7.city development plan - nagpur
TRANSCRIPT
2
Structure of Presentation
STATUS ON THE CDP PROCESS
NAGPUR’S POTENTIAL
FUTURE PERSPECTIVE AND VISION
GROWTH THEMES
JNNURM STRATEGY
3
Status on CDP Process
Conducted Rapid City Assessment SWOT Analysis CDP process:
3 Capacity building workshops with MC officials Initial workshops with stakeholder groups (Commerce associations, Clubs, NGOs, Media and
people’s representatives Personal interviews with select stakeholder groups Visioning workshop with MC officials Stakeholder Consultation Workshop
Others – soliciting citizens participation through: Suggestion box at all NMC ward offices and emails Essay competitions in schools Thought provoking Newspaper articles and editorials
Process being facilitated by CRISIL Infrastructure Advisory and coordinated by NMC JNNURM cell
6
Gateway to a large hinterland
Trading of resources and minerals
Logistics hub for agro and high value forest produce
Gateway for industrial produce for industrial estates
Health care facilities for Nagpur, Vidarbha, adjoining districts of MP and Chhattisgarh
Higher education institutes catering to students from various states
7
Intrinsic quality
City with one of the lowest income inequality (City Monitor 2002)
Ranked 10th Wealthiest Highest Consuming and Most Aware Town in India by INDIA TODAY – RK SWAMY BBDO Guide to Urban Markets 2004
Ranked Seventh in a Study on Top IT Cities in India conducted by DATAQUEST – IDC (Study Parameters included Manpower Availability, ICT Infrastructure Availability and Usage and Environment and Lifestyle)
One of the top four Tier II cities with potential for IT and ITES (KPMG – NASSCOM)
Urban infrastructure comparable with the best in the the country
Second highest number of Engineering colleges in Maharashtra (first is Pune)
Home to a number of super specialty hospitals
8
Quality human resources
Excellent base for graduation and post graduation courses and produces - annually 8600 engineers 1000 MBA 800 MCA And many more graduates every year
Literacy level 70%
Competitive skilled manpower costs
9
Growth triggers – MIHAN
Project area - 4025 ha Airport 1200 ha Road & rail terminal 200 ha SEZ 1475 ha
Captive power house 52 ha IT Parks 400 ha Health city 60 ha Manufacturing and Value add units 963 ha
International school 10 ha Other support infrastructure 1140 ha
Investment of over Rs.2,500 crores; potentially creating over 1.5 Lakh jobs
10
Growth triggers – MIHAN
Industries Potential Agriculture & agro based products Formulations IT & ITES Health services Aerospace engineering Fabrics, textiles, clothing and clothing
accessories Electrical machinery and equipments Office and telecom machinery Electronics and electronics equipments Engineering and precision engineering
industry Paper based industries Furniture etc.
MADC
11
Growth Multipliers
Rapid Industrialization at Butibori, Hingna Kalmeshwar Kamptee
Proposed convention centre International flights to and from
Nagpur Development of tourist circuits
Support infrastructure Finance and banking Warehousing Transportation Logistics Hotels Restaurants Entertainment
12
Investment climate
Maharashtra state is number 1 for industrial climate in investors perception (World Bank – CII study – India investment climate 2004)
Contributes upto 15% of India’s GDP
25% of country’s value add is made in Maharashtra
MIHAN would cater to a catchment area of 500 km radius within the country
14
VISION FOR NAGPUR
The Growth Nucleus of Central India
.. an eco city that provides adequate, equitable, sustainable access of urban services for all citizens
.. a city that is safe, livable and promotes growth of its citizens
16
DIRECTION FOR GROWTH
Visioning exercise has indicated that NMC should support the following growth themes:The City Attaining a key position in IT, ITES and health services
Support industrialization in its hinterland
Promoting education, culture and tourism
17
Infrastructure Development Strategy
Investment Plan – Rs. 2007 crores 100% coverage in water supply and improved service levels
100% coverage in sewerage collection
Safety and better management of traffic through provision of flyovers, bridges, parking facilities etc.
100% solid waste collection efficiency and disposal of waste in environmentally friendly manner
18
Water Supply and Distribution
Vision – Water For All and 24 x 7 SupplyWater Audit and Energy Programme
Strengthening of water supply system
Reducing raw water transportation losses – Pench IV
Augmentation of source
Water reuse
19
Sewerage
Vision: 100% Coverage in sewerage collection and treatmentStrengthening sewerage network
Setting up Sewerage Treatment Plants
Changing old and defective sewer lines
20
Storm Water Drainage
Vision: Strengthening and rejuvenation of natural drainage systemRejuvenation of Nag and Pilli rivers
Nallah Canalization and strengthening
Lake rejuvenation
Drainage along the roads
21
SOLID WASTE MANAGEMENT
Vision: Clean City, Bin-free CityDevelopment of land fill site
100% House to House Collection
Segregation at source, composting and waste to energy
22
TRANSPORT
Vision: Safe and Efficient Traffic ManagementRoad Network improvement with widening, ROBs, flyovers
planned to remove traffic congestion
Development of outer ring road
Techno-feasibility of MRTS already in place
Installing traffic signage's, signals, markings, GPRS systems and intelligent traffic management systems
23
Housing and Slum Upgradation
Vision: Slum Free CityAccess to basic services to slum dwellers
Slum rehabilitation programme
EWS / LIG Housing
Public toilets, night shelters, destitute children’s homes, beggar’s home, working women’s hostel and marriage halls
Sector
Water supply and distributionPench IV 422.31 162.62 259.69 - - - 422.31Leak detection 3.00 3.00 - - - - 3.00Energy and water Audit projects 80.00 50.00 - - - - 80.00Strengethening of WS System 115.00 44.00 71.00 - - - 115.00Total 620.31 259.62 330.69 0.00 0.00 0.00 620.31SewerageNorth zone 129.84 - 129.84 - - - 129.84Central zone 238.91 - 238.91 - - - 238.91South zone 146.73 - 146.73 - - - 146.73Total 515.48 0.00 515.48 0.00 0.00 0.00 515.48Storm water drainageDrainage along side Road 45.00 - 45.00 - - - 45.00Nalla canalization 55.50 - 55.50 - - - 55.50Strengthening exisiting nallas 45.00 - 45.00 - - - 45.00Rejunevation of Nag and Pilli rivers 50.00 - 50.00 - - - 50.00Lake rejunevation 50.00 - 50.00 - - - 50.00Total 245.50 0.00 245.50 0.00 0.00 0.00 245.50Solid Waste ManagementSanitary landfill 25.00 25.00 0.00 - - - 25.00Bin free city 25.00 - 25.00 - - - 25.00Total 50.00 25.00 25.00 0.00 0.00 0.00 50.00Slum Development / HousingNIT (EWS/ LIG) 125.00 - 125.00 - - 125.00 -MHADA 42.00 - 42.00 - - 42.00 -SRA 1350.00 - 250.00 1100.00 - 250.00 -Urban poor ameneties 75.00 - 75.00 - - - 75.00Total 1592.00 0.00 492.00 1100.00 0.00 417.00 75.00Water recycling and reuse 263.00 0.00 0.00 263.00 0.00 0.00 0.00RoadsOuter Ring Roads 6-lane highways 650.00 90.00 560.00 - 650.00 - -Seven ROBs within city limits 128.00 90.00 38.00 - - - 128.0010 Flyovers 100.00 - 100.00 - - - 100.00Road widening /improvements( >24 m) 200.00 15.00 185.00 - - - 200.00Bridges over rivers ( Three) 7.60 7.60 - - - - 7.60Total 1085.60 202.60 883.00 0.00 650.00 0.00 435.60MRTS and Traffic ManagementTraffic management 50.00 10.00 40.00 0.00 - - 50.00MRTS 1500.00 - 0.00 1500.00 - - 0.00Total 1550.00 10.00 40.00 1500.00 0.00 0.00 50.00Social AmenitiesDestitute Home ( one) 1.00 0.00 1.00 0.00 0.00 0.00 1.00Marriage Halls (ten) 5.00 0.00 5.00 0.00 0.00 0.00 5.00Night Shelters (four) 4.00 0.00 4.00 0.00 0.00 0.00 4.00Public Toilets 5.00 0.00 5.00 0.00 0.00 0.00 5.00Total 15.00 0.00 15.00 0.00 0.00 0.00 15.00Grand Total 5936.89 497.22 2546.67 2863.00 650.00 417.00 2006.89
Source of Funding
PPP
City Investment Plan Summary 2005-2011
2005-11 1st YearBalance Period
Investment in Rs croresState
GovernmenNMC / NURM
MHADA / NIT / SRA
Total projects proposed
Rs 5924 crores
during 2005 – 2011
Assistance sought under NURM
Rs 2007 crores
26
Business Plan for 2005-20065909512253228506504172007
Water supply and distribution 620 260 331 0 0 0 620Sewerage 515 0 515 0 0 0 515Storm water drainage 246 0 246 0 0 0 246Solid Waste Management 50 25 25 0 0 0 50Slum Development / Housing 1592 0 492 1100 0 417 75Water recycling and reuse 250 0 0 250 0 0 0Roads 1086 203 883 0 650 0 436MRTS and Traffic Management 1550 10 40 1500 0 0 50Social Amenities 15 0 15 0 0 0 15Total 5924 497 2547 2850 650 417 2007
Source of Funding
PPPSector
City Investment Plan Summary 2005-2011
2005-11 1st YearBalance Period
Investment in Rs croresState
GovernmenNMC / NURM
MHADA / NIT / SRA
27
Water Supply and Distribution
Pench IV – 162 crores
Leak detection 3 crores
Energy and water audit 50 crores
Strengthening the water supply system 44 crores
29
Road development
Outer ring road 90 crores
ROBs 90 crores
Road widening 15 crores
Bridges 7.6 crores
30
Traffic Management
Improvement of junctionsInstalling active CCTV surveillance systemsand area traffic control sensors 5 crores
Conversion of ATS with LED base plus solar energy system 5 crores
31
Funding requirements
Investment capacity of NMC – Rs. 1470Crs (Business as usual case)
Deficits, if any can be bridged by: Private sector participation in projects;
Prioritizing and phasing of investment
Implementing property tax reforms to increase revenue;
Increasing user charges for water and other urban services
32
Mandatory Reform preparednessAdoption of modern accrual based doubled
entry system of accounting system of accounting
Currently being implemented by NMC.
Introduction of system of e-governance Project has been initiated by NMC, is expected to be completed by March 2007
Reform of property tax with GIS GIS mapping of properties is currently being implemented. Property tax reform has been initiated and would be implemented by March 2011
Levy of reasonable user charges with the objective that full cost of operation and maintenance is collected within next 5 years
NMC plans to gradually increase the same to collect full cost of O&M by March 2011. NMC plans to collect full user charges for assets created under JNNURM
Internal earmarking within local body, budgets for basic services to the urban poor.
Five percent of the budget is earmarked for the provision of services for urban poor under various schemes and the expenditures on the same are indicated under a separate head in the budget.
Provision of basic services to Urban Poor NMC provides education through schools and health services through primary health care centres to urban poor. Access to basic services in slums is provided through various schemes of NMC, and slum upgradation programs are undertaken under the aegis of SRA. In addition, NMC also undertakes regularisation and rehabilitation of pre 1995 slums as per the Government policy.
33
Status on optional reformsRevision of bye-laws to streamline the approval
process for construction of buildings
Revisions have been undertaken and the process has been simplified.
Earmarking at least 20-25 percent of developed land in all housing projects for EWS and LIG category with a system of cross subsidisation
Partially achieved under ULCRA were there is a provision for government share in the land development to provide housing for EWS and LIG category.
Revision of byelaws to make rainwater harvesting mandatory in all buildings and adoption of water conservation measures
Implemented
Bye laws for reuse of recycled water A project for reuse of recycled water is planned and DPR for the same is under preparation. Draft policy for the reuse of recycled water is being formulated. NMC expects the same to be implemented by March 2008
Administrative reforms Shall be implemented in a phased manner over the period April 2007 to March 2011
Structural reforms Shall be implemented in a phased manner over the period April 2007 to March 2011
Encouraging PPP NMC has already experimented with private sector participation in various areas. Some of the initiatives involve – proposed laying of pipeline through BOT, development of commercial complexes, amusement parks and market centres on BOT basis, PPP in slum rehabilitation, community participation in collection of solid waste