1

1/2

006

26.9

82

1.3

83

28

.36

51

4.1

83

Su

bT

ota

l39.4

68

1.9

02

41

.37

00

.00

02

0.6

85

Pack

age

13

of

Ed

ucati

on

61591

GG

PS

Bum

lial

P-I

Kakul

23/1

1/2

006

2.5

60

0.0

00

2.5

60

1.2

80

61669

GP

SB

um

lial

P-I

Kakul

23/1

1/2

006

2.5

60

0.2

99

2.8

59

1.4

30

61700

GG

PS

Bandi

Dhundan

B.P

Khan

23/1

1/2

006

1.6

00

0.0

00

1.6

00

0.8

00

61707

GG

CM

SM

irpur

Mir

pur

23/1

1/2

006

1.5

50

0.0

00

1.5

50

0.7

75

61711

GP

SM

ian

De

Sari

Mir

pur

23/1

1/2

006

1.6

00

0.0

00

1.6

00

0.8

00

61595

GG

PS

Mair

aM

uzafa

rP

-II

Mir

pur

23/1

1/2

006

3.3

09

0.3

53

3.6

62

1.8

31

61704

GG

PS

Dham

tour

Dham

tour

23/1

1/2

006

2.3

50

0.0

00

2.3

50

1.1

75

61708

GG

PS

Sheik

hul

Bandi

Sheik

hul

Bandi

23/1

1/2

006

1.4

50

0.0

00

1.4

50

0.7

25

61747

GH

SJh

angi

Jhangi

23/1

1/2

006

5.5

60

0.0

00

5.5

60

2.7

80

61705

GG

PS

Jhangi

Jhangi

23/1

1/2

006

1.2

00

0.0

00

1.2

00

0.6

00

61749

GG

HS

Naw

ansh

ehr

Naw

ansh

ehr

23/1

1/2

006

2.2

50

0.0

00

2.2

50

1.1

25

Su

bT

ota

l25.9

89

0.6

52

26.6

41

0.0

00

13.3

21

32

Secto

r:E

ducati

on

Dis

tric

tR

econst

ructi

on

Unit

:A

bbott

abad

Reconst

ructi

on

Agency

:W

&S

(PE

RR

A)

Cap

ital

Reven

ue

To

tal

Esti

mate

dC

os

tA

llo

ca

tio

n

20

07

-08

Es

tim

ate

d

Ex

pe

nd

itu

reu

p

toJ

un

e,

20

07

Ap

pro

val

Date

Un

ion

Co

un

cil

Nam

eo

fP

roje

ct

&L

ocati

on

S.N

o

Pack

age

14

of

Ed

ucati

on

61655

GP

SK

ara

ga

P-I

IIG

ore

eni

23/1

1/2

006

4.0

57

0.2

21

4.2

78

2.1

39

61753

GH

SS

Lora

HS

-IL

ora

23/1

1/2

006

27.7

31

1.6

57

29

.38

81

4.6

94

61656

GP

SK

utl

iP

-II

Gore

eni

23/1

1/2

006

3.3

09

0.2

10

3.5

19

1.7

60

61720

GM

SG

ore

eni

M-I

IG

ore

eni

23/1

1/2

006

7.4

46

0.7

32

8.1

78

4.0

89

61670

GP

SS

ari

P-I

Lora

23/1

1/2

006

2.5

60

0.1

56

2.7

16

1.3

58

61671

GP

SL

ora

P-I

VL

ora

23/1

1/2

006

6.4

36

0.2

34

6.6

70

3.3

35

61672

GP

SG

arh

iP

-II

Lora

23/1

1/2

006

3.3

09

0.2

10

3.5

19

1.7

60

Su

bT

ota

l54.8

48

3.4

21

58.2

69

0.0

00

29.1

35

Pack

age

15

of

ed

ucati

on

61691

GP

SR

ahi

P-I

IIP

hall

ah

23/1

1/2

006

4.0

57

0.1

95

4.2

52

2.0

00

61692

GP

SG

um

beer

No.1

P-I

IP

hall

ah

23/1

1/2

006

3.3

09

0.1

84

3.4

93

1.7

49

61693

GP

SD

heri

Rakhala

P-I

VP

hall

ah

23/1

1/2

006

6.4

36

0.2

08

6.6

44

2.0

00

61694

GP

SK

und

Batt

el

P-I

IP

hall

ah

23/1

1/2

006

3.3

09

0.1

84

3.4

93

1.3

00

61613

GG

PS

Nall

aS

eer

P-I

Seer

23/1

1/2

006

2.5

60

0.1

30

2.6

90

1.3

45

61695

GP

SB

att

ian

P-I

Seer

23/1

1/2

006

2.5

60

0.1

30

2.6

90

1.3

45

61696

GP

SB

ut

Nara

P-I

VS

eer

23/1

1/2

006

6.4

36

0.2

08

6.6

44

2.0

00

61722

GM

SB

att

ian

M-I

Seer

23/1

1/2

006

4.3

94

0.5

11

4.9

05

2.0

00

61682

GP

SM

alm

ola

P-I

IN

agri

Tuti

al

23/1

1/2

006

3.3

09

0.1

84

3.4

93

1.3

00

61603

GG

PS

Malm

ola

P-I

IN

agri

Tuti

al

23/1

1/2

006

3.3

09

0.1

84

3.4

93

1.3

00

61681

GP

SN

agri

Tuti

al

P-I

VN

agri

Tuti

al

23/1

1/2

006

6.4

36

0.2

08

6.6

44

2.0

00

61673

GP

SB

ase

era

P-I

Langri

al

23/1

1/2

006

2.5

60

0.1

30

2.6

90

1.3

45

61752

GH

SS

Langri

al

HS

-IL

angri

al

23/1

1/2

006

27.7

31

1.6

31

29

.36

28

.82

0.5

62

Su

bT

ota

l76.4

06

4.0

84

80.4

90

8.8

00

40.2

45

Pack

age

16

of

Ed

ucati

on

61697

GP

SA

ziz

Bang

P-I

Sarb

ana

23/1

1/2

006

2.5

60

0.1

56

2.7

16

1.3

58

61698

GP

SM

air

aA

ziz

Bang

P-I

Sarb

ana

23/1

1/2

006

2.5

60

0.1

56

2.7

16

1.3

58

61699

GP

SA

ziz

Abad

P-I

Sarb

ana

23/1

1/2

006

2.5

60

0.1

56

2.7

16

1.3

58

61690

GP

SU

pper

Mals

aP

-IP

halk

ot

23/1

1/2

006

2.5

60

0.1

56

2.7

16

1.3

58

33

Secto

r:E

ducati

on

Dis

tric

tR

econst

ructi

on

Unit

:A

bbott

abad

Reconst

ructi

on

Agency

:W

&S

(PE

RR

A)

Cap

ital

Reven

ue

To

tal

Esti

mate

dC

ost

Allo

cati

on

2007-0

8

Esti

mate

d

Exp

en

dit

ure

up

toJu

ne,2007

Ap

pro

valD

ate

Un

ion

Co

un

cil

Nam

eo

fP

roje

ct

&L

ocati

on

S.N

o

61583

GG

PS

Low

er

Beri

nG

ali

P-I

VB

eri

nG

ali

23/1

1/2

006

6.4

36

0.2

34

6.6

70

3.3

35

61734

GH

SB

eri

nG

ali

H-I

IB

eri

nG

ali

23/1

1/2

006

26.9

82

1.3

07

28.2

89

14.1

45

61628

GP

SJa

ffar

P-I

IB

eri

nG

ali

23/1

1/2

006

3.3

09

0.2

10

3.5

19

1.7

60

61725

GG

MS

Kuth

wal

Kuth

wal

23/1

1/2

006

1.2

30

0.0

00

1.2

30

0.6

15

Su

bT

ota

l48.1

97

2.3

76

50.5

73

0.0

00

25.2

87

Pack

age

17

of

ed

uati

on

61739

GH

SK

okal

Bars

een

H-I

IH

aveli

an

Urb

an

23/1

1/2

006

26.9

82

1.4

50

28.4

32

8.4

719.9

62

61709

GP

SH

aveli

an

No.3

Haveli

an

Urb

an

23/1

1/2

006

1.3

58

0.0

00

1.3

58

0.6

79

61702

GG

PS

Saji

kote

Bald

heri

23/1

1/2

006

1.5

50

0.0

00

1.5

50

0.7

75

61740

GH

SJh

angra

H-I

IJh

angra

23/1

1/2

006

26.9

82

1.4

50

28.4

32

8.4

70

Su

bT

ota

l56.8

72

2.9

00

59.7

72

8.4

70

29.8

86

Pack

age

18

of

Ed

ucati

on

61674

GP

SC

hapri

P-I

Majo

han

23/1

1/2

006

2.5

60

0.1

79

2.7

39

1.3

70

61675

GP

SC

hando

Mair

aP

-II

Majo

han

23/1

1/2

006

3.3

09

0.2

33

3.5

42

1.7

71

61710

GP

SS

am

wala

Majo

han

23/1

1/2

006

1.3

50

0.0

00

1.3

50

0.6

75

61683

GP

SP

anakha

Sato

raP

-IN

ara

23/1

1/2

006

2.5

60

0.1

79

2.7

39

1.3

70

61724

GG

MS

Mohri

Bed

Bhen

Nara

23/1

1/2

006

3.5

00

0.0

00

3.5

00

1.7

50

61737

GH

SR

ajo

ya

H-I

IG

hari

Phulg

ran

23/1

1/2

006

26.9

82

1.3

30

28.3

12

14.1

56

61738

GH

ST

akia

Sheik

han

H-I

IG

hari

Phulg

ran

23/1

1/2

006

26.9

82

1.3

30

28.3

12

14.1

56

Su

bT

ota

l67.2

43

3.2

51

70.4

94

0.0

00

35.2

47

Pack

age

19

of

Ed

ucati

on

61602

GG

PS

Batt

aK

eri

P-I

Nagri

Bala

23/1

1/2

006

2.5

60

0.0

00

2.5

60

1.2

80

61726

GM

SK

ari

Sara

fali

Nagri

Bala

23/1

1/2

006

1.3

50

0.0

00

1.3

50

0.6

75

61723

GM

ST

hunda

M-I

Tajw

al

23/1

1/2

006

4.3

94

0.6

80

5.0

74

2.5

37

61712

GP

ST

upla

Tajw

al

23/1

1/2

006

1.3

50

0.0

00

1.3

50

0.6

75

61745

GH

SN

agri

Bala

H-I

IN

agri

Bala

23/1

1/2

006

26.9

82

1.4

50

28.4

32

14.2

16

Su

bT

ota

l36.6

36

2.1

30

38.7

66

0.0

00

19.3

83

34

Sec

tor:

Educa

tion

Dis

tric

tR

econst

ruct

ion

Unit

:A

bbott

abad

Rec

onst

ruct

ion

Agen

cy:

W&

S(P

ER

RA

)

Cap

ital

Reven

ue

To

tal

Esti

mate

dC

ost

Allo

cati

on

2007-0

8

Esti

mate

d

Exp

en

dit

ure

up

toJu

ne,2007

Ap

pro

valD

ate

Un

ion

Co

un

cil

Nam

eo

fP

roje

ct

&L

ocati

on

S.N

o

Pack

age

20

of

Ed

ucati

on

61703

GG

PS

Cit

yA

bbott

abad

Urb

an

Abbott

abad

23/1

1/2

006

5.0

60

0.2

00

5.2

60

2.6

30

61706

GG

PS

Upper

Keh

alU

rban

Keh

al23/1

1/2

006

3.0

80

0.2

00

3.2

80

1.6

40

Su

bT

ota

l8.1

40

0.4

00

8.5

40

0.0

00

4.2

70

Pack

age

21

of

Ed

ucati

on

61721

GM

SB

andi

Mat

rach

M-I

Paw

a23/1

1/2

006

4.3

94

0.6

13

5.0

07

2.5

04

61754

GH

SS

Ric

hB

hen

HS

-II

Paw

a23/1

1/2

006

34.1

24

2.6

53

36.7

77

18.3

89

61642

GP

ST

han

na

P-I

VC

ham

had

23/1

1/2

006

6.4

36

0.3

10

6.7

46

3.3

73

Su

bT

ota

l44.9

54

3.5

77

48.5

31

0.0

00

24.2

66

Pack

age

22

of

Ed

ucati

on

61755

GP

GC

oll

ege

No

1A

bbott

abad

A.A

bad

Urb

27/0

1/2

007

23.5

19

0.0

00

23.5

19

11.7

60

61756

GP

GC

No

2M

andia

nA

.Abad

Urb

27/0

1/2

007

19.6

76

0.0

00

19.6

76

9.8

38

61757

GG

CN

o1

A.A

bad

Urb

27/0

1/2

007

14.8

66

0.0

00

14.8

66

7.4

33

61758

GG

CM

andia

nA

.Abad

Urb

27/0

1/2

007

6.4

87

0.0

00

6.4

87

3.2

44

61759

GG

CN

awan

sher

Naw

ansh

ehr

27/0

1/2

007

0.9

07

0.0

00

0.9

07

0.4

54

61760

GC

Hav

elia

nH

avel

ian

27/0

1/2

007

0.2

00

0.0

00

0.2

00

0.1

00

Su

bT

ota

l65.6

55

0.0

00

65.6

55

0.0

00

32.8

28

Gran

dT

ota

l1,1

82.7

61

57.8

28

1,2

40.5

89

99.2

28

680.6

34

35

An

ne

x-I

1G

GP

SP

ehlw

an

B/G

AL

IU

nA

ppro

ved

2.6

59

0.0

00

1.3

30

2G

GP

SZ

iara

tB

akote

Bakote

Un

Appro

ved

2.6

59

0.0

00

1.3

30

3G

MP

SS

att

ian

De

Bandi

Boi

Un

Appro

ved

2.6

59

0.0

00

1.3

30

4G

PS

Gurd

aw

ara

Gali

Cit

yU

rb:

Un

Appro

ved

2.6

59

0.0

00

1.3

30

5G

GP

SK

iala

G.P

.Gra

nU

nA

ppro

ved

2.6

59

0.0

00

1.3

30

6G

PS

Chabgra

nG

roeeni

Un

Appro

ved

2.6

59

0.0

00

1.3

30

7G

PS

Nara

Buji

KA

KU

LU

nA

ppro

ved

2.6

59

0.0

00

1.3

30

8G

GP

SD

avli

Bandi

Kukm

ong

Un

Appro

ved

2.6

59

0.0

00

1.3

30

9G

PS

Lassan

Langri

al

Un

Appro

ved

2.6

59

0.0

00

1.3

30

10

GG

PS

Noor

Pur

Lora

Un

Appro

ved

2.6

59

0.0

00

1.3

30

11

GP

SP

angoora

N/M

AIR

AU

nA

ppro

ved

2.6

59

0.0

00

1.3

30

12

GP

SH

illa

nS

agana

N/T

uti

al

Un

Appro

ved

2.6

59

0.0

00

1.3

30

13

GG

PS

Kari

Sara

fali

Nath

aG

ali

Un

Appro

ved

2.6

59

0.0

00

1.3

30

14

GP

SK

han

Malk

ote

Plu

ck

Un

Appro

ved

2.6

59

0.0

00

1.3

30

15

GG

PS

Low

er

Mals

aS

arb

hana

Un

Appro

ved

2.6

59

0.0

00

1.3

30

16

GG

PS

Hir

ran

B/G

ali

B/G

AL

IU

nA

ppro

ved

3.4

62

0.0

00

1.7

31

17

GP

SG

rang

Dalo

laU

nA

ppro

ved

3.4

62

0.0

00

1.7

31

18

GG

PS

Kutl

iN

o.1

Gro

eeni

Un

Appro

ved

3.4

62

0.0

00

1.7

31

19

GP

ST

aro

rN

/Tuti

al

Un

Appro

ved

3.4

62

0.0

00

1.7

31

20

GG

PS

Mala

ch

Nath

iagali

Un

Appro

ved

3.4

62

0.0

00

1.7

31

21

GP

SL

arr

iP

att

:Kala

nU

nA

ppro

ved

3.4

62

0.0

00

1.7

31

22

GP

SJandar

Bari

Phalk

ote

Un

Appro

ved

3.4

62

0.0

00

1.7

31

23

GP

SJulg

ran

Phalk

ote

Un

Appro

ved

3.4

62

0.0

00

1.7

31

24

GG

PS

Mohall

aT

aj

Salh

ad

Un

Appro

ved

3.4

62

0.0

00

1.7

31

25

GP

SD

eedal

Boi

Un

Appro

ved

4.2

21

0.0

00

2.1

11

26

GP

SM

air

aR

ehm

at

Khan

Kuth

wal

Un

Appro

ved

4.2

21

0.0

00

2.1

11

27

GP

SR

ahi

Lora

Un

Appro

ved

4.2

21

0.0

00

2.1

11

28

GP

SM

irP

ur

No.1

Mir

pur

Un

Appro

ved

4.2

21

0.0

00

2.1

11

29

GP

SB

eri

Bagla

Nam

mal

Un

Appro

ved

4.2

21

0.0

00

2.1

11

B.

Ne

wA

pp

rov

ed

Sc

he

me

sN

IL

Es

tim

ate

d

Ex

pe

nd

itu

reu

pto

Ju

ne

,2

00

7

S.N

oN

am

eo

fP

roje

ct

&L

oc

ati

on

Un

ion

Co

un

cil

Ap

pro

ve

db

y

DR

AC

/PS

C/S

SC

/ER

RA

Bo

ard

CD

WP

/EC

NE

C(D

ate

so

fA

pp

rov

al

&C

om

ple

tio

n)

Es

tim

ate

d

Co

st

Re

co

ns

tru

cti

on

bu

tn

ot

inc

lud

ed

inA

WP

20

06

-20

07

C.

Ne

w(U

nA

pp

rov

ed

)

All

oc

ati

on

for

20

07

-08

An

nu

al

Work

Pla

n2007-0

8

Reco

nstr

ucti

on

Ag

en

cy

:W

&S

(PE

RR

A)

Dis

tric

tR

eco

nstr

ucti

on

Un

it:

Ab

bo

ttab

ad

Secto

r:E

du

cati

on

36

Es

tim

ate

d

Ex

pe

nd

itu

reu

pto

Ju

ne

,2

00

7

S.N

oN

am

eo

fP

roje

ct

&L

oc

ati

on

Un

ion

Co

un

cil

Ap

pro

ve

db

y

DR

AC

/PS

C/S

SC

/ER

RA

Bo

ard

CD

WP

/EC

NE

C(D

ate

so

fA

pp

rov

al

&C

om

ple

tio

n)

Es

tim

ate

d

Co

st

All

oc

ati

on

for

20

07

-08

An

nu

al

Work

Pla

n2007-0

8

Rec

onst

ruct

ion

Agen

cy:

W&

S(P

ER

RA

)

Dis

tric

tR

econst

ruct

ion

Unit

:A

bbott

abad

Sec

tor:

Educa

tion

30

GG

PS

Jan

dar

Bar

iP

hal

kote

Un

Appro

ved

4.2

21

0.0

00

2.1

11

31

GG

PS

Utl

ip

and

Phal

kote

Un

Appro

ved

4.2

21

0.0

00

2.1

11

32

GP

SD

har

iR

akh

ala

Phal

lah

Un

Appro

ved

4.2

21

0.0

00

2.1

11

33

GP

SK

asee

lB

/A/K

han

Un

Appro

ved

4.2

21

0.0

00

2.1

11

34

GP

SC

hat

riK

uth

wal

Un

Appro

ved

6.6

13

0.0

00

3.3

07

35

GH

SN

agri

Tu

tial

N/T

UT

IAL

Un

Appro

ved

28.2

32

0.0

00

14.1

16

36

GP

Sb

and

iH

amza

Boi

Un

Appro

ved

2.6

59

0.0

00

1.3

30

37

GP

SC

ho

ora

Gal

iB

oi

Un

Appro

ved

3.4

62

0.0

00

1.7

31

38

GP

SM

oh

riM

aira

Boi

Un

Appro

ved

2.6

59

0.0

00

1.3

30

39

GG

PS

Sam

bli

Kh

uy

Boi

Un

Appro

ved

2.6

59

0.0

00

1.3

30

40

GP

ST

aro

Di

Ban

di

Boi

Un

Appro

ved

2.6

59

0.0

00

1.3

30

41

GP

SB

arb

een

Boi

Un

Appro

ved

2.6

59

0.0

00

1.3

30

42

GG

PS

Daw

ata

Boi

Un

Appro

ved

2.6

59

0.0

00

1.3

30

43

GG

PS

Kal

gra

nD

alola

Un

Appro

ved

3.4

62

0.0

00

1.7

31

44

GP

SB

agla

Dal

ola

Un

Appro

ved

3.4

62

0.0

00

1.7

31

45

GP

SP

ata

Do

ga

Dal

ola

Un

Appro

ved

2.6

59

0.0

00

1.3

30

46

GP

ST

alak

Ba

nD

alola

Un

Appro

ved

3.4

62

0.0

00

1.7

31

47

GP

ST

alk

and

iK

ukm

on

gU

nA

ppro

ved

3.4

62

0.0

00

1.7

31

48

GP

SU

pp

erK

anth

ali

Kukm

ong

Un

Appro

ved

2.6

59

0.0

00

1.3

30

49

GG

PS

Maj

uh

anN

amal

Un

Appro

ved

3.2

21

0.0

00

1.6

11

Tota

l185.6

80

0.0

00

92.8

40

50

GG

PS

Kal

oo

rB

.PK

han

Un

Appro

ved

1.2

50

0.0

00

0.6

25

51

GG

PS

Man

gal

B.P

Khan

Un

Appro

ved

1.3

00

0.0

00

0.6

50

52

GH

SB

and

iD

hu

nd

anB

.P.K

ha

nU

nA

ppro

ved

13.8

52

0.0

00

6.9

26

53

GG

PS

Mu

jhat

B/A

/Khan

Un

Appro

ved

1.5

53

0.0

00

0.7

77

54

GP

SA

kh

reel

aB

/GA

LI

Un

Appro

ved

1.3

58

0.0

00

0.6

79

55

GP

SJo

gi

Mai

raB

/GA

LI

Un

Appro

ved

0.8

38

0.0

00

0.4

19

56

GP

SP

ellw

a nB

/GA

LI

Un

Appro

ved

0.8

38

0.0

00

0.4

19

57

GG

PS

Keh

alR

ajo

ya

BA

GH

Un

Appro

ved

0.8

45

0.0

00

0.4

23

58

GP

SK

oh

alia

nB

agh

Un

Appro

ved

1.3

58

0.0

00

0.6

79

59

GG

HS

Bag

no

ter

Bag

note

rU

nA

ppro

ved

1.4

75

0.0

00

0.7

38

60

GG

PS

Mo

hal

lah

Kiy

ani

Bak

ote

Un

Appro

ved

2.1

20

0.0

00

1.0

60

Rep

air

37

Esti

mate

d

Exp

en

dit

ure

up

to

Ju

ne,2007

S.N

oN

am

eo

fP

roje

ct

&L

ocati

on

Un

ion

Co

un

cil

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

/ER

RA

Bo

ard

CD

WP

/EC

NE

C(D

ate

so

fA

pp

roval

&C

om

ple

tio

n)

Esti

mate

d

Co

st

Allo

cati

on

for

2007-0

8

An

nu

al

Wo

rk

Pla

n2

00

7-0

8

Reco

nstr

ucti

on

Ag

en

cy

:W

&S

(PE

RR

A)

Dis

tric

tR

eco

nstr

ucti

on

Un

it:

Ab

bo

ttab

ad

Secto

r:E

du

cati

on

61

GP

ST

hurm

uti

an

Bakote

Un

Appro

ved

0.6

25

0.0

00

0.3

13

62

GG

PS

Saji

Kote

Bald

hari

Un

Appro

ved

1.5

50

0.0

00

0.7

75

63

GP

SM

angal

Bald

hari

Un

Appro

ved

1.6

60

0.0

00

0.8

30

64

GG

HS

Bero

teB

ero

teU

nA

ppro

ved

1.3

58

0.0

00

0.6

79

65

GH

SS

Bero

teB

ero

teU

nA

ppro

ved

2.1

00

0.0

00

1.0

50

66

GP

SB

andi

Bero

teB

ero

teU

nA

ppro

ved

0.5

25

0.0

00

0.2

63

67

GP

SC

hoolt

aB

ero

teU

nA

ppro

ved

0.6

00

0.0

00

0.3

00

68

GP

SJuli

an

Bero

teU

nA

ppro

ved

0.5

75

0.0

00

0.2

88

69

GP

SK

ohali

an

Bero

teU

nA

ppro

ved

0.5

85

0.0

00

0.2

93

70

GP

SL

ahoor

Bero

teU

nA

ppro

ved

1.4

50

0.0

00

0.7

25

71

GP

SM

ohra

Bero

teB

ero

teU

nA

ppro

ved

1.5

40

0.0

00

0.7

70

72

GP

SN

ari

Hota

rB

ero

teU

nA

ppro

ved

1.5

40

0.0

00

0.7

70

73

GG

PS

Bandi

Bero

teB

irote

Un

Appro

ved

2.1

20

0.0

00

1.0

60

74

GG

PS

Bir

ote

Bir

ote

Un

Appro

ved

1.5

40

0.0

00

0.7

70

75

GG

HS

Kunj

Cit

yU

rb:

Un

Appro

ved

3.8

00

0.0

00

1.9

00

76

GG

PS

Saji

Kote

Dew

al

Un

Appro

ved

1.3

58

0.0

00

0.6

79

77

GH

SM

.B.B

han

DE

WA

LU

nA

ppro

ved

2.2

50

0.0

00

1.1

25

78

GP

SN

agri

Payeen

Dew

al

Un

Appro

ved

2.1

96

0.0

00

1.0

98

79

GP

SN

alo

tha

Dew

al

Un

Appro

ved

2.8

43

0.0

00

1.4

22

80

GG

HS

SD

ham

tour

Dham

tou

rU

nA

ppro

ved

12.3

70

0.0

00

6.1

85

81

GG

PS

Dham

tour

Dham

tou

rU

nA

ppro

ved

2.3

52

0.0

00

1.1

76

82

GH

SD

ham

tour

Dham

tour

Un

Appro

ved

5.6

90

0.0

00

2.8

45

83

GP

SJasw

al

Dham

tou

rU

nA

ppro

ved

1.5

50

0.0

00

0.7

75

84

GG

PS

Malk

an

G.P

.Gra

nU

nA

ppro

ved

1.6

25

0.0

00

0.8

13

85

GP

SG

.P.G

ran

G.P

.Gra

nU

nA

ppro

ved

1.5

80

0.0

00

0.7

90

86

GP

SH

urn

ara

G.P

.Gra

nU

nA

ppro

ved

1.5

80

0.0

00

0.7

90

87

GG

HS

SH

aveli

an

Hav:U

rb:

Un

Appro

ved

4.9

83

0.0

00

2.4

92

88

GG

PS

Jarr

al

Jarr

al

Un

Appro

ved

1.5

50

0.0

00

0.7

75

89

GG

HS

Kakul

KA

KU

LU

nA

ppro

ved

4.2

30

0.0

00

2.1

15

90

GG

PS

Basali

Kakul

Un

Appro

ved

1.5

50

0.0

00

0.7

75

91

GH

SK

akul

KA

KU

LU

nA

ppro

ved

2.2

50

0.0

00

1.1

25

92

GG

PS

Upper

kehal

Kehal

Un

Appro

ved

3.0

80

0.0

00

1.5

40

93

GG

PS

Kala

sC

hatr

iK

hutw

al

Un

Appro

ved

1.4

52

0.0

00

0.7

26

38

Es

tim

ate

d

Ex

pe

nd

itu

reu

pto

Ju

ne

,2

00

7

S.N

oN

am

eo

fP

roje

ct

&L

oc

ati

on

Un

ion

Co

un

cil

Ap

pro

ve

db

y

DR

AC

/PS

C/S

SC

/ER

RA

Bo

ard

CD

WP

/EC

NE

C(D

ate

so

fA

pp

rov

al

&C

om

ple

tio

n)

Es

tim

ate

d

Co

st

All

oc

ati

on

for

20

07

-08

An

nu

al

Wo

rk

Pla

n2

00

7-0

8

Reco

nst

ructi

on

Ag

en

cy

:W

&S

(PE

RR

A)

Dis

tric

tR

eco

nst

ructi

on

Un

it:

Ab

bo

ttab

ad

Secto

r:E

du

cati

on

94

GG

PS

Du

bra

nL

an

gri

al

Un

Ap

pro

ved

1.3

58

0.0

00

0.6

79

95

GG

HS

SL

ora

LO

RA

Un

Ap

pro

ved

4.5

00

0.0

00

2.2

50

96

GP

SN

arh

ote

rL

ora

Un

Ap

pro

ved

1.7

17

0.0

00

0.8

59

97

GP

SH

aji

ag

ali

Majo

oh

an

Un

Ap

pro

ved

1.4

42

0.0

00

0.7

21

98

GH

SC

han

do

Mair

aM

aju

han

Un

Ap

pro

ved

3.1

00

0.0

00

1.5

50

99

GG

HS

SM

ali

kP

ura

Mali

kP

ura

Un

Ap

pro

ved

2.8

70

0.0

00

1.4

35

10

0G

HS

Mir

Pu

rM

irP

ur

Un

Ap

pro

ved

3.9

50

0.0

00

1.9

75

10

1G

PS

Mia

nD

esa

riM

irp

ur

Un

Ap

pro

ved

1.6

00

0.0

00

0.8

00

10

2G

GH

SN

aw

an

Sh

eh

rN

.Sh

eh

rU

nA

pp

rov

ed

2.2

50

0.0

00

1.1

25

10

3G

HS

SN

aw

an

sheh

rN

.Sh

eh

rU

nA

pp

rov

ed

3.5

30

0.0

00

1.7

65

10

4G

GP

SD

ak

han

Tatr

eela

N/B

AL

AU

nA

pp

rov

ed

1.3

58

0.0

00

0.6

79

10

5G

PS

No

or

Man

gN

/MA

IRA

Un

Ap

pro

ved

1.3

58

0.0

00

0.6

79

10

6G

GP

SB

ata

ng

iN

/Tu

tial

Un

Ap

pro

ved

0.5

50

0.0

00

0.2

75

10

7G

GP

SK

ho

ian

N/T

uti

al

Un

Ap

pro

ved

1.8

50

0.0

00

0.9

25

10

8G

PS

Bata

ng

iN

/Tu

tial

Un

Ap

pro

ved

1.4

40

0.0

00

0.7

20

10

9G

PS

Batk

nala

N/T

uti

al

Un

Ap

pro

ved

1.3

58

0.0

00

0.6

79

11

0G

PS

Ch

on

ali

N/T

uti

al

Un

Ap

pro

ved

1.3

58

0.0

00

0.6

79

111

GP

SN

ak

hati

the

rN

am

mal

Un

Ap

pro

ved

0.9

50

0.0

00

0.4

75

11

2G

PS

Pay

ian

Nam

mal

Un

Ap

pro

ved

1.3

58

0.0

00

0.6

79

11

3G

GP

SK

ula

nd

aN

AR

AU

nA

pp

rov

ed

1.3

58

0.0

00

0.6

79

11

4G

GP

SS

ato

raN

ara

Un

Ap

pro

ved

1.3

58

0.0

00

0.6

79

11

5G

HS

Sato

raN

AR

AU

nA

pp

rov

ed

1.2

40

0.0

00

0.6

20

11

6G

PS

Po

na

Nara

Un

Ap

pro

ved

1.3

58

0.0

00

0.6

79

11

7G

PS

Sato

raN

ara

Un

Ap

pro

ved

1.8

58

0.0

00

0.9

29

11

8G

PS

Su

mal

Dh

ara

NA

RA

Un

Ap

pro

ved

1.3

58

0.0

00

0.6

79

11

9G

GH

SK

ari

Rak

iN

ath

aG

ali

Un

Ap

pro

ved

0.8

38

0.0

00

0.4

19

12

0G

GP

SB

ud

hair

Nath

aG

ali

Un

Ap

pro

ved

0.8

38

0.0

00

0.4

19

12

1G

HS

SN

ath

aG

ali

Nath

aG

ali

Un

Ap

pro

ved

4.3

60

0.0

00

2.1

80

12

2G

PS

Bu

dia

rN

ath

aG

ali

Un

Ap

pro

ved

0.8

38

0.0

00

0.4

19

12

3G

PS

Mair

aP

asa

laN

ath

aG

ali

Un

Ap

pro

ved

1.2

00

0.0

00

0.6

00

12

4G

GP

SN

o:

1N

aw

an

sher

Naw

an

sher

Un

Ap

pro

ved

1.3

58

0.0

00

0.6

79

12

5G

HS

Patt

an

Kh

urd

Patt

:Kala

nU

nA

pp

rov

ed

4.3

50

0.0

00

2.1

75

12

6G

GP

SS

haq

iqa

Paw

aU

nA

pp

rov

ed

1.6

52

0.0

00

0.8

26

39

Es

tim

ate

d

Ex

pe

nd

itu

reu

pto

Ju

ne

,2

00

7

S.N

oN

am

eo

fP

roje

ct

&L

oc

ati

on

Un

ion

Co

un

cil

Ap

pro

ve

db

y

DR

AC

/PS

C/S

SC

/ER

RA

Bo

ard

CD

WP

/EC

NE

C(D

ate

so

fA

pp

rov

al

&C

om

ple

tio

n)

Es

tim

ate

d

Co

st

All

oc

ati

on

for

20

07

-08

An

nu

al

Wo

rk

Pla

n2

00

7-0

8

Reco

nst

ructi

on

Ag

en

cy

:W

&S

(PE

RR

A)

Dis

tric

tR

eco

nst

ructi

on

Un

it:

Ab

bo

ttab

ad

Secto

r:E

du

cati

on

127

GH

SP

aw

aP

aw

aU

nA

ppro

ved

3.5

40

0.0

00

1.7

70

128

GG

PS

Pangoora

Phalk

ote

Un

Appro

ved

1.4

78

0.0

00

0.7

39

129

GP

SP

halk

ote

Phalk

ote

Un

Appro

ved

1.3

58

0.0

00

0.6

79

130

GG

PS

Phall

ah

Phall

ah

Un

Appro

ved

1.8

59

0.0

00

0.9

30

131

GP

SK

hans

Pur

PL

UC

KU

nA

ppro

ved

1.3

58

0.0

00

0.6

79

132

GH

SM

usl

am

Aba

dS

alh

ad

Un

Appro

ved

4.5

42

0.0

00

2.2

71

133

GG

PS

Am

man

aS

eer

Un

Appro

ved

2.1

45

0.0

00

1.0

73

134

GG

PS

Dhara

hS

eer

Un

Appro

ved

2.1

23

0.0

00

1.0

62

135

GG

PS

Kala

sS

eer

Un

Appro

ved

1.3

45

0.0

00

0.6

73

136

GH

SS

Zia

rat

Maso

om

SE

ER

Un

Appro

ved

1.4

00

0.0

00

0.7

00

137

GH

SS

herw

an

Sherw

an

Un

Appro

ved

3.8

52

0.0

00

1.9

26

138

GG

PS

Tnunda

Tajw

al

Un

Appro

ved

1.0

50

0.0

00

0.5

25

139

GH

ST

ajw

al

Tajw

al

Un

Appro

ved

3.0

00

0.0

00

1.5

00

140

GP

SB

ajw

an

Tajw

al

Un

Appro

ved

1.1

50

0.0

00

0.5

75

141

GP

ST

upla

Tajw

al

Un

Appro

ved

1.3

58

0.0

00

0.6

79

142

GG

PS

Kaso

om

iD

alo

laU

nA

ppro

ved

0.5

50

0.0

00

0.2

75

143

GG

PS

Nagri

Payeen

Dew

al

Un

Appro

ved

0.2

00

0.0

00

0.1

00

144

GG

PS

Banda

Abdul

Jabar

G.P

.Gra

nU

nA

ppro

ved

0.4

58

0.0

00

0.2

29

145

GG

PS

Kuli

ala

Jarr

al

Un

Appro

ved

0.8

90

0.0

00

0.4

45

146

GG

PS

Raw

lay

Khutw

al

Un

Appro

ved

0.8

90

0.0

00

0.4

45

147

GG

PS

Dakhan

Cham

naka

Majo

ohan

Un

Appro

ved

0.7

45

0.0

00

0.3

73

148

GG

PS

Chappri

Maju

han

Un

Appro

ved

0.9

63

0.0

00

0.4

82

149

GG

PS

Dhakan

N//

Bala

Un

Appro

ved

0.6

48

0.0

00

0.3

24

150

GG

PS

Jhansa

N/G

ali

Un

Appro

ved

0.5

48

0.0

00

0.2

74

151

GG

PS

BH

AT

TIA

NN

/Tuti

al

Un

Appro

ved

0.6

75

0.0

00

0.3

38

152

GG

PS

NA

GR

IT

OT

IAL

N/T

uti

al

Un

Appro

ved

0.8

38

0.0

00

0.4

19

153

GG

PS

Sia

lK

ote

Patt

:Kala

nU

nA

ppro

ved

0.5

80

0.0

00

0.2

90

154

GG

PS

Thary

ati

Phalk

ote

Un

Appro

ved

0.3

65

0.0

00

0.1

83

155

GG

PS

Dhari

Mair

aS

alh

ad

Un

Appro

ved

0.9

50

0.0

00

0.4

75

156

GG

PS

Baso

ot

Tajw

al

Un

Appro

ved

0.5

00

0.0

00

0.2

50

157

GP

ST

otn

iC

ham

ha

dU

nA

ppro

ved

0.6

50

0.0

00

0.3

25

158

GP

SJa

swal

Dham

tou

rU

nA

ppro

ved

0.7

89

0.0

00

0.3

95

159

GP

ST

angola

Kakul

Un

Appro

ved

0.5

43

0.0

00

0.2

72

40

Es

tim

ate

d

Ex

pe

nd

itu

reu

pto

Ju

ne

,2

00

7

S.N

oN

am

eo

fP

roje

ct

&L

oc

ati

on

Un

ion

Co

un

cil

Ap

pro

ve

db

y

DR

AC

/PS

C/S

SC

/ER

RA

Bo

ard

CD

WP

/EC

NE

C(D

ate

so

fA

pp

rov

al

&C

om

ple

tio

n)

Es

tim

ate

d

Co

st

All

oc

ati

on

for

20

07

-08

An

nu

al

Wo

rk

Pla

n2

00

7-0

8

Reco

nst

ructi

on

Ag

en

cy

:W

&S

(PE

RR

A)

Dis

tric

tR

eco

nst

ructi

on

Un

it:

Ab

bo

ttab

ad

Secto

r:E

du

cati

on

160

GP

SA

mli

ala

LA

NG

RA

Un

Appro

ved

0.4

75

0.0

00

0.2

38

161

GP

SL

ari

Saydan

LA

NG

RA

Un

Appro

ved

0.7

50

0.0

00

0.3

75

162

GP

SS

ian

Da

Kath

aM

irpur

Un

Appro

ved

0.9

50

0.0

00

0.4

75

163

GP

SA

khora

Nam

al

Un

Appro

ved

0.5

20

0.0

00

0.2

60

164

GP

SC

hanja

hN

ara

Un

Appro

ved

0.4

70

0.0

00

0.2

35

165

GP

SD

ana

Bagan

Nath

aG

ali

Un

Appro

ved

0.9

50

0.0

00

0.4

75

166

GP

SJh

ansa

Nath

aG

ali

Un

Appro

ved

0.6

35

0.0

00

0.3

18

167

GP

SK

hata

rbagan

Nath

aG

ali

Un

Appro

ved

0.3

80

0.0

00

0.1

90

168

GP

SB

andi

Sarr

ara

Patt

:Kala

nU

nA

ppro

ved

0.8

38

0.0

00

0.4

19

169

GP

SB

arw

ala

Patt

:Kala

nU

nA

ppro

ved

0.5

50

0.0

00

0.2

75

170

GP

SC

ham

ali

Patt

:Kala

nU

nA

ppro

ved

0.6

20

0.0

00

0.3

10

171

GP

SD

and

Khate

rP

att

:Kala

nU

nA

ppro

ved

0.4

50

0.0

00

0.2

25

172

GP

SG

ehar

Patt

:Kala

nU

nA

ppro

ved

0.5

25

0.0

00

0.2

63

173

GP

SK

utl

aP

att

:Kala

nU

nA

ppro

ved

0.8

38

0.0

00

0.4

19

174

GP

SD

akhan

Seer

Un

Appro

ved

0.8

38

0.0

00

0.4

19

175

GP

SK

aghia

nT

ajw

al

Un

Appro

ved

0.7

50

0.0

00

0.3

75

176

GP

SP

irK

ote

Tajw

al

Un

Appro

ved

0.5

00

0.0

00

0.2

50

177

GH

SB

anda

Pir

Khan

B.P

.Kha

nU

nA

ppro

ved

0.7

83

0.0

00

0.3

92

178

GH

SN

o.1

Haveli

an

Hav:U

rb:

Un

Appro

ved

0.0

40

0.0

00

0.0

20

179

GH

SN

o.2

Haveli

an

Hav:U

rb:

Un

Appro

ved

0.7

35

0.0

00

0.3

68

180

GH

SS

eer

SE

ER

Un

Appro

ved

0.6

25

0.0

00

0.3

13

181

GG

PS

Bandi

Dhondan

B.P

Khan

Un

Appro

ved

1.6

00

0.0

00

0.8

00

182

GG

PS

Murd

ey

Patt

ian

B.P

Khan

Un

Appro

ved

1.8

00

0.0

00

0.9

00

183

GG

PS

Loon

Patt

ian

B.P

Khan

Un

Appro

ved

1.8

00

0.0

00

0.9

00

184

GG

PS

Jabri

Tarn

aw

iB

.P.K

ha

nU

nA

ppro

ved

1.6

00

0.0

00

0.8

00

185

GH

ST

arn

aw

ai

B.P

.Kha

nU

nA

ppro

ved

3.0

00

0.0

00

1.5

00

186

GP

SK

ali

Dhar

B.P

.Kha

nU

nA

ppro

ved

1.3

75

0.0

00

0.6

88

187

GP

ST

annan

B.P

.Kha

nU

nA

ppro

ved

1.1

20

0.0

00

0.5

60

188

GP

SA

nder

Seri

B/G

ali

Un

Appro

ved

1.5

40

0.0

00

0.7

70

189

GP

SB

egarM

al

Bag

hU

nA

ppro

ved

1.4

20

0.0

00

0.7

10

190

GP

SD

hari

kehal

BA

GH

Un

Appro

ved

1.2

35

0.0

00

0.6

18

191

GG

PS

Chata

rN

ath

Bagnote

rU

nA

ppro

ved

0.9

80

0.0

00

0.4

90

192

GH

SS

Bagnote

rB

agnote

rU

nA

ppro

ved

11.1

40

0.0

00

5.5

70

41

Es

tim

ate

d

Ex

pe

nd

itu

reu

pto

Ju

ne

,2

00

7

S.N

oN

am

eo

fP

roje

ct

&L

oc

ati

on

Un

ion

Co

un

cil

Ap

pro

ve

db

y

DR

AC

/PS

C/S

SC

/ER

RA

Bo

ard

CD

WP

/EC

NE

C(D

ate

so

fA

pp

rov

al

&C

om

ple

tio

n)

Es

tim

ate

d

Co

st

All

oc

ati

on

for

20

07

-08

An

nu

al

Work

Pla

n2007-0

8

Rec

on

stru

ctio

nA

gen

cy:

W&

S(P

ER

RA

)

Dis

tric

tR

eco

nst

ruct

ion

Un

it:

Ab

bo

ttab

ad

Sec

tor:

Ed

uca

tio

n

19

3G

PS

Mai

raB

agn

ote

rB

agn

ote

rU

nA

pp

rov

ed0

.69

50

.00

00

.34

8

19

4G

PS

Sar

iB

agn

ote

rU

nA

pp

rov

ed0

.43

50

.00

00

.21

8

19

5G

GP

SA

liA

bad

Bak

ote

Un

Ap

pro

ved

0.3

00

0.0

00

0.1

50

19

6G

GP

SJa

bri

Kh

un

Kal

anB

ako

teU

nA

pp

rov

ed2

.12

00

.00

01

.06

0

19

7G

GP

SK

hu

nK

hu

rdB

ako

teU

nA

pp

rov

ed2

.12

00

.00

01

.06

0

19

8G

GP

SM

oo

lia

Bak

ote

Un

Ap

pro

ved

1.8

00

0.0

00

0.9

00

19

9G

GP

SP

ikh

uo

Nak

arB

ako

teU

nA

pp

rov

ed2

.12

00

.00

01

.06

0

20

0G

PS

Bak

ote

Bak

ote

Un

Ap

pro

ved

0.5

50

0.0

00

0.2

75

20

1G

PS

Bal

iK

ote

Bak

ote

Un

Ap

pro

ved

0.5

60

0.0

00

0.2

80

20

2G

PS

Bat

nal

aB

ako

teU

nA

pp

rov

ed0

.49

00

.00

00

.24

5

20

3G

PS

Lo

wer

Bak

ote

Bak

ote

Un

Ap

pro

ved

1.2

50

0.0

00

0.6

25

20

4G

PS

Nak

ark

han

Kal

a nB

ako

teU

nA

pp

rov

ed0

.59

00

.00

00

.29

5

20

5G

PS

To

pa

Kh

anK

han

Kal

anB

ako

teU

nA

pp

rov

ed0

.59

50

.00

00

.29

8

20

6G

GH

SS

aji

Ko

teB

ald

har

iU

nA

pp

rov

ed1

.64

50

.00

00

.82

3

20

7G

GP

SB

ald

har

iB

ald

har

iU

nA

pp

rov

ed0

.97

80

.00

00

.48

9

20

8G

GP

SH

ill

Mai

raB

ald

har

iU

nA

pp

rov

ed1

.28

00

.00

00

.64

0

20

9G

GP

SK

ho

lay

Q.A

ba d

Bal

dh

ari

Un

Ap

pro

ved

1.2

50

0.0

00

0.6

25

21

0G

GP

SM

ore

Kal

anB

ald

har

iU

nA

pp

rov

ed2

.12

00

.00

01

.06

0

211

GP

SB

ald

har

iB

ald

har

iU

nA

pp

rov

ed1

.55

00

.00

00

.77

5

21

2G

PS

Ch

abri

anB

ald

har

iU

nA

pp

rov

ed1

.68

00

.00

00

.84

0

21

3G

PS

Ch

ita

Mai

raB

ald

har

iU

nA

pp

rov

ed1

.71

00

.00

00

.85

5

21

4G

PS

Mo

reK

alan

Bal

dh

ari

Un

Ap

pro

ved

1.8

80

0.0

00

0.9

40

21

5G

PS

Tan

nan

Bal

dh

ari

Un

Ap

pro

ved

1.7

60

0.0

00

0.8

80

21

6G

PS

Hil

lB

ero

teB

ero

teU

nA

pp

rov

ed0

.62

50

.00

00

.31

3

21

7G

PS

Ho

trar

yB

ero

teU

nA

pp

rov

ed0

.59

50

.00

00

.29

8

21

8G

GP

SH

otr

ary

Bir

ote

Un

Ap

pro

ved

2.1

20

0.0

00

1.0

60

21

9G

GP

SC

hat

taM

oh

riC

ham

adU

nA

pp

rov

ed2

.12

00

.00

01

.06

0

22

0G

GP

SB

aram

GA

LI

Cham

had

Un

Ap

pro

ved

1.3

75

0.0

00

0.6

88

22

1G

GP

SC

ham

had

Cham

had

Un

Ap

pro

ved

1.2

75

0.0

00

0.6

38

22

2G

GP

SK

assa

ki

Kh

urd

Cham

had

Un

Ap

pro

ved

1.5

42

0.0

00

0.7

71

22

3G

HS

Bh

ura

jC

ham

had

Un

Ap

pro

ved

1.8

20

0.0

00

0.9

10

22

4G

HS

Ch

amh

adC

ham

had

Un

Ap

pro

ved

2.5

00

0.0

00

1.2

50

22

5G

PS

Ch

amh

adC

ham

had

Un

Ap

pro

ved

1.2

00

0.0

00

0.6

00

42

Es

tim

ate

d

Ex

pe

nd

itu

reu

pto

Ju

ne

,2

00

7

S.N

oN

am

eo

fP

roje

ct

&L

oc

ati

on

Un

ion

Co

un

cil

Ap

pro

ve

db

y

DR

AC

/PS

C/S

SC

/ER

RA

Bo

ard

CD

WP

/EC

NE

C(D

ate

so

fA

pp

rov

al

&C

om

ple

tio

n)

Es

tim

ate

d

Co

st

All

oc

ati

on

for

20

07

-08

An

nu

al

Wo

rkP

lan

20

07

-08

Rec

onst

ruct

ion

Agen

cy:

W&

S(P

ER

RA

)

Dis

tric

tR

econst

ruct

ion

Unit

:A

bbott

abad

Sec

tor:

Educa

tion

226

GG

HS

No.1

Abbott

abad

Cit

yU

rb:

Un

Appro

ved

3.5

40

0.0

00

1.7

70

227

GG

PS

Cli

tyA

bbott

aba

dC

ity

Urb

:U

nA

ppro

ved

5.0

60

0.0

00

2.5

30

228

GG

PS

Kula

nda(

Mohra

)D

ewal

Un

Appro

ved

1.3

58

0.0

00

0.6

79

229

GH

SM

akool

pay

een

DE

WA

LU

nA

ppro

ved

3.6

00

0.0

00

1.8

00

230

GP

SD

ewal

Dew

alU

nA

ppro

ved

1.5

89

0.0

00

0.7

95

231

GP

SP

athia

nD

ewal

Un

Appro

ved

1.3

58

0.0

00

0.6

79

232

GP

SP

hal

Kote

Dew

alU

nA

ppro

ved

1.3

38

0.0

00

0.6

69

233

GG

PS

Har

iD

eban

B.P

.Kha

nU

nA

ppro

ved

0.7

77

0.0

00

0.3

89

234

GG

PS

Jabbar

B.P

.Kha

nU

nA

ppro

ved

0.5

42

0.0

00

0.2

71

235

GG

PS

Kal

iD

har

B.P

.Kha

nU

nA

ppro

ved

0.5

78

0.0

00

0.2

89

236

GG

PS

Man

dro

chB

.P.K

ha

nU

nA

ppro

ved

0.5

76

0.0

00

0.2

88

237

GG

PS

Man

uD

eB

anB

.P.K

ha

nU

nA

ppro

ved

0.5

85

0.0

00

0.2

93

238

GG

PS

Sam

asar

B.P

.Kha

nU

nA

ppro

ved

0.5

85

0.0

00

0.2

93

239

GG

PS

Sham

shar

Nak

aB

.P.K

ha

nU

nA

ppro

ved

0.5

86

0.0

00

0.2

93

240

GG

PS

Tar

han

aB

.P.K

ha

nU

nA

ppro

ved

0.7

43

0.0

00

0.3

72

241

GG

PS

Gag

anB

/A/K

han

Un

Appro

ved

0.4

85

0.0

00

0.2

43

242

GG

PS

Tar

mch

ian

B/A

/Khan

Un

Appro

ved

0.1

50

0.0

00

0.0

75

243

GG

PS

Geh

Bag

note

rU

nA

ppro

ved

0.3

45

0.0

00

0.1

73

244

GG

PS

Khuri

Ban

da

Bag

note

rU

nA

ppro

ved

0.4

79

0.0

00

0.2

40

245

GG

PS

Fai

zabad

Bak

ote

Un

Appro

ved

0.6

45

0.0

00

0.3

23

246

GG

CM

SC

hab

rian

Bal

dhar

iU

nA

ppro

ved

0.9

85

0.0

00

0.4

93

247

GG

PS

Ree

anB

agnote

rU

nA

ppro

ved

0.6

50

0.0

00

0.3

25

248

GG

PS

Mohra

Bir

ote

Un

Appro

ved

0.6

45

0.0

00

0.3

23

249

GG

PS

BA

GH

DA

RA

Cham

had

Un

Appro

ved

0.7

42

0.0

00

0.3

71

250

GG

PS

CH

MA

KM

AIR

AC

ham

had

Un

Appro

ved

0.7

45

0.0

00

0.3

73

251

GG

PS

Kas

saki

Kal

anC

ham

had

Un

Appro

ved

0.5

48

0.0

00

0.2

74

252

GG

PS

Nal

ota

Dew

alU

nA

ppro

ved

0.3

00

0.0

00

0.1

50

253

GG

PS

Pal

kote

Dew

alU

nA

ppro

ved

0.4

00

0.0

00

0.2

00

254

GG

PS

Pat

hie

nD

ewal

Un

Appro

ved

0.1

54

0.0

00

0.0

77

255

GG

PS

Choona

Dham

tour

Un

Appro

ved

0.7

70

0.0

00

0.3

85

256

GG

PS

Ban

da

Shak

han

G.P

.Gra

nU

nA

ppro

ved

0.2

10

0.0

00

0.1

05

257

GG

PS

Bat

ala

G.P

.Gra

nU

nA

ppro

ved

0.4

59

0.0

00

0.2

30

258

GG

PS

G.P

.Gra

nG

.P.G

ran

Un

Appro

ved

0.8

45

0.0

00

0.4

23

43

Es

tim

ate

d

Ex

pe

nd

itu

reu

pto

Ju

ne

,2

00

7

S.N

oN

am

eo

fP

roje

ct

&L

oc

ati

on

Un

ion

Co

un

cil

Ap

pro

ve

db

y

DR

AC

/PS

C/S

SC

/ER

RA

Bo

ard

CD

WP

/EC

NE

C(D

ate

so

fA

pp

rov

al

&C

om

ple

tio

n)

Es

tim

ate

d

Co

st

All

oc

ati

on

for

20

07

-08

An

nu

al

Wo

rkP

lan

20

07

-08

Rec

onst

ruct

ion

Agen

cy:

W&

S(P

ER

RA

)

Dis

tric

tR

econst

ruct

ion

Unit

:A

bbott

abad

Sec

tor:

Educa

tion

259

GG

PS

Ghora

Baz

gra

nG

.P.G

ran

Un

Appro

ved

0.9

45

0.0

00

0.4

73

260

GG

PS

Kutl

iN

o.2

Gore

eni

Gore

eni

Un

Appro

ved

0.8

90

0.0

00

0.4

45

261

GG

PS

Gaj

jal

Hav

:Urb

:U

nA

ppro

ved

0.4

35

0.0

00

0.2

18

262

GG

CM

SD

har

ian

Jhan

gi

Un

Appro

ved

0.7

75

0.0

00

0.3

88

263

GG

PS

BO

ID

EG

AL

IJh

angi

Un

Appro

ved

0.8

50

0.0

00

0.4

25

264

GG

PS

Ban

da

Lam

ba

Jhan

gi

Un

Appro

ved

1.3

20

0.0

00

0.6

60

265

GG

PS

Sult

anP

ur

Jhan

gra

Un

Appro

ved

0.6

80

0.0

00

0.3

40

266

GG

PS

Waz

eera

nJh

angra

Un

Appro

ved

0.3

45

0.0

00

0.1

73

267

GG

PS

Choona

Kar

iK

akul

Un

Appro

ved

0.8

75

0.0

00

0.4

38

268

GG

PS

Nee

lor

Kak

ul

Un

Appro

ved

0.5

48

0.0

00

0.2

74

269

GG

PS

Kak

ul

No.1

Kak

ul

Un

Appro

ved

0.5

60

0.0

00

0.2

80

270

GG

PS

Chat

riK

hutw

alU

nA

ppro

ved

0.3

25

0.0

00

0.1

63

271

GG

PS

Pat

her

gal

iK

ukm

ang

Un

Appro

ved

0.9

85

0.0

00

0.4

93

272

GG

PS

Kukm

ong

Kukm

ong

Un

Appro

ved

0.5

50

0.0

00

0.2

75

273

GG

PS

Gal

iB

ania

nK

uth

wal

Un

Appro

ved

0.8

38

0.0

00

0.4

19

274

GG

PS

Kan

yat

Kuth

wal

Un

Appro

ved

0.4

65

0.0

00

0.2

33

275

GG

PS

Mohar

Kal

nK

uth

wal

Un

Appro

ved

0.5

40

0.0

00

0.2

70

276

GG

PS

Rar

raT

hip

per

Lan

gri

al

Un

Appro

ved

0.5

45

0.0

00

0.2

73

27

7G

GP

SG

ali

Bat

ttag

ram

Lan

gri

alU

nA

ppro

ved

0.5

45

0.0

00

0.2

73

278

GG

PS

Dhar

iK

iala

Lora

Un

Appro

ved

0.5

60

0.0

00

0.2

80

279

GG

PS

Sar

iL

ora

Un

Appro

ved

0.4

58

0.0

00

0.2

29

280

GG

PS

Kund

Bat

tal

Lora

Un

Appro

ved

0.6

89

0.0

00

0.3

45

281

GG

PS

Dan

akM

ajoohan

Un

Appro

ved

0.4

25

0.0

00

0.2

13

282

GG

CM

SS

um

wal

aM

ajoohan

Un

Appro

ved

0.7

50

0.0

00

0.3

75

283

GG

PS

Cham

Nak

aM

ajuhan

Un

Appro

ved

0.0

15

0.0

00

0.0

08

284

GG

PS

Kar

ach

Maj

uhan

Un

Appro

ved

0.0

17

0.0

00

0.0

09

285

GG

PS

Mai

raP

ayee

nM

ajuhan

Un

Appro

ved

0.2

75

0.0

00

0.1

38

286

GG

PS

Noja

Ban

di

Maj

uhan

Un

Appro

ved

0.2

70

0.0

00

0.1

35

287

GG

PS

MA

KO

OL

BA

LA

N//

Bal

aU

nA

ppro

ved

0.6

25

0.0

00

0.3

13

288

GG

PS

Tat

reel

aN

/Bal

aU

nA

ppro

ved

0.7

50

0.0

00

0.3

75

289

GG

PS

Nam

liM

aira

N/M

aira

Un

Appro

ved

0.8

50

0.0

00

0.4

25

290

GG

PS

Upper

Mai

raK

alan

N/M

ira

Un

Appro

ved

0.6

25

0.0

00

0.3

13

291

GG

PS

Tar

hat

tiN

amal

Un

Appro

ved

0.5

70

0.0

00

0.2

85

44

Esti

mate

d

Exp

en

dit

ure

up

to

Ju

ne,2007

S.N

oN

am

eo

fP

roje

ct

&L

ocati

on

Un

ion

Co

un

cil

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

/ER

RA

Bo

ard

CD

WP

/EC

NE

C(D

ate

so

fA

pp

roval

&C

om

ple

tio

n)

Esti

mate

d

Co

st

Allo

cati

on

for

2007-0

8

An

nu

al

Work

Pla

n2007-0

8

Rec

onst

ruct

ion

Agen

cy:

W&

S(P

ER

RA

)

Dis

tric

tR

econst

ruct

ion

Unit

:A

bbott

abad

Sec

tor:

Educa

tion

292

GG

PS

Har

lan

NA

RA

Un

Appro

ved

0.4

70

0.0

00

0.2

35

Tota

l347.2

64

0.0

00

173.6

32

Tota

l(N

ew)

532.9

44

0.0

00

266.4

72

G-T

ota

l(O

ng

oin

g+

New

)1,7

73.5

33

99.2

28

947.1

06

45

Secto

r:In

du

str

ies

Dis

tric

tR

econstr

uction

Unit:

Ab

bo

tta

ba

d

Reconstr

uction

Agency:

NW

FP

Ind

ustr

yD

ep

art

me

nt

Tota

lF

ore

ign

Aid

(FE

C)

Rupee

Fore

ign

Exch

ange

Tota

l

12

34

56

78

9

1G

PG

CC

jha

ng

i A.A

ba

dJh

an

gi

DR

AC

7th

Me

etin

g

23

No

v,2

00

61

0.0

2_

_5

.01

0_

5.0

10

2G

CT

A.A

ba

dA

bb

ott

ba

dd

o1

0.0

0_

_5

.00

0_

5.0

00

3D

istt

.T

ran

sp

ort

Au

tho

rity

Offic

eC

ity

Ab

bo

tta

ba

dd

o1

0.0

6_

_5

.03

0_

5.0

30

4G

TV

C(W

)S

he

ikh

ulb

an

di

A.A

ba

d

Sh

eik

hu

lba

nd

id

o4

5.0

0_

_2

2.5

00

_2

2.5

00

5G

TV

C(B

)N

aw

an

sh

eh

r

A.A

ba

d

Na

wa

sh

eh

rd

o2

.00

__

1.0

00

_1

.00

0

To

tal

77

.08

03

8.5

40

38

.54

0

AN

NU

AL

WO

RK

PL

AN

20

07

-08

Est

imat

ed

Expen

dit

ure

Up

to

June,

2007,T

ota

l(F

-

Aid

)

All

oca

tion

for

2007-0

8

A)

On

goin

g

Loca

tion

S#

i.N

ame

of

the

pro

ject

ii.

Loca

tion

Appro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

D

CD

WP

/EC

NE

C

(Dat

esof

appro

val

&co

mple

tion)

Est

imat

edC

ost

46

WA

TS

AN

Ab

bo

ttab

ad

Lo

cal

Fo

reig

n

Aid

Ru

pees

Fo

reig

nTo

tal

A

PH

ED

EP

AR

TM

EN

T

1W

SS

Mangal

Appro

ved

by

DR

AC

on

29/0

9/2

006.

Banda

Pir

Khan

1.7

00

0.6

80

1.0

20

0.0

00

1.0

20

2W

SS

BandiD

hundan

do

do

6.5

00

2.6

00

3.9

00

0.0

00

3.9

00

3W

SS

Tanan

do

do

0.4

00

0.1

60

0.2

40

0.0

00

0.2

40

4W

SS

Mandro

ach

&S

maser

do

do

0.9

00

0.3

60

0.5

40

0.0

00

0.5

40

5W

SS

Kalu

DiB

andi

do

do

4.0

00

1.6

00

2.4

00

0.0

00

2.4

00

6W

SS

Tarn

aw

ai

do

do

3.0

00

1.2

00

1.8

00

0.0

00

1.8

00

7W

SS

Bagh

do

Bagh

3.0

00

1.2

00

1.8

00

0.0

00

1.8

00

8W

SS

Bagnota

rG

ala

ga

do

Bagnota

r2.5

00

1.0

00

1.5

00

0.0

00

1.5

00

9W

SS

Khan

Khurd

do

Beero

t2.5

00

1.0

00

1.5

00

0.0

00

1.5

00

10

WS

SB

eero

tK

ala

ndo

do

2.0

00

0.8

00

1.2

00

0.0

00

1.2

00

11

WS

SLahoor

Mohra

do

do

3.0

00

1.2

00

1.8

00

0.0

00

1.8

00

12

WS

SH

ari

Kheta

rdo

Dew

alM

anal

8.5

00

3.4

00

5.1

00

0.0

00

5.1

00

13

WS

SN

agri

TarliD

ew

al

do

do

1.5

00

0.6

00

0.9

00

0.0

00

0.9

00

14

WS

SB

anda

Said

Khan

do

Garh

iP

hulg

ran

4.1

00

1.6

40

2.4

60

0.0

00

2.4

60

15

.W

SS

Saja

walK

okari

do

do

1.8

90

0.7

56

1.1

34

0.0

00

1.1

34

16

Wss

Rajo

iado

do

0.7

00

0.2

80

0.4

20

0.0

00

0.4

20

17

WS

SD

era

wand

do

Jhangi

7.7

00

3.0

80

4.6

20

0.0

00

4.6

20

18

WS

SLam

ma

Maira

Banda

jala

lK

han

do

do

4.5

00

1.8

00

2.7

00

0.0

00

2.7

00

19

WS

SD

obata

rB

anda

Am

lok

do

do

4.9

50

1.9

80

2.9

70

0.0

00

2.9

70

20

WS

SB

anda

Phugw

arian

do

do

4.0

00

1.6

00

2.4

00

0.0

00

2.4

00

21

WS

SLam

ba

Banda

do

do

3.2

50

1.3

00

1.9

50

0.0

00

1.9

50

22

WS

SB

anda

Khair

Ali

Khan

do

do

0.6

00

0.2

40

0.3

60

0.0

00

0.3

60

23

WS

SJhangi

do

do

2.5

00

1.0

00

1.5

00

0.0

00

1.5

00

24

WS

Sbanda

Ghazan

do

do

3.5

00

1.4

00

2.1

00

0.0

00

2.1

00

25

WS

SJhangra

Kashka

do

Jhangra

3.4

00

1.3

60

2.0

40

0.0

00

2.0

40

26

WS

SH

avelian

Vill.

do

do

1.0

00

0.4

00

0.6

00

0.0

00

0.6

00

27

WS

SD

anna

do

Kuth

wal

5.0

00

2.0

00

3.0

00

0.0

00

3.0

00

28

WS

SM

aira

Rehm

atK

han

do

do

2.5

00

1.0

00

1.5

00

0.0

00

1.5

00

29

WS

SC

hattri

do

do

1.6

00

0.6

40

0.9

60

0.0

00

0.9

60

30

WS

SLangrial

do

Langrial

1.3

00

0.5

20

0.7

80

0.0

00

0.7

80

31

WS

SLassan

do

do

0.7

00

0.2

80

0.4

20

0.0

00

0.4

20

32

WS

SS

am

wala

do

Maju

han

0.6

00

0.2

40

0.3

60

0.0

00

0.3

60

33

WS

SIs

lam

kot

do

Mirpur

4.4

00

1.7

60

2.6

40

0.0

00

2.6

40

34

WS

SM

ian

DiS

eri

Pin

es

Kliff

do

do

4.1

00

1.6

40

2.4

60

0.0

00

2.4

60

35

WS

SM

irpur

do

do

3.5

00

1.4

00

2.1

00

0.0

00

2.1

00

36

WS

SN

am

mal

do

Nam

mal/M

aju

han

2.2

00

0.8

80

1.3

20

0.0

00

1.3

20

37

WS

SM

aju

han

do

do

2.5

00

1.0

00

1.5

00

0.0

00

1.5

00

38

WS

SK

urli

do

do

1.2

00

0.4

80

0.7

20

0.0

00

0.7

20

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

D

CD

WP

/EC

NE

C

(Date

sofappro

val

&com

ple

tion)

Un

ion

Co

un

cil

Esti

mate

d

Exp

en

dit

ure

up

to

Ju

ne

2007

(R

s.In

Millio

n)

On

-Go

ing

Pro

jects

AN

NW

AL

WO

RK

PL

AN

2007-0

8

Dis

tric

tR

eco

nstr

ucti

on

Un

it:

Secto

r:

Esti

mate

dC

ost

(Rs.In

Millio

n)

Allo

cati

on

for

2007-0

8(

Rs.In

Millio

n)

S#

Nam

eo

fS

ch

em

es

47

WA

TS

AN

Ab

bo

ttab

ad

Lo

cal

Fo

reig

n

Aid

Ru

pees

Fo

reig

nTo

tal

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

D

CD

WP

/EC

NE

C

(Date

sofappro

val

&com

ple

tion)

Un

ion

Co

un

cil

Esti

mate

d

Exp

en

dit

ure

up

to

Ju

ne

2007

(R

s.In

Millio

n)

AN

NW

AL

WO

RK

PL

AN

20

07

-08

Dis

tric

tR

eco

nstr

ucti

on

Un

it:

Secto

r:

Esti

mate

dC

ost

(Rs.In

Millio

n)

Allo

cati

on

for

2007-0

8(

Rs.In

Millio

n)

S#

Nam

eo

fS

ch

em

es

39

WS

SP

halk

otD

hakkiK

heta

rS

iana

do

Nam

liM

aira

3.0

00

1.2

00

1.8

00

0.0

00

1.8

00

40

WS

SN

am

liM

aira

do

do

3.0

00

1.2

00

1.8

00

0.0

00

1.8

00

41

WS

SP

ando

Thana

do

Paw

a4.3

00

1.7

20

2.5

80

0.0

00

2.5

80

42

WS

SG

ram

rido

do

1.1

00

0.4

40

0.6

60

0.0

00

0.6

60

43

WS

SG

andia

nP

hullan

DiB

andi

do

do

0.7

00

0.2

80

0.4

20

0.0

00

0.4

20

44

WS

SC

hattri

do

do

0.7

00

0.2

80

0.4

20

0.0

00

0.4

20

45

WS

SS

andoo

Galli

do

Pin

dkarg

oK

han

4.0

00

1.6

00

2.4

00

0.0

00

2.4

00

46

WS

SK

handa

Khoo

do

do

1.5

00

0.6

00

0.9

00

0.0

00

0.9

00

47

WS

SS

alh

ad

do

Salh

ad

4.0

00

1.6

00

2.4

00

0.0

00

2.4

00

48

WS

SS

arb

ana

do

Sarb

ana

2.0

00

0.8

00

1.2

00

0.0

00

1.2

00

49

WS

SB

anda

Dilazak

do

Sheik

hulB

andi

5.0

00

2.0

00

3.0

00

0.0

00

3.0

00

50

WS

SS

heik

hulB

andi

do

do

5.0

00

2.0

00

3.0

00

0.0

00

3.0

00

51

WS

STajw

al

do

Tajw

al

4.0

00

1.6

00

2.4

00

0.0

00

2.4

00

52

WS

ST

upla

do

do

2.0

00

0.8

00

1.2

00

0.0

00

1.2

00

53

WS

SK

ari

Asfa

fali

do

do

2.5

00

1.0

00

1.5

00

0.0

00

1.5

00

54

WS

SP

halw

ali

KaseelS

ei

do

BandiA

ttaiK

han

0.7

00

0.2

80

0.4

20

0.0

00

0.4

20

55

WS

SB

andiA

ttaiK

han

do

do

3.3

50

1.3

40

2.0

10

0.0

00

2.0

10

56

WS

SD

am

tor

do

Dam

tor

2.3

00

0.9

20

1.3

80

0.0

00

1.3

80

57

WS

SD

ota

rdo

do

1.6

50

0.6

60

0.9

90

0.0

00

0.9

90

58

WS

ST

ian

Leera

ndo

Gore

eni

2.5

00

1.0

00

1.5

00

0.0

00

1.5

00

59

WS

SK

hutiala

do

Khutiala

0.6

00

0.2

40

0.3

60

0.0

00

0.3

60

60

WS

SM

ubark

ado

do

1.0

00

0.4

00

0.6

00

0.0

00

0.6

00

61

WS

SLora

do

Lora

2.8

00

1.1

20

1.6

80

0.0

00

1.6

80

62

WS

Skassala

do

Nagri

Bala

2.0

00

0.8

00

1.2

00

0.0

00

1.2

00

63

WS

SD

anna

Kaghia

ndo

do

1.5

00

0.6

00

0.9

00

0.0

00

0.9

00

64

WS

SP

assala

Kundla

do

Nath

iagali

1.5

00

0.6

00

0.9

00

0.0

00

0.9

00

65

WS

SK

undla

Toheed

Abad

do

do

0.5

00

0.2

00

0.3

00

0.0

00

0.3

00

66

WS

SK

hushiK

ot

do

Plu

ck

2.0

00

0.8

00

1.2

00

0.0

00

1.2

00

67

WS

SS

urjal

do

do

1.4

00

0.5

60

0.8

40

0.0

00

0.8

40

68

WS

SK

hanis

pur

Ria

lado

do

1.5

00

0.6

00

0.9

00

0.0

00

0.9

00

69

WS

Sm

alk

otU

pper

&Low

er

do

do

4.0

00

1.6

00

2.4

00

0.0

00

2.4

00

70

WS

SN

ara

Ghora

do

Nara

3.0

00

1.2

00

1.8

00

0.0

00

1.8

00

71

WS

SC

ham

matti

do

Sherw

an

1.5

00

0.6

00

0.9

00

0.0

00

0.9

00

72

WS

SS

herw

an

do

do

3.6

00

1.4

40

2.1

60

0.0

00

2.1

60

To

tal

19

1.3

90

76

.55

611

4.8

34

0.0

00

11

4.8

34

1

Reh

ab

ilit

ati

on

of

Dri

nk

ing

Wate

rS

up

ply

Sch

em

eA

bb

ott

ab

ad

Cit

y

Appro

ved

by

DR

AC

on

23/1

1/2

006.

Mali

kp

ura

,C

en

tral

Urb

an

an

dK

eh

al

Urb

an

9.5

50

9.5

50

__

_

TM

AA

BB

OT

TA

BA

D(W

SS

)

48

WA

TS

AN

Ab

bo

ttab

ad

Lo

cal

Fo

reig

n

Aid

Ru

pees

Fo

reig

nTo

tal

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

D

CD

WP

/EC

NE

C

(Date

sofappro

val

&com

ple

tion)

Un

ion

Co

un

cil

Esti

mate

d

Exp

en

dit

ure

up

to

Ju

ne

2007

(R

s.In

Millio

n)

AN

NW

AL

WO

RK

PL

AN

2007-0

8

Dis

tric

tR

eco

nstr

ucti

on

Un

it:

Secto

r:

Esti

mate

dC

ost

(Rs.In

Millio

n)

Allo

cati

on

for

2007-0

8(

Rs.In

Millio

n)

S#

Nam

eo

fS

ch

em

es

2

Reh

ab

ilit

ati

on

of

Dri

nk

ing

Wate

rS

up

ply

sch

em

eN

aw

an

sheh

r(u

rban

)do

Naw

an

sher

Urb

an

7.8

40

7.8

40

__

_

3

H/P

um

pB

ag

hL

arr

iV

illa

ge

Mals

aU

/C

Ph

alk

ot

do

Phalk

ote

0.1

00

0.1

00

__

_

4H

/Pu

mp

Bati

an

gi

vil

lag

eM

als

aU

/CP

halk

ot

do

do

0.1

00

0.1

00

__

_

5P

um

pS

orr

aV

illa

ge

Mals

aU

/CP

halk

ot

do

do

0.1

00

0.1

00

__

_

6

Pu

mp

Vil

lag

eD

ho

nag

aL

ow

eK

uh

nU

/C

Sarb

han

ado

Sarb

hana

0.1

00

0.1

00

__

_

7P

um

pV

illa

ge

Seer g

ah

CS

arb

han

ado

do

0.1

00

0.1

00

__

_

8H

an

dP

um

pU

pp

er

Kh

un

CS

arb

han

ado

do

0.1

00

0.1

00

__

_

9M

oh

all

ah

Bu

nk

ot

U/C

Sarb

han

ado

do

0.1

00

0.1

00

__

_

10

Mo

hall

ah

Dari

aU

/CS

arb

han

ado

do

0.1

00

0.1

00

__

_

11

Mo

hall

ah

Su

nw

all

aU

/CS

arb

han

ado

do

0.1

00

0.1

00

__

_

12

Wate

rT

an

kV

illa

ge

do

do

0.1

00

0.1

00

__

_

13

Mo

hall

ah

To

ot

Bag

laU

/CS

arb

han

ado

do

0.1

00

0.1

00

__

_

To

tal

18

.49

01

8.4

90

__

_

TM

AA

BB

OT

TA

BA

D(S

AN

IT

AT

IO

N))

1P

av

em

en

to

fM

ian

Ro

ad

Mo

hall

ah

Mair

ado

Sarb

han

a0

.15

00

.15

0_

__

2P

ay

men

to

fS

treet

Zia

ratK

ao

toG

GP

SD

isal

do

do

0.5

00

0.5

00

__

_

3

Pav

em

en

to

fS

treet

Sh

op

of

Dan

ish

toH

/O

Qu

ain

din

do

do

0.4

50

0.4

50

__

_

4

Pav

em

en

to

fS

treet

fro

mH

/OM

ian

Dad

to

Mo

lviA

ziz

Ur

Reh

man

Ho

use

Mo

hall

ah

Ban

ko

tdo

do

0.4

50

0.4

50

__

_

5

Pav

em

en

to

fR

oad

Mo

har

Kh

urd

toP

itch

Dh

ok

aV

illa

ge

Mo

har

Kh

urd

do

do

2.3

20

2.3

20

__

_

6P

av

em

en

to

fS

treet

GP

Sto

Masj

idS

eer g

ado

do

0.4

45

0.4

45

__

_

To

tal

4.3

15

4.3

15

__

_

1B

/Io

fH

an

dP

um

pZ

iara

tS

aji

ko

tdo

Dew

alM

anal

0.1

00

0.1

00

__

_

2B

/Io

fH

an

dp

um

pM

oh

ala

Bata

ng

aS

aji

ko

tdo

do

0.1

00

0.1

00

__

_

3B

/Io

fH

an

dp

um

ps

Mo

hall

aM

oh

ari

Bu

db

hen

do

do

0.1

00

0.1

00

__

_

4R

ep

air

of

Tu

be

Well

No

.2

do

Hvelian

0.1

68

0.1

68

__

_

TM

AH

AV

EL

IA

N(W

SS

)

49

WA

TS

AN

Ab

bo

tta

ba

d

Lo

cal

Fo

reig

n

Aid

Ru

pees

Fo

reig

nTo

tal

Ap

pro

ve

db

y

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

D

CD

WP

/EC

NE

C

(Da

tes

of

ap

pro

va

l

&co

mp

letio

n)

Un

ion

Co

un

cil

Es

tim

ate

d

Ex

pe

nd

itu

reu

pto

Ju

ne

20

07

(R

s.

InM

illi

on

)

AN

NW

AL

WO

RK

PL

AN

2007-0

8

Dis

tric

tR

ec

on

str

uc

tio

nU

nit

:

Se

cto

r:

Es

tim

ate

dC

os

t

(Rs

.In

Mil

lio

n)

All

oc

ati

on

for

20

07

-08

(R

s.

In

Mil

lio

n)

S#

Na

me

of

Sc

he

me

s

5B

/Io

f5

no

sH

and

Pu

mp

Mad

ian

Lo

rado

Lora

0.5

00

0.5

00

__

_

6B

/Io

f5

No

s.H

and

Pu

mp

sV

illa

ge

Gh

ari

do

do

0.5

00

0.5

00

__

_

7B

/Io

f1

0N

os.

Han

dP

um

ps

inV

illa

ge

Ban

ani

do

Nagri

tutial

1.0

00

1.0

00

__

_

8B

/Io

fH

and

Pu

mp

Dh

eri

Kal

and

ado

Nara

0.1

00

0.1

00

__

_

9B

/Io

f5

No

s.H

and

Pu

mp

sin

Bas

wai

rdo

Seer

Gharb

i0

.50

00

.50

0_

__

10

B/I

of

5N

os.

Han

dP

um

ps

inV

illa

ge

Dan

na

Blo

chdo

do

0.5

00

0.5

00

__

_

11

B/I

of

5N

os.

Han

dP

um

ps

inV

illa

ge

Mal

mo

lado

do

0.5

00

0.5

00

__

_

12

WS

SL

ow

erB

hat

tin

do

Seer

Sharq

i0

.50

00

.50

0_

__

13

WS

ST

hat

hi

Bat

tian

do

do

1.0

00

1.0

00

__

_

5.5

68

5.5

68

__

_

B

1

Reconstr

uction/R

epair

ofof fic

e

/Re

sid

en

tia

lB

uild

ing

so

fP

HE

De

pt.

Appro

ved

by

DR

AC

on

23/1

1/2

006

Abbottabad

2.1

64

2.1

64

2.1

64

2

Repair

ofB

uild

ings

TM

AH

avalia

nU

C

Havalia

ndo

Havelia

n1.8

91.8

90

1.8

90

Su

bTo

tal

4.0

54

4.0

54

4.0

54

on

go

ing

219.7

63

0.0

00

104.9

29

114.8

34

0.0

00

114.8

34

Gra

nd

To

tal

22

3.8

17

0.0

00

10

4.9

29

11

8.8

88

0.0

00

11

8.8

88

NE

WA

PP

RO

VE

DP

RO

JE

CT

S

Tota

l

50

Roads

Abbott

abad

W&

SD

eptt

:(P

ER

RA

)Abbott

abad

To

tal

Fo

reig

n

Aid

(FE

C)

Ru

pee

Fo

reig

n

Ex

ch

an

ge

To

tal

12

34

56

78

9

1T

akia

Sheik

han

Cher

Road(

U/C

G.P

hulg

ran

&D

ew

al

Menal)

5th

DR

AC

7-0

8-2

006

32.2

39

13.2

60

14.1

33

18.1

06

-18.1

06

2B

agnota

rN

am

liM

air

aR

oad.(

U/C

Nam

liM

air

a)

9th

DR

AC

27-0

1-2

007

34.6

82

18.0

00

13.8

73

20.8

09

-20.8

09

3N

ath

iaG

ali

Bakot

Road.(

U/C

Bakot

)5th

DR

AC

7-0

8-2

006

21.3

00

13.0

00

8.5

20

12.7

80

-12.7

80

4K

ohala

Mooli

aN

am

al

Road.(

U/C

Nam

al

)9th

DR

AC

27-0

1-2

007

31.5

64

21.0

00

12.6

25

18.9

39

-18.9

39

5L

um

ba

Mair

aJh

angi

Road.u/c

(Jh

angi

)10th

DR

AC

26-0

3-2

007

6.2

37

3.5

00

3.7

37

2.5

00

-2.5

00

6M

irpur

Mair

aR

oad

wit

hli

nk

toH

abib

ull

ah

Colo

ny.u

/c(

Mir

pur

)

5th

DR

AC

7-0

8-2

006

6.5

00

3.0

00

2.0

00

4.5

00

-4.5

00

7D

alo

laH

adora

Bandi

Road.u

/c(

Dalo

la)

10th

DR

AC

26-0

3-2

007

11.5

88

5.6

00

4.0

88

7.5

00

-7.5

00

8P

hull

ian-W

ali

-Kanyal

Road

(u/c

Banda

Ata

iK

han)

10th

DR

AC

26-0

3-2

007

38.1

38

38.1

38

11.5

38

26.6

00

-26.6

00

9A

bbott

abd

Sherw

an

Road.(

U/C

Sherw

an

–K

huti

ala

)

(M

irpur

)

9th

DR

AC

27-0

1-2

007

100.0

00

20.0

00

30.0

00

70.0

00

-70.0

00

10

Kote

raS

alo

lB

andi

Road.(

u/c

Patt

an

Kala

n)

9th

DR

AC

27-0

1-2

007

4.0

00

2.5

00

1.2

00

2.8

00

-2.8

00

11

Thandia

ni

Khokri

ala

Dara

irR

oad.(

Patt

an

Kala

n)

9th

DR

AC

27-0

1-2

007

13.0

00

10.5

00

3.9

00

9.1

00

-9.1

00

12

Tre

ch

Nakhait

er

Lan

glo

ot

Road.(

u/c

Nam

mal

)9th

DR

AC

27-0

1-2

007

2.0

00

2.0

00

0.6

00

1.4

00

-1.4

00

13

Kh

an

isp

ur

Ria

laR

oad

.(P

luck

)9th

DR

AC

27-0

1-2

007

5.0

00

5.0

00

2.0

00

3.0

00

-3.0

00

14

Hath

rari

Road.(

u/c

Bero

te)

9th

DR

AC

27-0

1-2

007

3.0

00

3.0

00

0.9

00

2.1

00

-2.1

00

15

Zia

rat

Maso

om

Nagri

Toti

al

Road.(

u/c

Seer

Gharb

i)

9th

DR

AC

27-0

1-2

007

3.0

00

3.0

00

0.9

00

2.1

00

-2.1

00

16

Lin

kR

oad

Sanja

.(

u/c

Kokm

ang

)9th

DR

AC

27-0

1-2

007

2.0

00

1.0

00

0.6

00

1.4

00

-1.4

00

17

Barr

ian

Kalk

ot

Gore

eni

Road.(

u/c

Gore

eni

)9th

DR

AC

27-0

1-2

007

1.0

00

1.0

00

0.3

00

0.7

00

-0.7

00

18

Thall

aN

am

al

Road.(

u/c

Nam

mal

)9th

DR

AC

27-0

1-2

007

1.5

00

1.5

00

0.4

50

1.0

50

-1.0

50

19

Maju

teB

eri

Bagla

Road.(

u/c

Nam

mal

)9th

DR

AC

27-0

1-2

007

2.5

00

2.5

00

0.7

50

1.7

50

-1.7

50

20

Payeen

Tarh

att

iR

oad.(

u/c

Nam

mal

)9th

DR

AC

27-0

1-2

007

1.5

00

1.5

00

0.4

50

1.0

50

-1.0

50

21

Tre

ch

Majo

han

Road.(

u/c

Majo

han

)9th

DR

AC

27-0

1-2

007

2.0

00

2.0

00

0.6

00

1.4

00

-1.4

00

22

Bandi

Leera

nR

oad

(u/c

Nam

mal

).9th

DR

AC

27-0

1-2

007

2.0

00

2.0

00

0.6

00

1.4

00

-1.4

00

AN

NU

AL

WO

RK

PL

AN

2007-0

8S

ecto

r:

Dis

tric

tR

eco

nst

ructi

on

Un

it:

S#

i.N

am

eo

fth

ep

roje

ct

ii.

Lo

cati

on

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

DC

DW

P/E

CN

EC

(Date

so

fap

pro

val

&co

mp

leti

on

)

Reco

nst

ructi

on

Ag

en

cy

:

i)C

AT

EG

OR

Y-I

(AD

BF

un

ded

)

A.

On

-Go

ing

Pro

jects

All

ocati

on

for

20

07

-08

Est

imate

dC

ost

Est

imate

d

Ex

pen

dit

ure

Up

toJu

ne,

20

07

,

To

tal(

F-A

id)

51

Roads

Abbott

abad

W&

SD

eptt

:(P

ER

RA

)Abbott

abad

To

tal

Fo

reig

n

Aid

(FE

C)

Ru

pee

Fo

reig

n

Ex

ch

an

ge

To

tal

12

34

56

78

9

AN

NU

AL

WO

RK

PL

AN

2007-0

8S

ecto

r:

Dis

tric

tR

eco

nst

ructi

on

Un

it:

S#

i.N

am

eo

fth

ep

roje

ct

ii.

Lo

cati

on

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

DC

DW

P/E

CN

EC

(Date

so

fap

pro

val

&co

mp

leti

on

)

Reco

nst

ructi

on

Ag

en

cy

:A

llo

cati

on

for

20

07

-08

Est

imate

dC

ost

Est

imate

d

Ex

pen

dit

ure

Up

toJu

ne,

20

07

,

To

tal(

F-A

id)

23

Thandia

ni

Patt

an

Khurd

Road.(

u/c

Patt

an

Kala

n-

Khurd

)

10th

DR

AC

26-0

3-2

007

79.8

00

56.0

00

27.9

48

51.8

52

-51.8

52

24

Mandia

nB

anda

Ali

Khan

Road.

10th

DR

AC

26-0

3-2

007

4.4

27

4.4

27

2.4

27

2.0

00

-2.0

00

25

Abbott

abad

Thandia

ni

Road

(u/c

Khutw

al

)10th

DR

AC

26-0

3-2

007

12.0

47

12.0

47

3.5

00

8.5

47

-8.5

47

26

Boi

Chack

Road

i/c

Lin

kH

adora

Bogra

n(

u/c

Boi

10th

DR

AC

26-0

3-2

007

12.0

00

12.0

00

3.6

00

8.4

00

-8.4

00

433.0

22

257.4

72

151.2

39

281.7

83

0.0

00

281.7

83

27

Saw

ar

Gali

Lahoor

Road

(U/C

Plu

ck

)5th

DR

AC

7-0

8-2

006

85.0

00

85.0

00

25.5

00

59.5

00

-59.5

00

28

Mair

aR

ehm

at

Kanth

iali

Boi

Road

(K

uth

wal

&10th

DR

AC

26-0

3-0

7135.0

00

117.0

00

20.2

50

114.7

50

-114.7

50

29

Dalo

laD

aban

Road.(

U/C

Dalo

la)

10th

DR

AC

26-0

3-0

722.5

00

18.0

00

3.7

75

18.7

25

-18.7

25

30

Boi

Sath

al

Road.(

U/C

Boi

)10th

DR

AC

26-0

3-0

723.0

00

23.0

00

3.4

50

19.5

50

-19.5

50

31

Lora

Saw

ar g

ali

Road.(

U/C

Nagri

Toti

al/

Lora

)10th

DR

AC

26-0

3-0

785.0

00

52.0

00

12.7

50

72.2

50

-72.2

50

32

Bakot

Sungre

riR

oad(

U/C

Bero

te).

10th

DR

AC

26-0

3-0

712.0

00

12.0

00

1.8

00

10.2

00

-10.2

00

33

Nam

liG

ali

Khan

Kala

nR

oad.(U

/CB

akot

)10th

DR

AC

26-0

3-0

729.0

00

29.0

00

4.3

50

24.6

50

-24.6

50

34

Haro

Sum

ma

Gara

ka

Road.(U

/CG

ore

eni)

10th

DR

AC

26-0

3-0

76.0

00

6.0

00

0.9

00

5.1

00

-5.1

00

35

Batn

ara

Lin

kR

oad.(

U/C

Seer

Sharq

i)10th

DR

AC

26-0

3-0

76.0

00

6.0

00

0.9

00

5.1

00

-5.1

00

36

Cher

Sajj

angali

Kala

bagh

Road.(

U/C

Dew

al

Menal/

Nagri

Bala

)

10th

DR

AC

26-0

3-0

788.0

00

88.0

00

13.2

00

74.8

00

-74.8

00

37

Saji

kot

Sato

raJa

bri

Road.(

U/C

Nara

)10th

DR

AC

26-0

3-0

797.0

00

97.0

00

14.5

50

82.4

50

-82.4

50

38

Bara

Gali

Kasa

laC

her

Road.(U

/CN

agri

Bala

)10th

DR

AC

26-0

3-0

737.0

00

37.0

00

5.5

50

31.4

50

-31.4

50

39

Karl

an

Seri

Road

(Old

Bagnota

rR

oad)

(U/C

Bagnota

r)

10th

DR

AC

26-0

3-0

77.5

00

7.5

00

1.1

25

6.3

75

-6.3

75

40

Sarb

ana

Beera

ngali

Road.(

U/C

Sarb

ana

&B

eera

ngali

10th

DR

AC

26-0

3-0

751.6

70

31.0

00

7.7

51

43.9

19

-43.9

19

41

Bara

Hota

rM

als

aR

oad.(

U/C

Sarb

ana

Beera

ngali

)10th

DR

AC

26-0

3-0

725.0

00

25.0

00

3.7

50

21.2

50

-21.2

50

42

Bara

Gali

Sum

mander

Kath

aR

oad.(

U/C

Nagri

Bala

)10th

DR

AC

26-0

3-0

715.0

00

15.0

00

2.2

50

12.7

50

-12.7

50

43

Karl

an

Bagh

Road.(

U/C

Bagnota

r/B

agh

)10th

DR

AC

26-0

3-0

727.5

00

27.5

00

4.1

25

23.3

75

-23.3

75

44

Kuth

iala

Ric

hbehn

Road.(

U/c

Kuth

iala

)10th

DR

AC

26-0

3-0

733.6

00

33.6

00

16.8

00

16.8

00

-16.8

00

SU

BT

OT

AL

(i)

ii)

CA

TE

GO

RY

-II

(AD

BF

UN

DE

D)

52

Roads

Abbott

abad

W&

SD

eptt

:(P

ER

RA

)Abbott

abad

To

tal

Fo

reig

n

Aid

(FE

C)

Ru

pee

Fo

reig

n

Ex

ch

an

ge

To

tal

12

34

56

78

9

AN

NU

AL

WO

RK

PL

AN

20

07

-08

Secto

r:

Dis

tric

tR

econst

ructi

on

Unit

:

S#

i.N

am

eo

fth

ep

roje

ct

ii.

Lo

cati

on

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

DC

DW

P/E

CN

EC

(Date

so

fap

pro

val

&co

mp

leti

on

)

Reconst

ructi

on

Agency:

All

ocati

on

for

20

07

-08

Est

imate

dC

ost

Est

imate

d

Ex

pen

dit

ure

Up

toJu

ne,

20

07

,

To

tal(

F-A

id)

45

Qala

ndar

Abad

Tarn

aw

ai

Road

Khan)(

U/C

Banda

Pir

Kh

an

10th

DR

AC

26-0

3-0

720.5

60

20.5

60

3.0

84

17.4

76

-17.4

76

46

Kan

thia

lito

Marh

ais

wit

hin

kto

Ch

otr

i.(U

/CK

uk

man

g)

10

thD

RA

C2

6-0

3-0

715.0

00

15.0

00

2.2

50

12.7

50

-12.7

50

47

Banda

Ali

Khan

Kara

kM

air

aup

toM

air

aM

uzaff

er

link

Road.

10th

DR

AC

26-0

3-0

710.2

80

6.0

00

1.5

42

8.7

38

-8.7

38

48

Dharn

an

Ghora

Bazgra

nR

oad.

10th

DR

AC

26-0

3-0

712.0

00

12.0

00

1.8

00

10.2

00

-10.2

00

49

Havell

ian

Panjg

rian

Sare

ela

Road.(

U/C

Jhangra

)10th

DR

AC

26-0

3-0

715.0

00

15.0

00

2.2

50

12.7

50

-12.7

50

50

Soban

Gali

Banjg

ali

(U/C

Cham

mad

)10th

DR

AC

26-0

3-0

76.0

00

6.0

00

0.9

00

5.1

00

-5.1

00

Su

bT

ota

l(i

i)864.6

10

784.1

60

154.6

02

710.0

08

0.0

00

710.0

08

51

Sera

iN

aim

at

Khan

Road

(U

/CH

avell

ian

Ueban

)-

8.0

00

-2.4

00

5.6

00

-5.6

00

52

Dhobia

nB

ars

een

Road.(

U/C

Cham

had

))

-3.0

00

0.9

00

2.1

00

-2.1

00

53

Takia

Kholo

raP

indgali

Beer

Road

wit

hli

nk

toB

andi

Nik

raR

oad.

-10.0

00

3.0

00

7.0

00

-7.0

00

54

Sobangali

-Banasr

iw

ith

link

toK

ass

aki.

(U

/CC

ham

had

)-

10.0

00

-3.0

00

7.0

00

-7.0

00

55

Harn

oS

arb

ana

Road.(

U/C

Sarb

ana

)-

15.0

00

-4.5

00

10.5

00

-10.5

00

56

Gahia

Kutl

iR

oad.(

U/C

Nam

liM

air

a)

-4.0

00

-1.2

00

2.8

00

-2.8

00

57

Narr

ian

Aziz

Bang

i/c

wit

hli

nk

toM

air

aA

ziz

Bang.(

U/C

Sarb

ana

)

-3.0

00

-0.9

00

2.1

00

-2.1

00

58

Beera

ngali

toB

anjg

ali

(U

/CB

eera

ngali

)-

1.5

00

-0.4

50

1.0

50

-1.0

50

59

Mals

aJa

ndar

Bari

Road.(

U/C

Phalk

ot

)-

4.0

00

-1.2

00

2.8

00

-2.8

00

60

Harr

ian

toD

akh

Doga

Road.

-6.0

00

-1.8

00

4.2

00

-4.2

00

61

Kundla

Pasa

laR

oad.

(U

/CN

ath

iagali

)-

3.0

00

-0.9

00

2.1

00

-2.1

00

62

Cher

Hil

lK

arm

ati

Road.(

U/C

Dew

al

Menal

010th

DR

AC

27-0

3-2

007

12.0

00

-3.6

00

8.4

00

-8.4

00

63

Mohri

Badbhen

Chando

Mair

aR

oad.(

U/C

Nara

)10th

DR

AC

27-0

3-2

007

6.0

00

-1.8

00

4.2

00

-4.2

00

64

Bata

nhja

toK

aso

ori

an

Road.(

U/C

Nara

)-

3.0

00

-0.9

00

2.1

00

-2.1

00

65

Nelo

tha

toB

ata

laR

oad.(

U/C

Gari

Phulg

ran)

10th

DR

AC

27-0

3-2

007

3.0

00

-0.9

00

2.1

00

-2.1

00

66

Hir

lan

toK

anger

Hota

rR

oad.(

U/C

Nara

)10th

DR

AC

27-0

3-2

007

3.0

00

-0.9

00

2.1

00

-2.1

00

iii.

CA

TE

GO

RY

-I(E

RR

AF

UN

DE

D)

53

Roads

Abbott

abad

W&

SD

eptt

:(P

ER

RA

)Abbott

abad

To

tal

Fo

reig

n

Aid

(FE

C)

Ru

pee

Fo

reig

n

Ex

ch

an

ge

To

tal

12

34

56

78

9

AN

NU

AL

WO

RK

PL

AN

20

07

-08

Secto

r:

Dis

tric

tR

econst

ructi

on

Unit

:

S#

i.N

am

eo

fth

ep

roje

ct

ii.

Lo

cati

on

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

DC

DW

P/E

CN

EC

(Date

so

fap

pro

val

&co

mp

leti

on

)

Reconst

ructi

on

Agency:

All

ocati

on

for

20

07

-08

Est

imate

dC

ost

Est

imate

d

Ex

pen

dit

ure

Up

toJu

ne,

20

07

,

To

tal(

F-A

id)

67

Saji

kot

Ghora

Road.(

U/C

Nara

)10th

DR

AC

27-0

3-2

007

21.0

00

-6.3

00

14.7

00

-14.7

00

68

Mair

aR

ehm

at

Khan

Road.U

/CK

uth

wal

-6.0

00

-1.8

00

4.2

00

-4.2

00

69

Mase

ena

Bata

ngi

Road.(

U/C

Patt

an

Kala

n)

-6.0

00

-1.8

00

4.2

00

-4.2

00

70

Nam

ligali

Khan

Kala

nA

liabad

i/c

link

Road

toM

ooli

a.(

U/C

Bakot/

Nam

mal)

-10.0

00

-3.0

00

7.0

00

-7.0

00

71

Lora

Malm

oola

Road.(

U/C

Lora

)-

5.0

00

-1.5

00

3.5

00

-3.5

00

72

Mair

aR

oom

al

Road.(

U/C

Seer

Sharq

i)

-4.0

00

-1.2

00

2.8

00

-2.8

00

73

Now

shera

Tupla

Road.(

U/C

Tajw

al

)-

10.0

00

-3.0

00

7.0

00

-7.0

00

74

Jals

iT

upla

Road.(

U/C

Tajw

al)

-5.0

00

-1.5

00

3.5

00

-3.5

00

75

Sajj

angali

Bagan

Road.(

U/C

Nath

iagali

)-

8.0

00

-2.4

00

5.6

00

-5.6

00

76

Tajw

al

toD

anna

Road.(

U/C

Tajw

al)

-4.0

00

-1.2

00

2.8

00

-2.8

00

77

Khoi

Daw

ata

Road.

-3.0

00

-0.9

00

2.1

00

-2.1

00

78

Salh

ad

Fore

stB

arr

ier

toK

ass

aaki

Kala

nvia

Shah

De

Gali

wit

hL

ink

toD

hobia

nS

ohala

n.

5th

DR

AC

7-0

8-2

006

60.0

00

-18.0

00

42.0

00

-42.0

00

79

Sheik

hubandi

link

Road..(

U/C

Sheik

hubandi

)10th

DR

AC

26-0

3-0

79.0

00

-2.0

00

7.0

00

-7.0

00

80

Mir

pur

Musa

zai

Road.(

U/C

Meer

Pur)

10th

DR

AC

26-0

3-0

72.5

00

-1.0

00

1.5

00

-1.5

00

81

Musa

-De-H

ati

toS

ham

er -

Da-T

arh

ana

via

Isla

mkot

Road.(

U/C

Meer

Pur

)

10th

DR

AC

26-0

3-0

720.0

00

-3.5

00

16.5

00

-16.5

00

82

Mair

aM

andro

ach

Dana

Road.(U

/CK

akul

)10th

DR

AC

26-0

3-0

730.0

00

-5.0

00

25.0

00

-25.0

00

83

Nari

an

link

Road.(

U/C

Sheik

hubandi

)10th

DR

AC

26-0

3-0

730.0

00

-5.0

00

25.0

00

-25.0

00

84

Dheri

Choona

Kari

Road.(

Naw

an

Sher

)10th

DR

AC

26-0

3-0

75.0

00

-2.5

00

2.5

00

-2.5

00

85

Thanda

Chow

aIl

lyasi

Road.(

U/C

Naw

an

Sher)

10th

DR

AC

26-0

3-0

72.5

00

-1.0

00

1.5

00

-1.5

00

-335.5

00

0.0

00

90.9

50

244.5

50

0.0

00

244.5

50

iv

86

Lass

an

Thakra

lto

Kanger

Payeen

via

Cham

ati

.(U

/C

Sherw

an)

10th

DR

AC

26-0

3-0

79.0

00

9.0

00

0.0

00

9.0

00

-9.0

00

87

Gham

beer

Rakhala

Road.(

U/C

Lora

)10th

DR

AC

26-0

3-0

74.5

00

4.5

00

0.0

00

4.5

00

-4.5

00

88

Dew

al

Manal

toN

ara

Chack

Hall

Road.(

U/C

Dew

al

Manal

)

10th

DR

AC

26-0

3-0

715.0

00

15.0

00

0.0

00

10.0

00

-10.0

00

Su

bT

ota

l(B

)

Germ

an

Deb

tS

wat

54

Roads

Abbott

abad

W&

SD

eptt

:(P

ER

RA

)Abbott

abad

To

tal

Fo

reig

n

Aid

(FE

C)

Ru

pee

Fo

reig

n

Ex

ch

an

ge

To

tal

12

34

56

78

9

AN

NU

AL

WO

RK

PL

AN

2007-0

8S

ecto

r:

Dis

tric

tR

eco

nst

ructi

on

Un

it:

S#

i.N

am

eo

fth

ep

roje

ct

ii.

Lo

cati

on

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

DC

DW

P/E

CN

EC

(Date

so

fap

pro

val

&co

mp

leti

on

)

Reco

nst

ructi

on

Ag

en

cy

:A

llo

cati

on

for

20

07

-08

Est

imate

dC

ost

Est

imate

d

Ex

pen

dit

ure

Up

toJu

ne,

20

07

,

To

tal(

F-A

id)

89

Rajo

ya

Road.(

U/C

G.P

hulg

ran/D

ew

al)

10th

DR

AC

26-0

3-0

78.0

00

8.0

00

0.0

00

8.0

00

-8.0

00

90

Danna

Road.(

U/C

Kuth

wal)

10th

DR

AC

26-0

3-0

722.0

00

22.0

00

0.0

00

10.0

00

-10.0

00

91

Path

er

Gali

Boi

via

Ria

liR

ankot

Road.(

U/C

Kukm

ang)

10th

DR

AC

26-0

3-0

740.0

00

40.0

00

0.0

00

20.0

00

-20.0

00

Su

bT

ota

l98.5

00

98.5

00

0.0

00

61.5

00

61.5

00

Tota

lO

n-G

oin

g1731.6

32

1140.1

32

396.7

91

1297.8

41

0.0

00

1297.8

41

1C

onst

ructi

on

of

sub

strc

utu

reand

appro

ach

road

of

Bell

yB

ridge

at

Boi

Bata

ngi

9th

DR

AC

27-0

1-2

007

6.1

79

6.1

79

6.1

79

6.1

79

2C

onst

ructi

on

of

sub

stru

ctu

reand

appro

ach

road

of

Bell

y

Bri

dge

at

Saw

ar g

ali

Lahoor

9th

DR

AC

27-0

1-2

007

5.3

54

5.3

54

5.3

54

5.3

54

SU

BT

OT

AL

11.5

33

11.5

33

011.5

33

011.5

33

3K

anair

Kass

toK

ohala

.(U

/CB

ero

te)

10th

DR

AC

26-0

3-0

722.0

00

22.0

00

0.0

00

10.0

00

-10.0

00

4B

ridge

on

Thandin

iP

att

an

Khurd

Road

inK

M-4

5

(U/C

Patt

an

Khurd

)

10th

DR

AC

26-0

3-0

737.0

00

37.0

00

0.0

00

20.0

00

-20.0

00

5Im

pro

vem

ent

&B

lack

toppin

gof

Lahoor

Kass

toB

akote

Mohra

road

10th

DR

AC

26-0

3-0

790.0

00

90.0

00

0.0

00

45.0

00

0.0

00

45.0

00

6P

att

an

Khurd

Boi

Road.(

U/C

Patt

an

Khurd

)10th

DR

AC

26-0

3-0

735.0

00

35.0

00

0.0

00

17.5

00

-35.0

00

7S

eer

Dheri

toB

oi

Road(

U/C

Boi

)10th

DR

AC

26-0

3-0

740.0

00

40.0

00

0.0

00

20.0

00

-20.0

00

8R

ehabil

itati

on

&R

epair

Work

on

Bri

dge

on

Kohala

Mooli

a

Road

10th

DR

AC

26-0

3-0

718.0

00

18.0

00

0.0

00

10.0

00

0.0

00

10.0

00

9R

ehabil

itati

on,R

epair

and

Bla

ck

Toppin

gof

Terh

ana

Mali

ar

Road

10th

DR

AC

26-0

3-0

71.5

00

1.5

00

0.0

00

1.5

00

0.0

00

1.5

00

10

Rehabil

itati

on,R

epair

and

Bla

ck

Toppin

gof

Banda

Bata

nga

via

Banda

Qazi

Road.

10th

DR

AC

26-0

3-0

79.0

00

9.0

00

0.0

00

9.0

00

0.0

00

9.0

00

11

Rehabil

itati

on,R

epair

and

Bla

ck

Toppin

gof

Const

ructi

on

of

Bri

dge

on

Nam

liM

air

aN

ath

iagali

road

10th

DR

AC

26-0

3-0

79.0

00

9.0

00

0.0

00

9.0

00

0.0

00

9.0

00

12

Danna

Gore

eni

Road

(U/C

Gore

eni

)10th

DR

AC

26-0

3-0

740.0

00

40.0

00

0.0

00

20.0

00

-20.0

00

Tota

l(G

erm

an

Fu

nd

ed

)301.5

00

301.5

00

0.0

00

162.0

00

0.0

00

179.5

00

B.

New

Sch

em

es

ii.

Germ

an

Deb

tS

wa

p

i.C

ate

go

ry

-IV

(DF

IDF

un

ded

).

55

Roads

Abbott

abad

W&

SD

eptt

:(P

ER

RA

)Abbott

abad

To

tal

Fo

reig

n

Aid

(FE

C)

Ru

pee

Fo

reig

n

Ex

ch

an

ge

To

tal

12

34

56

78

9

AN

NU

AL

WO

RK

PL

AN

2007-0

8S

ecto

r:

Dis

tric

tR

eco

nst

ructi

on

Un

it:

S#

i.N

am

eo

fth

ep

roje

ct

ii.

Lo

cati

on

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

DC

DW

P/E

CN

EC

(Date

so

fap

pro

val

&co

mp

leti

on

)

Reco

nst

ructi

on

Ag

en

cy

:A

llo

cati

on

for

20

07

-08

Est

imate

dC

ost

Est

imate

d

Ex

pen

dit

ure

Up

toJu

ne,

20

07

,

To

tal(

F-A

id)

13

Mair

aR

ehm

at

Khan-H

ari

ala

Road.(

U/C

Kuth

wal/

Kukm

ang)

-22.0

00

--

22.0

00

-22.0

00

14

Barr

ian

Kalk

ot

Road(

U/C

Gore

eni

).

-5.0

00

--

5.0

00

-5.0

00

15

Mooli

aK

ala

ban

Road.(

U/C

Nam

mal

)-

10.0

00

--

10.0

00

-10.0

00

16

Abbott

abad

link

Road.(

U/C

Kehal

Urb

an)

-8.5

00

--

8.5

00

-8.5

00

17

Cir

cula

rR

oad.(

U/C

Kehal

Urb

an

)-

2.5

00

--

2.5

00

-2.5

00

18

Com

mis

sioner

Road

(U/C

Cit

yU

rban

).-

0.5

00

--

0.5

00

-0.5

00

19

Old

Deputy

Com

mis

sioner

Road(U

/CC

ity

Urb

an

).-

0.3

80

--

0.3

80

-0.3

80

20

Dis

tric

tC

ourt

Road.(

U/C

Cit

yU

rban)

-0.3

50

--

0.3

50

-0.3

50

21

Old

XE

NB

uil

din

gO

ffic

eR

oad(U

/CC

ity

Urb

an

)-

0.3

30

--

0.3

30

-0.3

30

22

Old

XE

NH

ighw

ay

Off

ice

Road(U

/CC

ity

Urb

an

)-

0.2

00

--

0.2

00

-0.2

00

23

Fro

nti

or

House

Road.(

U/C

Cit

yU

rban

)-

2.5

00

--

2.5

00

-2.5

00

24

Guest

House

Road.(

U/C

Cit

yU

rban)

-0.3

00

--

0.3

00

-0.3

00

25

Kutw

ali

Road.(

U/C

Cit

yU

rban)

-2.5

00

--

2.5

00

-2.5

00

26

Poli

ce

link

Road.(

U/C

Cit

yU

rban

)-

0.3

30

--

0.3

30

-0.3

30

27

Sess

ion

House

Road.(

U/C

Cit

yU

rban

)-

1.5

00

--

1.5

00

-1.5

00

28

Old

Cir

cle

Off

ice

Road.(

U/C

Cit

yU

rban

)-

0.5

00

--

0.5

00

-0.5

00

29

Jab

Jhangi

Road.(

U/C

Jhangi

)-

2.3

00

--

2.3

00

-2.3

00

30

PM

Ato

Naw

ansh

er

Road.(

U/C

Kakul

)-

3.3

00

--

3.3

00

-3.3

00

31

Naw

ansh

er

link

Road.(

U/C

Naw

an

Sher)

-1.5

00

--

1.5

00

-1.5

00

32

Jinnah

Road.(

U/C

Cit

yU

rban

)-

2.3

00

--

2.3

00

-2.3

00

33

DIG

House

Road.(U

/CC

ity

Urb

an

)-

0.3

00

--

0.3

00

-0.3

00

34

KK

Hto

Kara

kM

air

avia

Mair

aM

uzaf f

arR

oad.

(U/C

Bakdheri

)

-10.0

00

--

10.0

00

-10.0

00

35

Maju

hia

nK

ass

Patt

an

Road

(U/C

Patt

an

Kala

n)

-28.0

00

--

28.0

00

-28.0

00

36

Beer

toN

abi

Banda(U

/CM

eer

Pur)

.-

15.0

00

--

15.0

00

-15.0

00

37

Salh

ad

Dara

Road.(

U/C

Salh

ad)

-15.0

00

--

15.0

00

-15.0

00

38

Mir

pur

toK

akul

via

Mair

aR

oad.(

U/C

Meer

Pur

)-

20.0

00

--

20.0

00

-20.0

00

39

Kali

dar

Road.(

U/C

Banda

Pir

Khan)

-25.0

00

--

25.0

00

-25.0

00

D.

New

Un

ap

pro

ved

Sch

em

es

56

Road

s

Abbott

abad

W&

SD

eptt

:(P

ER

RA

)Abbott

abad

Tota

lF

ore

ign

Aid

(FE

C)

Rupee

Fore

ign

Exch

ange

Tota

l

12

34

56

78

9

AN

NU

AL

WO

RK

PL

AN

20

07

-08

Sec

tor:

Dis

tric

tR

eco

nst

ruct

ion

Un

it:

S#

i.N

ame

of

the

pro

ject

ii.

Loca

tion

Appro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

DC

DW

P/E

CN

EC

(Dat

esof

appro

val

&co

mple

tion)

Rec

on

stru

ctio

nA

gen

cy:

All

oca

tion

for

2007-0

8E

stim

ated

Cost

Est

imat

ed

Expen

dit

ure

Up

toJu

ne,

2007,

Tota

l(F

-Aid

)

40

Mia

n-D

e-S

airi

KK

Hto

Mohri

Rd.(

U/C

Mee

rP

ur)

-12.5

00

--

12.5

00

-12.5

00

41

KK

Hto

Lal

azar

Colo

ny

Rd.(U

/CM

eer

Pur)

-3.0

00

--

3.0

00

-3.0

00

42

Lam

bi

Dher

iR

oad

.(U

/CJh

angi)

-3.0

00

--

3.0

00

-3.0

00

43

Kak

ul

Mal

ach

Road

(U/C

Kak

ul)

-5.0

00

--

5.0

00

-5.0

00

44

Qal

andar

Abad

Saj

ikot

Road

.(U

/CB

aldher

i)

-6.0

00

--

6.0

00

-6.0

00

45

Zaf

far

Mar

ket

toJa

bber

via

Tar

han

aG

har

bia

nan

d

Tar

han

aB

ala

Road

.(U

/CM

eer

Pur

)

-42.0

00

--

42.0

00

-42.0

00

46

Qal

andar

Abad

toG

ojr

iw

ith

link

toM

ast

Mai

ra.

(U

/CB

aldher

i)

-16.0

00

--

16.0

00

-16.0

00

47

Man

gal

toR

ian-D

e-M

aira

wit

hli

nk

toP

athi

Dam

Mai

ra

via

Nik

aaP

ani

Road

.(U

/CB

aldher

i)

-25.0

00

--

25.0

00

-25.0

00

48

Fro

nti

or

House

toB

oi-

De-

Gal

ivia

Dobat

her

Road

.

(U/C

Jhan

gi

)

-30.0

00

--

30.0

00

-30.0

00

49

That

hiA

hm

adK

han

toM

aira

Nec

han

wit

hli

nk

to

Khar

par

.

-30.0

00

--

30.0

00

-30.0

00

50

Man

gal

toH

all

Mai

raZ

aria

nR

oad

.(U

/CB

aldher

i)

-35.0

00

--

35.0

00

-35.0

00

51

Nar

rian

Road

.(U

/CS

hei

khuban

di

)-

7.5

00

--

7.5

00

-7.5

00

395.0

90

0.0

00

0.0

00

395.0

90

0.0

00

395.0

90

708.1

23

313.0

33

0.0

00

568.6

23

0.0

00

586.1

23

2439.7

55

1453.1

65

396.7

91

1866.4

64

0.0

00

1883.9

64

Tota

lN

ew

GT

ota

l(O

n-G

oin

g+

New

)

Su

bT

ota

l(N

ewU

nap

pr o

vec

dS

chem

e)

57

Secto

r:R

oad

/Bri

dg

e

Dis

tric

tR

eco

nst

ructi

on

Un

it:

Ab

bo

ttab

ad

Reco

nst

ructi

on

Ag

en

cy

:T

MA

Ab

bo

ttab

ad

Tota

lF

ore

ign

Aid

(FE

C)

Reupee

Fore

ign

Exchange

Tota

l

12

34

56

78

9

A

1Im

pro

vem

en

t/B

TR

Mo

har

Kh

urd

u/c

Sarb

an

a

DR

AC

26

-9-2

00

6.

9.0

00

-5

.00

05

.00

0

2Im

pro

vem

en

t/B

TR

Ban

di

Dh

un

dan

to

Sam

esa

rR

oad

u/c

Ban

da

Pir

Kh

an

do

9.0

00

-5

.00

05

.00

0

3Im

pro

vem

en

t/B

TR

Bo

ito

To

riR

oad

(P-I

)

u/c

Bo

id

o1

2.0

00

-8

.00

08

.00

0

4Im

pro

vem

en

t/B

TR

Gali

Ban

ian

toD

an

na

Ro

ad

(P-I

)u

/cK

uth

aw

al

do

6.0

00

-3

.00

03

.00

0

5Im

pro

vem

en

t/B

TR

Hil

lM

air

aR

oad

(P-I

)

u/c

Bad

deh

rid

o6

.00

0-

3.0

00

3.0

00

6R

ah

ab

ilit

aio

no

fS

hin

gle

Ro

ad

Ku

lian

Bri

dg

eto

Nam

mal

u/c

Nam

mal

do

7.0

00

-4

.00

04

.00

0

7R

ah

ab

ilit

aio

no

fS

hin

gle

Ro

ad

Nam

mal

to

Sh

ala

nL

eera

nR

oad

u/c

Nam

mal

do

5.0

00

-2

.00

02

.00

0

8R

ah

ab

ilit

aio

no

fS

hin

gle

Ro

ad

Gan

dala

to

Pata

rG

ali

u/c

Ku

km

on

gd

o3

.00

0-

3.0

00

3.0

00

9R

ah

ab

ilit

aio

no

fS

hin

gle

Ro

ad

Bata

ng

ito

Masi

na

Ro

ad

u/c

Ku

km

on

gd

o3

.00

0-

3.0

00

3.0

00

10

Reh

ab

ilit

aio

no

fS

hin

gle

Ro

ad

Mo

lia

to

Ali

Ab

ad

Ro

ad

(P-I

)u

/cB

ak

ot

do

5.0

00

-5

.00

05

.00

0

NE

W(A

pp

ro

ved

)R

oa

ds

(AN

NU

AL

WO

RK

PL

AN

2007-0

8)

S#

i.N

am

eo

fth

ep

roje

ct

ii.

Lo

cati

on

Ap

pro

ved

by

RA

C/P

SC

/SS

C

ER

RA

BO

AR

D

CD

WP

/EC

NE

CD

ate

so

f

ap

pro

val

&co

mp

leti

on

)

Est

imate

d

Ex

pendit

ure

Up

to

June,2007,T

ota

l

(F-A

id)

All

ocati

on

for

2007-0

8E

stim

ate

dcost

58

Secto

r:R

oad

/Bri

dg

e

Dis

tric

tR

eco

nst

ructi

on

Un

it:

Ab

bo

ttab

ad

Reco

nst

ructi

on

Ag

en

cy

:T

MA

Ab

bo

ttab

ad

Tota

lF

ore

ign

Aid

(FE

C)

Reupee

Fore

ign

Exchange

Tota

l

12

34

56

78

9

(AN

NU

AL

WO

RK

PL

AN

2007-0

8)

S#

i.N

am

eo

fth

ep

roje

ct

ii.

Lo

cati

on

Ap

pro

ved

by

RA

C/P

SC

/SS

C

ER

RA

BO

AR

D

CD

WP

/EC

NE

CD

ate

so

f

ap

pro

val

&co

mp

leti

on

)

Est

imate

d

Ex

pendit

ure

Up

to

June,2007,T

ota

l

(F-A

id)

All

ocati

on

for

2007-0

8E

stim

ate

dcost

11

Reh

ab

ilit

aio

no

fS

hin

gle

Ro

ad

Dak

hd

og

a

toP

aja

Beeri

an

Gali

u/c

Beri

an

Gali

do

1.5

00

-1

.50

01

.50

0

12

Reh

ab

ilit

aio

no

fS

hin

gle

Ro

ad

Harr

ian

to

Dak

hD

og

a

u/c

Beri

an

Gali

do

3.0

00

-3

.00

03

.00

0

13

Reh

ab

ilit

aio

no

fS

hin

gle

Ro

ad

Ku

tli

Ro

ad

Ph

ulk

ot

u/c

Ph

alk

ot

do

3.0

00

-3

.00

03

.00

0

14

Reh

ab

ilit

aio

no

fS

hin

gle

Ro

ad

Ph

alk

ot

vil

lag

eR

oad

(P-I

)u

/cP

halk

ot

do

3.0

00

-3

.00

03

.00

0

15

Reh

ab

ilit

aio

no

fS

hin

gle

Ro

ad

Gan

dla

nia

road

(P-I

)u

/cB

an

da

Pir

Kh

an

do

3.0

00

-3

.00

03

.00

0

16

Imp

rov

em

en

t/B

TR

Bero

tto

Juli

al

Bero

t

(P-I

)u

/cB

ero

td

o9

.00

05

.00

05

.00

0

17

Imp

rov

em

en

t/B

TR

bak

ot

vil

lag

eR

oad

(P-

I)u

/cB

ak

ot

do

9.0

00

5.0

00

5.0

00

18

Imp

rov

em

en

t/B

TR

Dab

ban

Dalo

la(P

-I)

u/c

Dalo

lad

o1

2.0

00

6.0

00

6.0

00

19

BT

RK

ak

ul

toB

alo

lia

Ro

ad

(P-I

)u

/c

Kak

ul

do

12

.00

06

.00

06

.00

0

20

BT

RM

asj

id-e

-Kh

azra

,A

nw

ar-

e-M

ad

ina

u/c

Naw

an

sheh

rd

o6

.00

03

.00

03

.00

0

21

BT

RT

ak

iaT

oB

an

da

Said

Kh

an

(P-I

)u

/c

Dh

am

tau

rd

o9

.00

05

.00

05

.00

0

59

Secto

r:R

oad

/Bri

dg

e

Dis

tric

tR

eco

nst

ructi

on

Un

it:

Ab

bo

ttab

ad

Reco

nst

ructi

on

Ag

en

cy

:T

MA

Ab

bo

ttab

ad

Tota

lF

ore

ign

Aid

(FE

C)

Reupee

Fore

ign

Exchange

Tota

l

12

34

56

78

9

(AN

NU

AL

WO

RK

PL

AN

20

07

-08

)

S#

i.N

am

eof

the

pro

ject

ii.

Locati

on

Ap

pro

ved

by

RA

C/P

SC

/SS

C

ER

RA

BO

AR

D

CD

WP

/EC

NE

CD

ate

so

f

ap

pro

val

&co

mp

leti

on

)

Est

imate

d

Expendit

ure

Up

to

June,2007,T

ota

l

(F-A

id)

All

ocati

on

for

2007-0

8E

stim

ate

dcost

22

BT

RL

ink

road

Ast

ab

al

toM

irp

ur

Mair

a

u/c

Mir

pu

rd

o7

.50

04

.50

04

.50

0

23

PC

CR

oad

Masj

id-e

-Kh

azra

toH

/OM

r.

Ria

zN

aw

an

sheh

ru

/cN

aw

an

sheh

rd

o0

.80

00

.80

00

.80

0

24

Imp

rov

em

en

tC

on

stru

cti

om

no

fB

TR

Th

an

da

Ch

oa

Naw

ash

eh

rR

oad

u/c

Naw

an

sheh

r

do

6.0

00

3.0

00

3.0

00

25

Imp

rov

em

en

t/B

TR

Th

an

da

Mair

aR

oad

u/c

Salh

ad

do

3.0

00

3.0

00

3.0

00

26

imp

rov

em

en

t/B

TR

Gari

Pan

ato

Sta

diu

m

u/c

Naw

an

sheh

rd

o2

.25

02

.25

02

.25

0

Su

bT

ota

l1

55

.05

09

8.0

50

98

.05

0

B 1B

ird

ge

ov

er

Nala

Ban

da

Kh

air

Ali

Kan

U/

Jhan

gi

-0

.80

0-

0.8

00

-0

.80

0

21

No

.C

ulv

ert

Mo

oli

ato

Ali

ab

ad

road

U/C

Mo

oli

a-

0.1

50

-0

.15

0-

0.1

50

31

0N

o.

Cu

lvert

Bero

teto

Juli

al

Ro

ad

U/C

Bero

te-

2.7

50

-2

.75

0-

2.7

50

45

No

.C

ulv

ert

sL

ink

Dalo

laR

oad

u/c

Dalo

la-

1.3

70

-1

.37

0-

1.3

70

54

No

.C

ulv

ert

sB

ata

ng

iM

ase

en

aR

oad

u/c

Ku

km

on

g-

1.1

00

-1

.10

0-

1.1

00

New

(un

-ap

pro

ved

)B

rid

ges/

Cu

lvert

s

60

Sec

tor:

Road

/Bri

dge

Dis

tric

tR

econst

ruct

ion

Unit

:A

bbott

abad

Rec

onst

ruct

ion

Agen

cy:

TM

AA

bbott

abad

To

tal

Fo

reig

n

Aid

(FE

C)

Reu

pee

Fo

reig

n

Ex

chan

ge

To

tal

12

34

56

78

9

(AN

NU

AL

WO

RK

PL

AN

20

07

-08

)

S#

i.N

ame

of

the

pro

ject

ii.

Lo

cati

on

Appro

ved

by

RA

C/P

SC

/SS

C

ER

RA

BO

AR

D

CD

WP

/EC

NE

CD

ates

of

appro

val

&co

mple

tion)

Est

imat

ed

Ex

pen

dit

ure

Up

to

Jun

e,2

00

7,T

ota

l

(F-A

id)

All

oca

tio

nfo

r2

00

7-0

8E

stim

ated

cost

66

No.C

ulv

erts

Dobat

har

Boi

de

Gal

i

Road

u/c

jhan

gi

-1.6

50

-1.6

50

-1.6

50

Su

bT

ota

l7.8

20

7.8

20

7.8

20

Gra

nd

Tota

l(A

+B

)162.8

70

105.8

70

105.8

70

61

Se

cto

r:R

oa

d

Dis

tric

tR

eco

nstr

uctio

nU

nit:

Ab

bo

tta

ba

d

Re

co

nstr

uctio

nA

ge

ncy:

TM

AH

ave

lia

n

Tota

lF

ore

ign

aid

(FE

C)

Rupees

Fore

ign

exchange

Tota

l

12

34

56

78

9

1.

Nagri

Toti

al

chanali

2.5

00

--

2.5

00

-2.5

00

2.

Narh

ote

rkhoia

nR

oad

3.0

00

--

3.0

00

-3.0

00

3.

Mari

Peer

kot

Road

1.5

00

--

1.5

00

-1.5

00

4.

Saji

kot

toG

ali

Road

1.0

00

--

1.0

00

-1.0

00

5.

Chapri

toM

anji

aR

oad

1.5

00

--

1.5

00

-1.5

00

6.

Karw

ala

Base

er

Road

1.6

00

--

1.6

00

-1.6

00

7.

Haw

ari

an

toG

andaw

an

Road

1.3

00

--

1.3

00

-1.3

00

8.

Barr

ian

Chatt

ala

Road

1.5

00

--

1.5

00

-1.5

00

9.

Langri

al

Dubra

nR

oad

4.0

00

--

4.0

00

-4.0

00

10.

Kari

Bulk

hu

Road

1.0

00

--

1.0

00

-1.0

00

11.

Malm

oola

Batk

anala

Road

Bla

stin

g5.0

00

--

5.0

00

-5.0

00

12.

Chanali

Dham

yal

kath

aR

oad

2.5

00

--

2.5

00

-2.5

00

13.

Lora

Ghari

Road

1.5

00

--

1.5

00

-1.5

00

14.

Malm

oola

Seri

Road

1.5

00

--

1.5

00

-1.5

00

15.

Jhangri

Rakhala

Road

2.5

00

--

2.5

00

-2.5

00

16.

Low

er

Barr

ian

Haw

ari

Dhokan

Road

1.2

50

--

1.2

50

-1.2

50

17.

Kalk

ot

Gore

eni

Baw

ar

Road

1.5

00

--

1.5

00

-1.5

00

18.

Nagri

Toti

al

Thuba

Road

via

Bata

ngi

2.5

00

--

2.5

00

-2.5

00

19.

Narh

ote

rchath

rial

via

Path

ani

Road

1.5

00

--

1.5

00

-1.5

00

Bla

ck

To

pR

oad

s

New

Un

ap

pro

ved

Sch

em

es

All

ocati

on

for

2007-0

8E

stim

ate

dcost

AN

NU

AL

WO

RK

PL

AN

20

07

-08

S#

i-N

am

eof

the

Pro

ject

ii-

Locati

on

Appro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

D

CD

WP

/EC

NE

C(D

ate

sof

appro

val

&com

ple

tion)

Est

imate

d

expendit

ure

upto

June

2007

(tota

l

F.A

id)

62

Se

cto

r:R

oa

d

Dis

tric

tR

eco

nstr

uctio

nU

nit:

Ab

bo

tta

ba

d

Re

co

nstr

uctio

nA

ge

ncy:

TM

AH

ave

lia

n

Tota

lF

ore

ign

aid

(FE

C)

Rupees

Fore

ign

exchange

Tota

l

12

34

56

78

9

All

ocati

on

for

2007-0

8E

stim

ate

dcost

AN

NU

AL

WO

RK

PLA

N2007-0

8

S#

i-N

am

eof

the

Pro

ject

ii-

Locati

on

Appro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

D

CD

WP

/EC

NE

C(D

ate

sof

appro

val

&com

ple

tion)

Est

imate

d

expendit

ure

upto

June

2007

(tota

l

F.A

id)

20.

Leera

nhaji

an

toS

am

oli

Gore

eni

1.0

00

--

1.0

00

-1.0

00

21.

Jaw

aL

ink

Road

0.7

50

--

0.7

50

-0.7

50

22.

Rahi

Chankot

Toad

1.5

00

--

1.5

00

-1.5

00

23.

Karh

aki

Road

1.7

50

--

1.7

50

-1.7

50

24.

Haji

aG

ali

kia

laR

oad

1.5

00

--

1.5

00

-1.5

00

TO

TA

L45.1

50

45.1

50

45.1

50

1L

angri

al

Dana

Road

3.0

00

--

3.0

00

-3.0

00

2C

heir

Nil

oth

road

1.5

00

--

1.5

00

-1.5

00

3C

heir

Hari

Khayte

rR

oad

1.3

00

--

1.3

00

-1.3

00

4M

ari

Nagri

Toti

al

Road

1.5

00

--

1.5

00

-1.5

00

5B

andi

toD

hakan

Pass

er

Road

2.0

00

--

2.0

00

-2.0

00

6Ja

ndala

road

2.0

00

--

2.0

00

-2.0

00

7M

ohair

Budbhen

toC

ham

naka

Road

1.5

00

--

1.5

00

-1.5

00

8M

air

aR

om

al

Leera

nR

oad

0.7

50

--

0.7

50

-0.7

50

9M

air

aH

asn

al

Chow

ain

Road

1.5

00

--

1.5

00

-1.5

00

10

Masa

hG

ojr

iK

iala

Road

1.2

50

--

1.2

50

-1.2

50

11

Gali

Bata

gra

nR

oad

0.7

50

--

0.7

50

-0.7

50

12

Langri

al

Road

0.5

00

--

0.5

00

-0.5

00

13

Nagri

Chanali

road

2.5

00

--

2.5

00

-2.5

00

Tota

l20.0

50

20.0

50

20.0

50

Gran

dT

ota

l6

5.2

00

65.2

00

65

.20

0

Sh

ing

leR

oad

63

Se

cto

r:G

ove

rna

nce

Bu

ild

ing

Dis

tric

tR

eco

nstr

uctio

nU

nit:

Ab

bo

tta

ba

d

Re

co

nstr

uctio

nA

ge

ncy:

W&

SD

ep

tt.A

bb

ott

ab

ad

Tota

lF

ore

ign

Aid

(FE

C)

Rupee

Fore

ign

Exchange

Tota

l

12

34

56

78

9

1P

HC

Ab

bo

tta

ba

dA

bb

otta

ba

dC

ity

DR

AC

5th

Me

etin

g

27

Au

g,2

00

68

0.0

00

_25.0

00

30.0

00

_30.0

00

2P

oli

ce

Lin

e(A

dm

nB

lock)

Ab

bo

tta

ba

dC

ity

do

81.1

77

_25.0

00

25.0

00

_25.0

00

3D

CO

Resi

dence.

Ab

bo

tta

ba

dC

ity

do

7.0

82

_3.0

00

4.0

82

_4.0

82

4D

RO

Off

ice/C

ourt

Room

.A

bb

otta

ba

dC

ity

do

15.3

12

_3.0

00

8.0

00

_8.0

00

5C

entr

al

Jail

(Adm

n/R

esi

denti

al

Blo

ck),

B/W

all

)A

bb

otta

ba

dC

ity

do

74.7

63

_20.7

63

25.0

00

_25.0

00

6P

oli

ce

Lin

e(R

es.

Blo

ck)

Ab

bo

tta

ba

dC

ity

do

82.3

70

_23.0

00

25.0

00

_25.0

00

7N

aib

Na

zim

Offic

e(O

ldD

CO

ffic

e)

Ab

bo

tta

ba

dC

ity

DR

AC

7th

Me

etin

g

23

rdN

ov,2

00

6

6.0

53

_2

.00

04.0

53

_4.0

53

8D

istr

ictA

cco

un

tO

ffic

eA

bb

otta

ba

dC

ity

do

9.0

00

_4

.00

05.0

00

_5.0

00

9M

aa

lK

ha

na

Ab

bo

tta

ba

dC

ity

do

1.2

32

_1

.23

20.0

00

_0.0

00

10

Mo

ha

fiz

Kh

an

aA

bb

otta

ba

dC

ity

do

5.2

00

_3

.20

02.0

00

_2.0

00

11

Ma

gis

tra

teC

olo

ny

Typ

e-I

II(8

No

s)

Ab

bo

tta

ba

dC

ity

do

8.3

68

_3

.00

05.3

68

_5.3

68

12

Ma

gis

tra

teC

olo

ny

Typ

eIV

(6N

os

)A

bb

otta

ba

dC

ity

do

7.4

26

_3

.00

04.4

26

_4.4

26

13

Ma

gis

tra

teC

olo

ny

Typ

eV

I(1

6N

os)

Ab

bo

tta

ba

dC

ity

do

3.7

23

_3

.72

30.0

00

_0.0

00

14

Bo

un

da

ryW

all

of

Mir

Pu

rO

ffic

er

Co

lon

yTyp

eII

I(1

6N

os)

On

ly

Mirp

ur

do

6.7

50

_6

.75

00.0

00

_0.0

00

15

Po

rch

an

dM

ain

Ga

teo

fM

irP

ur

Offic

er

Co

lon

yTyp

eII

I(1

6N

o).

Mirp

ur

do

2.9

04

_2

.90

40.0

00

_0.0

00

16

Ma

gis

tra

teC

olo

ny

Typ

e-I

II(8

No

s)

Ab

bo

tta

ba

dC

ity

do

7.8

43

_3

.00

04.8

43

_4.8

43

17

Ma

gis

tra

teC

olo

ny

Typ

eIV

(6N

os

)A

bb

otta

ba

dC

ity

do

2.3

20

_2

.32

00.0

00

_0.0

00

A)

On

-Go

ing

Pro

jec

t

(AN

NU

AL

WO

RK

PLA

N2007-0

8)

S#

i.N

am

eof

the

pro

ject

ii.

Locati

on

Appro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

D

CD

WP

/EC

NE

C(D

ate

s

of

appro

val

&com

ple

tion)

Est

imate

dC

ost

Est

imate

d

Expendit

ure

Up

toJu

ne,2007,

Tota

l(F

-Aid

)

All

ocati

on

for

2007-0

8L

ocati

on

64

Se

cto

r:G

ove

rna

nce

Bu

ild

ing

Dis

tric

tR

eco

nstr

uctio

nU

nit:

Ab

bo

tta

ba

d

Re

co

nstr

uctio

nA

ge

ncy:

W&

SD

ep

tt.A

bb

ott

ab

ad

Tota

lF

ore

ign

Aid

(FE

C)

Rupee

Fore

ign

Exchange

Tota

l

12

34

56

78

9

(AN

NU

AL

WO

RK

PLA

N2007-0

8)

S#

i.N

am

eof

the

pro

ject

ii.

Locati

on

Appro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

D

CD

WP

/EC

NE

C(D

ate

s

of

appro

val

&com

ple

tion)

Est

imate

dC

ost

Est

imate

d

Expendit

ure

Up

toJu

ne,2007,

Tota

l(F

-Aid

)

All

ocati

on

for

2007-0

8L

ocati

on

18

Typ

eV

(24

No

s)

Ma

gis

tra

teC

olo

ny

Abbottabad

City

do

6.7

89

_3

.00

03.7

89

_3.7

89

19

Ma

gis

tra

teC

olo

ny

Typ

eV

I(1

6N

os)

Abbottabad

City

do

1.1

64

_1

.16

40.0

00

_0.0

00

20

Mir

Pu

rO

ffic

er

Co

lon

yTyp

eIV

Qu

art

er

(15

No

s)

Mirp

ur

do

0.6

71

_0

.67

10.0

00

_0.0

00

21

Ba

ch

elo

r(H

oste

lS

uit

No

16

)M

ir

Pu

rO

ffic

er

Co

lon

y

Mirp

ur

do

0.7

00

_0

.70

00.0

00

_0.0

00

22

Qu

art

er

12

No

sC

&W

Co

lon

yN

ea

r

DH

QA

bbottabad

City

do

0.6

27

_0

.62

70.0

00

_0.0

00

23

Qu

art

ers

5N

Os

C&

WC

olo

ny

Iqb

al

Ro

ad

.A

bbottabad

City

do

0.1

70

_0

.17

00.0

00

_0.0

00

24

Dis

tric

tS

ecre

taria

t(O

ldP

ala

ce

Ho

tel)

Abbottabad

City

do

0.8

40

_0

.84

00.0

00

_0.0

00

25

C&

WS

tore

/Offic

eA

bbottabad

City

do

1.1

27

_1

.12

70.0

00

_0.0

00

26

Da

ru

lA

ma

nA

bb

ott

ab

ad

Abbottabad

City

do

4.7

78

_2

.00

02.7

78

_2.7

78

27

Blin

din

stitu

teA

bbottabad

City

do

1.6

04

_1

.60

40.0

00

_0.0

00

28

Po

lice

Sta

tio

nL

ora

Lo

rad

o1

5.8

72

_6

.00

09.8

72

_9.8

72

29

Po

lice

Sta

tio

nB

ako

teB

ako

ted

o1

5.8

72

_6

.00

09.8

72

_9.8

72

30

Po

lice

Sta

tio

nB

ag

no

tar

Na

mli

Ma

ira

do

21

.28

0_

6.0

00

10.0

00

_10.0

00

31

Dis

tric

tC

ou

rts

A.A

ba

dA

bbottabad

City

do

19

.30

5_

9.0

00

10.3

05

_10.3

05

32

Dis

tric

tC

ou

rts

A.A

ba

dA

bbottabad

City

do

6.7

80

_6

.78

00.0

00

_0.0

00

33

Po

lice

Sta

tio

nS

he

rwa

nS

he

rwa

nd

o2

1.2

80

_6

.00

010.0

00

_10.0

00

65

Secto

r:G

ove

rna

nce

Bu

ildin

g

Dis

tric

tR

econstr

uction

Unit:

Ab

bo

tta

ba

d

Reconstr

uction

Agency:

W&

SD

ep

tt.A

bb

ott

ab

ad

To

tal

Fo

reig

n

Aid

(FE

C)

Ru

pee

Fo

reig

n

Ex

chan

ge

To

tal

12

34

56

78

9

(AN

NU

AL

WO

RK

PL

AN

20

07

-08

)

S#

i.N

ame

of

the

pro

ject

ii.

Lo

cati

on

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

D

CD

WP

/EC

NE

C(D

ates

of

app

rov

al

&co

mp

leti

on

)

Est

imat

edC

ost

Est

imat

ed

Ex

pen

dit

ure

Up

toJu

ne,

20

07

,

To

tal(

F-A

id)

All

oca

tio

nfo

r2

00

7-0

8L

oca

tio

n

34

Po

lice

Sta

tio

nD

on

ga

Ga

liD

on

ga

Ga

lid

o3

.40

0_

3.4

00

0.0

00

_0.0

00

To

tal

(On

-Go

ing

Pro

jec

ts)

52

3.7

82

18

9.9

75

19

9.3

88

199.3

88

B).

New

Pro

jects

1

Reconstr

uction

ofdam

aged

port

ion

of

Govern

or 's

House

Nath

agali

Nath

iagali

DR

AC

26/0

3/2

007

5.2

65

__

2.6

32

5_

2.6

32

5

2

Reconstr

uction

ofpolic

esta

tion

Cantt.

Board

Cantt

Abbottabad

_4

3.4

16

21

.70

82

1.7

08

Su

bTo

tal

(Ne

wP

roje

cts

)4

8.6

81

24

.34

12

4.3

4

Gra

nd

To

tal

(A

+B

)5

72

.46

32

23

.72

9413.7

04

66

SE

CT

OR

:IR

RIG

AT

ION

DIS

TR

ICT

RE

CO

NS

TR

UC

TIO

NU

NIT

:A

BB

OT

TA

BA

D

RE

CO

NS

TR

UC

TIO

NA

GE

NC

Y:

IRR

IGA

TIO

ND

EP

TT.A

BB

OT

TA

BA

D

Tota

lF

ore

ign

Aid

(FE

C)

Rupee

Fo

reig

nE

xch

an

gTo

tal

12

34

56

78

9

aB

uild

ing

Co

mp

on

en

t.

1Jhangi

DR

AC

23

Nov,

2006

1.4

00

_1.4

00

_1.4

00

2R

epair/c

onstn

:ofdam

aged

work

sof

Irrigation

colo

ny ,

RestH

ouse

and

of fic

e

Bild

ii

Abb

ttb

d

do

do

2.0

71

_2.0

71

_2.0

71

Su

bTo

tal(a

)3.4

71

3.4

71

3.4

71

bC

ivil

Ch

an

nels

1R

ehabili

tation

ofIr

rigation

Civ

ilC

hannel

Sanal

Sanal

DR

AC

7th

Meeting

23

Nov,

2006

1.5

00

_1.5

00

_1.5

00

2R

ehabili

tation

ofIr

rigation

Civ

ilC

hannel

Molia

Bakot

Boket

do

5.1

00

_3.5

00

_3.5

00

3R

ehabili

tation

ofIr

rigation

Civ

ilC

hannel

Nam

bal

Nam

mal

do

1.8

00

_1.5

00

_1.5

00

4R

ehabili

tation

ofIr

rigation

Civ

ilC

hannel

Beer

Beer

do

1.5

00

_1.0

00

_1.0

00

5R

ehabili

tation

ofIr

rigation

Civ

ilC

hannel

Chabgra

n

Chabgra

ndo

4.5

00

_3.0

00

_3.0

00

6R

ehabili

tation

ofIr

rigation

Civ

ilC

hannel

Seer

Gharb

i

Seer

do

3.3

00

_2.0

00

_2.0

00

7R

ehabili

tation

ofIr

rigation

Civ

ilC

hannel

Bath

ian

Seer

do

3.0

00

_1.5

00

_1.5

00

8R

ehabili

tation

ofIr

rigation

Civ

ilC

hannel

Chakhal

Chakhal

do

2.7

00

_1.5

00

_1.5

00

9R

ehabili

tation

ofIr

rigation

Civ

ilC

hannel

Magri

Magri

do

5.4

00

_2.5

00

_2.5

00

10

Rehabili

tation

ofIr

rigation

Civ

ilC

hannel

KokalB

ars

een

KokalB

are

en

do

3.6

00

_2.0

00

_2.0

00

11

Rehabili

tation

ofIr

rigation

Civ

ilC

hannel

Sim

liala

Sim

liala

do

3.0

00

_1.5

00

_1.5

00

A)

On

Go

ing

AN

NU

AL

WO

RK

PLA

N2007-0

8

Location

S#

i).

Nam

eofth

eP

roje

ct

ii).Location

Appro

ved

By

DR

AC

/PS

C/S

SC

ER

RA

Board

CD

WP

/EC

NE

C

Date

sofA

ppro

val&

Com

ple

tion

Estim

ate

dC

ost

Estim

ate

d

Expenditure

up

toJune

2007

Tota

l(F

.Aid

)

Allo

cation

for

2007-0

8

67

SE

CT

OR

:IR

RIG

AT

ION

DIS

TR

ICT

RE

CO

NS

TR

UC

TIO

NU

NIT

:A

BB

OT

TA

BA

D

RE

CO

NS

TR

UC

TIO

NA

GE

NC

Y:

IRR

IGA

TIO

ND

EP

TT.A

BB

OT

TA

BA

D

To

tal

Fo

reig

nA

id(F

EC

)R

up

ee

Fo

reig

nE

xch

an

gTo

tal

12

34

56

78

9

AN

NU

AL

WO

RK

PLA

N2007-0

8

Lo

ca

tio

nS

#i).

Na

me

of

the

Pro

ject

ii).

Lo

ca

tio

n

Ap

pro

ve

dB

y

DR

AC

/PS

C/S

SC

ER

RA

Bo

ard

CD

WP

/EC

NE

C

Da

tes

ofA

pp

rova

l&

Co

mp

letio

n

Estim

ate

dC

ost

Estim

ate

d

Exp

en

ditu

reu

p

toJu

ne

20

07

To

tal(F

.Aid

)

Allo

ca

tio

nfo

r2

00

7-0

8

12

Rehabili

tation

ofIr

rigation

Civ

ilC

hannel

Band

Saib

Khan

Banda

Saib

Khan

do

3.3

00

_2.0

00

_2

.00

0

13

Rehabili

tation

ofIr

rigation

Civ

ilC

hannel

Gora

baz

Gara

n

Gora

Baz

Gra

n

do

4.5

00

_2.0

00

_2

.00

0

14

Rehabili

tation

ofIr

rigation

Civ

ilC

hannel

KotN

ali

KotN

ali

do

1.2

00

_0.7

00

_0

.70

0

15

Rehabili

tation

ofIr

rigation

Civ

ilC

hannel

Jogan

Jogan

do

1.8

00

_0.7

61

_0

.76

1

16

Rehabili

tation

ofIr

rigation

Civ

ilC

hannel

Ilyasi

Naw

asher

do

2.1

00

_1.0

00

_1

.00

0

17

Rehabili

tation

ofIr

rigation

Civ

ilC

hannel

Cham

ba

Sultanpur

Havelia

ndo

5.4

00

_2.5

00

_2

.50

0

18

Rehabili

tation

ofIr

rigation

Civ

ilC

hannel

Kalu

Maira

Kalu

Maira

do

3.5

00

_2.0

00

_2

.00

0

19

Rehabili

tation

ofIr

rigation

Civ

ilC

hannel

Kassaki/B

urj

Kassaki/B

urj

do

6.0

00

_1.0

98

_1

.09

8

Su

bTo

tal(b

)63.2

00

33.5

59

33.5

59

cF

loo

dP

rote

cti

on

Wo

rks

1R

ehab/R

epair

ofF

lood

Pro

tection

Work

s

Cham

ba

Havelia

nD

RA

C7

thM

ee

tin

g

23

No

v,2

00

64.0

00

-4.0

00

_4

.00

0

2R

ehab/R

epair

ofF

lood

Pro

tection

Work

s

Havelia

n

Havelia

ndo

4.0

00

-4.0

00

_4

.00

0

3R

ehab/R

epair

ofF

lood

Pro

tection

Work

s

Jangra

Kashka

Jangra

Kashka

do

5.5

00

-5.5

00

_5

.50

0

4R

ehab/R

epair

ofF

lood

Pro

tection

Work

s

Hazeera

Are

a

Hazeera

do

5.0

00

-5.0

00

_5

.00

0

5R

ehab/R

epair

ofF

lood

Pro

tection

Work

s

Upper

Salh

ad

Salh

ad

do

2.0

00

-2.0

00

_2

.00

0

6R

ehab/R

epair

ofF

lood

Pro

tection

Work

s

Salh

ad

do

do

4.0

00

-4.0

00

_4

.00

0

7R

ehab/R

epair

ofF

lood

Pro

tection

Work

s

Sia

nD

aK

ath

a

Sia

Da

Kath

a1.0

00

1.0

00

1.0

00

Su

bTo

tal(

c)

25.5

00

25.5

00

25

.50

0

Su

bTo

talN

ew

(a

+b

+c)

92.1

71

62.5

30

62

.53

0

Narr

ian

Sum

mandar

Khatta

U/C

Nagribala

Nagribala

4.0

00

_4.0

00

_4

.00

0

Su

bTo

tal(B

)4.0

00

4.0

00

_4

.00

0

B)

New

Un

ap

pro

ved

Sch

em

es

68

SE

CT

OR

:IR

RIG

AT

ION

DIS

TR

ICT

RE

CO

NS

TR

UC

TIO

NU

NIT

:A

BB

OT

TA

BA

D

RE

CO

NS

TR

UC

TIO

NA

GE

NC

Y:

IRR

IGA

TIO

ND

EP

TT.A

BB

OT

TA

BA

D

Tota

lF

ore

ign

Aid

(FE

C)

Rupee

Fo

reig

nE

xch

an

gTo

tal

12

34

56

78

9

AN

NU

AL

WO

RK

PL

AN

20

07

-08

Location

S#

i).

Nam

eofth

eP

roje

ct

ii).Location

Appro

ved

By

DR

AC

/PS

C/S

SC

ER

RA

Board

CD

WP

/EC

NE

C

Date

sofA

ppro

val&

Com

ple

tion

Estim

ate

dC

ost

Estim

ate

d

Expenditure

up

toJune

2007

Tota

l(F

.Aid

)

Allo

cation

for

2007-0

8

Gan

dTo

tal(

A+

B)

96.1

71

66.5

30

69

Secto

r:In

dustr

ies

Dis

tric

tR

econstr

uction

Unit:

Abbottabad

Reconstr

uction

Agency:

NW

FP

Industr

yD

epart

ment

To

tal

Fo

reig

n

Aid

(FE

C)

Ru

pee

Fo

reig

n

Ex

chan

ge

To

tal

12

34

56

78

9

1G

PG

CC

jhangi A

.A

bad

Jhangi

DR

AC

7th

Meeting

23

Nov,

2006

10.0

2_

_5.0

10

_5.0

10

2G

CT

A.A

bad

Abbottbad

do

10.0

0_

_5.0

00

_5.0

00

3D

istt.T

ransport

Auth

ority

Offic

eC

ity

Abbottabad

do

10.0

6_

_5.0

30

_5.0

30

4G

TV

C(W

)S

heik

hulb

andi

A.A

bad

Sheik

hulb

andi

do

45.0

0_

_22.5

00

_22.5

00

5G

TV

C(B

)N

aw

anshehr

A.A

bad

Naw

ashehr

do

2.0

0_

_1.0

00

_1.0

00

To

tal

77.0

80

38.5

40

38.5

40

AN

NU

AL

WO

RK

PLA

N2007-0

8

Est

imat

ed

Ex

pen

dit

ure

Up

to

Jun

e,2

00

7,T

ota

l(F

-

Aid

)

All

oca

tio

nfo

r2

00

7-0

8

A)

On

go

ing

Lo

cati

on

S#

i.N

ame

of

the

pro

ject

ii.

Lo

cati

on

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

D

CD

WP

/EC

NE

C

(Dat

eso

fap

pro

val

&co

mp

leti

on

)

Est

imat

edC

ost

70

Agriculture

Dis

tric

tR

ec

on

str

uc

tio

nU

nit

:A

bbottabad

Re

co

ns

tru

cti

on

Ag

en

cy

:A

griculture

Deptt.A

bbottabad

To

tal

Fo

reig

n

Aid

(FE

C)

Rupee

Fore

ign

Exchange

Tota

l

12

34

56

78

9

1

Repair

ofD

istA

griculture

Offic

e/E

xective

Dis

t

Offic

eA

griculture

and

Resid

entialC

olo

ny

etc

JhangiA

td_

8.0

00

__

4.0

00

_4.0

00

2

Constu

rcio

nofO

ffic

es,

Nath

iagali,H

avelian,

Lora

&R

esid

ences

Havelian,Lora

and

Nath

iagali

_15.0

00

__

5.0

00

_5.0

00

3

Constu

rctionof24

No

Offic

e/R

esid

ences

for

field

assis

tant.(U

/CLevel

Agriculture

Dept

Dis

tric

tA

td_

24.0

00

__

8.0

00

_8.0

00

4

Soil

conserv

ation

work

;

Spurs

,P

rote

ction

Bunds,

Chek

Dam

sand

Develo

pm

etofW

ate

r

Dis

tric

tA

td_

7.7

00

__

4.0

00

_4.0

00

5

Reconsru

cio

nof

wate

rcours

es

and

wate

r

sto

rage

tanks

Dis

tric

tA

td_

9.7

75

__

4_

4

6R

econst&

Repair

of

Offic

eB

lock

Dis

tric

tA

td_

0.6

10

__

0.6

10

_0.6

10

7R

econst&

Repair

ofV

ty:

Hospital

Dis

tric

tA

td_

4.7

30

__

4.7

30

_4.7

30

Se

cto

r:

AN

NU

AL

WO

RK

PLA

N2007-0

8

A)

On

Go

ing

Pro

ject

(Un

ap

pro

ved

)

Lo

cati

on

S#

i.N

am

eo

fth

ep

roje

ct

ii.

Lo

cati

on

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

D

CD

WP

/EC

NE

C

(Dt

fl

Est

imate

dC

ost

Est

imate

d

Expendit

ure

Up

toJu

ne,2007,

Tota

l(F

-Aid

)

All

ocati

on

for

2007-0

8

71

Agriculture

Dis

tric

tR

eco

nstr

ucti

on

Un

it:

Abbottabad

Reco

nstr

ucti

on

Ag

en

cy:

Agriculture

Deptt.A

bbottabad

To

tal

Fo

reig

n

Aid

(FE

C)

Ru

pee

Fo

reig

n

Ex

chan

ge

To

tal

12

34

56

78

9

Secto

r:

AN

NU

AL

WO

RK

PL

AN

20

07

-08

Lo

cati

on

S#

i.N

ame

of

the

pro

ject

ii.

Lo

cati

on

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

D

CD

WP

/EC

NE

C

(Dt

fl

Est

imat

edC

ost

Est

imat

ed

Ex

pen

dit

ure

Up

toJu

ne,

20

07

,

To

tal

(F-A

id)

All

oca

tio

nfo

r2

00

7-0

8

8R

econst&

Repair

of

Cam

pO

ffic

e_

1.9

90

__

1.9

90

_1.9

90

9R

econst&

Repair

of

Vety

:H

ospitalH

avelia

nH

avelia

n_

6.0

00

__

6.0

00

_6.0

00

10

Reconst&

Repair

ofV

ey:

HospitalLora

Lora

_6.0

00

__

6.0

00

_6.0

00

11

Reconst&

Repair

of

Vety

:H

ospitalB

akote

Bakote

_6.0

80

__

6.0

80

_6.0

80

12

Reconst&

Repair

of

Vety

:H

ospitalS

herw

an

Sherw

an

_6.0

00

__

6.0

00

_6.0

00

13

Reconst&

Repair

ofV

ety

Dis

pensary

Kala

Bagh

Nath

iagali

_6.0

00

__

6.0

00

_6.0

00

14

Reconst&

Repair

of

Govt:

Poultry

Farm

Mandia

n

Jhangi

_4.8

00

__

4.8

00

_4.8

00

106.6

85

67.2

10

67.2

10

To

tal(O

nG

oin

g)

72

Se

cto

r:F

ore

str

y

Dis

tric

tR

eco

nstr

uctio

nU

nit:

Abbott

abad

Re

co

nstr

uctio

nA

ge

ncy:

NW

FP

Fore

st

Depart

ment

Tota

lF

ore

ign

Aid

(FE

C)

Rupee

Fore

ign

Exch

ange

Tota

l

12

34.0

00

56

78

9

1R

econstr

uction

and

repair

of

dam

aged

build

ings

ofN

WF

P

Fore

stD

epart

mentin

Dis

tric

t

Abbott

abad

6th

DR

AC

meeting

29,

Sep

2006

85.7

23

_5

5.3

01

_5

5.3

01

2

Reconstr

uction

and

repair

of

dam

aged

build

ings

ofN

WF

P

Wild

life

Depart

mentin

Dis

tric

t

Abb

ottabad

Abbott

abad

DR

AC

27,

Sep

2006

5.1

38

__

5.1

38

_5

.13

8

90.8

61

60.4

39

60.4

39

AN

NU

AL

WO

RK

PLA

N2007-0

8

A)

On

go

ing

Est

imat

edC

ost

All

oca

tion

for

2007-0

8S

#i.

Nam

eof

the

pro

ject

ii.

Loca

tion

Appro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

D

CD

WP

/EC

NE

C

(Dat

esof

appro

val

&co

mple

tion)

Est

imat

ed

Expen

dit

ure

Up

to

June,

2007,

Tota

l(F

-Aid

)

Loca

tion

73

SE

CT

OR

:F

oo

d

DIS

TR

ICT

RE

CO

NS

TR

UC

TIO

NU

NIT

:A

BB

OT

TA

BA

D

RE

CO

NS

TR

UC

TIO

NA

GE

NC

Y:

ER

RA

To

tal

Fo

reig

n

Aid

(FE

C)

Ru

pee

Fo

reig

n

Ex

chan

ge

To

tal

12

34

56

78

9

1R

eh

ab

ilita

tio

no

fe

xis

tin

gP

RC

Ha

ve

lian

u/c

Ha

ve

lian

DR

AC

26/0

3/2

007

1.5

00

__

1.5

00

_1

.50

0

2R

eh

ab

ilita

tio

no

fe

xis

tin

gP

RC

Sa

lha

d

u/c

Ab

bo

tta

ba

dD

RA

C26/0

3/2

008

1.6

00

__

1.6

00

_1

.60

0

3R

eh

ab

ilita

tio

no

fe

xis

tin

gP

RC

jha

ng

i

u/c

Ab

bo

tta

ba

dD

RA

C26/0

3/2

009

0.4

00

__

0.4

00

_0

.40

0

4C

on

str

uctio

no

f3

No

s.

Gra

ing

od

ow

ns

in

PR

CH

ave

lian

u/c

Ab

bo

tta

ba

dD

RA

C26/0

3/2

010

17

.73

9_

_7

.00

0_

7.0

00

To

tal

(Ne

w)

21

.23

91

0.5

00

10

.50

0

On

goin

g

AN

NU

AL

WO

RK

PL

AN

20

07

-08

S#

i.N

ame

of

the

pro

ject

ii.

Lo

cati

on

Ap

pro

ved

by

DR

AC

/PS

C/S

SC

ER

RA

BO

AR

D

CD

WP

/EC

NE

C

(Dat

eso

fap

pro

val

&co

mple

tion)

Est

imat

edC

ost

Est

imat

ed

Ex

pen

dit

ure

Up

to

Jun

e,2

00

7,T

ota

l(F

-

Aid

)

All

oca

tio

nfo

r2

00

7-0

8

74

Secto

r:Liv

elihood

Sponcering

Org

:E

RR

AR

up

ee

sin

Millio

n

To

tal

Fo

reig

n

Aid

(EF

C)

To

tal

Fo

reig

n

Aid

(FE

C)

Ru

pe

eF

ore

ign

Exch

an

ge

To

tal

1

Pro

mo

tio

no

fH

igh

Yie

ldin

g

Ce

rea

ls,

Ve

ge

tab

les

an

dF

ruit

Orc

ha

rds

Ap

pro

ve

db

y6

thD

RA

C

on

26

-09

-20

06

57

.45

2-

--

21

.88

7-

21

.88

7

2

Se

ttin

gu

po

fS

ee

dC

um

De

mo

nstr

atio

nF

arm

do

13

.47

0-

--

6.4

82

-6

.48

2

3

Co

nstn

./L

inin

go

fW

ate

rC

ou

rse

s,

Wa

ter

Sto

rag

eTa

nks

an

dP

LL

(Wa

ter

Ma

na

ge

me

nt)

do

44

.11

0-

--

15

.14

0-

15

.14

0

4

En

viro

nm

en

tal/R

eh

ab

ila

tio

nin

the

Ea

rth

qu

ake

Affe

cte

dA

rea

sd

o2

1.8

53

--

-7

.17

3-

7.1

73

5

Wo

me

n's

SkillT

rain

ing

sin

Fru

its

an

dV

eg

:P

rese

rva

tio

nIn

the

EQ

A

Are

as

do

3.0

45

--

-1

.55

7-

1.5

57

6

Esta

blish

me

nt

ofA

gro

-Ve

terin

ary

Se

rvic

es

Ce

ntr

es

do

5.0

00

--

-5

.00

0-

5.0

00

7

Tra

inin

gfo

rth

eF

arm

ers

&F

ield

Sta

ffd

o5

.00

0-

--

3.0

00

-3

.00

0

8R

esto

ckin

go

fL

ive

sto

ck

&P

ou

ltry

do

34

.63

0-

--

10

.00

0-

10

.00

0

9

Str

en

gth

en

ing

of

Liv

esto

ck

De

pa

rtm

en

td

o1

7.0

00

--

-8

.00

0-

8.0

00

10

Re

affo

resta

tio

n/R

eh

ab

ilita

tio

nin

the

EQ

AA

rea

sin

Ga

lis

Fo

rest

Div

n.

do

45

.53

2-

--

18

.14

1-

18

.14

1

Estim

ate

dC

ost

Estim

ate

d

Exp

en

ditu

reu

pto

Ju

ne

20

07

Allo

ca

tio

nfo

r2

00

7-0

8N

am

eo

fS

ch

em

e&

Lo

ca

tio

n(T

he

Pro

jects

are

tob

eim

ple

me

nte

din

all

9U

nio

nC

ou

ncils

of

the

EQ

affe

cte

dA

rea

s)

Ap

pro

ve

db

y

DR

AC

/PS

C/S

SC

/ER

RA

Bo

ard

/CD

WP

/EC

NE

C

(Da

teo

fA

pp

rova

l&

Co

mp

letio

n)

A.

On

go

ing

Nil

B.

Ne

w(A

pp

rov

ed

)

AnnualW

ork

Pla

n2007-0

8

Ag

ric

ult

ure

S.N

o.

Fo

res

try,

Wil

dli

fe&

Fis

he

rie

s

75

Rupees

inM

illio

n

Tota

lF

ore

ign

Aid

(EF

C)

Tota

lF

ore

ign

Aid

(FE

C)

Rupee

Fore

ign

Exchange

Tota

l

Estim

ate

dC

ost

Estim

ate

d

Expenditure

up

to

June

2007

Allo

cation

for

2007-0

8N

am

eofS

chem

e&

Location

(The

Pro

jects

are

tobe

imple

mente

din

all

9U

nio

nC

ouncils

ofth

eE

Q

affecte

dA

reas)

Appro

ved

by

DR

AC

/PS

C/S

SC

/ER

RA

Board

/CD

WP

/EC

NE

C

(Date

ofA

ppro

val&

Com

ple

tion)

S.N

o.

11

Wate

rshed

Activitie

sin

EQ

Are

as

do

99.9

21

--

-37.3

36

-37.3

36

12

Pro

motion

ofM

edic

inalP

lants

and

Mushro

om

Cultiv

ation

do

11.5

03

--

-7.1

74

-7.1

74

13

Pro

motion/E

sta

blis

hm

entof

Sericulture

and

Apic

ulture

Activitie

sdo

32.4

38

--

-16.7

89

-16.7

89

14

Esta

blis

hm

entofW

ildlif

eP

ark

do

58.0

20

--

-9.8

84

-9.8

84

15

Pro

motion

ofA

vic

ulture

(Bird

Farm

ing)

do

26.1

40

--

-10.5

03

-10.5

03

16

Esta

blis

hm

entofC

om

munity

Gam

eR

eserv

es

do

50.8

43

--

-42.3

43

-42.3

43

17

Esta

blis

hm

entofT

handia

ni

NationalP

ark

do

72.5

52

--

-12.9

90

-12.9

90

18

Develo

pm

entofE

coto

urism

in

Galia

tdo

99.9

80

--

-22.9

47

-22.9

47

19

Pro

motion

offa

rmfisheries

do

18.0

00

--

-7.0

38

-7.0

38

20

Esta

blis

hm

entofV

ocational

Tra

inin

gC

entr

es/Incom

e

Genera

tin

gP

rogra

mm

edo

22.5

53

--

-10.5

64

-10.5

64

To

tal

739.0

42

273.9

48

273.9

48

Ind

ustr

ies

(Vo

cati

on

alC

en

tres)

76

ANNEX B

UNION COUNCILS OF DISTRICT ABBOTTAABDAs per provincial govt. notification No PEA/1(8)2005 dated 20th June 2005

1 DALOLA DALOLA Dalola, Dabban, Naroka 18900

NAME OF MOUZZIAT POPULATION

S.NO UNION COUNCIL

PATWAR

CIRCLE (HALQA PATWAR)

(1998

CENSUS)

BOIBoi, Bandi Samad, Barbeen, Batangi,

Diddal, Nakka,Pal, Rankot, Tori

2 BOISAMBLI

DHERISambli Dheri, Bandi Hamza, Bandi Pahar,

Chak, Gali Mohri, Phogran 17001

3 KUKMONG KUKMONG Kukmong, Kothiala, Pattan Kalan 10843

4 NAMBAL NAMBAL Nambal, Majuhan 14173

P/ KALAN Pattan Kalan

5 PATTAN KALAN SIALKOTSialkot, Bandi Saraha, Banota, Chamiali,

Khokhriala, Larri 16116

BAKOT Bakot

6 BAKOT MOOLIA Moolia, Sangal 23153

B/KALAN Berote Kalan, Kahoo Sharqi7 BEROTE KALAN

B/KHURD Berote Khurd, Kahoo Gharbi 26012

PALAK Palak, Arwar, Darwaza, Soorjal8 PALAK

RIALA Riala, Kala Ban, Longal, Malkot 18997

9NAGRIL BALA

N/BALA Nagri bala, Akhroota, Makool bala, Tatreela 12911

MALACH Malach, Keri Sarfali, Pasala10 NATHIA GALI

BAGAN Jhansa, Lassan 16702

11 NAMLI MAIRA

NAMLI

MAIRADhaki Khaiter, Namli Maira, Noormang,

Panghora 11093

12BAGNOTAR

BAGNOTAR Bagnotar, Bandi Maira, Chhaan 9352

13BEERANGALI

B/GALI Beerangali, Adndarseri, Jhafar 12329

14 SARBANA SARBANASarbana, Desal, Khun, Seergah, Sadra,

Mohar Khurd, Aziz Bang, Sangli, Sawal 11343

15PHALKOT

PHALKOT Phalkot, Malsa 9777

16 BAGH BAGH Bagh, Jaggian, Kohalian, Kehial 13240

17 KUTHWAL CHATRIChatri, Bandi Mansoor, Gali Banian,

Kuthwal, Maira Rehmat Khan, Mohar Kalan 11669

BANDI

DHUNDAN Bandi Dhundan, Banda Pir Khan

18 BANDA PIR KHAN TARNAWAI Tarnawai 25385

19 BALDHERI BALDHERI

Baldheri, Gojri, Hal Maira Tarla, Hal Maira

Utla, Jalalpura, More More Kalan, Sajikot,

Tannan 14796

20

MIRPUR(50%R) MIRPUR

Mirpur 18765

77

Mandroch Khurd

N/SHEHR

SHAMALI Nawanshehr Shamali

N/SHEHR

JANOOBI Nawanshehr Janoobi

DHAMTOUR Dhamtour, Banda Shohalian, Guldhok

22 DHAMTOUR NAGAKI Nagaki, Banda Bazdar, Jaswal, Ukhreela 18493

23 SHEIKHULBANDI(50%R) S/BANDISheikhulbandi, Qasba A/Abad, Rakh Civil

/Military 18193

24 SALHAD(50%R) SALHAD

Salhad, Khokar 21211

25 JHANGI(75%R) JHANGI

Jhangi, Banda Amlok, Banda Batang, Banda

Faizullah, Banda Gasan , Banda Khair Ali

Khan, Banda Lamba Banda Noor Ahmad,

Banda Phagwarian, Banda Qazi, Banda Sher

Khan, Dheri, Dobather 26226

KAKOT

Kakot, Bandi Matrach, Bazurgal, Chatrhi,

Gogarhi, Pando Thana, Garamri, Pasial,

Patheri Syedan, Peshail, Sargal, Sherbai, Sial,

Talehar, Thathi

26 PAWA PAWA

Pawa, Banda Jagian, Kamhar, Bandi Kishna,

Laley-De-Bandi, Mochi Kot, Paswal Mian,

Richbhen, Sohlan Bala, Sohlan Tarli 18326

CHAMHAD Chmhad, Bagh Darah, Beram Gali, Bisala,

Chamak Maira, Fateh Bandi, Khani Thathiara,

Sarbangala, Shadial

27 CHAMHAD

KASAKI

KALAN

Kasaki Kalan, Kasaki Khurd, Baghati, Bain

Gojri, Bain Noora, Banseri, Bhoraj, Botiala,

Daroparh, Jattal, Mehal, Thana 17824

P-KARGU

KHANPing Kargu Khan, Barkot, Haal, Khalora

Tarla, Khalora Utla

LAKHALALakhala, Gandah, Kangrora, Khanda Khoo,

Pind

28 PIND KARGU KHANSERI SHER

SHAH

Seri Sher Shah, Bandi Nikra, Bareela, Bacha

Kalan, Bacha Khurd, Chahar, Chatha,

Tandhara, Kanger Bala, Pohar, Rata 17755

29 KUTHIALA KUTHIALA Kuthiala, Gheley, Gup, Joghan Mar,

Mukhdabi, Nallah, Paswal, Salyut, Sobra,

Thali, Todoo

11647

30 JARRAL JARRAL Jarral, Bacha Sani, Bhajwal, Gul Bandi, Jabbi,

Khutiala, Kotnali, Nakhey6945

SHERWAN

Sherwan Kalan, Sherwan Khurd, Bamochi,

Bhateel Kalar, Khaitar, Kumhar(Amir Abad),

Shaheedabad, Thorey

31 SHERWAN

CHAMHATI Chamhati, Beri, Chakar, Bain, Chorgran, Juna,

Kamila, Kangar Pin, Khalabat, Kharperh,

Thati Ahmad Khan 15307

B-1 Shimla Hill,

B-2 Chari & Chandni Chowk

B-3 Moh: Sher Mohammad

B-4 Moh: Chita pul,

CIRCLE-I B-5 Moh: Jail

B-1 Moh: Dhakki, B-2 Moh: Nazami Darul

Khair,

B-3 Moh: Maira Darul Khair

B-4 Chitta Pul, Madni Mohallah

32 MALIKPURA (URBAN) CIRCLE-II B-5 Chitta Pul New Tehsil, Circular Road 16530

78

NAME OF MOUZZIAT POPULATION

S.NO UNION COUNCIL

PATWAR

CIRCLE (HALQA PATWAR)

(1998

CENSUS)

Kanshirpura

CIRCLE-II B-6 Bus Stand, Moh: Sapan, Sabzi Mandi

B-1 Moh: Forest, Moh: Sikandar, Ahata

Kotchary, Moh: Rais Khan,

B-2 Moh: Noor-Ud-Din, Ahata Mian, Diggi

Mohallah

B-3 Moh: Thakar, Gardwara, Jalian Moh: ,

Wakeel Moh: , Sirsyed, Moh: Saiban

CIRCLE-III B-4 Kadim Board Office, Aram Bagh

B-1 Kunj Jadeed

B-2 Kunj Qadeem

B-3 Dak Buglow, Kunj Ground, Qabli

Mosque, Comp: School

33

CENTRAL

ABBOTTABAD CIRCLE-IV B-7 Chari Moh: New Abadi, Kund Jadeed 15096

B-4 Moh: Mag: , Moh: Asif Shah, Abu-Zar

Street

B-5 Saddiqua Mohallah

CIRCLE-IV B-6 Moh: Farooq Azam, Moh: Usmanian

B-1 Karbala, Lower Kehal

B-2 Upper Kehal

B-3 Khola Kehal, Moh: Kassi, Moh: Piran

B-4 Khola Kehal, Moh: Sardar Sadiq,

B-5 R.O.Office, Makki Mohallah

34 KEHAL (URBAN) CIRCLE-V B-6 Moh: Uchari, Arambagh 15983

35 NAWANSHEHR (URBAN) CIRCLE 1 to 3

Moh: Muhammad Zai, Moh: Nia, Ilyasi, Moh:

Sohaib Zai, Moh: Imran Zai, Joggan, Moh:

Mosa Zai, Kund, Moh: Khalil Zai, Dhodial 19371

Tehsil HavelianGHARI

PHULGRAN

Ghari Phulgran, Harnara, Ghora Bazgran,

Mannan, Kiala

1 GHARI PHULGRAN RAJOYA Rajoya, Thith Ochar 20433

2 BANDI ATTAI KHANBANDI ATTAI

KHAN

Bandi Attai Khan, Barseen, Batolni, Kotla,

Manhat, Phullan Wali, Pipal, Salwala, Sureela 13853

JHANGRA Jhangra, Chamba, Kalu Maira, Nowshera

3 JHANGRA (25%U) HAVELIANHavelian (Rural), Darooni Maira, Mala,

Sultanpur, Wazeera 23629

MAJOHANMajohan, Garba, Masah Gojri, Masah Syedan,

Mera Tarla

4 MAJOHAN RIALAChamnaka, Chandu Maira, Dhanak, Hajia,

Karach, Mohari Sanwala, Tarmuchian 15528

LANGRIAL Langrial, Dabran, Karhaki, Gali Batgran

5 LANGRIALDANNA

NOORALDanna Nooral, Baseera, Cholata, Faqir

Muhammad, Lassan, Manjia 12451

NARA Nara, Gohra, Maira Utla, Mohri-Bad-Bhen

6 NARA SATORASatora, Dakhan, Ghangah, Kanger Hoter,

Kehan Mari 15690

7 DEWAL MANAL SAJIKOTSajikot, Ghehr, Dewal Manal, Makool Tarli,

Nagri Tarli 10899

GOREENI Goreeni, Kotal, Palasi

8 GOREENI DANNAHDanah, Bagla, Bajarian, Banwari, Suma

Garhaga 15516

9 PHALLAH GHAMBEERPhallah, Ghambeer, Ateran, Dheri Rakhala,

Gali Kashmir, Ropar 18996

79

NAME OF MOUZZIAT POPULATION

S.NO UNION COUNCIL

PATWAR

CIRCLE (HALQA PATWAR)

(1998

CENSUS)

RAHIRahi, Battal Kund, Bhajoora, Charbat,

Dhakhan, Paisar, Maira, Sher Pur

10

LORA

LORALora, Dheri Kiala, Ghari Ghora, Narhoter,

Noorpur, Seri Thath Karam Shah 11733

11 LANGRA LANGRA Langra, Banda Sahib Khan, Lari 16705

HAVEILAN

(URBAN)

Moh: Loharan, Moh: Bega, Street Rozi Shah,

National Bank, Lunda Bazar, Post Office

Road, Moh: Upper Bega, Forest Check Post,

Moh: Kashmarian, Street Dr. Farid, Street

Naseem Sarhadi, Moh: Tanki, Moh: Tall,

Moh: Tamber Market, Moh: Qabli, Moh:

Mehboob Abad, Moh: Al-e-Hadees, Moh:

Behram Khan, Kathra, Mian Feroz Shah,

Moh: Markazi Jamia Masjid, Street Ajab Khan

Zaib, St: Iqbal Market, Moh: Toti Khan, Moh:

Roshan Din, Moh: Qasab, Moh: Zaman Shah,

Gali Chan Pir, Gali Muhammad Din, Moh:

Azam Khan, Abadi Tel: Exchange etc

12 HAVELIAN (URBAN) KOKAL Kokal, Gajjal, Jandaka 20566

13 SEER GHARBI SEER GHARBI Seer Gharbi, Bashbher, Malmola 8895

14 TAJWAL TAJWAL Tajwal, Nowshera, Pirkot, Topla 9766

15

NAGRI TOTIAL NAGRI

TOTIAL Nagri Totial 9358

16

SEER SHARQI

BHATTIAN SEER SHARQI Seer Sharqi, Bhattian, Taror 8274

80

NAME OF MOUZZIAT POPULATION

S.NO UNION COUNCIL

PATWAR

CIRCLE (HALQA PATWAR)

(1998

CENSUS)

Annex-C

Contacts of key Governmental and

Non- Governmental Organization

District Abbottabad

Sardar Haider Zaman Nazim Aala 9310209 9310391 0300-5636291

Office Phone Fax Mobile

District Government Abbottabad

Mr Arshad majeed 9310200-01 9310202

EDO Agriculture 383026 380325-381357

EDO Agriculture Ishtaiq Abbasi 380302-6DO Agriculture

Younis sb 380325

EDO Colleges GPGC # 1 Atd Pro.Riaz-ul-Islam 9310126 9310126

EDO Education Bashir HussainShah 9310102 9310102

EDO F&P Ishtiaq Qureshi9310333-35

Res.9310336 -9310202

EDO Health Dr. Javid 9310191-2 9310196 0300-5641455

EDO Industeries 382211 383444

EDO Schools & Literacy BashirShah sb 9310102 9310102 0300-5924956

EDO Social Welfare Aurang ZebAbbasi 9310359 0304-5049444

EDO W&S 9310258 9310202

D EDO Health Dr. SardarMuhammad 0333-5038289 0345-9598998

Sardar Nawaz ADO Education 9310102 9310102 0300-8366328

Assitant Coordination Officer 9310203 9310202

Assistant Director Information 9310165

Abbottabad Developmetn Authority 9310241 0345-9541104

Sub. Registrar Tehsil atd 03004-5003090

Bait-ul-mall office 9310262

BISE Abbottabad 392013

Cant Board Executive 9310181 0345-9522663

Conservator Forest 9310323 0300-5621164

Deputy Director NHA Atd

383113-381164-382117 384627

D Dir. Public Health 382176 9310242

81

D Dir. W & S Ijaz Ansari 9310242 0300-5631727

D DRO 0300-5733755

D E PTCL Zahoor ab 380455 380444

DFO Galiyat 9310306

DFO Wild Life Ayubia National Prk 9310340

DFO Water Shed 9310305

DFO WaterShed9310305-303-

233

DFO WILDLIFE 9310323

Dir. Audit ERRA Jinnah Abad Office 380456

Dir. Finance Bashir Ayub MedicalComplex 0301-8175850

Dir. Maintanence AMC Atd 382348

Dist. Food Controller Munir Shah 9310326

Dist. Information Officer 9310165

Distrcit and Session Judge 9310051

Distrcit Planning Offcier 9310337

District Account Officer 9310219-351 9310352

District Council Atd 9310250

DO Social Welfare 380047

DOR Abbottabad 9310207 0333-9116063

Engr. Shafqat sb Cantt. Board 9310180 0333-5216543

Excise & Taxstion Officer 9310308

Frontier House 9310212

Frontier House + Governer House 9310212

GDA Abbottabad 9310241

GM PTCL 337728

Grid Station Mandian 380742

Gul Hameed Khan Sui Gas 9310069

Gul Hameed Sales Officer SNGPL 9310074

Gul Muhammad Conservator Forest 9310304 9310233

Gul Sb SNGPL 0306-5047797

Gul Shahzad Irrigation 0345-9552018

Hayat Ali Shah District & SessionJudge 9310051

HRD Officer Habib Ullah Jadoon 9310200-01

Information Officer (Mubashir/Arif) 9310165

INOR Cancer Hospital Sajid 385461-62

M Naseer RM SNGPL 9310076

NADRA ERRA IN DCO Office 335356

82

Office Phone Fax Mobile

District Government Abbottabad

NPB APS Branch 380537 0345-9180834

Press Club Atd 337797

Rafi-ud-Deen CNW..W & S 9310344 9310343 0333-5039210

Raja Ashraf C & W PERRA Raffi-udin Office 0333-5055203

Range Officer WildLife Khurshid Sb 0304-5033257

S E PESCO ATD 9310404 9310405

Sajjad Shah PICIC Bank 0304-5003646

Sanitaion Officer Cant. Board 9310180

Sarfraz sb DSP Headquarter Atd 9310034

Sec. District Council/ Naib Nazim 9310106

Shakeel Ahmed Exchange Mandian 0300-9119634

SNGPL 9310070

Station Commandar 9310423

Sultan Haroon PTCL 380770 0300-9114755

Tariq sb Sports Officer 9310224 0345-9556668

Tourism Office 9310168

Wapda Grid station 9310089

Wapda Complaint office 384078

XEN Irrigation Mazhar sb 9310246-47 0300-9155450

XEN Parviz Khan Sb 9310081

XEN Shabir sb Kaghan Colony XENOperaton 390805 0301-8583170

Zahida Yasmeen Social WelfareOfficer 0304-5010239

Social Welfare Officer Munir sb 0304-5010483

Tehsil Nazim 9310373 9310202

Tehsil Nazim Havalian MehmoodHayat Abbasi 812810 0301-5164207

TMA Abbottabad Arbab Jamil Sb 9310399 330931 0301-8704500

TMA Havelian 810825 810878 0300-5630595

Engr.Zahid sb TMA Office Atd. 9310248

District Reconstruction UnitAbbottabad

Nazar Hussain Shah Prog.Manager 380386 0300-5998537

Faisal Azam M&E Section 0992380056 03219802248

NGOs/Ios

Abid Gil UNICEF 383449 0333-4264166

Al Haji Bha UNICEF 382935 0300-5018785

83

Office Phone Fax Mobile

District Government Abbottabad

Aniq sb DOSTI 0997-302734 0333-5058092

Anwar Ul haq PM UNDP 381239 0301-8550779

Arthur CARITAS 0997-4403940301-519405403219670716

BEST 3335043720

Bilal sb DOSTI 0997-302734 0345-9174813

CESSD 337511

DONA PM World Vision 440356

DOSTI 385240

Dr. Builal UNICEF 0333-9292920

EEF 331546

International Relief 305152

Miss Shoko Noda UNDP051-2800133

ext 2818 2800031-34 0300-8568770

Miss Tanver Ocha 3018166234

Mukhtair Javid Sungi 0304-5006043

Mumtaz Tanoli Umar Asghar Khan 381529 0304-5032298

NCHD 383518

PERA CARITAS 0302-5473423

Sky Inn 385199

SMU Unicef 331488

SRSP 343739/334126 334109 0300-5613264

SUNGI BOI FIELD OFFICE845011-845397

SUNGI Samina Khan Exective Dir.

334750-336957-333414 337126

Surkhab sb DOSTI 0997-302734 0304-5011180

UMAR ASGHAR FOUNDATION 385699 3834180

UNDP Atd Waheed Anwar 381239-40 0301-8542472

UNDP Islamabad 051-2652840

UNICEF

383449-382935-383267

Waheed Ocha 0300-5883038

Wajid Accounts International Relief 0300-5874705

Dr.Javid Ali Khawaja (CARITAS) 0997-440394 0300-3037242

Hamayat Shah Shell Pakistan 0300-5925699

Zia-ud-din Shell Pakistan 0300-8116490

84

Office Phone Fax Mobile

District Government Abbottabad

District Profile Development Team

Earthquake Reconstruction and Rehabilitation Authority

ERRA

Lt. Gen Nadeem Ahmed Deputy Chairman ERRA

Khadija Khan Chief Knowledge Management

Abdul Akbar Shah Research Officer

Hina Tabassum Cheema Research Officer

Taniya Shah Research Officer

Waheed Ahmed Research Officer

Ishtiaq Ahmed Sandhu GIS Specialist

Zahid Malik Data Analyst

State Earthquake Reconstruction and Rehabilitation Agency

SERRA (AJK)

Dr. Syed Asif Hussain Director General – SERRA

Dr. Syed Ghulam Haider Kazmi Regional Planning Expert

Malik M. Sadiq District Planning Expert

DRU, Bagh

Muhammad Khan Ranjha District Planning Expert

DRU, Rawalakot

Qaiser Alam Khan District Planning Expert

DRU, Muzaffarabad

Mr. Habib Ullah Khan Director General - PERRA

Provincial Earthquake Reconstruction and Rehabilitation Agency

PERRA (NWFP)

Musaddiq A. Khan Provincial Planning Expert

Mohammad Ashraf District Planning Expert

DRU, Mansehera

Abdul-Haleem & Faisal Azam M&E Officers

DRU, Abbottabad

Ayaz Gul District Planning Expert

DRU, Battagram

Noor-ul-Hadi M&E Officer

DRU, Kohistan

S. Bahadur Qutoshi Senior Program Coordinator

DRU, Shangla

85

Other Publications

of

Earthquake Reconstruction and Rehabilitation Authority (ERRA)

Published

Annual Review 2005-06 District Profiles

1. Rebuild Revive With Dignity & Hope 1. Muzaffarabad/Neelum

ERRA’s Sector Wise Strategies 2. Rawalakot/Poonch

1. Rural Housing 3. Bagh

2. Urban Housing & Town Planning 4. Abbottabad

3. Health 5. Mansehera

4. Education 6. Battagram

5. Governance 7. Shangla

6. Water Supply & Sanitation 8. Kohistan

7. Transport ERRA Brochure

8. Environment ERRA Newsletter (Monthly)

9. Livelihood

10. Power

11. Social Protection

12. Telecommunication

Soon to be Published

1. Annual Review 2006-07

2. Case Studies

i- Housing ii- Livelihood Cash Grants

iii- Social Sector (Health & Education) iv- Handling of IDPs

Knowledge Management Cell (KMC)

Earthquake Reconstruction & Rehabilitation Authority (ERRA)

Prime Minister’s Secretariat (Public) Ph: +92-51-9030-967

Islamabad Fax: +92-51-9030-949 URL: www.erra.gov.pk