Great Kneighton. A Project Update for Trumpington Residents’ Association. The Team. Countryside Properties - Special Projects Jo Clark – Planning Nigel Borrell – Clay Farm Technical James Blair – Clay Farm Site Manager Countryside Properties– Housebuilding Jonathan Gimblett – Development - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: A Project Update for Trumpington Residents’ Association

A Project Update for Trumpington A Project Update for Trumpington Residents’ AssociationResidents’ Association

Great Kneighton

Page 2: A Project Update for Trumpington Residents’ Association

The Team

Countryside Properties - Special Projects

• Jo Clark – Planning• Nigel Borrell – Clay Farm Technical• James Blair – Clay Farm Site Manager

Countryside Properties– Housebuilding

• Jonathan Gimblett – Development• Janice Kain – Glebe Farm Technical• Steve Clarke – Glebe Farm Technical

• Richard Mortimer – Oxford Archaeology• Paddy Mohan – Tamdown

Page 3: A Project Update for Trumpington Residents’ Association

Planning Permissions

On 6th August 2010 the following approvals were granted:

Clay Farm

• Outline planning permission for up to 2250 dwellings, community facilities, 49ha strategic open space, landscaping, infrastructure.

• Full planning permission for the spine road, balancing ponds, landscaping and works to trees

Glebe Farm

• Full planning permission for 286 dwellings, open spaces and landscaping.

Page 4: A Project Update for Trumpington Residents’ Association

Clay Farm Outline Planning Permission

Outline planning permission for up to 2250 dwellings, community facilities, 49ha strategic open space, landscaping, infrastructure.

Page 5: A Project Update for Trumpington Residents’ Association

Full Planning Permission for the Spine Road at Clay Farm

Including works to plantations and formation of balancing ponds

Page 6: A Project Update for Trumpington Residents’ Association

Glebe Farm Full Planning Permission

Full planning permission for 286 dwellings, open spaces and landscaping.

Page 7: A Project Update for Trumpington Residents’ Association

Clay Farm Outline Planning Conditions

Approved:

• Site-wide Ecological Conservation Management Plan• Green Corridor Strategic Landscaping• Groundwater Report• Play Strategy• Allotments and Community Gardens Proposal• Phasing Plan

Submitted but not yet approved:

• Design Code – exhibition on 4th February• Surface Water Strategy• Strategic Construction Environmental Management Plan

Page 8: A Project Update for Trumpington Residents’ Association

Clay Farm Phasing Plan

Page 9: A Project Update for Trumpington Residents’ Association

Clay Farm Design Code – Exhibition on 4th February at Trumpington Pavilion

Page 10: A Project Update for Trumpington Residents’ Association

Current Applications at Clay Farm

Reserved Matters Application for 308 dwellings – submitted 22nd

December. Exhibition on 4th February.

Page 11: A Project Update for Trumpington Residents’ Association

Current Applications at Clay Farm

Reserved Matters Application

for foul pumping station and

works to plantations

Page 12: A Project Update for Trumpington Residents’ Association

The Next Countryside Planning Applications at Clay Farm

Reserved Matters Application for landscaping and drainage west of Hobson’s Brook

Page 13: A Project Update for Trumpington Residents’ Association

The Next Countryside Planning Applications at Clay Farm

Reserved Matters Application for landscaping of the Green Corridor

Page 14: A Project Update for Trumpington Residents’ Association

The Housebuilders

Page 15: A Project Update for Trumpington Residents’ Association

Infrastructure Work at Clay and Glebe Farm

Clay Farm, Glebe Farm and the Cambridge

Biomedical Campus in context

Page 16: A Project Update for Trumpington Residents’ Association

Infrastructure Work at Glebe Farm

Glebe Farm Site Access

Page 17: A Project Update for Trumpington Residents’ Association

Infrastructure Work at Glebe Farm

Glebe Farm off-site improvements to pedestrian and cycle routes

Page 18: A Project Update for Trumpington Residents’ Association

Programme of Work on Site at Clay Farm

• Surface water

• Foul water

• Highways

Page 19: A Project Update for Trumpington Residents’ Association

Clay Farm Spine Road Trees

Page 20: A Project Update for Trumpington Residents’ Association

Clay Farm Spine Road Trees

Page 21: A Project Update for Trumpington Residents’ Association

Glebe Farm Site Layout andTraffic Management Plan 1

Page 22: A Project Update for Trumpington Residents’ Association

Glebe Farm Site Layout and Traffic Management Plan 2

Page 23: A Project Update for Trumpington Residents’ Association

Glebe Farm Aerial View

Page 24: A Project Update for Trumpington Residents’ Association

Glebe Farm Landscaping

Page 25: A Project Update for Trumpington Residents’ Association

Programme Summary

• Site Infrastructure works underway

• House building to start on Clay Farm in June – south-western part of the site (subject to planning), and Glebe Farm in May 2011

• During 2011 Applications from Bovis, Skanska and Countryside

• First housing occupations 2012

• Countryside to continue to manage the sites

• New Great Kneighton website