Subcontract Rates 2007-09-15 IPEL Master Resource File ($Cdn) Subcontract Category Subcontract Description Sequence Description Code Sequence Description Metric Unit Imperial Unit Conversion Factor Metric Rate Imperial Rate 13000 Site Facilities Facilities 1360000 ** Site Facilities ** 0.0000 0.00 0.00 Scale300 1362100 Certification of Scale ea ea 1.0000 1,030.00 1,030.00 Setup Scale 1382100 Calibrate Scales ea ea 1.0000 5,150.00 5,150.00 14000 Site Services SiteServices 1400000 ** Site Services ** 0.0000 0.00 0.00 Helicopter01 1416100 Helicopter Service Day Day 1.0000 5,562.00 5,562.00 14100 Cleaning Services Garbage100 1414100 Garbage Pickup Service Month Month 1.0000 1,030.00 1,030.00 Toilet120 1414210 Toilet Cleanout Service Month Month 1.0000 824.00 824.00 Janitor100 1414300 Office Cleaning Service Month Month 1.0000 515.00 515.00 14500 Hauling Services HaulHighboy011415100 Hauling Sub - Highboy 1 Load Load 1.0000 8,600.50 8,600.50 HaulLowboy01 1415200 Hauling Sub - Lowboy 1 Load Load 1.0000 13,390.00 13,390.00 14900 Security Services Security100 1419100 Site Security Services Month Month 1.0000 1,030.00 1,030.00 Medic 10 1419310 Level 3 Medic Day Day 1.0000 499.55 499.55 Medic 20 1419320 Intermediate Medic Day Day 1.0000 602.55 602.55 Medic 30 1419330 Industrial Medic Day Day 1.0000 679.80 679.80 Medic 40 1419340 ETV-Emergency Treatment Vehicle Day Day 1.0000 1,987.90 1,987.90 15000 Survey Services Survey100 1510000 Site Survey Services Month Month 1.0000 20,600.00 20,600.00 16000 Quality Control QualityControl 1600000 ** Quality Control Services ** 0.0000 0.00 0.00 QCPlan10 1611100 QC Plan Development Month Month 1.0000 10,300.00 10,300.00 ISOPlan10 1611200 ISO Plan Development Month Month 1.0000 20,600.00 20,600.00 QVE10 1631000 QVE Inspection Services Day Day 1.0000 772.50 772.50 Test510 1644300 Welding Tests Day Day 1.0000 1,030.00 1,030.00 Test520 1644400 Pressure Testing Day Day 1.0000 1,030.00 1,030.00 HydroTest10 1651200 Hydrostatic Testing m ft 3.2808 3.09 0.94 16200 Inspection Services Inspect110 1621100 Pre-Construction Inspection Services Month Month 1.0000 15,450.00 15,450.00 Inspect120 1622100 Inspection Service Month Month 1.0000 10,300.00 10,300.00 Inspect410 1624100 Flush Storm Sewer m ft 3.2808 3.21 0.98 Inspect420 1624200 Video Inspection of Sewer m ft 3.2808 4.28 1.31 16400 Testing Services Testing 1640000 ** Testing Services ** 0.0000 0.00 0.00 16410 Concrete Testing Test100 1641100 Concrete Testing Service m3 cy 1.3080 10.71 8.19 15/09/2007 5:37:14 PM Page No 1 of 40

Upload: satria-pinandita

Post on 07-Nov-2014

55 views

Category:

Documents


1 download

DESCRIPTION

Subcon rates

TRANSCRIPT

Page 1: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesFacilities 1360000 ** Site Facilities ** 0.0000 0.00 0.00Scale300 1362100 Certification of Scale ea ea 1.0000 1,030.00 1,030.00Setup Scale 1382100 Calibrate Scales ea ea 1.0000 5,150.00 5,150.00

14000 Site ServicesSiteServices 1400000 ** Site Services ** 0.0000 0.00 0.00Helicopter01 1416100 Helicopter Service Day Day 1.0000 5,562.00 5,562.00

14100 Cleaning ServicesGarbage100 1414100 Garbage Pickup Service Month Month 1.0000 1,030.00 1,030.00Toilet120 1414210 Toilet Cleanout Service Month Month 1.0000 824.00 824.00Janitor100 1414300 Office Cleaning Service Month Month 1.0000 515.00 515.00

14500 Hauling ServicesHaulHighboy011415100 Hauling Sub - Highboy 1 Load Load 1.0000 8,600.50 8,600.50HaulLowboy01 1415200 Hauling Sub - Lowboy 1 Load Load 1.0000 13,390.00 13,390.00

14900 Security ServicesSecurity100 1419100 Site Security Services Month Month 1.0000 1,030.00 1,030.00Medic 10 1419310 Level 3 Medic Day Day 1.0000 499.55 499.55Medic 20 1419320 Intermediate Medic Day Day 1.0000 602.55 602.55Medic 30 1419330 Industrial Medic Day Day 1.0000 679.80 679.80Medic 40 1419340 ETV-Emergency Treatment Vehicle Day Day 1.0000 1,987.90 1,987.90

15000 Survey ServicesSurvey100 1510000 Site Survey Services Month Month 1.0000 20,600.00 20,600.00

16000 Quality ControlQualityControl 1600000 ** Quality Control Services ** 0.0000 0.00 0.00QCPlan10 1611100 QC Plan Development Month Month 1.0000 10,300.00 10,300.00ISOPlan10 1611200 ISO Plan Development Month Month 1.0000 20,600.00 20,600.00QVE10 1631000 QVE Inspection Services Day Day 1.0000 772.50 772.50Test510 1644300 Welding Tests Day Day 1.0000 1,030.00 1,030.00Test520 1644400 Pressure Testing Day Day 1.0000 1,030.00 1,030.00HydroTest10 1651200 Hydrostatic Testing m ft 3.2808 3.09 0.94

16200 Inspection ServicesInspect110 1621100 Pre-Construction Inspection Services Month Month 1.0000 15,450.00 15,450.00Inspect120 1622100 Inspection Service Month Month 1.0000 10,300.00 10,300.00Inspect410 1624100 Flush Storm Sewer m ft 3.2808 3.21 0.98Inspect420 1624200 Video Inspection of Sewer m ft 3.2808 4.28 1.31

16400 Testing ServicesTesting 1640000 ** Testing Services ** 0.0000 0.00 0.00

16410 Concrete TestingTest100 1641100 Concrete Testing Service m3 cy 1.3080 10.71 8.19

15/09/2007 5:37:14 PM Page No 1 of 40

Page 2: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesTest120 1641200 Concrete Testing for Curb m3 cy 1.3080 10.71 8.19Test200 1642100 Asphalt Testing Service t ton 1.1023 3.11 2.82

16430 Aggregate TestingTest310 1643100 Granular & Compaction Testing t ton 1.1023 0.32 0.29Test320 1643200 Granular Testing at Quarry/Pit t ton 1.1023 0.11 0.10

16440 Compaction TestingTest410 1644100 Earth Compaction Testing m3 cy 1.3080 0.11 0.08

16440 Soil TestingTest420 1644200 Topsoil Soil Analysis LS LS 1.0000 1,071.20 1,071.20

16500 Clean & DisinfectDisinfect100 1651100 Disinfect Watermain m ft 3.2808 2.06 0.63

16600 Monitoring ServicesMonitor 1660000 ** Monitoring Services ** 0.0000 0.00 0.00Monitor100 1661000 Monitor Blast Vibrations Day Day 1.0000 1,030.00 1,030.00Monitor200 1662000 Monitor Slope Stability Day Day 1.0000 1,030.00 1,030.00Monitor300 1663000 Monitor Tunnel Excavations Day Day 1.0000 1,030.00 1,030.00Monitor400 1664000 Monitor Air Quality ea ea 1.0000 515.00 515.00Monitor500 1664040 Monitor Noise Levels ea ea 1.0000 360.50 360.50

16700 Environmental ControlsEnvironment101667110 Environmental Monitor Day Day 1.0000 1,030.00 1,030.00Environment201667210 Environmental Mitigation Plan Day Day 1.0000 1,030.00 1,030.00Hazardous10 1667310 Hazardous Waste Removal t ton 1.1023 154.50 140.16

16800 Diving ServicesDive100 1681100 Mob/Demob Commercial Dive Crew - Ea Trip ea ea 1.0000 927.00 927.00Dive200 1681200 Commercial Dive Crew Day Day 1.0000 2,008.50 2,008.50

16900 InstrumentationInstrument110 1691010 Strain Gauge per Pair ea ea 1.0000 128.75 128.75Instrument120 1691020 Piezometer m ft 3.2808 211.15 64.36Instrument130 1691030 Extensometer m ft 3.2808 242.05 73.78Instrument140 1691040 Inclinometer m ft 3.2808 309.00 94.18

17000 Subsistence17200 Hourly Subsistence

Catering10 1723000 Camp Catering Service Man-dayMan-day 1.0000 87.55 87.5517300 Camp

Camp10 1731000 Camp Rental 1 Person Person 1.0000 20,600.00 20,600.0017400 Incentive

Incentive10 1741000 North Incentive Pay 60/62 Week Week 1.0000 57.68 57.6821000 Site Remediation

15/09/2007 5:37:14 PM Page No 2 of 40

Page 3: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site Facilities22100 Site Investigation

TestHoles100 2210010 Test Hole by Hydro-Vacuum ea ea 1.0000 1,030.00 1,030.00CoreDrill110 2210020 Core Drill Test hole ea ea 1.0000 500.00 500.00BoreHole110 2210030 Bore Hole Shallow ea ea 1.0000 2,000.00 2,000.00BoreHole120 2210040 Bore Hole Deep ea ea 1.0000 25,000.00 25,000.00

31000 Concrete FormworkConcrete 3000000 ** Concrete Forming & Placing** 0.0000 0.00 0.00Form110 3100010 Formwork Footings m2 sf 10.7639 72.10 6.70Form120 3100020 Formwork Walls m2 sf 10.7639 77.25 7.18Form130 3100030 Formwork Beams m2 sf 10.7639 82.40 7.66Form140 3100040 Formwork Slab m2 sf 10.7639 87.55 8.13

32000 Concrete ReinforcingReinforcing 3210000 ** Reinforcing Steel ** 0.0000 0.00 0.00Mesh110 3220010 Welded Wire Mesh m2 sf 10.7639 4.12 0.38

32100 RebarRebar110 3210010 Black Reinforcing Steel Bar t ton 1.1023 2,060.00 1,868.80Rebar120 3210020 Epoxy Coated Reinforcing Steel Bar t ton 1.1023 2,472.00 2,242.56Rebar130 3210025 Galvanized Reinforcing Steel Rebar t ton 1.1023 3,296.00 2,990.08Rebar140 3210030 Stainless Steel Rebar t ton 1.1023 12,875.00 11,680.01

32300 Stressing SystemsStress10 3230010 Longitudinal Stressing System m3 cy 1.3080 164.96 126.12Stress20 3230020 Longitudinal Stressing System kg lb 2.2046 6.44 2.92Stress30 3230030 Transverse Stressing System m3 cy 1.3080 164.96 126.12Stress40 3230040 Transverse Stressing System kg lb 2.2046 6.44 2.92Strand10 3230050 Ungrouted Strand kg lb 2.2046 6.44 2.92PTB10 3230060 Post-tensioned Bar Ungrouted kg lb 2.2046 7.73 3.50PTB20 3230070 Post-tensioned Bar Grouted kg lb 2.2046 14.42 6.54

32400 Rebar AccessoriesCoupler100 3230010 Black Mechanical Coupler ea ea 1.0000 28.33 28.33Coupler110 3230030 Coated Mechanical Coupler ea ea 1.0000 58.92 58.92Coupler120 3230030 Stainless Steel Mechanical Coupler ea ea 1.0000 84.98 84.98

32500 Concrete AccessoriesFiller10 3250010 Joint Filler 6mm (1/4 inch) m ft 3.2808 9.27 2.83Filler20 3250020 Joint Filler 12mm (1/2 inch) m ft 3.2808 12.36 3.77Filler30 3250030 Joint Filler 24mm (1 inch) m ft 3.2808 18.54 5.65

33000 Concrete PlacingPour110 3300010 Pour Concrete m3 cy 1.3080 30.90 23.62

33500 Concrete Finishing

15/09/2007 5:37:14 PM Page No 3 of 40

Page 4: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesScreed10 3350005 Screed Finish Concrete m2 sf 10.7639 3.61 0.33Trowel10 3350007 Machine Trowel Concrete m2 sf 10.7639 6.70 0.62RubFinish10 3350010 Rub Finish Concrete m2 sf 10.7639 7.21 0.67Sandblast10 3350020 Sandblast Concrete m2 sf 10.7639 25.75 2.39Bushhammer103350030 Bushhammer Concrete m2 sf 10.7639 77.25 7.18Harden10 3350040 Premium for Hardener m2 sf 10.7639 3.61 0.33Harden20 3350050 Premium for Colour Hardener m2 sf 10.7639 10.30 0.96

34000 Precast ConcretePrecast 3400000 ** Precast Concrete ** 0.0000 0.00 0.00

34100 Building PrecastCoreSlab10 3410010 200mm Precast Hollow Core Slab m2 sf 10.7639 113.30 10.53CoreSlab20 3410020 300mm Precast Hollow Core Slab m2 sf 10.7639 128.75 11.96TeeSlab10 3410030 610mm Deep Precast Double Tees m2 sf 10.7639 144.20 13.40ArchPanel10 3410040 Precast Architectural Panels m2 sf 10.7639 288.40 26.79PrecastCol10 3410050 Precast Columns (600mm x 600mm) m ft 3.2808 669.50 204.06

34300 Bridge PrecastPrecastBeam403432010 Precast U-Beam (5B-28) Fabrication m ft 3.2808 566.50 172.67PrecastBeam423432020 Precast U-Beam (5B-28) Delivery m ft 3.2808 147.29 44.89PrecastBeam443432030 Precast U-Beam (5B-28) Erection m ft 3.2808 113.30 34.53

34310 Precast I-BeamsPrecastBeam103431010 Prestressed Members CPCI 1200 (48") Fabrication m ft 3.2808 294.58 89.79PrecastBeam123431020 Prestressed Members CPCI 1200 (48") Delivery m ft 3.2808 117.83 35.92PrecastBeam143431030 Prestressed Members CPCI 1200 (48") Erection m ft 3.2808 70.70 21.55PrecastBeam163431040 Prestressed Members CPCI 1400 (54") Fabrication m ft 3.2808 471.33 143.66PrecastBeam183431050 Prestressed Members CPCI 1400 (54") Delivery m ft 3.2808 147.29 44.89PrecastBeam203431060 Prestressed Members CPCI 1400 (54") Erection m ft 3.2808 117.83 35.92PrecastBeam223431070 Prestressed Members CPCI 1600 (64") Fabrication m ft 3.2808 589.16 179.58PrecastBeam243431080 Prestressed Members CPCI 1600 (64") Delivery m ft 3.2808 147.29 44.89PrecastBeam263431090 Prestressed Members CPCI 1600 (64") Erection m ft 3.2808 117.83 35.92PrecastBeam283431100 Prestressed Members CPCI 1900 (76") Fabrication m ft 3.2808 589.16 179.58PrecastBeam303431110 Prestressed Members CPCI 1900 (76") Delivery m ft 3.2808 235.66 71.83PrecastBeam323431120 Prestressed Members CPCI 1900 (76") Erection m ft 3.2808 117.83 35.92PrecastBeam343431130 Prestressed Members CPCI 2300 (92") Fabrication m ft 3.2808 648.08 197.53PrecastBeam363431140 Prestressed Members CPCI 2300 (92") Delivery m ft 3.2808 176.75 53.87PrecastBeam383431150 Prestressed Members CPCI 2300 (92") Erection m ft 3.2808 117.83 35.92

34330 Precast Box BeamsPrecastBox10 3433010 Precast Box Girder 48" x 28" (1.22Wx0.7D) - Fabrication m ft 3.2808 589.16 179.58PrecastBox20 3433020 Precast Box Girder 48"x 40" (1.22Wx1.0D) - Fabrication m ft 3.2808 706.99 215.49

15/09/2007 5:37:14 PM Page No 4 of 40

Page 5: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesPrecastBox30 3433030 Precast Box Girder 48" x 28" (1.22Wx0.7D) - Transportion m ft 3.2808 176.75 53.87PrecastBox40 3433040 Precast Box Girder 48"x 40" (1.22Wx1.0D) - Transporation m ft 3.2808 176.75 53.87PrecastBox50 3433050 Precast Box Girder 48" x 28" (1.22Wx0.7D) - Erect m ft 3.2808 88.37 26.94PrecastBox60 3433060 Precast Box Girder 48"x 40" (1.22Wx1.0D) - Erect m ft 3.2808 88.37 26.94PrecastBox70 3433070 Precast Box Girder - Connectors ea ea 1.0000 589.16 589.16

34350 Precast Deck PanelsPrecastPanel103435010 Precast Panels 10ft x 6 ft (3m x 2m) m2 sf 10.7639 412.41 38.31

35000 Cementitious Roof deckCementitious103510010 Light Weight Roof Insulation m2 sf 10.7639 20.00 1.86Cementitious113510020 Cementitious Roof Deck m2 sf 10.7639 90.00 8.36

36000 Grouting & ShotcreteGrout140 3610050 Curtain Grouting m2 sf 10.7639 154.50 14.35

36100 Pressure groutingGrout050 3610000 Drill Pressure Grout Holes m ft 3.2808 169.95 51.80Grout100 3610010 Pressure Grout Connection ea ea 1.0000 618.00 618.00Grout105 3610015 Place Grout m3 cy 1.3080 14.42 11.02Grout110 3610020 Grout Material (43m3/m) 0.25cf/ft m3 cy 1.3080 2,472.00 1,889.98Grout120 3610030 Void Grouting m3 cy 1.3080 5,150.00 3,937.46Grout130 3610040 Place Chemical Grout litre gal 0.2642 0.62 2.34

36500 Epoxy GroutingEpoxy10 3650010 Epoxy Grout Slab on Grade m ft 3.2808 51.50 15.70Epoxy20 3650020 Epoxy Grout Walls & Elevated Slabs m ft 3.2808 82.40 25.12Epoxy30 3650030 Epoxy Grout Patches Slabs m2 sf 10.7639 360.50 33.49Epoxy40 3650040 Fill Voids with Epoxy Grout m3 cy 1.3080 13,390.00 10,237.39

39000 Concrete RestorationRestoration 3910000 ** Concrete Restoration ** 0.0000 0.00 0.00BlastClean10 3910010 Abrasive Blast Cleaning of Deck Concrete m2 sf 10.7639 5.89 0.55BlastClean20 3910020 Abrasive Blast Cleaning of Concrete m2 sf 10.7639 11.78 1.09BlastClean30 3910030 Abrasive Blast Cleaning of Reinforcing Steel m2 sf 10.7639 35.35 3.28BlastClean40 3910040 Abrasive Blast Cleaning of Concrete - Small Areas m2 sf 10.7639 45.32 4.21

39400 Bridge Deck RestorationRestore110 3940010 Partial Depth Bridge Deck Repair m2 sf 10.7639 618.00 57.41Restore120 3940020 Full Depth Bridge Deck Repair m2 sf 10.7639 875.50 81.34Restore130 3940030 Deck Overlay Concrete m3 cy 1.3080 927.00 708.74

40000 MasonryMasonry 4210000 ** Masonry ** 0.0000 0.00 0.00

42100 BrickBrick110 4210010 Clay Brick (unreinforced) (3-5/8 inch) m2 sf 10.7639 139.05 12.92

15/09/2007 5:37:14 PM Page No 5 of 40

Page 6: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesBrick120 4210020 Clay Brick (reinforced) (3-5/8 inch) m2 sf 10.7639 144.20 13.40

42200 BlockBlock100 4220010 Concrete Block 4" (100mm) m2 sf 10.7639 72.10 6.70Block110 4220020 Concrete Block 8" (200mm) m2 sf 10.7639 87.55 8.13Block120 4220030 Concrete Block 12" (300mm) m2 sf 10.7639 123.60 11.48Block130 4220040 Premium Architectural Faced Block m2 sf 10.7639 15.45 1.44

42700 Glass UnitsGlassUnit10 4270010 Glass Unit Masonry m2 sf 10.7639 515.00 47.85

44000 StoneStone100 4400010 Rough Limestone m2 sf 10.7639 180.25 16.75Stone110 4400020 Rough Fieldstone m2 sf 10.7639 334.75 31.10Stone125 4400025 Cut Sandstone m2 sf 10.7639 360.50 33.49Stone120 4400030 Cut Limestone m2 sf 10.7639 412.00 38.28Stone130 4400040 Cut Marble m2 sf 10.7639 721.00 66.98Stone140 4400050 Cut Granite m2 sf 10.7639 875.50 81.34

50000 Steel FabricationSteel 5000000 ** Steel ** 0.0000 0.00 0.00SteelFab110 5001010 Supply Detail Fabricate Extra Heavy Steel (>125 kg) t ton 1.1023 2,575.00 2,336.02SteelFab120 5001020 Supply Detail Fabricate Heavy Steel (65-125 kg) t ton 1.1023 3,090.00 2,803.23SteelFab130 5001030 Supply Detail Fabricate Medium Steel (25-65 kg) t ton 1.1023 3,811.00 3,457.28SteelFab140 5001040 Supply Detail Fabricate Light Steel (<25 kg) t ton 1.1023 6,695.00 6,073.60SteelFab150 5001050 Supply Detail Fabricate Steel Stairs t ton 1.1023 7,107.00 6,447.36SteelFab160 5001060 Supply Detail Fabricate Steel Ladders & Misc Metal t ton 1.1023 10,506.00 9,530.89

51200 Structural Steel51219 Building Structural Steel

Steel100 5121910 Building Structural Steel t ton 1.1023 2,575.00 2,336.00Steel110 5121920 Open Web Steel Joists t ton 1.1023 2,678.00 2,429.44

51230 Bridge Structural SteelSteel310 5123010 Coating of New Structural Steel t ton 1.1023 11.78 10.69Steel320 5123020 Erection of Structural steel t ton 1.1023 176.75 160.34Steel330 5123030 Delivery of Structural Steel t ton 1.1023 471.33 427.58Steel350 5123050 Fabrication of Bridge Structural Steel t ton 1.1023 2,592.30 2,351.70

53000 Metal DeckMetalDeck110 5300010 Galvanized Metal Deck m2 sf 10.7639 30.90 2.87

54000 Metal FramingMetalFrame10 5400010 Metal Partition Framing System 1-5/8" (41mm studs) m2 sf 10.7639 11.33 1.05MetalFrame20 5400020 Metal Partition Framing System 3-5/8" (92mm studs) m2 sf 10.7639 14.94 1.39MetalFrame30 5400030 Metal Partition Framing System 6"(152mm studs) m2 sf 10.7639 25.75 2.39

15/09/2007 5:37:14 PM Page No 6 of 40

Page 7: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site Facilities54500 Supply Detail & Fab Steel Bldgs

MetalBldg110 5450010 Supply Detail Fabricate Metal Enclosure m3 cy 1.3080 30.90 23.62MetalBldg120 5450020 Supply Detail Fabricate Metal Shop Bldg m3 cy 1.3080 36.05 27.56MetalBldg130 5450030 Supply Detail Fabricate Metal Warehouse Bldg m3 cy 1.3080 46.35 35.44MetalBldg140 5450040 Supply Detail Fabricate Metal Stockpile Bldg m3 cy 1.3080 206.00 157.50MetalBldg150 5450050 Supply Detail Fabricate Metal Powerhouse Bldg m3 cy 1.3080 283.25 216.56MetalBldg160 5450060 Supply Detail Fabricate Metal Silo Bldg m3 cy 1.3080 412.00 315.00

55000 Metal FabricationsMiscMetal110 5510010 Miscellaneous Metal kg lb 2.2046 2.36 1.07MetalStair10 5510020 Metal Stairs per Riser ea ea 1.0000 133.90 133.90MetalStair20 5510030 Metal Landings m2 sf 10.7639 721.00 66.98MetalLadder10 5510040 Metal Ladders (Open) m ft 3.2808 103.00 31.39MetalLadder20 5510050 Metal Ladders (with Safety loops) m ft 3.2808 180.25 54.94

55200 Metal Railings55210 Bridge Railings

Railing 5521000 ** Steel Railing ** 0.0000 0.00 0.00Railing110 5521010 Install - Rail 3-1/2" (88.9mm) OD x 3.175mm Wall Structural T m ft 3.2808 23.57 7.18Railing120 5521020 Pedestrian Hand Railing m ft 3.2808 100.16 30.53Railing130 5521030 Supply & Install - Rail 3-1/2" (88.9mm) OD x 3.175mm Wall St m ft 3.2808 117.83 35.92Railing140 5521040 Pedestrian Railing 52" (1300mm high) m ft 3.2808 265.12 80.81Railing150 5521060 Aluminum Railing m ft 3.2808 589.16 179.58

55220 Building RailRailing210 5522010 Railings on Wall Brackets m ft 3.2808 66.95 20.41Railing220 5522020 Steel Railings (900mm) 36 inch high m ft 3.2808 175.10 53.37

58000 Expansion Control58200 Bearings

Bearing110 5820010 Plain Elastomeric Bearing- 26"x16"x3/4" (660x400x20mm) ea ea 1.0000 353.50 353.50Bearing120 5820020 Laminated Elastomeric Bearing- 20"x16"x2" (500 x 400 x 50m ea ea 1.0000 353.50 353.50Bearing130 5820030 Bearing Strip - 3/4" (20mm) thick m2 sf 10.7639 1,413.98 131.36Bearing140 5820040 Rotational Bearing ea ea 1.0000 5,891.60 5,891.60

60000 Rough Carpentry61100 Wood Framing

Framing 6110000 ** Wood Framing ** 0.0000 0.00 0.00Frame105 6110105 Floor Framing m2 sf 10.7639 23.57 2.19Frame110 6110110 Wood Framing m2 sf 10.7639 35.35 3.28

61600 SheathingFrame100 6110100 Plywood Sheathing m2 sf 10.7639 20.60 1.91Frame120 6110120 Plywood Paneling m2 sf 10.7639 58.92 5.47

15/09/2007 5:37:14 PM Page No 7 of 40

Page 8: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site Facilities62000 Finish Carpentry

Frame50 6110050 Wood Paneling m2 sf 10.7639 88.37 8.2171000 Waterproofing

Waterproof 7110000 ** Waterproofing ** 0.0000 0.00 0.0071100 Dampproofing

Damp110 7110010 Damproofing m2 sf 10.7639 5.89 0.5571200 Building Waterproofing

Waterproof110 7120010 Protection Board m2 sf 10.7639 8.24 0.77Waterproof120 7120020 Membrane Waterproofing (Polyethelene) m2 sf 10.7639 20.60 1.91Waterproof130 7120030 Fluid Applied Waterproofing m2 sf 10.7639 25.75 2.39Waterproof140 7120040 Membrane Waterproofing (Rubber) m2 sf 10.7639 36.05 3.35Waterproof160 7120060 Waterproofing - Building Complete m2 sf 10.7639 35.35 3.28

71300 Bridge Deck WaterproofingWaterproof210 7130010 Bridge Deck Waterproofing m2 sf 10.7639 17.67 1.64Waterproof220 7130020 Spray Applied Watering (Eliminator Applicator - Stirling Lloyd) m2 sf 10.7639 117.83 10.95Waterproof230 7130030 Sawcut and Seal Asphalt m ft 3.2808 11.78 3.59

71500 DampproofingDamp110 7110010 Damproofing m2 sf 10.7639 5.89 0.55

72000 InsulationInsulate110 7200010 Loose Fill Insulation m3 cy 1.3080 77.25 59.06Insulate120 7200020 Glass Fibre Insulation m2 sf 10.7639 16.48 1.53Insulate130 7200030 Foamed in Place Insulation m2 sf 10.7639 21.63 2.01Insulate140 7200040 25 mm Rigid Perimeter Insulation m2 sf 10.7639 17.51 1.63Insulate150 7200050 50 mm Rigid Perimeter Insulation m2 sf 10.7639 28.33 2.63Insulate160 7200060 25mm Roof Deck Insulation m2 sf 10.7639 10.30 0.96Insulate170 7200070 50mm Roof Deck Insulation m2 sf 10.7639 16.48 1.53Insulate180 7200080 75mm Roof Deck Insulation m2 sf 10.7639 24.72 2.30Insulate190 7200090 100mm Roof Deck Insulation m2 sf 10.7639 32.96 3.06

72500 Fire Resistant CoatingsFireCoat110 7250010 Spayed Fireproofing Floor Decks m2 sf 10.7639 14.42 1.34FireCoat120 7250020 Spayed Fireproofing Structural Steel m2 sf 10.7639 17.51 1.63

73000 ShinglesShingle110 7200030 Asphalt Shingles m2 sf 10.7639 11.78 1.09Shingle110 7300010 Asphalt Shingles m2 sf 10.7639 15.45 1.44Shingle120 7300020 Cedar Shingles m2 sf 10.7639 51.50 4.78Shingle130 7300030 Slate Shingles m2 sf 10.7639 118.45 11.00Siding110 7400030 Baked Enamel Steel Siding m2 sf 10.7639 87.55 8.13Siding120 7400040 Baked Enamel Auminum Siding m2 sf 10.7639 103.00 9.57

15/09/2007 5:37:14 PM Page No 8 of 40

Page 9: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesFascia110 7400050 Baked Enamel Steel Fascia Panels m2 sf 10.7639 113.30 10.53Fascia120 7400060 Baked Enamel Aluminum Fascia Panels m2 sf 10.7639 118.45 11.00Sandwich110 7400070 Baked Enamel Steel Insulated Sandwich Panel m2 sf 10.7639 123.60 11.48Sandwick120 7400080 Baked Enamel Aluminum Insulated Sandwich Panel m2 sf 10.7639 139.05 12.92

75000 Membrane Roofing75100 Built Up Roofing

Roof110 7500010 Membrane Roofing Base Sheet (Vapour Barrier) m2 sf 10.7639 3.61 0.33Roof120 7500020 Membrane Roofing Impregnated Felt m2 sf 10.7639 3.09 0.29Roof130 7500030 Membrane Roofing Bitumen kg lb 2.2046 0.88 0.40Roof140 7500040 Membrane Roofing Granular Surface t ton 1.1023 82.40 74.75Roof150 7500050 Membrane Roofing Complete m2 sf 10.7639 51.50 4.78

75400 Fluid Applied RoofingRoof160 7500060 Sheet Reinforced Rubberized Asphalt (hot applied) m2 sf 10.7639 30.90 2.87Roof170 7500070 Elastomeric Roofing (cold applied) m2 sf 10.7639 33.99 3.16

76000 Flashing & Sheet Metal76100 Copper Sheetmetal Roofing

CopperRoof10 7610010 Copper Sheet Metal Roofing m2 sf 10.7639 412.00 38.2876200 Sheetmetal Flashing & Trim

Flashing10 7620010 Flashing & Trim m2 sf 10.7639 66.95 6.2279000 Joint Sealing

Sealing 7900000 ** Joint Sealing ** 0.0000 0.00 0.00SealPavement17900010 Rout & Fill Cracks or Joints in Concrete Pavement m ft 3.2808 7.93 2.42SealPavement27900020 Sawcutting & Sealing Joints in Concrete Pavement m ft 3.2808 5.67 1.73SealPavement37900030 Resealing of Joints & Sealing or Resealing of Cracks in Concr m ft 3.2808 4.53 1.38SealAsphalt10 7900040 Sawcut and Seal Asphalt m ft 3.2808 11.33 3.45SealAsphalt20 7900050 Sawcutting & Sealing Joints in Asphalt Pavement m ft 3.2808 5.67 1.73

80000 Doors & WindowsDoors 8000000 ** Doors & Windows ** 0.0000 0.00 0.00

81000 Metal DoorsDoor110 8100010 Steel Door & Frame ea ea 1.0000 463.50 463.50Door120 8100020 Aluminum Door & Frame ea ea 1.0000 1,030.00 1,030.00

82000 Wood DoorsDoor130 8210010 Wood Door & Frame ea ea 1.0000 360.50 360.50

83000 Specialty DoorsOverheadDoor 8300010 Wood Overhead Door m2 sf 10.7639 206.00 19.14OverheadDoor28300020 Steel Overhead Door m2 sf 10.7639 309.00 28.71OverheadDoor38300030 Insulated Overhead Double Skin Door m2 sf 10.7639 412.00 38.28TunnelDoor1108300040 Powerhouse Access Tunnel Portal Main Door (Motorized, Steeea ea 1.0000 25,500.00 25,500.00

15/09/2007 5:37:14 PM Page No 9 of 40

Page 10: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesServiceBayDoo8300050 Powerhouse Service Bay Fire Door (Motorized, Steel Roll-Up) ea ea 1.0000 25,500.00 25,500.00

84000 StorefrontsStorefront110 8400010 Single Glazed Storefronts m2 sf 10.7639 113.30 10.53Storefront120 8400020 Double Glazed Storefront m2 sf 10.7639 144.20 13.40Storefront130 8400030 Automated Swing Doors ea ea 1.0000 8,240.00 8,240.00Storefront140 8400040 Automated Sliding Doors ea ea 1.0000 12,360.00 12,360.00Storefront150 8400050 Automated Aluminum Revolving Doors ea ea 1.0000 51,500.00 51,500.00

85000 WindowsWindow110 8500010 Steel Windows (excluding glazing) m2 sf 10.7639 123.60 11.48Window120 8500020 Aluminum Windows (excluding glazing) m2 sf 10.7639 154.50 14.35Window130 8500030 Wood Windows (excluding glazing) m2 sf 10.7639 175.10 16.27

86000 SkylightsSkylight10 8600010 Skylights m2 sf 10.7639 772.50 71.77

87000 HardwareHardware110 8710010 Door Push Plates ea ea 1.0000 15.45 15.45Hardware120 8710020 Door Butts ea ea 1.0000 49.44 49.44Hardware130 8710030 Door Pulls ea ea 1.0000 51.50 51.50Hardware140 8710040 Door Closers ea ea 1.0000 180.25 180.25Hardware150 8710050 Door Locksets ea ea 1.0000 206.00 206.00Hardware160 8710060 Door Hardware (complete) ea ea 1.0000 309.00 309.00

88000 GlazingGlazing110 8800010 Sheet Glass m2 sf 10.7639 87.55 8.13Glazing120 8800020 Float Glass m2 sf 10.7639 180.25 16.75Glazing130 8800030 Insulated Glass m2 sf 10.7639 247.20 22.97Glazing140 8800040 Wired Glass m2 sf 10.7639 283.25 26.31

89000 CurtainwallCurtainWall1108900010 Framing for Single Glazed Curtainwall m2 sf 10.7639 324.45 30.14CurtainWall1208900020 Framing for Double Glazed Curtainwall m2 sf 10.7639 412.00 38.28CurtainWall1508900050 Glazed Curtainwall (complete) m2 sf 10.7639 515.00 47.85CurtainWall1608900060 Sloped Curtainwall (complete) m2 sf 10.7639 1,030.00 95.69

90000 Interior FinishingFinishing 9000000 ** Interior Finish ** 0.0000 0.00 0.00

91000 Metal Wall FramingWall10 9100010 Metal Wall Framing m2 sf 10.7639 11.78 1.09

92000 Wall FinishFurring110 9200010 Steel Channel Furring m ft 3.2808 4.12 1.26Lath110 9210010 Metal Lath m2 sf 10.7639 15.45 1.44Plaster110 9210030 Sprayed Acoustical Plaster m2 sf 10.7639 30.90 2.87

15/09/2007 5:37:14 PM Page No 10 of 40

Page 11: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesPlaster120 9210040 Trowel Applied Plaster m2 sf 10.7639 82.40 7.66Drywall110 9210050 Drywall m2 sf 10.7639 15.45 1.44Wall30 9260010 Partition Wall m2 sf 10.7639 42.42 3.94

93000 TileTile110 9300010 Unglazed Ceramic Tile m2 sf 10.7639 92.70 8.61Tile120 9300020 Glazed Ceramic Tile m2 sf 10.7639 103.00 9.57Tile130 9300030 Quarry Tile m2 sf 10.7639 133.90 12.44Tile140 9300040 Marble Tile m2 sf 10.7639 515.00 47.85Tile150 9300050 Tile Base m ft 3.2808 36.05 10.99

94000 TerrazzoTerrazzo10 9400010 Terrazzo m2 sf 10.7639 206.00 19.14

95000 CeilingsCeiling110 9500010 Suspended Ceiling (exposed suspension) m2 sf 10.7639 30.90 2.87Ceiling120 9500020 Suspended Ceiling (concelaed suspension) m2 sf 10.7639 72.10 6.70

95500 Wood FlooringWoodFloor110 9550010 Parquet Wood Flooring m2 sf 10.7639 77.25 7.18WoodFloor120 9550020 Strip Wood Flooring m2 sf 10.7639 123.60 11.48WoodFloor130 9550030 Resilient Wood Flooring m2 sf 10.7639 133.90 12.44

96000 FlooringResilientFloor1 9650010 Vinyl Tile Flooring m2 sf 10.7639 25.75 2.39ResilientFloor1 9650020 Vinyl Flooring m2 sf 10.7639 41.20 3.83ResilientFloor1 9650030 Linoleum Flooring m2 sf 10.7639 46.35 4.31ResilientFloor1 9650040 Rubber Tile Flooring m2 sf 10.7639 82.40 7.66Carpet110 9680010 Polypropylene Carpeting m2 sf 10.7639 30.90 2.87Carpet120 9680020 Nylon Carpeting m2 sf 10.7639 46.35 4.31Carpet130 9680030 Wool Carpeting m2 sf 10.7639 61.80 5.74

99000 PaintingPaint110 9900010 Interior Painting (2-coats brush applied) m2 sf 10.7639 8.24 0.77Paint120 9900020 Exterior Painting (3-coats brush applied) m2 sf 10.7639 10.30 0.96

99500 Wall CoveringWallCover10 9950010 Wall Covering m2 sf 10.7639 22.66 2.11

100000 SpecialtiesSpecial110 10110010 Chaulkboards m2 sf 10.7639 92.70 8.61Special120 10130010 Tackboards m2 sf 10.7639 77.25 7.18Special130 10145010 Aluminum Trim m ft 3.2808 10.30 3.14Special140 10150010 Toilet Compartments ea ea 1.0000 721.00 721.00Special150 10260010 Wall & Corner Guards m ft 3.2808 103.00 31.39Special160 10270010 Access Flooring m2 sf 10.7639 257.50 23.92

15/09/2007 5:37:14 PM Page No 11 of 40

Page 12: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesSpecial170 10350010 Flagpoles ea ea 1.0000 2,060.00 2,060.00Special180 10505010 Lockers ea ea 1.0000 206.00 206.00Special190 10615010 Demountable Drywall Partitions m2 sf 10.7639 257.50 23.92Special200 10652010 Folding Partitions m2 sf 10.7639 772.50 71.77

110000 Equip. InstallationsLoad110 11160010 Dock Levellers ea ea 1.0000 6,180.00 6,180.00Load120 11160020 Protective Bumpers ea ea 1.0000 133.90 133.90

140000 Conveying SystemsElevator110 14210010 Geared Building Elevators ea ea 1.0000 386,250.00 386,250.00Escalator110 14310010 Escalator per 4.6m rise ea ea 1.0000 180,250.00 180,250.00Walkway110 14320010 Moving Walkways m ft 3.2808 10,300.00 3,139.44

200000 MechanicalMechanical 20000000 ** Mechancial ** LS LS 1.0000 0.00 0.00Mech10 20000010 Sub Mechancial LS LS 1.0000 0.00 0.00

210000 Mechanical Piping211100 Steel Pipe

PipeSteel110 21110010 Black Steel Sch40 Pipe 25mm (1 inch)-Screwed m ft 3.2808 82.40 25.12PipeSteel120 21110020 Black Steel Sch40 Pipe 50mm (2 inch)-Screwed m ft 3.2808 139.05 42.38PipeSteel130 21110030 Black Steel Sch40 Pipe 100mm (4 inch)-Screwed m ft 3.2808 211.15 64.36PipeSteel140 21110040 Black Steel Sch40 Pipe 65mm (2-1/2 inch)-Welded m ft 3.2808 185.40 56.51PipeSteel150 21110050 Black Steel Sch40 Pipe 100mm (4 inch)-Welded m ft 3.2808 283.25 86.33PipeSteel160 21110050 Black Steel Sch40 Pipe 200mm (8 inch)-Welded m ft 3.2808 592.25 180.52

211300 Copper PipeCopperPipe11021130010 Copper Pipe 12mm (1/2 inch) m ft 3.2808 41.20 12.56CopperPipe12021130020 Copper Pipe 25mm (1inch) m ft 3.2808 56.65 17.27CopperPipe13021130030 Copper Pipe50mm (2 inch) m ft 3.2808 118.45 36.10

211900 Iron PipeCastIronPipe1121190010 Cast Iron Pipe 100mm (4 inch)-Mechanical Joint m ft 3.2808 103.00 31.39CastIronPipe1221190020 Cast Iron Pipe 200mm (8 inch)-Mechanical Joint m ft 3.2808 293.55 89.47CastIronPipe1321190030 Cast Iron Pipe 100mm (4 inch)-Mechanical Joint m ft 3.2808 463.50 141.27

212000 ValvesValve110 21210010 Valve 12mm (1/2 inch) ea ea 1.0000 51.50 51.50Valve120 21210020 Valve 25mm (1 inch) ea ea 1.0000 82.40 82.40Valve130 21210030 Valve 50mm (2 inch) ea ea 1.0000 164.80 164.80Valve140 21210040 Valve 100mm (4 inch) ea ea 1.0000 515.00 515.00Valve150 21210050 Valve 200mm (8 inch) ea ea 1.0000 1,442.00 1,442.00

213000 Pipe InsulationInsulatePipe11 21310010 Pipe Insulation 12mm (1/2 inch) m ft 3.2808 18.54 5.65

15/09/2007 5:37:14 PM Page No 12 of 40

Page 13: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesInsulatePipe12 21310020 Pipe Insulation 25mm (1 inch) m ft 3.2808 22.66 6.91InsulatePipe13 21310030 Pipe Insulation 50mm (2 inch) m ft 3.2808 27.81 8.48InsulatePipe14 21310040 Pipe Insulation 100mm (4 inch) m ft 3.2808 39.14 11.93InsulatePipe15 21310050 Pipe Insulation 200mm (8 inch) m ft 3.2808 51.50 15.70

230000 HVACs235200 Boilers

Boiler110 23520010 97 kw (10hsp) Boiler ea ea 1.0000 17,510.00 17,510.00Boiler120 23520020 193 kw (20hsp) Boiler ea ea 1.0000 20,600.00 20,600.00Boiler130 23520030 774 kw (80hsp) Boiler ea ea 1.0000 41,200.00 41,200.00Boiler140 23520040 1210 kw (125hsp) Boiler ea ea 1.0000 51,500.00 51,500.00

260000 ElectricalElectrical 26000000 ** Building Electrical ** LS LS 1.0000 0.00 0.00

261000 Electrical WiringConduit110 26100010 Electrical Conduit 12mm (1/2 inch) m ft 3.2808 15.45 4.71Conduit120 26100020 Electrical Conduit 25mm (1 inch) m ft 3.2808 25.75 7.85Conduit130 26100030 Electrical Conduit 50mm (2 inch) m ft 3.2808 51.50 15.70Conduit140 26100040 Electrical Conduit 75mm (3 inch) m ft 3.2808 139.05 42.38Conduit150 26100050 Electrical Conduit 100mm (4 inch) m ft 3.2808 180.25 54.94ElecFitting110 26100060 Electrical Fitting 12mm (1/2 inch) m ft 3.2808 10.30 3.14ElecFitting120 26100070 Electrical Fitting 25mm (1 inch) m ft 3.2808 51.50 15.70ElecFitting130 26100080 Electrical Fitting 50mm (2 inch) m ft 3.2808 103.00 31.39ElecFitting140 26100090 Electrical Fitting 75mm (3 inch) m ft 3.2808 206.00 62.79ElecFitting150 26100100 Electrical Fitting 100mm (4 inch) m ft 3.2808 309.00 94.18Conductor110 26100110 No 8 Wire Conductor m ft 3.2808 5.15 1.57Conductor120 26100120 No 1 Wire Conductor m ft 3.2808 15.45 4.71Conductor130 26100130 250mcm Wire Conductor m ft 3.2808 30.90 9.42Conductor140 26100140 500mcm Wire Conductor m ft 3.2808 51.50 15.70

263000 Electrical EquipmentTransformer11026100150 30 kva Transformer ea ea 1.0000 3,090.00 3,090.00Transformer12026100160 300 kva Transformer ea ea 1.0000 17,510.00 17,510.00Transformer13026100170 750 kva Transformer ea ea 1.0000 51,500.00 51,500.00

311000 Site Preparation311200 Clearing & Grubbing

ClearGrub1 31120000 ** Clear & Grub ** 0.0000 0.00 0.00Clear10 31120010 Clear Site ha acre 2.4710 14,139.84 5,722.21Clear20 31120020 Clear Site (each tree) ea ea 1.0000 589.16 589.16Grub10 31120030 Grub Site ha acre 2.4710 7,069.92 2,861.11Grub20 31120040 Grub Site (each tree) ea ea 1.0000 235.66 235.66

15/09/2007 5:37:14 PM Page No 13 of 40

Page 14: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesClearGrub10 31120050 Clearing & Grubbing ha acre 2.4710 17,674.80 7,152.77

311500 EnvironmentalHazardous110 31152010 hazardous Material Removal t ton 1.1023 150.00 136.08

312000 EarthworkExcavation 31220000 ** Earthwork ** 0.0000 0.00 0.00Dumpfee10 31220010 Disposal Fee m3 cy 1.3080 3.40 2.60Haul10 31230050 Haul Offsite (1 hr round trip) m3 cy 1.3080 0.00 0.00

312200 GradingGrade10 31220010 Grade Sub-base m2 sf 10.7639 1.08 0.10Grade20 31220020 Grade Site m2 sf 10.7639 1.18 0.11

312300 ExcavationExcavate05 31230025 Stripping m3 cy 1.3080 0.00 0.00Excavate10 31230030 Bulk Excavation m3 cy 1.3080 3.53 2.70Excavate20 31230035 Structural Excavation m3 cy 1.3080 10.30 7.87Excavate40 31230040 Tenching Including Backfill m ft 3.2808 17.51 5.34

312500 Erosion ControlErosion110 31250010 Geotextile - Nonwoven (Supply and Install) m2 sf 10.7639 2.27 0.21Erosion120 31250020 Erosion Control Blanket c/w Type 1 Seeding m2 sf 10.7639 2.36 0.22Erosion130 31250030 Gabion Mattress m2 sf 10.7639 77.25 7.18Erosion140 31250040 Gabion Baskets m3 cy 1.3080 231.75 177.19

312700 Structural ExcavationStructuralExc1031270020 Footing Excavation m3 cy 1.3080 10.30 7.87Backfill10 31270030 Native Backfill m3 cy 1.3080 10.30 7.87Backfill20 31270040 Granular Backfill m3 cy 1.3080 27.81 21.26Backfill30 31270050 Crushed Backfill m3 cy 1.3080 41.20 31.50

312000 RemovalsRemove95 30210100 Remove Overhead Sign Supports ea ea 1.0000 3,965.50 3,965.50Demolish10 30250010 Building Demolition m3 cy 1.3080 10.60 8.11

312100 Site RemovalsRemovals 30210000 ** Removals ** 0.0000 0.00 0.00SiteRemoval 30210000 ** Site Removals ** 0.0000 0.00 0.00Remove10 30210010 Removal of Fence m ft 3.2808 3.54 1.08Remove20 30210020 Removal of Chainlink Fence m ft 3.2808 9.43 2.87Remove30 30210030 Removal of Delineator Posts ea ea 1.0000 5.89 5.89Remove40 30210040 Removal of Cable Guide Rail m ft 3.2808 5.89 1.80Remove50 30210050 Removal of Anchor Blocks ea ea 1.0000 176.75 176.75Remove60 30210060 Removal of Steel Beam Guide Rail m ft 3.2808 17.67 5.39Remove70 30210070 Removal of Steel Box Beam Barrier m ft 3.2808 29.46 8.98

15/09/2007 5:37:14 PM Page No 14 of 40

Page 15: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesRemove80 30210080 Removal of Guide Rail End Treatment ea ea 1.0000 1,767.48 1,767.48Remove90 30210090 Removal of Noise Barrier m ft 3.2808 47.13 14.37

312200 Pavement RemovalsPavementRem 30221000 ** Pavement Removals ** 0.0000 0.00 0.00Remove100 30221010 Mobilization for Asphalt Removal ea ea 1.0000 1,699.50 1,699.50

312210 Full Depth Asphalt RemovalRemove110 30221010 In-Place Full Depth Reclamation Pavement m2 sf 10.7639 0.47 0.04

312220 Pulverize AsphaltPulverize10 30222010 Pulverize, Load & Haul Asphalt m2 sf 10.7639 3.54 0.33Pulverize20 30222020 Pulverize & Load Asphalt m2 sf 10.7639 2.27 0.21

312230 Grind AsphaltGrind100 30223010 Grind 150mm Strip Full Depth m ft 3.2808 1.13 0.35Grind110 30223020 Grind 500mm Strip Full Depth m ft 3.2808 1.13 0.35Grind120 30223030 Grind & Load Asphalt (600mm wide) Full Depth m ft 3.2808 7.93 2.42Grind200 30223040 Grind for Step Joint (300mm to 450mm wide) m2 sf 10.7639 5.89 0.55Grind210 30223050 Grinding,Loading and Sweeping m2 sf 10.7639 2.04 0.19Grind220 30223060 Grind, Load, Sweep & Truck Asphalt Partial Depth m2 sf 10.7639 2.36 0.22Grind230 30223070 Haul Grinding t ton 1.1023 2.36 2.14Grind240 30223080 Grind, Load, Sweep & Truck Asphalt from Concrete Surfaces m2 sf 10.7639 2.83 0.26Grind250 30223090 Grind for Step Joint (300mm to 450mm wide) m2 sf 10.7639 5.67 0.53Grind260 30223100 Grinding Asphalt Pavement t ton 1.1023 7.07 6.41

312280 Mill Concrete PavementMillConcrete11 30228100 Mill Concrete Pavement Partial Depth m2 sf 10.7639 4.00 0.37MillConcrete12 30228200 Mill Concrete Pavement Full Depth m2 sf 10.7639 6.00 0.56MillConcrete13 30228300 Crush Concrete Rubble t ton 1.1023 4.00 3.63

312400 Structural Concrete RemovalsStructureRemo30240000 ** Structure Removals ** 0.0000 0.00 0.00Scarify 30240010 Scarifying Concrete Deck m2 sf 10.7639 4.53 0.42ScarifyDeck 30240020 Scarify Bridge Deck m2 sf 10.7639 28.33 2.63Demolish20 30240050 Bridge Demolition LS LS 1.0000 58,916.00 58,916.00

312700 Cutting & CoringCoreDrill 30270000 ** Cutting & Coring ** 0.0000 0.00 0.00Saw10 30271010 Asphalt Road Sawing - 1/2"-4" (13mm to 105mm) deep m ft 3.2808 1.18 0.36Saw20 30271020 Asphalt Road Sawing - 5" (125mm) deep m ft 3.2808 1.54 0.47Saw30 30271030 Asphalt Road Sawing - 6-7" (150mm to 175mm) deep m ft 3.2808 1.85 0.56Saw40 30271040 Asphalt/Concrete Road Sawing - < 8" (203mm) deep m ft 3.2808 2.47 0.75Saw50 30271050 Asphalt/Concrete Road Sawing - 9" (228mm) deep m ft 3.2808 2.78 0.85Saw60 30271060 Asphalt/Concrete Road Sawing - 10" (254mm) deep m ft 3.2808 3.09 0.94

15/09/2007 5:37:14 PM Page No 15 of 40

Page 16: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesSaw70 30271070 Asphalt/Concrete Road Sawing - 11" (279mm) deep m ft 3.2808 3.41 1.04Saw80 30271080 Asphalt/Concrete Road Sawing - 12" (305mm) deep m ft 3.2808 3.71 1.13Saw90 30271085 Minimum Charge for Cutting Asphalt/Concrete Load Load 1.0000 347.60 347.60Cut10 30271090 Plunge Cuts through Curb ea ea 1.0000 5.89 5.89Cut20 30271100 Curb Cut (Horizontal) m ft 3.2808 28.33 8.63Core10 30272010 Core Drill 1/3/4" x24" (40mm Holes x 600mm) long ea ea 1.0000 57.27 57.27Core20 30272020 Core 4" (100mm) Hole 16" (400mm) deep ea ea 1.0000 101.97 101.97Core30 30272030 Core Drill ( Per inch Dia. x Per inch Depth) ea ea 1.0000 1.59 1.59

312100 DewateringDewater 31210000 ** Dewatering ** 0.0000 0.00 0.00WellPoints05 31210005 Well Point Dewatering-first montrh Month Month 1.0000 82,400.00 82,400.00WellPoints10 31210010 Well Point Dewatering-subsequent months Month Month 1.0000 47,132.80 47,132.80Wick10 31210020 Supply & Install Wick Drains m ft 3.2808 2.83 0.86

313900 Rock ExcavationRock 31390000 ** Rock Excavation ** 0.0000 0.00 0.00DrillBlast60 31390010 Drill Rock Face Softrock (900mm c-c) m2 sf 10.7639 10.00 0.93DrillBlast70 31390015 Drill Rock Face (750mm c-c) m2 sf 10.7639 30.00 2.79DrillBlast80 31390020 Drill Rock Face (600mm c-c) m2 sf 10.7639 40.00 3.72DrillBlast100 31390030 Drill Blast Quarry Rock (Limestone) m3 cy 1.3080 1.47 1.13DrillBlast110 31390040 Drill Blast Quarry Rock (Silica) m3 cy 1.3080 2.65 2.03DrillBlast115 31390045 Drill Blast Soft Rock m3 cy 1.3080 3.60 2.75DrillBlast120 31390050 Drill Blast Mass Rock m3 cy 1.3080 4.53 3.47DrillBlast130 31390060 Drill Blast Grade Rock m3 cy 1.3080 10.02 7.66DrillBlast140 31390070 Drill Blast Channel Rock m3 cy 1.3080 11.33 8.66DrillBlast150 31390080 Drill Blast Sliver Rock m3 cy 1.3080 22.66 17.32DrillBlast160 31390090 Drill Blast Road Rock m3 cy 1.3080 33.99 25.99DrillBlast170 31390100 Drill Blast Ditch Rock m ft 3.2808 47.13 14.37DrillBlast175 31390110 Drill Blast Trench Rock m3 cy 1.3080 88.37 67.57DrillBlast180 31390120 Drill Blast Structural Rock m3 cy 1.3080 117.83 90.09DrillBlast185 31390130 Drill Blast Electrical Rock m3 cy 1.3080 117.83 90.09Haul-Rock 31390140 Haul Rockfill t ton 1.1023 2.83 2.57

314000 ShoringShoring 31410000 ** Shoring ** 0.0000 0.00 0.00

314100 Shore ExcavationsShotcrete10 31410005 Sub Shotcrete m3 cy 1.3080 396.55 303.18Shore10 31410010 Shotcrete & Soil Nails m2 sf 10.7639 235.66 21.89Shore20 31410020 Soldier Piles & Lagging m2 sf 10.7639 294.58 27.37Shore30 31410030 Sheetpile Shoring m2 sf 10.7639 324.04 30.10

15/09/2007 5:37:14 PM Page No 16 of 40

Page 17: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site Facilities314200 Soil Anchors

Anchor10 31420010 Sub Soil Anchors m ft 3.2808 117.83 35.92316000 Piling & Caissons

Piling 31640000 ** Piling ** 0.0000 0.00 0.00316400 Drive Piles

Piles10 31640010 Pipe Piles m ft 3.2808 141.40 43.10Piles20 31640020 H-Piles m ft 3.2808 164.80 50.23

316500 Bore HolesAuger510 31650010 Mobilization for Augering ea ea 1.0000 17,674.80 17,674.80

316510 Auger Holes in EarthAuger512 31651010 Auger 600mm Holes in Earth m ft 3.2808 235.66 71.83Auger513 31651020 Auger 750mm Holes in Earth m ft 3.2808 0.00 0.00Auger514 31651030 Auger 1200mm Holes in Earth for Sign Supports m ft 3.2808 1,060.49 323.24Auger515 31651040 Auger 1200mm Holes in Earth for Sign Supports ea ea 1.0000 6,598.59 6,598.59

316520 Auger Holes in ShaleAuger522 31652010 Auger 600mm Holes in Rock (Shale) m ft 3.2808 706.99 215.49Auger524 31652020 Auger 750mm Holes in Rock (Shale) m ft 3.2808 793.10 241.74Auger526 31652030 Auger 900mm Holes in Rock (Shale) m ft 3.2808 849.75 259.00Auger528 31652040 Auger 1200mm Holes in Rock (Shale) m ft 3.2808 906.40 276.27

316600 CaissonsCaissons 31660000 ** Caissons ** 0.0000 0.00 0.00

316610 Caisson in TillCaisson610 31661010 48" (1220mm) Dia. Caisson in Till (Auger,Rebar,Concrete) m ft 3.2808 1,246.30 379.87Caisson611 31661020 60" (1524mm) Dia. Caisson in Till (Auger,Rebar,Concrete) m ft 3.2808 1,413.98 430.98Caisson612 31661030 68" (1676mm) Dia. Caisson in Till (Auger,Rebar,Concrete) m ft 3.2808 1,531.82 466.90Caisson613 31661040 72" (1829mm) Dia. Caisson in Till (Auger,Rebar,Concrete) m ft 3.2808 1,649.65 502.81Caisson614 31661050 78" (1981mm) Dia. Cassion in Till (Auger,Rebar,Concrete) m ft 3.2808 1,885.31 574.64Caisson615 31661060 80" (2000mm) Dia. Caisson in Till (Auger,Rebar,Concrete) m ft 3.2808 2,356.64 718.30Caisson616 31661070 84" (2134mm) Dia. Caisson in Till (Auger,Rebar,Concrete) m ft 3.2808 2,719.20 828.81Caisson617 31661080 96" (2400mm) Dia. Caisson in Till (Auger,Rebar,Concrete) m ft 3.2808 3,172.40 966.95

316620 Caisson in Weathered RockCaisson620 31662010 48" (1220mm) Dia. Caisson in Weathered Rock (Auger,Rebar,m ft 3.2808 0.00 0.00Caisson621 31662020 60" (1524mm) Dia. Caisson in Weathered Rock (Auger,Rebar,m ft 3.2808 2,120.98 646.47Caisson622 31662030 68" (1676mm) Dia. Caisson in Weathered Rock (Auger,Rebar,m ft 3.2808 2,238.81 682.39Caisson623 31662040 72" (1829mm) Dia. Caisson in Weathered Rock (Auger,Rebar,m ft 3.2808 2,356.64 718.30Caisson624 31662050 78" (1981mm) Dia. Caisson in Weathered Rock (Auger,Rebar,m ft 3.2808 2,592.30 790.13Caisson625 31662060 84" (2134mm) Dia. Caisson in Weathered Rock (Auger,Rebar,m ft 3.2808 3,059.10 932.41Caisson626 31662070 96" (2400mm) Dia. Caisson in Weathered Rock (Auger,Rebar,m ft 3.2808 3,512.30 1,070.55

15/09/2007 5:37:14 PM Page No 17 of 40

Page 18: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site Facilities317000 Tunneling & Boring

317700 Bore & JackJackBore10 31770010 Jack & Bore Casing m ft 3.2808 1,133.00 345.34

321100 Aggregate Base321110 Process Aggregate

ProcessAggreg32111000 ** Process Aggregates ** 0.0000 0.00 0.00Screen10 32111010 Screen Granular t ton 1.1023 0.59 0.53Screen20 32111020 Screen Granular t ton 1.1023 0.57 0.51Crush10 32111030 Crushed Granular t ton 1.1023 1.98 1.80Crush20 32111040 Crush Rap t ton 1.1023 3.40 3.08

321120 Haul AggregateGran20 32112010 Haul Granular Base t ton 1.1023 3.54 3.21Gran30 32112020 Haul Granular Subbase t ton 1.1023 3.54 3.21Gran50 32112030 Haul Granular with Trailer t ton 1.1023 4.71 4.28Gran60 32112040 Haul Granular with Tri-axle t ton 1.1023 7.07 6.41

321130 Place AggregatesGran10 32113010 Granular Base t ton 1.1023 11.79 10.69

321200 Asphalt PavingAsphalt 32121100 ** Asphalt ** 0.0000 0.00 0.00

321200 Asphalt PavingAsphalt110 32121110 Asphalt Surface Course t ton 1.1023 58.92 53.45Asphalt120 32121120 Dense Friction Course t ton 1.1023 67.98 61.67Asphalt130 32121130 Asphalt Base Course t ton 1.1023 53.02 48.10Asphalt140 32121140 Heavy Duty Binder Course t ton 1.1023 58.92 53.45Asphalt150 32121150 Medium Duty Binder Course t ton 1.1023 50.99 46.25HL1 32121410 HL1 Asphalt Paving t ton 1.1023 73.65 66.81HL1-M 32121420 HL1 Modified Asphalt Paving t ton 1.1023 62.32 56.53HL2 32121430 HL2 Asphalt Paving t ton 1.1023 79.31 71.95HL3 32121440 HL3 Asphalt Paving t ton 1.1023 56.65 51.39HL4 32121450 HL4 Asphalt Paving t ton 1.1023 50.99 46.25HL4-M 32121460 HL4 Modified t ton 1.1023 50.99 46.25HL8 32121470 HL8 Asphalt Paving t ton 1.1023 50.99 46.25

321212 Superpave AsphaltSuperpave10 32121210 Superpave 3/8" (9.5 mm) t ton 1.1023 67.98 61.67Superpave20 32121220 Superpave 1/2" (12.5 mm) t ton 1.1023 62.32 56.53Superpave30 32121230 Superpave 3/4" (19 mm) t ton 1.1023 67.98 61.67

321213 Stone Mastic AsphaltSMA100 32121310 Stone Mastic Asphalt t ton 1.1023 73.65 66.81

15/09/2007 5:37:14 PM Page No 18 of 40

Page 19: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site Facilities321210 Asphalt Paving

Asphalt110 32121110 Asphalt Surface Course t ton 1.1023 58.92 53.45Asphalt120 32121120 Dense Friction Course t ton 1.1023 67.98 61.67Asphalt130 32121130 Asphalt Base Course t ton 1.1023 53.02 48.10Asphalt140 32121140 Heavy Duty Binder Course t ton 1.1023 58.92 53.45Asphalt150 32121150 Medium Duty Binder Course t ton 1.1023 50.99 46.25HL1 32121410 HL1 Asphalt Paving t ton 1.1023 73.65 66.81HL1-M 32121420 HL1 Modified Asphalt Paving t ton 1.1023 62.32 56.53HL2 32121430 HL2 Asphalt Paving t ton 1.1023 79.31 71.95HL3 32121440 HL3 Asphalt Paving t ton 1.1023 56.65 51.39HL4 32121450 HL4 Asphalt Paving t ton 1.1023 50.99 46.25HL4-M 32121460 HL4 Modified t ton 1.1023 50.99 46.25HL8 32121470 HL8 Asphalt Paving t ton 1.1023 50.99 46.25

321212 Superpave AsphaltSuperpave10 32121210 Superpave 3/8" (9.5 mm) t ton 1.1023 67.98 61.67Superpave20 32121220 Superpave 1/2" (12.5 mm) t ton 1.1023 62.32 56.53Superpave30 32121230 Superpave 3/4" (19 mm) t ton 1.1023 67.98 61.67

321213 Stone Mastic AsphaltSMA100 32121310 Stone Mastic Asphalt t ton 1.1023 73.65 66.81

321230 Haul Asphalt CementHaulAC10 32123010 Transport Asphalt Cement - per load ea ea 1.0000 1,302.95 1,302.95HaulAC20 32123020 Transport Asphalt Cement - per ton t ton 1.1023 39.66 35.97

321240 Temporary AsphaltTempAsphalt1032124010 Hot Mix Miscellaneous m2 sf 10.7639 14.73 1.37TempAsphalt2032124020 Heavy Duty Binder Course Padding t ton 1.1023 76.59 69.48TempAsphalt3032124030 Asphalt Base Padding t ton 1.1023 76.59 69.48TempAsphalt4032124040 Temporary Hot Mix Pavement t ton 1.1023 90.64 82.23

321250 Rap ProcessingRap110 32125010 Screen Rap for Asphalt Aggregates t ton 1.1023 1.77 1.60Rap120 32125020 Blend Rap for Asphalt Aggregates t ton 1.1023 2.36 2.14Rap130 32125030 Crush Rap for Asphalt Aggregates t ton 1.1023 2.95 2.67

321260 Asphalt HandworkAsphaltHand1032126010 Asphalt Surface Handwork t ton 1.1023 88.37 80.17AsphaltHand2032126020 Heavy Duty Binder Course Handwork t ton 1.1023 88.37 80.17AsphaltHand3032126030 Asphalt Base Handwork t ton 1.1023 88.37 80.17AsphaltHand4032126040 Bituminous Patches to Spalls m2 sf 10.7639 181.28 16.84

321260 Tack CoatingTackCoat 32127000 ** Tack Coat ** 0.0000 0.00 0.00

15/09/2007 5:37:14 PM Page No 19 of 40

Page 20: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site Facilities321261 Tack Coat per m2

TackCoat10 32127010 Tack Coat m2 sf 10.7639 0.29 0.03321262 Tack Coat per litre

TackCoat20 32127020 Tack Coat litre gal 0.2642 0.65 2.45PrimeCoat30 32127030 Prime Coat litre gal 0.2642 0.77 2.90

321270 Asphalt SpillwaysAsphaltSpillway32128010 Asphalt Spillways m ft 3.2808 17.67 5.39AsphaltSpillway32128020 Asphalt Gutter Outlets ea ea 1.0000 28.33 28.33

321280 Asphalt SealingAsphaltSeal10 32129010 Granular Sealing (Hand) m2 sf 10.7639 2.36 0.22AsphaltSeal20 32129020 Granular Sealing (Machine) m2 sf 10.7639 1.18 0.11

321210 Asphalt PavingAsphalt 32121100 ** Asphalt ** 0.0000 0.00 0.00

321200 Asphalt PavingAsphalt110 32121110 Asphalt Surface Course t ton 1.1023 58.92 53.45Asphalt120 32121120 Dense Friction Course t ton 1.1023 67.98 61.67Asphalt130 32121130 Asphalt Base Course t ton 1.1023 53.02 48.10Asphalt140 32121140 Heavy Duty Binder Course t ton 1.1023 58.92 53.45Asphalt150 32121150 Medium Duty Binder Course t ton 1.1023 50.99 46.25HL1 32121410 HL1 Asphalt Paving t ton 1.1023 73.65 66.81HL1-M 32121420 HL1 Modified Asphalt Paving t ton 1.1023 62.32 56.53HL2 32121430 HL2 Asphalt Paving t ton 1.1023 79.31 71.95HL3 32121440 HL3 Asphalt Paving t ton 1.1023 56.65 51.39HL4 32121450 HL4 Asphalt Paving t ton 1.1023 50.99 46.25HL4-M 32121460 HL4 Modified t ton 1.1023 50.99 46.25HL8 32121470 HL8 Asphalt Paving t ton 1.1023 50.99 46.25

321212 Superpave AsphaltSuperpave10 32121210 Superpave 3/8" (9.5 mm) t ton 1.1023 67.98 61.67Superpave20 32121220 Superpave 1/2" (12.5 mm) t ton 1.1023 62.32 56.53Superpave30 32121230 Superpave 3/4" (19 mm) t ton 1.1023 67.98 61.67

321213 Stone Mastic AsphaltSMA100 32121310 Stone Mastic Asphalt t ton 1.1023 73.65 66.81

321210 Asphalt PavingAsphalt110 32121110 Asphalt Surface Course t ton 1.1023 58.92 53.45Asphalt120 32121120 Dense Friction Course t ton 1.1023 67.98 61.67Asphalt130 32121130 Asphalt Base Course t ton 1.1023 53.02 48.10Asphalt140 32121140 Heavy Duty Binder Course t ton 1.1023 58.92 53.45Asphalt150 32121150 Medium Duty Binder Course t ton 1.1023 50.99 46.25

15/09/2007 5:37:14 PM Page No 20 of 40

Page 21: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesHL1 32121410 HL1 Asphalt Paving t ton 1.1023 73.65 66.81HL1-M 32121420 HL1 Modified Asphalt Paving t ton 1.1023 62.32 56.53HL2 32121430 HL2 Asphalt Paving t ton 1.1023 79.31 71.95HL3 32121440 HL3 Asphalt Paving t ton 1.1023 56.65 51.39HL4 32121450 HL4 Asphalt Paving t ton 1.1023 50.99 46.25HL4-M 32121460 HL4 Modified t ton 1.1023 50.99 46.25HL8 32121470 HL8 Asphalt Paving t ton 1.1023 50.99 46.25

321212 Superpave AsphaltSuperpave10 32121210 Superpave 3/8" (9.5 mm) t ton 1.1023 67.98 61.67Superpave20 32121220 Superpave 1/2" (12.5 mm) t ton 1.1023 62.32 56.53Superpave30 32121230 Superpave 3/4" (19 mm) t ton 1.1023 67.98 61.67

321213 Stone Mastic AsphaltSMA100 32121310 Stone Mastic Asphalt t ton 1.1023 73.65 66.81

321230 Haul Asphalt CementHaulAC10 32123010 Transport Asphalt Cement - per load ea ea 1.0000 1,302.95 1,302.95HaulAC20 32123020 Transport Asphalt Cement - per ton t ton 1.1023 39.66 35.97

321240 Temporary AsphaltTempAsphalt1032124010 Hot Mix Miscellaneous m2 sf 10.7639 14.73 1.37TempAsphalt2032124020 Heavy Duty Binder Course Padding t ton 1.1023 76.59 69.48TempAsphalt3032124030 Asphalt Base Padding t ton 1.1023 76.59 69.48TempAsphalt4032124040 Temporary Hot Mix Pavement t ton 1.1023 90.64 82.23

321250 Rap ProcessingRap110 32125010 Screen Rap for Asphalt Aggregates t ton 1.1023 1.77 1.60Rap120 32125020 Blend Rap for Asphalt Aggregates t ton 1.1023 2.36 2.14Rap130 32125030 Crush Rap for Asphalt Aggregates t ton 1.1023 2.95 2.67

321260 Asphalt HandworkAsphaltHand1032126010 Asphalt Surface Handwork t ton 1.1023 88.37 80.17AsphaltHand2032126020 Heavy Duty Binder Course Handwork t ton 1.1023 88.37 80.17AsphaltHand3032126030 Asphalt Base Handwork t ton 1.1023 88.37 80.17AsphaltHand4032126040 Bituminous Patches to Spalls m2 sf 10.7639 181.28 16.84

321260 Tack CoatingTackCoat 32127000 ** Tack Coat ** 0.0000 0.00 0.00

321261 Tack Coat per m2TackCoat10 32127010 Tack Coat m2 sf 10.7639 0.29 0.03

321262 Tack Coat per litreTackCoat20 32127020 Tack Coat litre gal 0.2642 0.65 2.45PrimeCoat30 32127030 Prime Coat litre gal 0.2642 0.77 2.90

321270 Asphalt Spillways

15/09/2007 5:37:14 PM Page No 21 of 40

Page 22: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesAsphaltSpillway32128010 Asphalt Spillways m ft 3.2808 17.67 5.39AsphaltSpillway32128020 Asphalt Gutter Outlets ea ea 1.0000 28.33 28.33

321280 Asphalt SealingAsphaltSeal10 32129010 Granular Sealing (Hand) m2 sf 10.7639 2.36 0.22AsphaltSeal20 32129020 Granular Sealing (Machine) m2 sf 10.7639 1.18 0.11

321300 Concrete PavingConcretePaving32131000 ** Concrete Paving ** 0.0000 0.00 0.00

321310 Concrete Paving per m2ConcretePave132131010 Portland Cement Concrete Pavement for Runway & Taxiway m2 sf 10.7639 69.52 6.46ConcretePave132131020 Concrete Base - Road m2 sf 10.7639 101.97 9.47ConcretePave132131030 Full Depth Concrete Slab Repair m2 sf 10.7639 271.92 25.26ConcretePave132131040 Fast Track Full Depth Concrete Repair m2 sf 10.7639 906.40 84.21

321320 Concrete Paving per m3ConcretePave232132010 Cement Stabilized Base for Runway & Taxiway m3 cy 1.3080 88.37 67.57ConcretePave232132020 Concrete Subbase for Runway & Taxiway m3 cy 1.3080 114.30 87.39

321400 Unit PaversPaver110 32140010 Re-install Exist Interlocking Pavers m2 sf 10.7639 58.92 5.47Paver120 32140020 Supply & Install Interlocking Pavers m2 sf 10.7639 100.16 9.30

321600 Sidewalk / Curb Gutter321610 Concrete Curb & Gutter

Curb 32161000 ** Curb & Gutter ** 0.0000 0.00 0.00Curb110 32161010 Concrete Curb m ft 3.2808 47.13 14.37Curb120 32161020 Concrete Barrier Curb m ft 3.2808 47.13 14.37Curb130 32161030 Concrete Curb & Gutter m ft 3.2808 53.02 16.16Curb140 32161040 Raised Concrete Planter Curb m ft 3.2808 70.70 21.55Curb150 32161050 Concrete Gutter Outlets ea ea 1.0000 441.87 441.87

321620 Asphalt CurbAsphaltCurb21 32162010 Asphalt Curb m ft 3.2808 11.78 3.59

321640 SidewalksSidewalk 32164000 ** Sidewalk ** 0.0000 0.00 0.00Sidewalk110 32164010 Asphalt Sidewalk m2 sf 10.7639 5.89 0.55Sidewalk120 32164020 Concrete Sidewalk m2 sf 10.7639 41.24 3.83Sidewalk130 32164030 Concrete Slab Type Raised Median m2 sf 10.7639 41.24 3.83Sidewalk140 32164040 Coloured Concrete Apron Strip m2 sf 10.7639 141.40 13.14

321700 Pavement MarkingStriping 32171000 ** Pavement Markings ** 0.0000 0.00 0.00

321710 Durable Pavement MarkingsDurable10 32171010 Pavt Markings, Durable m ft 3.2808 5.10 1.55

15/09/2007 5:37:14 PM Page No 22 of 40

Page 23: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesDurable20 32171020 Pavt Marking Symbols, Durable ea ea 1.0000 206.21 206.21

321720 Painted Traffic LinesPaintline10 32172010 Pavt Markings, Paint m ft 3.2808 1.18 0.36Paintline20 32172020 Pavt Marking Symbols, Paint ea ea 1.0000 147.29 147.29

321730 Rumble StripsRumble10 32173010 Rumble Strip m ft 3.2808 1.18 0.36

321740 Obliterate Pavement MarkingsObliterate10 32174010 Pavt Markings, Obliterating m ft 3.2808 3.24 0.99Obliterate20 32174020 Pavt Markings, Obliterating (Grinding) m ft 3.2808 3.12 0.95Obliterate30 32174030 Pavt Marking, Obliterating (Soda Blasting) m ft 3.2808 14.16 4.32

321750 Recessed Pavement MarkingsInlaid10 32175010 Pav't Markings, Durable - Inlaid m ft 3.2808 13.60 4.14

321760 Raised Pavement MarkersRaised10 32176010 Reflective Pavement Markers (one way) ea ea 1.0000 58.92 58.92

321770 Temporary Pavement MarkingsTempLine100 32177010 Pavt Markings, Temporary m ft 3.2808 1.13 0.35TempLine110 32177020 Pavt Markings, Temporary, Removable m ft 3.2808 9.06 2.76TempLine120 32177030 Raised Pavement Markers, Temporary ea ea 1.0000 11.78 11.78TempLine130 32177040 Removable Black Line Mask,Temporary m ft 3.2808 18.85 5.75TempLine140 32177050 Pavt Marking Symbols, Temporary ea ea 1.0000 147.29 147.29

321780 Pavement Marking-RunwaysRunwalLine10 32178010 Pavement Markings for Runway & Taxiway m2 sf 10.7639 4.71 0.44

323100 Fences & GatesFence 32311100 ** Fence ** 0.0000 0.00 0.00

323110 Chainlink Fence323111 Fence

ChanlinkFence 32311110 1200mm High Chainlink Fence m ft 3.2808 51.50 15.70ChanlinkFence 32311130 1500mm High Chainlink Fence m ft 3.2808 56.65 17.27ChanlinkFence 32311140 1800mm High Chainlink Fence m ft 3.2808 61.80 18.84ChanlinkFence 32311160 2400mm high Chainlink Fence m ft 3.2808 72.10 21.98ChanlinkFence 32311220 Relocated Chain Link Fence - Mounted on Temporary Concretm ft 3.2808 47.13 14.37ChanlinkFence 32311250 Relocated Chain Link Fence - Ground Installed m ft 3.2808 58.92 17.96ChanlinkFence 32311370 Temporary Chain Link Fence - Mounted on Temporary Concrem ft 3.2808 58.92 17.96ChanlinkFence 32311380 Temporary Chain Link Fence - Ground Installed m ft 3.2808 70.70 21.55

323112 GatesGates 32311210 Supply & Install Gates ea ea 1.0000 339.90 339.90Fence34 32311220 Gate 5ft (1.5M Wide) ea ea 1.0000 235.66 235.66Fence36 32311230 Gate 10ft (3M Wide) ea ea 1.0000 471.33 471.33

15/09/2007 5:37:14 PM Page No 23 of 40

Page 24: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesFence38 32311240 Gate 15ft (4.5 Wide) ea ea 1.0000 706.99 706.99Fence40 32311250 Gate 23 ft (6M Wide) ea ea 1.0000 942.66 942.66Fence42 32311260 Gate 30 ft (9M Wide) ea ea 1.0000 1,413.98 1,413.98

357710 GatesGates 32311210 Supply & Install Gates ea ea 1.0000 339.90 339.90Fence34 32311220 Gate 5ft (1.5M Wide) ea ea 1.0000 235.66 235.66Fence36 32311230 Gate 10ft (3M Wide) ea ea 1.0000 471.33 471.33Fence38 32311240 Gate 15ft (4.5 Wide) ea ea 1.0000 706.99 706.99Fence40 32311250 Gate 23 ft (6M Wide) ea ea 1.0000 942.66 942.66Fence42 32311260 Gate 30 ft (9M Wide) ea ea 1.0000 1,413.98 1,413.98

323120 Highway FenceHighwayFence 32311190 Barbed Wire Fence m ft 3.2808 17.67 5.39

323150 Ornamental FenceOrnamental51032315010 Wrought Iron Fence 5ft (1500mm high) m ft 3.2808 147.29 44.89

323160 Wood FenceWoodFence10 32316010 Wooden Fence m ft 3.2808 88.37 26.94WoodFence20 32316020 Wooden Privacy Fence 5ft (1.5 m) m ft 3.2808 198.28 60.43

323170 Fence Screens & AccessoriesFence710 32317010 Relocated Vision Screen in Chain Link Fence m2 sf 10.7639 11.78 1.09Fence720 32317020 Vision Screen in Chain Link Fence m2 sf 10.7639 11.78 1.09Fence730 32317030 Replace Fence Overhang (3 strands of barbed wire) m ft 3.2808 17.00 5.18Fence740 32317040 Expanded Metal Antiglare Screen m ft 3.2808 90.64 27.63Fence750 32317050 Brace Panel ea ea 1.0000 176.75 176.75

323200 Earth WallsEarthwall 32321000 ** Earthwall "" 0.0000 0.00 0.00

323210 MSE WallsMSE100 32321010 Wire Mesh MSE Walls m2 sf 10.7639 154.50 14.35MSE130 32321020 RECO-Precast Reinforced Earth Wall m2 sf 10.7639 589.16 54.73MSE120 32321030 ARES- Precast Retaining Wall System m2 sf 10.7639 668.47 62.10MSE110 32321040 MESA- Stone Retaining Wall System m2 sf 10.7639 526.85 48.95

323220 Bin WallsBinWall10 32322010 Galvanized Steel Bin Walls m2 sf 10.7639 353.50 32.84

323230 Durisol WallsDurisol10 32323020 Install Durisol Panels ea ea 1.0000 147.29 147.29

323500 Screening Devices323510 Noise Barriers

NoiseBarrier 32351000 ** Noise Barrier ** 0.0000 0.00 0.00Noise110 32351010 Noise Barrier Wall m2 sf 10.7639 294.58 27.37

15/09/2007 5:37:14 PM Page No 24 of 40

Page 25: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesNoise115 32351020 5.0M Salvageable Noise Barrier Including Precast Noise/Traffi m ft 3.2808 471.33 143.66Noise120 32351030 Noise Barrier Fire Hose Access ea ea 1.0000 471.33 471.33Noise125 32351040 Precast Noise / Traffic Barrier m ft 3.2808 530.24 161.62Noise130 32351050 8ft (2.5M) Noise Barrier m ft 3.2808 807.15 246.02Noise135 32351060 11.5 ft (3.5M) Noise Barrier m ft 3.2808 854.28 260.39Noise140 32351070 13ft (4.0M) Noise Barrier m ft 3.2808 930.87 283.73Noise145 32351080 15ft (4.5M) Noise Barrier m ft 3.2808 1,013.36 308.87Noise150 32351090 13 ft (4.0M) Noise Barrier including Precast Noise/Traffic Barri m ft 3.2808 1,172.43 357.36Noise155 32351100 15ft (4.5M) Noise Barrier including Precast Noise/Traffic Barriem ft 3.2808 1,260.80 384.29Noise160 32351110 16.5ft (5.0M) Noise Barrier m ft 3.2808 1,413.98 430.98Noise165 32351120 16.5ft (5.0M) Noise Barrier including Precast Noise/Traffic Bar m ft 3.2808 1,472.90 448.94

328000 Sprinkler SystemSprinkler 32800000 ** Sprinklers ** 0.0000 0.00 0.00Sprinkler10 32800010 Sprinkler System Complete m ft 3.2808 117.83 35.92

329000 LandscapingLandscaping 32910000 ** Landscaping ** 0.0000 0.00 0.00

329100 TopsoilTopsoil110 32910010 Supply & Install Topsoil - Imported m3 cy 1.3080 26.78 20.47

329200 Seed & SodLand40 32920010 Sodding Level Ground m2 sf 10.7639 3.24 0.30Land50 32920020 Staked Sod to Slopes m2 sf 10.7639 4.12 0.38Seed110 32920030 Seeding & Wood Fibre Mulch m2 sf 10.7639 0.41 0.04

329300 Trees & PlantsTopsoil105 32910005 Rehandle & Spread Topsoil m3 cy 1.3080 8.24 6.30Seed120 32920035 Seeding to Slopes m2 sf 10.7639 0.57 0.05ShrubBed 32930010 Shrub Bed Preparation m2 sf 10.7639 22.66 2.11Plant110 32930020 Perennial Plants ea ea 1.0000 11.33 11.33Shrub110 32930050 Shrubs 20" to 33" (500mm to 1000mm)Height ea ea 1.0000 41.20 41.20Tree120 32930060 Coniferous Trees 5ft (1.5m) ea ea 1.0000 206.00 206.00Tree125 32930065 Coniferous Trees 8ft (2.4m) ea ea 1.0000 515.00 515.00Tree130 32930070 Deciduous Trees 1-3/4" to 2-1/2" (45mm to 60mm Caliper) ea ea 1.0000 471.33 471.33Tree135 32930075 Deciduous Trees 3" to 3-1/2" (75mm to 90mm Caliper) ea ea 1.0000 875.50 875.50Tree140 32930080 Transplanting of Existing Trees ea ea 1.0000 566.50 566.50

329500 Riparian PlantingRiparian10 32950010 Riparian Planting m2 sf 10.7639 5.67 0.53

331100 WatermainWaterSewer 33110000 ** Water & Sewer ** 0.0000 0.00 0.00

331110 Watermain Pipe

15/09/2007 5:37:14 PM Page No 25 of 40

Page 26: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesWM100 33110010 Watermain 4" (100)mm m ft 3.2808 195.70 59.65WM200 33110020 Watermain 8" (200)mm m ft 3.2808 272.95 83.20WM300 33110030 Watermain 12" (300)mm m ft 3.2808 412.00 125.58WM450 33110040 Watermain 18" (450)mm m ft 3.2808 669.50 204.06WM600 33110050 Watermain 24" (600)mm m ft 3.2808 1,004.25 306.10

331130 Water ServicesWM12 33110060 Water Service 1/2" (12 mm) Copper m ft 3.2808 180.25 54.94WM20 33110070 Water Service 3/4" (20mm) Copper m ft 3.2808 195.70 59.65WM25 33110080 Water Service 1" (25mm) Copper m ft 3.2808 211.15 64.36CurbStop20 33110090 Curb Stop 3/4 " (20mm) incl Box ea ea 1.0000 319.30 319.30CurbStop25 33110100 Curb Stop 1" (25mm) incl Box ea ea 1.0000 360.50 360.50

332000 Steam Distribution332100 Steam Pipe Buried

Steam100 33210110 Steam Pipe 4" (100mm) Buried m ft 3.2808 1,030.00 313.94Steam200 33210120 Steam Pipe 8" (200mm) Buried m ft 3.2808 1,596.50 486.61Steam300 33210130 Steam Pipe 12" (300mm) Buried m ft 3.2808 2,678.00 816.25

333000 Sanitary SewerCCTVSewer10 33113010 CCTV Video Inspection of Sewer m ft 3.2808 33.99 10.36CleanSewer10 33300020 Cleanout Sewer m ft 3.2808 56.65 17.27

333100 Sanitary Sewer PipeSan10 33300010 Sanitary Sewers m ft 3.2808 147.29 44.89

334000 Drainage334200 Culverts

Culvert110 33420010 Culverts - Supply and Install 16" (400 mm) dia. C.S.P. m ft 3.2808 154.50 47.09Culvert120 33420020 Culverts - Supply and Install 24" (600 mm) dia. C.S.P. m ft 3.2808 180.25 54.94Culvert130 33420030 Culverts - Supply and Install 32" (800 mm) dia. C.S.P. m ft 3.2808 206.00 62.79Culvert140 33420040 Culverts - Supply and Install 48" (1200 mm) dia. C.S.P. m ft 3.2808 412.00 125.58Culvert200 33420050 Auger Smooth Wall Culvert 36" (900 mm) dia C.S.P. m ft 3.2808 824.00 251.16

334400 Storm SewersStorm300 33440030 Storm Sewer 12" (300mm) m ft 3.2808 242.05 73.78Storm450 33440045 Storm Sewer 18" (450mm) m ft 3.2808 303.85 92.61Storm600 33440060 Storm Sewer 24" (600mm) m ft 3.2808 412.00 125.58Storm750 33440070 Storm Sewer 30" (750mm) m ft 3.2808 576.80 175.81Storm900 33440090 Storm Sewer 36" (900mm) m ft 3.2808 757.05 230.75

334600 SubdrainsSubdrain100 33460110 Sub Drain Perforated 4" (100mm) m ft 3.2808 30.90 9.42Subdrain200 33460120 Sub Drain Perforated 6" (150mm) m ft 3.2808 43.26 13.19

334900 Drainage Structures

15/09/2007 5:37:14 PM Page No 26 of 40

Page 27: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesManhole100 33490010 Manholes ea ea 1.0000 2,945.80 2,945.80

335000 Pipeline335100 Station Piping

StationPiping 33511000 ** Station Piping ** 0.0000 0.00 0.00335110 Station Piping Fabrication

StationPipeFab33511010 Station Pipe Fabrication 1 LS LS 1.0000 103,000.00 103,000.00StationPipeFab33511020 Station Pipe Fabrication 2 LS LS 1.0000 123,600.00 123,600.00StationPipeFab33511030 Station Pipe Fabrication 3 LS LS 1.0000 133,900.00 133,900.00

335120 Station Steel FabricationStationSteelFa 33512010 Station Steel Fabrication 1 LS LS 1.0000 41,200.00 41,200.00StationSteelFa 33512020 Station Steel Fabrication 2 LS LS 1.0000 51,500.00 51,500.00StationSteelFa 33512030 Station Steel Fabrication 3 LS LS 1.0000 61,800.00 61,800.00

335130 Station Haul FabricationStationHaul10 33513010 Station Fabrication Haul 1 LS LS 1.0000 82,400.00 82,400.00StationHaul20 33513020 Station Fabrication Haul 2 LS LS 1.0000 92,700.00 92,700.00StationHaul30 33513030 Station Fabrication Haul 3 LS LS 1.0000 103,000.00 103,000.00

335140 Station Shop CoatingStationCoating 33514010 Station Shop Coating 1 LS LS 1.0000 10,300.00 10,300.00StationCoating233514020 Station Shop Coating 2 LS LS 1.0000 20,600.00 20,600.00StationCoating333514030 Station Shop Coating 3 LS LS 1.0000 30,900.00 30,900.00

335160 Station Pile DrivingStationPiling10 33515010 Station Piling 1 LS LS 1.0000 103,000.00 103,000.00StationPiling20 33515020 Station Piling 2 LS LS 1.0000 128,750.00 128,750.00StationPiling30 33515030 Station Piling 3 LS LS 1.0000 154,500.00 154,500.00

335200 Directional DrillingDirectionalDrill 33520000 ** Directional Drilling ** 0.0000 0.00 0.00DirectionalDrill433520010 Directional Drilling 42" (1067mm) m ft 3.2808 3,347.50 1,020.32

335300 CRCCRCGang10 33530010 CRC Main Gang Rent 1 m ft 3.2808 2.68 0.82CRCGang20 33530020 CRC Main Gang Mobe 1 m ft 3.2808 2.68 0.82

335400 Welding SchoolWeldSchool10 33540010 Welding School m ft 3.2808 4.74 1.44DitchBreaker1033550010 Ditch Breaker Sub m3 CY 1.3080 195.70 149.62

337000 Electrical SiteworkSiteElectrical 33710000 ** Site Electrical ** 0.0000 0.00 0.00

337100 Transmission & DistributionDistribution100 33710010 Distribution Assemblies ea ea 1.0000 31,157.50 31,157.50Distribution200 33710020 Modification of Power Supply Equipment LS LS 1.0000 28,325.00 28,325.00

15/09/2007 5:37:14 PM Page No 27 of 40

Page 28: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesDistribution300 33710030 Modification of Power Supply Equipment for Freeway Traffic Mea ea 1.0000 0.00 0.00Distribution400 33710040 Maintenance and Warranty for Freeway Traffic Management SLS LS 1.0000 23,793.00 23,793.00

337200 Ductbanks337210 Direct Bury Ductbanks

BuriedDucts 33720000 ** Buried Ducts ** 0.0000 0.00 0.00Duct100 33721010 Flexible Ducts m ft 3.2808 22.66 6.91Duct110 33721020 Flexible Ducts (Temporary) m ft 3.2808 29.46 8.98Duct120 33721030 Rigid Ducts, Direct Buried m ft 3.2808 33.99 10.36Duct130 33721040 Rigid Ducts, Direct Buried (Temporary) m ft 3.2808 33.99 10.36Duct140 33721050 Rigid Ducts by Subsurface Installation m ft 3.2808 113.30 34.53Duct150 33721060 Rigid Ducts, Steel Encased by Subsurface Installation m ft 3.2808 339.90 103.60

337220 Concrete Encased DuctbanksDuct200 33722010 Rigid Ducts, Concrete Encased m ft 3.2808 169.95 51.80

337230 Embedded Work in StructuresDuct300 33723010 Electrical Embedded Work in Structure (Ministry) m ft 3.2808 84.98 25.90

337240 Surface Mounted DuctsDuct410 33724010 Surface Mounted Duct Systems (Temporary) m ft 3.2808 67.98 20.72Duct420 33724020 Surface Mounted Duct Systems m ft 3.2808 283.25 86.33

337250 Suspend DuctsDuct700 33725010 Suspension of Direct Buried Ducts (Temporary) LS LS 1.0000 33,990.00 33,990.00

337260 Inner DuctsInnerduct10 33726010 Innerducts m ft 3.2808 7.93 2.42

337300 Underground StructuresHandhole 33730000 ** Underground Structures ** 0.0000 0.00 0.00Handhole110 33730010 Electrical Chamber Drains m ft 3.2808 226.60 69.07Handhole111 33730020 Adjusting & Rebuilding Electrical Chambers ea ea 1.0000 906.40 906.40Handhole121 33730030 Electrical Handholes (Temporary) ea ea 1.0000 1,133.00 1,133.00Handhole130 33730030 Electrical Maintenance Holes ea ea 1.0000 2,832.50 2,832.50Handhole122 33730040 Electrical Handholes ea ea 1.0000 1,133.00 1,133.00

337400 Utility PolesPoles 33741000 ** Poles ** 0.0000 0.00 0.00

337410 Pole FoundationsPoleFdn10 33741010 Concrete Footings in Earth ea ea 1.0000 1,133.00 1,133.00PoleFdn20 33741030 Concrete Footing for High Mast Poles ea ea 1.0000 11,330.00 11,330.00

337420 Wood PolesWoodPole10 33742010 Wood Poles, Direct Buried in Earth (Temporary) ea ea 1.0000 339.90 339.90WoodPole20 33742020 Wood Poles, Direct Buried in Earth ea ea 1.0000 623.15 623.15WoodPole30 33742030 Wood Poles, Direct Buried in Rock (Temporary) ea ea 1.0000 0.00 0.00

15/09/2007 5:37:14 PM Page No 28 of 40

Page 29: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site Facilities337430 Concrete Poles

ConcretePole1 33743020 Concrete Poles, Direct Buried in Earth (Temporary) ea ea 1.0000 1,416.25 1,416.25337440 Steel Poles

SteelPole10 33744010 Frangible Bases ea ea 1.0000 396.55 396.55SteelPole20 33744020 Steel Poles, Base Mounted ea ea 1.0000 1,246.30 1,246.30SteelPole30 33744030 Sectional Steel Poles, Direct Buried in Earth ea ea 1.0000 1,416.25 1,416.25SteelPole40 33744040 Sectional Steel Poles, Base Mounted ea ea 1.0000 2,379.30 2,379.30

337450 High Mast PolesHighMast10 33745010 High Mast Poles and Equipment ea ea 1.0000 45,320.00 45,320.00

337460 Pole BracketsPoleBracket10 33746010 Single Member Arms and Signal Hangers ea ea 1.0000 453.20 453.20PoleBracket20 33746020 Single Member Arms and Signal Hangers (Temporary) ea ea 1.0000 453.20 453.20PoleBracket30 33746030 Double Arm Brackets ea ea 1.0000 481.53 481.53

337470 Guy AnchorsGuyAnchor10 33747010 Guy Anchors (Temporary) ea ea 1.0000 226.60 226.60GuyAnchor20 33747020 Guy Anchors ea ea 1.0000 396.55 396.55

337500 Site LightingLights 33751000 ** Lights ** 0.0000 0.00 0.00

337510 LuminairesLuminaire111 33751010 Relamp Roadway Lighting Luminaires ea ea 1.0000 56.65 56.65Luminaire112 33751020 Relamp Underpass Luminaires ea ea 1.0000 96.31 96.31Luminaire113 33751030 Roadway Lighting Luminaires and Bracket Assemblies (Tempoea ea 1.0000 566.50 566.50Luminaire114 33751040 Roadway Lighting Luminaires and Bracket Assemblies ea ea 1.0000 566.50 566.50Luminaire115 33751050 Underpass Luminaires (Temporary) ea ea 1.0000 793.10 793.10Luminaire116 33751060 Underpass Luminaires ea ea 1.0000 793.10 793.10Luminaire117 33751070 Replace Underpass Luminaires ea ea 1.0000 1,246.30 1,246.30Luminaire118 33751080 High Mast Luminaires, High Bay Type ea ea 1.0000 2,832.50 2,832.50

337520 FlashersFlasher120 33752010 Flasher Mechanisms (Temporary) ea ea 1.0000 339.90 339.90Flasher122 33752020 Flasher Mechanisms ea ea 1.0000 339.90 339.90Flasher124 33752030 Flasher Beacons and Downlights ea ea 1.0000 849.75 849.75Flasher126 33752040 Flasher Beacons and Downlights (Temporary) ea ea 1.0000 934.73 934.73

337600 Cables & Loop Detectors337610 Low Voltage Cables

Cable 33761000 ** Cable ** 0.0000 0.00 0.00Cable100 33761100 Coaxial Cables, in Ducts m ft 3.2808 2.27 0.69Cable110 33761110 Extra Low Voltage Cables, in Ducts m ft 3.2808 2.27 0.69Cable120 33761120 Low Voltage Cables, in Ducts (Temporary) m ft 3.2808 2.83 0.86

15/09/2007 5:37:14 PM Page No 29 of 40

Page 30: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesCable130 33761130 Low Voltage Cables, Aerial on Messenger Cable (Temporary) m ft 3.2808 3.40 1.04Cable140 33761140 Low Voltage Cables, in Ducts m ft 3.2808 3.40 1.04Cable150 33761150 Low Voltage Cables, Aerial with ACSR Neutral m ft 3.2808 5.10 1.55Cable160 33761160 Extra Low Voltage Cables, Aerial on Messenger Cable (Tempom ft 3.2808 5.67 1.73Cable170 33761170 Communication Cables, in Ducts m ft 3.2808 6.23 1.90Cable180 33761180 Extra Low Voltage Cables, in Ducts (Temporary) m ft 3.2808 6.80 2.07Cable190 33761190 Extra Low Voltage Cables in Sawcut Slots m ft 3.2808 7.93 2.42Cable200 33761200 Traffic Signal Cables, Aerial on Messenger Cable (Temporary)m ft 3.2808 9.35 2.85Cable210 33761210 Steel Messenger Cables, Aerial (Temporary) m ft 3.2808 22.66 6.91Cable220 33761220 Traffic Signal Cables, in Ducts m ft 3.2808 23.79 7.25Cable230 33761230 Fibre Optic Communication Cables, in Ducts m ft 3.2808 24.93 7.60Cable240 33761240 Traffic Signal Cables, in Ducts (Temporary) m ft 3.2808 28.33 8.63Cable250 33761250 Sawcut Slot for Extra Low Voltage Cables m ft 3.2808 28.33 8.63

337620 Loop DetectorsLoop150 33761150 Splice Enclosures for Fibre Optic Cables ea ea 1.0000 1,133.00 1,133.00Loop 33762000 ** Loop Detectors ** 0.0000 0.00 0.00Loop100 33762100 Test Existing Loop Detectors ea ea 1.0000 135.96 135.96Loop110 33762110 Loop Vehicle Detector Sensor Units ea ea 1.0000 368.23 368.23Loop120 33762120 Prefabricated Loops ea ea 1.0000 736.45 736.45Loop130 33762130 Loop Detectors (Temporary) ea ea 1.0000 849.75 849.75Loop140 33762140 Loop Detectors ea ea 1.0000 906.40 906.40Loop160 33762160 Loop Vehicle Detector Sensor Units ea ea 1.0000 1,869.45 1,869.45

337700 Controllers & CabinetsControllers 33771000 ** Controllers ** 0.0000 0.00 0.00

337710 ControllersController10 33771040 Traffic Signal Controllers (Temporary) ea ea 1.0000 3,399.00 3,399.00

337720 Traffic ControlTraffic100 33772010 Traffic Counting Station ea ea 1.0000 538.18 538.18Traffic110 33772020 Remote Traffic Microwave Sensors ea ea 1.0000 1,416.25 1,416.25Traffic120 33772030 Removal of Freeway Traffic Management System LS LS 1.0000 11,330.00 11,330.00Traffic130 33772040 Maintenance and Operation for Temporary Traffic Signal SysteLS LS 1.0000 45,320.00 45,320.00Traffic140 33772050 Emergency Vehicle Pre-emption Equipment ea ea 1.0000 0.00 0.00

337730 CabinetsCabinet10 33773010 Supply Control Cabinet Assemblies (Temporary) ea ea 1.0000 3,399.00 3,399.00Cabinet20 33773020 Controller Cabinets (Temporary) ea ea 1.0000 7,364.50 7,364.50Cabinet30 33773030 Controller Cabinets ea ea 1.0000 7,364.50 7,364.50Cabinet40 33773040 Power Supply Cabinets (Temporary) ea ea 1.0000 7,364.50 7,364.50Cabinet50 33773050 Power Supply Cabinets ea ea 1.0000 7,364.50 7,364.50

15/09/2007 5:37:14 PM Page No 30 of 40

Page 31: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site Facilities337740 Signal Heads

Signals 33774000 ** Signals ** 0.0000 0.00 0.00Signal100 33774010 Pedestrian Pushbuttons ea ea 1.0000 113.30 113.30Signal110 33774020 Pedestrian Type Signal Heads (Temporary) ea ea 1.0000 481.53 481.53Signal120 33774030 Pedestrian Type Signal Heads ea ea 1.0000 481.53 481.53Signal130 33774040 Highway Type Signal Heads (Temporary) ea ea 1.0000 764.78 764.78Signal140 33774050 Highway Type Signal Heads ea ea 1.0000 764.78 764.78Signal150 33774060 Special Type Signal Heads (Temporary) ea ea 1.0000 934.73 934.73Signal160 33774070 Special Type Signal Heads ea ea 1.0000 934.73 934.73

337750 Foundation PadsPad100 33775010 Wooden Pads (Temporary) ea ea 1.0000 481.53 481.53Pad110 33775020 Base Mounted Communication Pedestals ea ea 1.0000 1,416.25 1,416.25Pad120 33775030 Concrete Pads (Temporary) ea ea 1.0000 3,399.00 3,399.00Pad130 33775040 Concrete Pads ea ea 1.0000 3,399.00 3,399.00

337800 Cathodic Protection & GroundingGrounding 33782000 ** Grounding ** 0.0000 0.00 0.00Ground100 33782010 Ground Wires m ft 3.2808 2.27 0.69Ground110 33782020 Ground Wires (Temporary) m ft 3.2808 2.27 0.69Ground120 33782030 Ground Electrodes ea ea 1.0000 90.64 90.64Ground130 33782040 Ground Electrodes (Temporary) ea ea 1.0000 113.30 113.30

337900 CCTV CamerasVideo 33790000 ** Video ** 0.0000 0.00 0.00Video110 33790010 Outdoor Pan / Tilt Units (Temporary) ea ea 1.0000 934.73 934.73Video120 33790020 Outdoor Pan / Tilt Units ea ea 1.0000 934.73 934.73Video130 33790030 Closed Circuit Television Maintenance Sites ea ea 1.0000 1,416.25 1,416.25Video140 33790040 Fibre Optic Modems (Temporary) ea ea 1.0000 2,379.30 2,379.30Video150 33790050 Fibre Optic Modems ea ea 1.0000 2,379.30 2,379.30Video160 33790060 Outdoor Closed Circuit Television Cameras (Temporary) ea ea 1.0000 7,024.60 7,024.60Video170 33790070 Outdoor Closed Circuit Television Cameras ea ea 1.0000 7,024.60 7,024.60Video180 33790080 Video Transmitters and Receivers (Temporary) ea ea 1.0000 7,024.60 7,024.60Video190 33790090 Video Transmitters and Receivers ea ea 1.0000 9,630.50 9,630.50

341100 Railway WorkRail 34110000 ** Rail ** 0.0000 0.00 0.00Rail110 34110010 Haul Rail Ballast t ton 1.1023 8.25 7.48Rail120 34110020 Railway Flagman Hour Hour 1.0000 70.70 70.70

344100 Traffic Signs/Control344110 Traffic Control Signs

Signs 34411100 ** Signs ** 0.0000 0.00 0.00

15/09/2007 5:37:14 PM Page No 31 of 40

Page 32: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site Facilities344111 Post Mounted Signs

Sign120 34411110 Supply, Install, Maintain & Remove Construction Signs ea ea 1.0000 84.98 84.98Sign150 34411120 Advanced Notification Signs ea ea 1.0000 368.23 368.23Sign110 34411130 Sign Tabs ea ea 1.0000 56.65 56.65Sign140 34411150 Install Government Signs c/w Base and Posts ea ea 1.0000 198.28 198.28Sign130 34411160 Relocated Advanced Notification Signs ea ea 1.0000 169.95 169.95

344112 Structure Mounted SignsSignStructure1 34411210 Installation of Cantilever Structures ea ea 1.0000 2,266.00 2,266.00SignStructure2 34411220 Assemble & Install Trichord Structures ea ea 1.0000 3,399.00 3,399.00

344120 Temporary Traffic ControlsDetour 34412000 ** Detours ** 0.0000 0.00 0.00Traffic210 34412010 Truck Mounted Attenator Hour Hour 1.0000 88.37 88.37Traffic220 34412020 Sub Two-Man Traffic Control Crew Hour Hour 1.0000 96.31 96.31Police100 34412030 Pay Duty Police c/w Car Hour Hour 1.0000 96.31 96.31

347100 Barriers & Guiderail347110 Concrete Barrier

Barrier 34711010 ** Barrier ** 0.0000 0.00 0.00Barrier110 34711010 Temporary Concrete Barrier m ft 3.2808 76.59 23.34Barrier120 34711020 Concrete Barrier - Type "A" m ft 3.2808 117.83 35.92Barrier130 34711030 Temporary Concrete Barrier - Relocation m ft 3.2808 17.67 5.39Barrier140 34711040 Tall Wall Barrier - Type "E" m ft 3.2808 206.21 62.85Barrier150 34711050 Asymmetric Tall Wall Barrier - Type "E2" m ft 3.2808 353.50 107.75

347120 Metal Post Beam Guide RailGuiderail 34712000 ** Guiderail ** 0.0000 0.00 0.00Guiderail210 34712010 Single Rail Steel Beam Guide Rail m ft 3.2808 82.48 25.14Guiderail220 34712020 Single Rail Steel Beam Guide Rail c/w Channel m ft 3.2808 106.05 32.32Guiderail230 34712030 Steel Box Beam Median Barrier m ft 3.2808 176.75 53.87Guiderail240 34712040 Double Rail Steel Beam Guide Rail m ft 3.2808 294.58 89.79Guiderail250 34712050 Transition Rail Adjustment ea ea 1.0000 2,651.22 2,651.22Guiderail260 34712060 Temporary Transition Rails ea ea 1.0000 2,651.22 2,651.22Guiderail270 34712070 Temporary Transition Rails - Left-in-Place ea ea 1.0000 3,240.38 3,240.38

347140 Post & Cable GuiderailAdjustCGR 34714010 Adjust Cable Guide Rail m ft 3.2808 11.33 3.45CableRail10 34714020 Cable Guide Rail m ft 3.2808 16.50 5.03

347150 Impact Attenuating DevicesAttenuator 34715000 ** Attenuating Devices ** 0.0000 0.00 0.00Attenuator710 34715010 Anchor Blocks ea ea 1.0000 648.08 648.08Attenuator715 34715020 Eccentric Loader ea ea 1.0000 2,945.80 2,945.80

15/09/2007 5:37:14 PM Page No 32 of 40

Page 33: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesAttenuator720 34715030 Temp. Crash Cushion Attenuating Terminal Relocation ea ea 1.0000 4,713.28 4,713.28Attenuator725 34715040 Temporary Energy Attenuator - Relocation ea ea 1.0000 5,302.44 5,302.44Attenuator730 34715050 Temporary Quadguard - Relocation ea ea 1.0000 5,891.60 5,891.60Attenuator735 34715060 Extruder ea ea 1.0000 5,891.60 5,891.60Attenuator740 34715070 Crash-Cushion Attenuating Terminal ea ea 1.0000 14,139.84 14,139.84Attenuator745 34715080 Trend End Treatment ea ea 1.0000 16,496.48 16,496.48Attenuator750 34715090 Temporary Quadguard ea ea 1.0000 17,674.80 17,674.80Attenuator755 34715100 Temporary Energy Attenuator ea ea 1.0000 22,977.24 22,977.24Attenuator760 34715110 Temp. Crash Cushion Attenuating Terminal ea ea 1.0000 7,069.92 7,069.92Attenuator765 34715120 Temp. Guide Rail Energy Absorbing Terminal - Relocation ea ea 1.0000 11,783.20 11,783.20Attenuator770 34715130 Temp. Guide Rail Energy Absorbing Terminal ea ea 1.0000 23,566.40 23,566.40Attenuator775 34715140 Temp. Guide Rail Energy Absorbing Terminal - Left in Place ea ea 1.0000 53,024.40 53,024.40

347160 Flexible Guide PostsReflector 34716000 ** Refectors ** 0.0000 0.00 0.00Reflector10 34716010 Retro Reflectors ea ea 1.0000 2.36 2.36GuidePost10 34716020 Delineator Posts ea ea 1.0000 58.92 58.92GuidePost20 34716030 Temporary Flexible Guide Posts - Relocation ea ea 1.0000 117.83 117.83GuidePost30 34716040 Temporary Flexible Guide Posts ea ea 1.0000 324.04 324.04

357600 PenstocksHydro110 35700000 ** Hydro Work ** 0.0000 0.00 0.00Penstock110 35760000 ** Penstocks ** 0.0000 0.00 0.00

357700 Hydro GatesGates110 35770000 ** Hydro Gates ** 0.0000 0.00 0.00

323112 Gates357711 Gate Structure

Gates1100 35771100 Gates - Structural Steel kg lb 2.2046 13.80 6.26Gates1110 35771110 Service Gates m2 sf 10.7639 4,000.00 371.61Gates1115 35771115 Spillway Radial Gates (13.3 m wide x 14.5 m high) - head 14.1mm2 sf 10.7639 7,000.00 650.32Gates1130 35771130 Intake Gates (10.2 m x 16 m high) - head 49m - 130000kg/gate m2 sf 10.7639 11,500.00 1,068.39Gates1135 35771135 Intake Wheel Gates (8.2 m wide x 7.3 m high) - head 44m - 175 m2 sf 10.7639 18,000.00 1,672.25Gates1140 35771140 Draft Tube Gates (3.2 wide x 4.4 high) m2 sf 10.7639 19,000.00 1,765.16Gates1145 35771145 Power Tunnel Emergency Gate ( 7.3 m x 7 m) m2 sf 10.7639 21,000.00 1,950.96Gates1150 35771150 Diversion Structure Sluice Gates (4m x 5 m) - 5mhead 35,000 k m2 sf 10.7639 21,500.00 1,997.42Gates1155 35771155 Radial Sluice Gates (7 m wide x 5 m high) incl-hydraulic hoist m2 sf 10.7639 22,000.00 2,043.87Gates1160 35771160 Sediment Extraction Gate (1.4 x 1.2m) w/embeded parts,hydram2 sf 10.7639 38,500.00 3,576.77

357712 Gate Embedded PartsGuides1210 35771210 Gate Guides (Upper Mattagami) m ft 3.2808 900.00 274.32Gates1215 35771215 Intake Gates Embedded Parts 12500kg/gate - 76kg/m2 m2 sf 10.7639 1,200.00 111.48

15/09/2007 5:37:14 PM Page No 33 of 40

Page 34: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesGates1220 35771220 Intake Wheel Gates Embedded Parts 20,000 kg/gate - 142kg/m m2 sf 10.7639 2,100.00 195.10Gates1225 35771225 Spillway Radial Gate Embedded Parts 32,000 kg/gate - 161kg/mm2 sf 10.7639 2,400.00 222.97

357721 Gate StructureGates1100 35771100 Gates - Structural Steel kg lb 2.2046 13.80 6.26Gates1110 35771110 Service Gates m2 sf 10.7639 4,000.00 371.61Gates1115 35771115 Spillway Radial Gates (13.3 m wide x 14.5 m high) - head 14.1mm2 sf 10.7639 7,000.00 650.32Gates1130 35771130 Intake Gates (10.2 m x 16 m high) - head 49m - 130000kg/gate m2 sf 10.7639 11,500.00 1,068.39Gates1135 35771135 Intake Wheel Gates (8.2 m wide x 7.3 m high) - head 44m - 175 m2 sf 10.7639 18,000.00 1,672.25Gates1140 35771140 Draft Tube Gates (3.2 wide x 4.4 high) m2 sf 10.7639 19,000.00 1,765.16Gates1145 35771145 Power Tunnel Emergency Gate ( 7.3 m x 7 m) m2 sf 10.7639 21,000.00 1,950.96Gates1150 35771150 Diversion Structure Sluice Gates (4m x 5 m) - 5mhead 35,000 k m2 sf 10.7639 21,500.00 1,997.42Gates1155 35771155 Radial Sluice Gates (7 m wide x 5 m high) incl-hydraulic hoist m2 sf 10.7639 22,000.00 2,043.87Gates1160 35771160 Sediment Extraction Gate (1.4 x 1.2m) w/embeded parts,hydram2 sf 10.7639 38,500.00 3,576.77

357722 Gate Embedded PartsGuides1210 35771210 Gate Guides (Upper Mattagami) m ft 3.2808 900.00 274.32Gates1215 35771215 Intake Gates Embedded Parts 12500kg/gate - 76kg/m2 m2 sf 10.7639 1,200.00 111.48Gates1220 35771220 Intake Wheel Gates Embedded Parts 20,000 kg/gate - 142kg/m m2 sf 10.7639 2,100.00 195.10Gates1225 35771225 Spillway Radial Gate Embedded Parts 32,000 kg/gate - 161kg/mm2 sf 10.7639 2,400.00 222.97

357710 Gates357711 Gate Structure

Gates1100 35771100 Gates - Structural Steel kg lb 2.2046 13.80 6.26Gates1110 35771110 Service Gates m2 sf 10.7639 4,000.00 371.61Gates1115 35771115 Spillway Radial Gates (13.3 m wide x 14.5 m high) - head 14.1mm2 sf 10.7639 7,000.00 650.32Gates1130 35771130 Intake Gates (10.2 m x 16 m high) - head 49m - 130000kg/gate m2 sf 10.7639 11,500.00 1,068.39Gates1135 35771135 Intake Wheel Gates (8.2 m wide x 7.3 m high) - head 44m - 175 m2 sf 10.7639 18,000.00 1,672.25Gates1140 35771140 Draft Tube Gates (3.2 wide x 4.4 high) m2 sf 10.7639 19,000.00 1,765.16Gates1145 35771145 Power Tunnel Emergency Gate ( 7.3 m x 7 m) m2 sf 10.7639 21,000.00 1,950.96Gates1150 35771150 Diversion Structure Sluice Gates (4m x 5 m) - 5mhead 35,000 k m2 sf 10.7639 21,500.00 1,997.42Gates1155 35771155 Radial Sluice Gates (7 m wide x 5 m high) incl-hydraulic hoist m2 sf 10.7639 22,000.00 2,043.87Gates1160 35771160 Sediment Extraction Gate (1.4 x 1.2m) w/embeded parts,hydram2 sf 10.7639 38,500.00 3,576.77

357712 Gate Embedded PartsGuides1210 35771210 Gate Guides (Upper Mattagami) m ft 3.2808 900.00 274.32Gates1215 35771215 Intake Gates Embedded Parts 12500kg/gate - 76kg/m2 m2 sf 10.7639 1,200.00 111.48Gates1220 35771220 Intake Wheel Gates Embedded Parts 20,000 kg/gate - 142kg/m m2 sf 10.7639 2,100.00 195.10Gates1225 35771225 Spillway Radial Gate Embedded Parts 32,000 kg/gate - 161kg/mm2 sf 10.7639 2,400.00 222.97

357721 Gate StructureGates1100 35771100 Gates - Structural Steel kg lb 2.2046 13.80 6.26Gates1110 35771110 Service Gates m2 sf 10.7639 4,000.00 371.61

15/09/2007 5:37:14 PM Page No 34 of 40

Page 35: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesGates1115 35771115 Spillway Radial Gates (13.3 m wide x 14.5 m high) - head 14.1mm2 sf 10.7639 7,000.00 650.32Gates1130 35771130 Intake Gates (10.2 m x 16 m high) - head 49m - 130000kg/gate m2 sf 10.7639 11,500.00 1,068.39Gates1135 35771135 Intake Wheel Gates (8.2 m wide x 7.3 m high) - head 44m - 175 m2 sf 10.7639 18,000.00 1,672.25Gates1140 35771140 Draft Tube Gates (3.2 wide x 4.4 high) m2 sf 10.7639 19,000.00 1,765.16Gates1145 35771145 Power Tunnel Emergency Gate ( 7.3 m x 7 m) m2 sf 10.7639 21,000.00 1,950.96Gates1150 35771150 Diversion Structure Sluice Gates (4m x 5 m) - 5mhead 35,000 k m2 sf 10.7639 21,500.00 1,997.42Gates1155 35771155 Radial Sluice Gates (7 m wide x 5 m high) incl-hydraulic hoist m2 sf 10.7639 22,000.00 2,043.87Gates1160 35771160 Sediment Extraction Gate (1.4 x 1.2m) w/embeded parts,hydram2 sf 10.7639 38,500.00 3,576.77

357722 Gate Embedded PartsGuides1210 35771210 Gate Guides (Upper Mattagami) m ft 3.2808 900.00 274.32Gates1215 35771215 Intake Gates Embedded Parts 12500kg/gate - 76kg/m2 m2 sf 10.7639 1,200.00 111.48Gates1220 35771220 Intake Wheel Gates Embedded Parts 20,000 kg/gate - 142kg/m m2 sf 10.7639 2,100.00 195.10Gates1225 35771225 Spillway Radial Gate Embedded Parts 32,000 kg/gate - 161kg/mm2 sf 10.7639 2,400.00 222.97

357720 Stoplogs357711 Gate Structure

Stoplog2100 35772100 Stoplogs - Structural Steel kg lb 2.2046 11.55 5.24Stoplog2110 35772110 Construction Stoplogs (6 m x 10 m) - head 9.5m - 19,000kg/sem2 sf 10.7639 3,900.00 362.32Stoplog2115 35772115 Construction Stoplogs (6 m x 15 m) - head 14.5m - 33,000kg/sm2 sf 10.7639 4,500.00 418.06Stoplog2120 35772120 Spillway Stoplogs (13.7 m x 17.1 m) - head 16.6 - 97,000kg/sem2 sf 10.7639 5,100.00 473.81Stoplog2130 35772130 Draftube Stoplogs (8.5 m x 11.2 m) - head 31m - 52,000kg/setm2 sf 10.7639 6,600.00 613.16Stoplog2135 35772135 Intake Stoplogs (8.2 m x 19 m) - head 42m - 95,000kg/set - 61m2 sf 10.7639 7,400.00 687.48Stoplog2140 35772140 Intake Stoplogs (10.2 m x 19m) - head 48m - 140,000kg/set - 7m2 sf 10.7639 8,500.00 789.68Stoplog2145 35772145 Draftube Stoplogs (8.7 m x 9.4m) - head 32m - 60,000kg/set - m2 sf 10.7639 9,000.00 836.13

357712 Gate Embedded PartsStoplog2210 35772210 Spillway Stoplogs- embedded parts - 7500kg/set - 32 kg/m2 m2 sf 10.7639 470.00 43.66Stoplog2215 35772215 Construction Stoplogs- embedded parts - 5500kg/set - 61 kg/mm2 sf 10.7639 890.00 82.68Stoplog2220 35772220 Intake Stoplogs- embedded parts - 10000kg/set - 64 kg/m2 m2 sf 10.7639 940.00 87.33Stoplog2225 35772225 Intake Stoplogs- embedded parts - 12500kg/set - 66 kg/m2 m2 sf 10.7639 960.00 89.19Stoplog2230 35772230 Construction Stoplogs- embedded parts - 5000kg/set - 83 kg/mm2 sf 10.7639 1,200.00 111.48Stoplog2235 35772235 Draft Tube Stoplogs- embedded parts - 9000kg/set - 95 kg/m2 m2 sf 10.7639 1,380.00 128.21Stoplog2240 35772240 Draft Tube Stoplogs- embedded parts - 11000kg/set - 135 kg/mm2 sf 10.7639 1,975.00 183.48Stoplog2245 35772245 Stop Log Slot Embedded Parts 8 ea sets (Forrest Kerr) Set Set 1.0000 63,000.00 63,000.00

357721 Gate StructureStoplog2100 35772100 Stoplogs - Structural Steel kg lb 2.2046 11.55 5.24Stoplog2110 35772110 Construction Stoplogs (6 m x 10 m) - head 9.5m - 19,000kg/sem2 sf 10.7639 3,900.00 362.32Stoplog2115 35772115 Construction Stoplogs (6 m x 15 m) - head 14.5m - 33,000kg/sm2 sf 10.7639 4,500.00 418.06Stoplog2120 35772120 Spillway Stoplogs (13.7 m x 17.1 m) - head 16.6 - 97,000kg/sem2 sf 10.7639 5,100.00 473.81Stoplog2130 35772130 Draftube Stoplogs (8.5 m x 11.2 m) - head 31m - 52,000kg/setm2 sf 10.7639 6,600.00 613.16

15/09/2007 5:37:14 PM Page No 35 of 40

Page 36: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesStoplog2135 35772135 Intake Stoplogs (8.2 m x 19 m) - head 42m - 95,000kg/set - 61m2 sf 10.7639 7,400.00 687.48Stoplog2140 35772140 Intake Stoplogs (10.2 m x 19m) - head 48m - 140,000kg/set - 7m2 sf 10.7639 8,500.00 789.68Stoplog2145 35772145 Draftube Stoplogs (8.7 m x 9.4m) - head 32m - 60,000kg/set - m2 sf 10.7639 9,000.00 836.13

357722 Gate Embedded PartsStoplog2210 35772210 Spillway Stoplogs- embedded parts - 7500kg/set - 32 kg/m2 m2 sf 10.7639 470.00 43.66Stoplog2215 35772215 Construction Stoplogs- embedded parts - 5500kg/set - 61 kg/mm2 sf 10.7639 890.00 82.68Stoplog2220 35772220 Intake Stoplogs- embedded parts - 10000kg/set - 64 kg/m2 m2 sf 10.7639 940.00 87.33Stoplog2225 35772225 Intake Stoplogs- embedded parts - 12500kg/set - 66 kg/m2 m2 sf 10.7639 960.00 89.19Stoplog2230 35772230 Construction Stoplogs- embedded parts - 5000kg/set - 83 kg/mm2 sf 10.7639 1,200.00 111.48Stoplog2235 35772235 Draft Tube Stoplogs- embedded parts - 9000kg/set - 95 kg/m2 m2 sf 10.7639 1,380.00 128.21Stoplog2240 35772240 Draft Tube Stoplogs- embedded parts - 11000kg/set - 135 kg/mm2 sf 10.7639 1,975.00 183.48Stoplog2245 35772245 Stop Log Slot Embedded Parts 8 ea sets (Forrest Kerr) Set Set 1.0000 63,000.00 63,000.00

357730 Trashracks357731 Trashrack Structure

TrashRack311035773110 Trash Racks m2 sf 10.7639 2,200.00 204.39TrashRack311535773115 Fine Trash Racks 6ea-(5m wide x approx 16m high) m2 sf 10.7639 3,500.00 325.16TrashRack312035773120 Trash Racks 8.6 m x 23.5 m head 41 m 70000kg/set 346kg/m2m2 sf 10.7639 5,050.00 469.16TrashRack312535773125 Trash Racks 10.6 m x 23.5 m head 41 m 88000kg/set 371kg/mm2 sf 10.7639 5,400.00 501.68

357732 Trashrack Embedded PartsTrashrack3210 35773210 Trash Rack- embedded parts - 7000kg/set - 35 kg/m2 (Hat-Albm2 sf 10.7639 500.00 46.45Trashrack3220 35773220 Trash Rack- embedded parts - 8500kg/set - 36 kg/m2 (Chard-Am2 sf 10.7639 520.00 48.31

357733 Trashrack AccessoriesTrashrack3310 35773310 Trash Rack Grapple ea ea 1.0000 10,800.00 10,800.00Trashrack3320 35773320 Trash Rack Cleaning Machine 18 kN, manual op telescopic boea ea 1.0000 305,000.00 305,000.00

357800 Hydro Hoisting EquipmentHoist110 35780000 ** Hydro Hoists ** 0.0000 0.00 0.00

357810 Hydro Overhead CranesPHCrane1010 35781010 Overhead Crane (5 Tonne for Service & Assembly Area) ea ea 1.0000 71,500.00 71,500.00PHCrane1015 35781015 Powerhouse Crane 95/15 ton for 38.5 MW Francis Turbines ea ea 1.0000 870,000.00 870,000.00PHCrane1020 35781020 Powerhouse Crane 200 ton for 70 MW Francis Turbines ea ea 1.0000 1,870,000.00 1,870,000.00PHCrane1025 35781025 Powerhouse Crane 300 ton for 166 MW kaplan Turbines ea ea 1.0000 3,100,000.00 3,100,000.00PHCrane1030 35781030 Powerhouse Crane 350 ton for 187 MW kaplan Turbines ea ea 1.0000 3,360,000.00 3,360,000.00

357820 Service ElevatorsPHElevator20135782010 Above Ground Powerhouse Service Elevator ea ea 1.0000 410,000.00 410,000.00PHElevator20235782020 Underground Powerhouse Cable Shaft Elevating work platformea ea 1.0000 435,000.00 435,000.00

357830 Gate HoistsGateHoist3010 35783010 Draftube Crane ea ea 1.0000 168,000.00 168,000.00GateHoist3015 35783015 Spillway Hoists - 10 ea Hoist Support Structure & Frame ea ea 1.0000 254,000.00 254,000.00

15/09/2007 5:37:14 PM Page No 36 of 40

Page 37: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesGateHoist3020 35783020 Spillway Hoists - 10 ea Electric Wire Rope Hoist (125 T) (Slaveea ea 1.0000 420,000.00 420,000.00GateHoist3025 35783025 Gantry Crane for Draft Tube Stoplogs (15 Tonne Capacity) ea ea 1.0000 560,000.00 560,000.00

357900 Hydro Balance of PlantBOP100 35790000 ** Balance of Plant ** 0.0000 0.00 0.00

357910 Balance of Plant MechanicalBOPlant1010 35791010 Balance of Plant Mechanical for 3 ea 38.5 MW Vertical FrancisMW MW 1.0000 15,000.00 15,000.00BOPlant1015 35791015 Balance of Plant Mechanical for 2 ea 70 MW Francis Turbines MW MW 1.0000 27,000.00 27,000.00BOPlant1020 35791020 Balance of Plant Mechanical for 3 ea 166 MW Kaplan TurbinesMW MW 1.0000 28,000.00 28,000.00BOPlant1025 35791030 Balance of Plant Mechanical for 3 ea 187 MW Kaplan TurbinesMW MW 1.0000 32,000.00 32,000.00

357920 Balance of Plant ElectricalBOPlant2010 35792010 Balance of Plant Electrical for 2 ea 70 MW Francis Turbines MW MW 1.0000 15,000.00 15,000.00BOPlant2015 35792015 Balance of Plant Electrical for 3 ea 38.5 MW Vertical Francis TMW MW 1.0000 18,000.00 18,000.00BOPlant2020 35792020 Balance of Plant Electrical for 3 ea 166 MW Kaplan Turbines MW MW 1.0000 21,000.00 21,000.00BOPlant2025 35792025 Balance of Plant Electrical for 3 ea 189 MW Kaplan Turbines MW MW 1.0000 23,500.00 23,500.00

400000 Process Equipment430000 Gas & Liquid Handling Equipment

434000 Gas Liquid Storage EquipmentSphere1110 43411110 ASME Sphere incl fdns 6 m dia 10 mm wall 120m3 volume 12 ea ea 1.0000 85,000.00 85,000.00Sphere1120 43411120 ASME Sphere incl fdns 10 m dia 15 mm wall 620m3 volume 4 ea ea 1.0000 250,000.00 250,000.00Sphere1140 43411140 ASME Sphere incl fdns 15 m dia 15 mm wall 1800m3 volume ea ea 1.0000 425,000.00 425,000.00Sphere1150 43411150 ASME Sphere incl fdns 20 m dia 10mm wall 3200m3 volume 1ea ea 1.0000 570,000.00 570,000.00ConeRoof211043412110 API Cone Roof Storage Tanks 5 m dia 5,500 kg ea ea 1.0000 75,000.00 75,000.00ConeRoof212043412120 API Cone Roof Storage Tanks 10 m dia 24,000 kg ea ea 1.0000 120,000.00 120,000.00ConeRoof213043412130 API Cone Roof Storage Tanks 25 m dia 120,000 kg ea ea 1.0000 350,000.00 350,000.00ConeRoof214043412140 API Cone Roof Storage Tanks 30 m dia 175,000 kg ea ea 1.0000 450,000.00 450,000.00ConeRoof215043412150 API Cone Roof Storage Tanks 45 m dia 400,000 kg ea ea 1.0000 850,000.00 850,000.00ConeRoof216043412160 API Cone Roof Storage Tanks 60 m dia 600,000 kg ea ea 1.0000 1,300,000.00 1,300,000.00FloatRoof2210 43412210 API Floating Roof Storage Tanks 15 m dia 64,000 kg ea ea 1.0000 350,000.00 350,000.00FloatRoof2220 43412220 API Floating Roof Storage Tanks 25 m dia 124,000 kg ea ea 1.0000 500,000.00 500,000.00FloatRoof2230 43412230 API Floating Roof Storage Tanks 30 m dia 180,000 kg ea ea 1.0000 650,000.00 650,000.00FloatRoof2240 43412240 API Cone Roof Storage Tanks 45 m dia 410,000 kg ea ea 1.0000 1,200,000.00 1,200,000.00FloatRoof2250 43412250 API Cone Roof Storage Tanks 60 m dia 610,000 kg ea ea 1.0000 1,800,000.00 1,800,000.00

483000 Hydro Water to Wire Equipment483100 Water to Wire - complete

W2W100 48300000 ** Water to Wire Equipment ** 0.0000 0.00 0.00W2W110 48310010 Water to Wire equipment for 1224 MW Plant (9 ea 136 MW FixMW MW 1.0000 375,000.00 375,000.00W2W120 48310020 Water to Wire equipment for 561 MW Plant (3 ea Kaplan turbinMW MW 1.0000 380,000.00 380,000.00W2W130 48310030 Water to Wire equipment for 498 MW Plant (3 ea Kaplan TurbiMW MW 1.0000 420,000.00 420,000.00

15/09/2007 5:37:14 PM Page No 37 of 40

Page 38: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesW2W140 48310040 Water to Wire equipment for 140 MW Plant (2 ea 70 MW Fran MW MW 1.0000 500,000.00 500,000.00W2W150 48310050 Water to Wire equipment for 116 MW Plant (3 ea 38.5 MW Ve MW MW 1.0000 609,000.00 609,000.00W2W160 48310060 Water to Wire equipment for 44 MW Plant (2 ea 22 MW TurbinMW MW 1.0000 1,009,000.00 1,009,000.00W2W170 48310070 Water to Wire equipment for 16 MW (2 ea 7.9 Vertical Francis MW MW 1.0000 1,083,000.00 1,083,000.00W2W175 48310075 Water to Wire equipment for 15 MW (2 ea 7.3 Vertical Saxo TuMW MW 1.0000 1,287,000.00 1,287,000.00W2W180 48310080 Water to Wire equipment for 19 MW Plant (2 ea 9.5 MW TurbinMW MW 1.0000 1,338,203.00 1,338,203.00W2W190 48310090 Water to Wire equipment for 6 MW Plant (1 ea 5.8 Vertical KapMW MW 1.0000 2,100,000.00 2,100,000.00

483200 TurbinesTurbine100 48320000 ** Turbines ** 0.0000 0.00 0.00Turbine120 48320020 Turbines for 3 ea 187 MW Kaplan MW MW 1.0000 160,000.00 160,000.00Turbine130 48320030 Turbines & Governors for 2 ea 70 MW Francis MW MW 1.0000 165,000.00 165,000.00Turbine140 48320040 Turbines for 3 ea 38.5 MW Vertical Francis MW MW 1.0000 170,000.00 170,000.00Turbine150 48320050 Turbines for 9 ea 136 MW Fixed Blade Propeller MW MW 1.0000 175,000.00 175,000.00Turbine150 48320060 Turbines for 3 ea 166 MW Kaplan MW MW 1.0000 210,000.00 210,000.00Turbine170 48320070 Turbines & Governors for 7 ea 6 MW Saxo MW MW 1.0000 570,000.00 570,000.00

483300 GovernorsGovernor100 48330000 ** Governors ** 0.0000 0.00 0.00Governor110 48330010 Governors for 3 ea 187 MW Kaplan Units MW MW 1.0000 13,000.00 13,000.00Governor120 48330015 Governors for 9 ea 136 MW Fixed Blade Propeller Units MW MW 1.0000 14,500.00 14,500.00Governor130 48330020 Governors for 3 ea 166 MW Kaplan Units MW MW 1.0000 15,000.00 15,000.00Governor140 48330025 Governors for 3 ea 38.5 MW Vertical Francis MW MW 1.0000 22,250.00 22,250.00

483400 Generators & AuxilliariesGenerator100 48340000 ** Generators ** 0.0000 0.00 0.00

483410 GeneratorsGenerator110 48341010 Generator (181 MVA) with Excitation system for 3 ea 166 MW MW MW 1.0000 125,000.00 125,000.00Generator120 48341020 Generator (150 MVA) with Excitation System for 9 ea 136 MWMW MW 1.0000 130,000.00 130,000.00Generator130 48341030 Generator (204 MVA) with Excitation system for 3 ea 187 MW MW MW 1.0000 135,000.00 135,000.00Generator140 48341040 Generators for 3 ea 38.5 MW Vertical Francis MW MW 1.0000 140,000.00 140,000.00Generator150 48341050 Generators for 2 ea 70 MW Units MW MW 1.0000 150,000.00 150,000.00Generator160 48341060 Generators for 7 ea 6 MW Saxo Units MW MW 1.0000 450,000.00 450,000.00

483420 Breaker & BusGeneratorBus148342010 Generator Breaker & Bus for 3 ea 187 MW Kaplan Units MW MW 1.0000 6,000.00 6,000.00GeneratorBus148342020 Generator Breaker & Bus for 3 ea 166 MW Kaplan Units MW MW 1.0000 7,000.00 7,000.00GeneratorBus148360030 Generator Bus and Switching for 2 ea 70 MW Francis MW MW 1.0000 8,200.00 8,200.00

483430 Controls, Metering & ProtectionGeneratorCont 48343010 Control, Metering and Relaying for 2 ea 70 MW Francis Units MW MW 1.0000 5,000.00 5,000.00GeneratorCont 48343020 Generator Controls, Metering & Protection for 3 ea 187 MW KaMW MW 1.0000 12,000.00 12,000.00GeneratorCont 48343030 Generator Controls, Metering & Protection for 3 ea 166 MW KaMW MW 1.0000 13,600.00 13,600.00

15/09/2007 5:37:14 PM Page No 38 of 40

Page 39: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesGeneratorCont 48343040 Protection and Control System for 7 ea 6 MW Saxo Units MW MW 1.0000 35,000.00 35,000.00

483500 ExcitersExciter100 48350010 ** Exciters ** 0.0000 0.00 0.00Exciter120 48350020 Exciters for 3 ea 38.5 MW Vertical Francis MW MW 1.0000 104,000.00 104,000.00

483600 TransformersTransformer11048350000 ** Transformers ** 0.0000 0.00 0.00

483610 Main Power TransformersTransformer11048361010 Transformers for 2 ea 70 MW Francis Units MW MW 1.0000 19,000.00 19,000.00Transformer12048361020 Main Power Transformers (157.5 MVA) for 9 ea 136 MW FixedMW MW 1.0000 31,000.00 31,000.00Transformer13048361030 Main Power Transformer (185 MVA) for 3 ea 166 MW Kaplan MW MW 1.0000 44,000.00 44,000.00Transformer14048361040 Main Power Transformer (210 MVA) for 3 ea 187 MW Kaplan MW MW 1.0000 45,000.00 45,000.00Transformer15048361050 Transformers for 7 ea 6 MW Saxo Units MW MW 1.0000 60,000.00 60,000.00Substation160 48361060 Substation Complete for 3 ea 38.5 MW Vertical Francis MW MW 1.0000 131,300.00 131,300.00

483620 Station Service TransformersTransformer20 48362010 Station Service Transformer and Switchgear for 2 ea 70 MW FraMW MW 1.0000 2,500.00 2,500.00Transformer20248362020 Auxiliary Station Services for 7 ea 6 MW Saxo Units MW MW 1.0000 15,000.00 15,000.00

483700 SwitchgearSwitchgear110 48360000 ** Switchgear ** 0.0000 0.00 0.00

483721 Switchyard EquipmentSwitchyard110 48372110 Switchyard Equipment for 2 ea 70 MW Francis Units MW MW 1.0000 11,500.00 11,500.00Switchyard120 48372120 Outdoor Apparatus for 7 ea 6 MW Saxo Units MW MW 1.0000 28,000.00 28,000.00

483722 Batteries & Charger SystemSwitchgear170 48372210 DC Switchgear and Batteries for 2 ea 70 MW Francis Units MW MW 1.0000 925.00 925.00

483724 High Voltage Cable to SwitchyardSwitchgear410 48372410 Cable for 2 ea 70 MW Francis Units MW MW 1.0000 1,525.00 1,525.00Switchgear410 48372420 Electrical Wire, Cable and Raceway for 7 ea 6 MW Saxo UnitsMW MW 1.0000 44,000.00 44,000.00

483725 BreakersSwitchgear180 48372510 MV Switch Gear for 7 ea 6 MW Saxo Units MW MW 1.0000 50,000.00 50,000.00

483800 Supervision & CommissioningCommission11 48380010 Supervision & Commissioning for 7 ea 6 MW Saxo Units MW MW 1.0000 150,000.00 150,000.00

600000 EngineeringEngineering 60000000 ** Engineering ** 0.0000 0.00 0.00Investigate100 60000010 Geotechnical Investigation % % 1.0000 0.52 0.52Investigate200 60000020 Environmental Studies % % 1.0000 0.52 0.52Investigate300 60000030 Hydrology Study % % 1.0000 0.26 0.26Investigate400 60000040 Initial Site Survey % % 1.0000 0.52 0.52Design100 60000050 Preliminary Design (Proposal Phase) % % 1.0000 0.62 0.62Design300 60000060 Detailed Design (Design Phase) % % 1.0000 5.15 5.15

15/09/2007 5:37:14 PM Page No 39 of 40

Page 40: 640 Subcontract Rates

Subcontract Rates2007-09-15 IPEL Master Resource File ($Cdn)

Subcontract Category Subcontract Description

Sequence Description Code Sequence Description Metric Unit

Imperial Unit

Conversion Factor Metric Rate Imperial Rate

13000 Site FacilitiesDesign200 60000070 Architectural Design (Design Phase) % % 1.0000 1.03 1.03Design400 60000080 Resident Engineering (Construction Phase) % % 1.0000 2.06 2.06

15/09/2007 5:37:14 PM Page No 40 of 40