Page 1: AASHTO Crumb Rubber Modified (CRM) 1993 Cost … · AASHTO CRM HMA 1993 Cost Survey September 24. 1993 Page 2 • • Below is TABLE A summar~z~ng the results from the survey, state

\ .,

American Association of State Highway and

Transportation Officials

MEMORANDUM

September 24, 1993

To: Standing Committee on Highways

From: Amy Steine~ Subject: AASHTO C';:UHE ~BER MODIFIED (CRM) 1993 COST SURVEY

Wayne Muri, President Chief Engineer

Missouri Highway and Transportation

Depanment

Francis B. Francois Executive Director

At the request of Senate staff, AASHTO was requested this week to provide information on 1993 cost experience by the states with crumb rubber modified hot mix asphalt projects (CRM HMA), based on actual project costs . In the Association's earlier 1993 AASHTO Rubberized Asuhalt Survey released on April 1, 1993, actual costs for 1992 projects was reported, state by state. The Senate staff desires information for 1993 cos~s, to compare with the 1992 . costs in the April 1 report.

To respond to this request, on September 23 }.ASHTO Headquarters faxed a survey form to its member departments, asking for 1993 project cost information for the months of January through September, 1993. The survey was forwarded to all member departments, but concentrated on the 34 departments who advised in our 1993 &~SHTO Rubberized Asuhalt Survey that they planned to construct at least one crumb rubber modified hot mix asphalt pavement project during 1993. By today's survey return deadline, 38 member departments had responded.

The member dep~rtments were requested to p~ovide information under the following headings, based on actual bid prices for their projects, with price/Ton referring to the asphalt mix, not the liquid asphalt.

Number. Size and Cost of Contracts Awarded in Calendar 1993

Month Number of Ave. Size CRM HMA in Tons

Projects

Ave. Cost/Ton Patented

Process

Executive Office: 444 N. Capitol St.. N.W .• Suite 249. Washington D.C. 20001 Telephone (202) 624·5800 Telefax (202) 624·5806 Telex 4900009580 HTO

Ave. Cost/Ton Unpatented

Process

Ave. Cost/Ton Conventional

HMA

Workins To ~

a~j< Connect Am.-ricQ

Page 2: AASHTO Crumb Rubber Modified (CRM) 1993 Cost … · AASHTO CRM HMA 1993 Cost Survey September 24. 1993 Page 2 • • Below is TABLE A summar~z~ng the results from the survey, state

. . AASHTO CRM HMA 1993 Cost Survey September 24. 1993 Page 2

• •

Below is TABLE A summar~z~ng the results from the survey, state by state. Of the 38 responding states, 13 reported that they have not yet undertaken a CRM HMA project in 1993. Accordingly, TABLE A includes cost data from 25 states that have 1993 CRM HMA projects.

The average cost of CRM HMA pavements for the six states reporting utilization of a patented process was $44.81/Ton. The range of cost for the CRM HMA was from a low of $35.58/Ton (KS) in June, to a high of $56.00/Ton (NV) in August. The average cost paid for conventional HMA in these six states was $24.23/Ton, ranging from a low of $18.59 (MT) in June, to a high of $28.65 (KS) in June.

Of the 22 states reporting use of an unpatented process, three states also used a patented process. The 22 states utilizing an unpatented process reported an average cost for CRM HMA of $48.35 per ton, from a low of $30 . 00 (OH) in February, to a high of $96.07/Ton (AL) in July. The average cost paid for conventional HMA in these 22 states was $29.37/Ton, ranging from a low of $19.25/Ton (MN) in September, to a high of $47.40 in May.

It is observed that patented process CRM HMA averaged $44.81/Ton while CRM HMA produced by an unpatented process averaged $48.35.

Overall, the average cost of CRM HMA. ignoring process, was ,$47 . 80, and for conventional HMA $28.60. Thus, average cost of CRM HMA for these 66 actual projects over the period January through September, 1993, was about 67 percent more than the average cost of conventional HMA projects.

Month State

Conventional January CA

February OH MD CA

March AR PA CA NM

TABLE A

AASHTO CRM HMA COST SURVEY, SUMMARY OF RESULTS SEPTEMBER, 1993

# of Ave. tons Ave. S/ton Ave. $/ton Projects per Project No Patent Patented

1 26,500 41. 25

1 4,288 30.00 1 2,200 64.46 2 19,400 45.60

1 12,571 40.89 1 4,963 30.15 2 5,800 59.50 1 30,000 48 . 40

Ave. $/ton

19.63 22.05 29.50

28.00

40.75

Page 3: AASHTO Crumb Rubber Modified (CRM) 1993 Cost … · AASHTO CRM HMA 1993 Cost Survey September 24. 1993 Page 2 • • Below is TABLE A summar~z~ng the results from the survey, state

: ~-.

AASHTO CRM HMA 1993 Cost Survey September 24, 1993 Page 3

April J.;£. 1 9,270 60.72 46.50 NC 1 3,335 48.23 26.94 NY 1 8,820 52.00 23 . 00 CA 3 24,800 42.47 31. 4 7 NM 1 6,416 60.00

May IA 1 10 , 950 36.16 22.50 TN 1 9,000 30.56 24.42 PA 2 3,000 36.23 31. 00 OR 1 10 , 900 34 . 06 25.59 CA 2 4,700 64.38 47.40

June TX 1 26,007 58.92 31. 30 MT 1 8,200 37.60 18 . 59 PA 4 13,221 34.11 28 . 05 KS 3 69,639 31. 93 35.58 28.65 OR 1 4,550 35.03 28.50 CA 5 14, 100 55 . 08 39 . 60 SC 1 1,848 72.23 25.98

July TX 1 18,417 48.75 32.05 AL 1 1 ,296 96.07 31. 96 MT 1 82,880 42.30 20.06 TN 2 11,000 41. 96 22.61 OH 1 6,090 52.25 24.60 VA 1 5000/5000 51. 50 51.50 28.10 lL 2 3 , 670 40.82 32.30 KY 1 3,200 46.26 23 . 88 CA 5 42,700 47.80 33.80

August FL 1 4,397 71. 64 31.15 AL 1 1 ,540 65.00 40.00 CA 4 26,900 41.56 25.67 NV 1 2 , 600 56 . 00 25.00

September J.;£. 1 3,700 74.00 32.00 MN 1 3,500 33.50 19.25 l-!I 1 3 , 600 33.99 38.49 24.61 SD 1 1,100 32.00 20 . 50

SPECIAL NOTES

38 states responded to the survey, of which 13 reported that they have not yet undertaken a CRM HMA project in 1993 . A total of 66 projects were reported.

Michigan reported t ha t they rec e ived a special price discount for t heir CRM pavement.

Page 4: AASHTO Crumb Rubber Modified (CRM) 1993 Cost … · AASHTO CRM HMA 1993 Cost Survey September 24. 1993 Page 2 • • Below is TABLE A summar~z~ng the results from the survey, state

1 r

.. AASHTO CRM HMA 1993 Cost Survey September 24, 1993 Page 4

California and Nevada reported that they reduce the thicknesse s for their CRM pavements.

Virginia bid one contract that contained both a patented and a non-patented process and received one identical per ton price for both processes.

All averages reported are on a per project basis .