EXPERT MINERALS PROCESSING SOFTWARE AND CONSULTING [email protected] www.minerality.com.au Solutions to Manage Ore Variability Effects

Upload: renzo-paolo-davila-medina

Post on 13-Jul-2016

237 views

Category:

Documents


1 download

DESCRIPTION

Presentación Revestimientos Molinos

TRANSCRIPT

Page 1: 7 Presentacion Ben Steyn

EXPERT MINERALS PROCESSING SOFTWARE AND CONSULTING

[email protected]

Solutions to Manage Ore Variability Effects

Page 2: 7 Presentacion Ben Steyn

1. Live Ore Hardness Monitoring

2. Continuous Performance Predictions

3. Continuous Advice

3 Important things to make our jobs easier

Page 3: 7 Presentacion Ben Steyn

3Este estudio de caso puede ayudarlo de muchas maneras

Page 4: 7 Presentacion Ben Steyn

4

Objectives

1.Higher throughput from 120 tph to 150 tph

2.Higher energy efficiency

3.Higher recovery of valuablesPrimary Product size 80%-45um,17%Copper grade, 60% Copper recovery

And an extra goal – lower stress on

equipment

Objetivos

Page 5: 7 Presentacion Ben Steyn

Problems

1. Ore hardness varies significantly

SAG load fluctuates-not good for liners

2.Recirculating loads fluctuate

3. Final product size fluctuates

Problemas

5

Page 6: 7 Presentacion Ben Steyn

6

Page 7: 7 Presentacion Ben Steyn

Reasons for problem

Ore test results are required for simulation

1.Long time before receiving results

2.Test not representative of ore body

3.Test not valid over all size rangesRazones del problema

7

Page 8: 7 Presentacion Ben Steyn

Razones del problema

8

“SOFT” big rock breaks

The broken pieces become “HARD” to break

Page 9: 7 Presentacion Ben Steyn

Solutions

1.Measure ore hardness live-Immediate result-Maximum representivity-Valid for the ore inside the mill at that time

Soluciones

9

Page 10: 7 Presentacion Ben Steyn

10

Page 11: 7 Presentacion Ben Steyn

June 2011

Page 12: 7 Presentacion Ben Steyn

Specific benefits

1.Understand the full plant and make informed

choices

2.Immediate advice to

-Minimize SAG load fluctuations-Maintain recirculating loads around 250 %-Maintain correct product size

3. Continuous LIVE measurement-Continuous LIVE simulation-

Continuous LIVE advice-

Continuous LIVE savings

Beneficios especificos

12

Page 13: 7 Presentacion Ben Steyn

August 2011

Page 14: 7 Presentacion Ben Steyn

Specific benefits of one change

Beneficios especificos

14

June 2011 August 2011

SAG Index 55 55

Throughput [tph] 110 130

Total Power [kW] 2100 2270

P80 [micron] 55 50

Grade Cu [%] 17 17

Recovery [%] 52 56

4% higher recovery of 17% Cu at 20 tph higher total throughput at $7630/ton but 170 kW extra

=$1033/hr more Copper