59228227 ravi bhel report

33
BHARAT HEAVY ELECTRICAL LIMITED HARIDWAR TRANING REPORT IN ‘TURBINE SECTION’ SUBMITTED BY: RAVI PRAKASH SINGH B.Tech -FINAL YEAR(2007-08) MECHANICAL ENGINEERING ROLL NO-0404340029 B.I.E.T-JHANSI TRANING PERIOD-(9 th June - 8 th July 2006) SUBMITTED TO: Mr.ALOK SHUKLA SENIOR MANAGER TURBINE GOVERNING SECTION BHARAT HEAVY ELECTRICAL LIMITED HARIDWAR

Upload: bharat-singh-bharti

Post on 27-Oct-2015

21 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 59228227 Ravi Bhel Report

BHARAT HEAVY ELECTRICAL LIMITED HARIDWAR

TRANING REPORT IN

‘TURBINE SECTION’

SUBMITTED BY:RAVI PRAKASH SINGH

B.Tech -FINAL YEAR(2007-08)MECHANICAL ENGINEERING

ROLL NO-0404340029B.I.E.T-JHANSI

TRANING PERIOD-(9th June - 8th July 2006)

SUBMITTED TO:Mr.ALOK SHUKLA

SENIOR MANAGERTURBINE GOVERNING SECTION

BHARAT HEAVY ELECTRICAL LIMITED HARIDWAR

Page 2: 59228227 Ravi Bhel Report

BUNDELKHAND INSTITUTE OF ENGINEERING &

TECHNOLOGY,JHANSI

TRANING REPORT IN

‘TURBINE SECTION’

SUBMITTED BY:RAVI PRAKASH SINGH

B.Tech -FINAL YEAR(2007-08)MECHANICAL ENGINEERING

ROLL NO-0404340029B.I.E.T-JHANSI

TRANING PERIOD-(9th June - 8th July 2006)

SUBMITTED TO:Dr.V K BHATT

Prof & HEAD OF DEPARTMENTMECHANICAL ENGINEERING DEPARTMENT

Page 3: 59228227 Ravi Bhel Report

B.I.E.T-JHANSI

ACKNOWLEDGEMENT

Before we get into detail of the report,I feel the heartfelt responsibility to mention my acknowledgement to several people to whom I owe the success of my venture of training and writing this report. I am grateful to Mr.ALOK SHUKLA Sr.MANAGER(TURBINE GOVERNING SECTION) who allowed me to undergo vocational summer training and guided me during training period at BHARAT HEAVY ELECTRICAL LIMITED,HARIDWAR which holds the rank amongst the top Public Sectors in india , exhibiting excellent performance with safest and most friendly enviornment, fulfilling all kinds of standards respective to its name,reputation and fame. I would like to give special thank to all the staff of BHEL TURBINE SECTION for their great and remarkable contribution, support and guidance during training period.Their constant effort made this training really a learning experience. The well planned schedule and structure helped me in understanding the systems and equipments easily and effectively.

Ravi Prakash Singh 24th Dec 2007

Page 4: 59228227 Ravi Bhel Report

CONTENT

1. BHEL–AN OVERVIEW

2. HEEP–AN OVERVIEW

3. TURBINES & AUXILLIARY BLOCK

4. HYDRO TURBINE

5. STEAM TURBINE

6. GAS TURBINE

7. MANUFACTURING PROCESS

8. BLADE SHOP

9.BROAD SPECIFICATION OF MAJOR MACHINES TOOLS & MACHINES - CNC MACHINE TOOLS

10. NON CNC MACHINE TOOLS

Page 5: 59228227 Ravi Bhel Report

1.BHEL– AN OVERVIEW

BHEL is the largest engineering and manufacturing enterprise in India in the energy related infrastructure sector today. BHEL was established more than 40 years ago when its first plant was setup in Bhopal ushering in the indigenous Heavy Electrical Equipment Industry in India a dream which has been more than realized with a well recognized track record of performance it has been earning profits continuously since 1971-72 and achieved a sales turnover of Rs. 6347 crore with a pre-tax profit of Rs. 294 crore in 2000-01.

BHEL caters to core sectors of the Indian Economy viz., Power Generation's & Transmission, Industry, Transportation, Telecommunication, Renewable Energy, Defense, etc. The wide network of BHEL's 14 manufacturing division, four power Sector regional centres, over 150 project sites, eight service centres and 18 regional offices, enables the Company to promptly serve its customers and provide them with suitable products, systems and services – efficiently and at competitive prices. BHEL has already attained ISO 9000 certification for quality management, and ISO 14001 certification for environment management.

POWER GENERATION

Power generation sector comprises thermal, gas, hydro and nuclear power plant business as of 31.03.2001, BHEL supplied sets account for nearly 64737 MW or 65% of the total installed capacity of 99,146 MW in the country, as against nil till 1969-70.

BHEL has proven turnkey capabilities for executing power projects from concept to commissioning, it possesses the technology and capability to produce thermal sets with super critical parameters up to 1000 MW unit rating and gas turbine generator sets of up to 240 MW unit rating. Co-generation and combined-cycle plants have been introduced to achieve higher plant efficiencies. to make efficient use of the high-ash-content coal available in India, BHEL supplies circulating fluidized bed combustion boilers to both thermal and combined cycle power plants.

The company manufactures 235 MW nuclear turbine generator sets and has commenced production of 500 MW nuclear turbine generator sets.

Page 6: 59228227 Ravi Bhel Report

2.HEEP: AN OVERVIEW

Over the years, Bharat Heavy Electricals Limited has emerged as world class Engineering and Industrial giant, the best of its kind in entire South East Asia. Its business profile cuts across various sectors of Engineering/Power utilities and Industry. The Company today enjoys national and international presence featuring in the "Fortune International-500" and is ranked among the top 12 companies in the world, manufacturing power generation equipment. BHEL has now 14 Manufacturing Divisions, 8 Service Centres and 4 Power Sectors Regional Centres besides a large number of project sites spread over India and abroad.

HEEP: FACILITIES AND INFRASTRUCTURE

Modernization and regular up gradation / up gradation of facilities and other infrastructure is a continuous endeavor at HEEP, BHEL. After initial setting up of the plant during the year 1964-72, in collaboration with the Soviet Union, the plant facilities and infrastructures have since been continuously upgraded under various investment projects viz, Stamping Unit Project, LSTG Project, Motor Project, Governing Components Project, TG Facilities Modernization, TG Facilities Augmentation, Quality Facilities Augmentation, EDP projects, Gas Turbine Project, Facilities have also been added and establishments have been created for new projects in Defense and Aviation Project. Additionally, R &D facilities have also been created under Generators Research Institute, Pollution Control Research Institute, HTL modernization and other such scheme

Today the Plant has unique manufacturing and testing facilities, computerized numerically controlled machine-tools, Blade shop, heavy duty lathes, milling machines, boring machines, machining centers and many more. The Over Speed Vacuum Balancing Tunnel created for rotors up to 1300 MW (32T, 6.9 M – dia bladed rotor, 6 rpm up to 4500 rpm) is one of the 8 of its kind in the entire world.

The total spectrum of sophisticated, unique and other facilities at HEEP, Hardwar are the state-of-the-art in manufacturing processes and can be utilized for a variety of products' manufacture.

Page 7: 59228227 Ravi Bhel Report

3.TURBINE AND AUXILIARY BLOCK-III

GENERAL

Block-III manufactures Steam Turbines, Hydro Turbines, Gas Turbines and Turbines Blades. Special Toolings for all products are also manufactured in the Tool Room located in the same block. Equipment layout plan is as per Drawing appended in Section III. Details of facilities are given in Section II.

The Block consists of four Bays, namely, Bay-I and II of size 36x378 metres and 36x400 metres respectively and Bay-III and IV of size 24x402 metres and 24x381 metres respectively. The Block is equipped with the facilities of EOT Cranes, compressed air, Steam, Overspeed Balancing Tunnel, indicating stands for steam turbine, rotors, one Test stand for testing 210 MW steam turbines Russian Design, one Test Stand for Hydro Turbine Guide Apparatus and two separate Test Stands for the testing of Governing Assemblies of Steam and Hydro Turbines.

Page 8: 59228227 Ravi Bhel Report

4.HYDRO TURBINES

For manufacturing of Hydro Turbines, Bay-I has the following sections:

Circular Components Machining Section – This section is equipped with a number of large/ heavy size Horizontal and Vertical Boring Machines, Drilling Machines, Centre Lathes, Marking Table and Assembly Bed. The major components machined in this section are Spiral Casing with Stay Ring, Spherical and Disc Valve bodies and Rotors.

Runner and Servo Motor Housing Machining Section – This section is equipped with NC/CNC and conventional machines comprising Heavy and Medium size vertical and Horizontal Boring Machines, Centre Lathes, Grinding machines and Drilling Machines, Marking Table, Assembly Bed, Assembly Stands for Steam Turbine and Gas Turbine assemblies and Wooden Platform for overturning heavy components. Hydro Turbine Runners, Servomotors, cylinders, Labyrinth Ring, Regulating Ring, Stay Ring, Turbine Cover, Lower Ring, Kaplan Turbine Runner Body and Blades are machined here.

Guide Vanes and Shaft Machining Section – This section is equipped with Heavy duty Lathe machines upto 16 metres bed, CNC turning machines, Horizontal Boring Machine, Heavy planer, Deep Drilling Machine, Boring Machines, marking Table, Marking Machines and Assembly Beds. Turbine shafts, Guide Vanes, Journals and Rotors of Spherical and Disc Valves are machined here. Rotors of Steam Turbines are also machined in this section.

Assembly Section – In this section, assembly and testing of Guide Apparatus, Disc Valve, Spherical Valves, Servo motor shaft and combined Boring of coupling holes are done.

Preservation and Packing Section – Final preservation and packing of all the Hydro Turbine components / assemblies is done here.

Small components Machining Section – This is equipped with Planetary Grinding Machine, Cylindrical Grinding Machines, small size Lathes, Planers, Vertical and Horizontal Boring Machines. Small components like Bushes, Levers, Flanges etc. and governing assemblies and machines here.

Page 9: 59228227 Ravi Bhel Report

Governing Elements Assembly and Test Stand Section – This section is equipped with facilities like oil Pumping Unit, Pressur Receiver.

5.STEAM TURBINES

The facilities and parts manufactured in the various sections of Steam Turbine manufacture are as follows:

Turbine casing Machining Section – It is equipped with large size Planer, Drilling, Horizontal Boring, Vertical Boring, CNC Horizontal and Vertical Boring machines etc. Fabrication works like casings, Pedestals etc. are received from Fabrication Block-II.

Rotor Machining Section – It is equipped with large size machining tools like Turning Lathe, CNC Lathes, Horizontal Boring Machines, special purpose Fir tree Groove Milling Machine etc. Some rotor forgings are imported from Russia and Germany and some are indigenously manufactured at CFFP, BHEL, Hardwar.

Rotor Assembly Section – This is equipped with Indicating Stand, Small size Grinding, Milling, Drilling, machines, Press and other devices for fitting Rotors and Discs. Machined Rotor, Discs and Blades are assembled here. Balancing and over speeding of Rotor is done on the dynamic balancing machine.

Turbine casing Assembly Section – Machined casings are assembled and hydraulically tested by Reciprocating Pumps at two times the operating pressure.

Test Station - Test station for testing of 210 MW USSR Steam Turbine at no load is equipped with condensers, Ejector, Oil Pumps, Oil containers Steam Connections etc, required for testing. Overspeed testing is done for emergency Governor. Assembly Test Stands for different modules of Siemens design are equipped with accessory devices.

Painting Preservation and Packing Section – All the parts are painted, preserved and packed here for final dispatch.

Bearings and Miscellaneous Parts Machining Section – This section is equipped with small and medium size basic machine tools, e.g., lathes, Milling M/c, Horizontal Borer, Vertical Borer, drilling M/c etc. for

Page 10: 59228227 Ravi Bhel Report

manufacture of bearings and other miscellaneous parts of turbine.

ROTOR ASSEMBLY OF V94.3A STEAM TURBINE

Page 11: 59228227 Ravi Bhel Report

Sealing and Diaphragm Machining Section – It is equipped with medium size Vertical Boring, Horizontal Boring, Planning, Drilling Machines etc. wherein castings of sealing Housings, Liner housings, Forgings of Rotor Discs, castings and fabricated Diaphragms and components are machined. It is also equipped with CNC machining center.

Precision Horizontal Boring, Plano-Milling machines etc, are for manufacture of Governing Casting, Servo Casings and other medium parts of governing and Main Turbine assemblies.

Governing Machining Section – This section is equipped with medium size and small size lathes, medium CNC lathe, Milling, Grinding, Drilling, Slotting and Honing Machines. Governing assembly parts are machined here.

Diaphragm and Governing Assembly Section – It is equipped with deflection testing equipment for Diaphragms, Dynamic Balancing Machine for balancing Impeller of Centrifugal Oil Pumps and small fittings and assembly equipment. Governing test stand is equipped with the facilities like Oil Pumping Unit, Pressure Receiver, Servomotor, overspeed testing of Emergency Governor etc.

Light machine shop – In addition to normal conventional machine tools it is equipped with CNC Lathes, CNC Milling, CNC Vertical Boring, Precision Milling, planetary grinding machines etc. for manufacture of small and medium precision components of governing and other turbine parts.

Page 12: 59228227 Ravi Bhel Report

6.GAS TURBINE

All the components of Gas Turbine are machined and assembled using the facilities available for manufacturing of steam and hydro turbines except the following facilities which are procured exclusively for the manufacturing of Gas Turbine and are installed in the areas specified for gas turbine manufacturing.

Hydraulic Lifting Platform

This facility is used for assembly and disassembly of G.T. Rotor. This is a hydraulically operated platform which travels upto 10 M height to facilitate access to different stages of Rotor. This is installed in Bay-I assembly area.

CNC Creep Feed Grinding M/c.

This is installed in Gas Turbine machining area Bay-II Extn. This M/c grinds the hearth serration on rotor disc faces. Hirth serrations are radial grooves teeth on both the faces of rotor discs. Torque is transmitted trough these serrations, which are very accurately ground.

External Broaching Machine

This machine is installed in GT machining area and is used to make groove on the outer dia of rotor discs for the fitting of moving blades on the discs.

CNC Facing Lathe

This machine is installed in GT machining area and is used basically for facing rotor disc but can turn other components also.

CNC Turning Lathe

This machine is installed in Bay-I Heavy Machine Shop and is used to turn Tie Rods of Gas Turbine, which have very high length / diameter ratio. Tie-Rod is a very long bolt (length approx. 10 meter & dia 350-mm) which is used to assembly and holds the gas turbine rotor discs to form a composite turbine rotor.

Page 13: 59228227 Ravi Bhel Report

GAS TURBINE

Page 14: 59228227 Ravi Bhel Report

Wax Melting Equipment

This is low temp. electric furnace installed in Gas Turbine blading area in Bay-II. It is used to mix and melt Wax and Colaphonium, which is required to arrest the blade movement during the blade tip machining of stator blade rings.

Gas Turbine Test Bed

This test bed is installed near the Gas Turbine Machining area in Bay-II. This facility is used to finally assemble the gas turbine. Combustion chambers are not assembled here, which are assembled with main assembly at the site.

Combustion Chamber Assembly Platform

This facility is a 3 Tier Platform installed in Bay-I assembly area and is used for assembly of Combustion Chambers of Gas Turbine.

Page 15: 59228227 Ravi Bhel Report

7.MANUFACTURING PROCESS

HYDRO TURBINES

The major processes involved in various Hydro Turbine Sections are as follows:

Marking and checking of blanks – manual as well as with special marking M/c.

Machining on Horizontal Boring, Vertical Boring, Lathes etc. as the case may be on CNC /Conventional Machines. Intermediate assembly operation is carried out on the respective assembly beds provided.

The sub-assemblies are further assembled for hydraulic/functional testing. Hydraulic testing is done using a power driven triple piston horizontal hydraulic pump, which can generate a pressure of 200 Kg/Cm2. It can also be carried out using a power pack.

On Governing elements / assembly and test stand, the components / sub-assemblies / assemblies are tested up to a hydraulic pressure of 200 Kg / c m2 using the piston pump. Oil testing upto 40 Kg / c m2 is carried out with oil pumping unit, which is permanently installed on this bed.

STEAM TURBINE

Processes carried out in various sections of steam turbine manufacture are based on the following main phases.

Machine section – Castings, Forgings, welded structures and other blanks are delivered to this section. The manufacturing process is based on the use of high efficiency carbide tipped tools, high speed and high feed machining techniques with maximum utilization of machine – tool capacity and quick acting jigs and fixtures.

Assembly Section – Casings and governing assemblies are hydraulically tested for leakage on special test Bed. Assembled unit of governing and steam distribution systems is tested on Governing Test Bed. General Assembly and testing of Steam Turbine is carried out on the main Test Bed in Bay-II.

Page 16: 59228227 Ravi Bhel Report

OVERSPEED & BALANCING TUNNEL

Painting, Preservation and Packing – After testing the turbine, it is disassembled and inspected. Then the parts are painted, conserved and

Page 17: 59228227 Ravi Bhel Report

packed for final dispatch.

GAS TURBINE

The major processes involved in manufacturing Gas Turbine in various sections of Bk-III are as

Machining

Castings, Forgings, welded structures and other blanks are received from concerned agencies in the respective sections. These are machined keeping in view optimum utilization of machine tools and toolings. Special jigs and fixtures are made available to facilitate accurate and faster machining. Proper regime and tool grades have been established to machine the materials like inconel, which have poor machinablity.

Main Assembly

Final assembly is done on test bed. Parts are assembled to make sub-assemblies. These sub-assemblies are again machined as per technological and design requirements and are made ready for final assembly. After assembly and insulation assembled Gas Turbine is sent to site.

Rotor Assembly

The rotor is assembled on Hydraulic Lifting Platform and sent to main assembly, where after checking clearances, it is sent for machining. After balancing, turbine side of rotor is disassembled, inner casing is fitted and rotor reassembled. This work is also carried out on Hydraulic Lifting Platform. Finally rotor is sent for assembly on test bed.

Combustion Chamber Assembly

This assembly is carried out on 3 tier platform installed for this purpose in Bay-I assembly. After machining of all components, ceramic tiles are fitted in flame tube. Burner and piping etc. is fitted in dome and combustion chamber is finally assembled. It is directly sent to site after insulation.

Page 18: 59228227 Ravi Bhel Report

8.BLADE SHOP

Introduction:

Major part of Turbine Blade Machining Shop is located in Bay-IV of Block-III. In this shop various types of Steam Turbine and Gas Turbine Compressor blades are machined from bar stock, drawn profile, precision and envelope forgings. It is a batch production shop comprising of various kinds of CNC Machines and Machining Centers, besides various special purpose and general purpose machines. The layout of equipments is as per technological sequence of the manufacturing process. Blade shop implements various On Line Quality Control Techniques through Run Charts and Control charts. This shop is divided into four distinct areas. Details of facilities are given in various schedules of Section-II.

Manufacturing Facilities:

Plain Milling Section

It prepares accurate reference surfaces on the blade blanks by milling and grinding operation. It also manufactures the brazed type blades by induction brazing of drawn profile and suitably machined spacers. This section carries out banking by Band Saws, rhomboid grinding on Duplex grinding machines and thickness grinding on Surface grinders.

Copy Milling Section

The Semi blanks prepared from plain milling section are further machined by copy Milling Machines / CNC machines (CNC Heller and BSK – Bed type Klopp, BFH / BEK Knee type Machines) for concave and convex aero-dynamic profile forms, (HTC-600, BFK Machines) for expansion angles, Compound taper grinding of radial plane is carried out by Surface grinders. It comprises of T-root machining centers for machining of T-root.

LP Section

This area deals with all types of free standing and forged blades for steam Turbine Compressor. The freestanding blades are cerrobend casted in boxes to hold the blade with respect to the profile. These blades roots are subsequently machined on NTH, MPA-80A and T30 Machining Centers.

Page 19: 59228227 Ravi Bhel Report

There is a five station 360o circular copy milling machine for machining the profile of envelope forged blades / stocks for Steam Turbine and Gas Turbine Blades. It also has 3D copy Milling and CNC Machines with digitizing features for Tip-thinning, Fitted milling. The inlet edge of the last stage of Low pressure Turbine Moving blades are hardened on a Special Purpose Flame Hardening equipment.

Polishing Section

Blade Contours are ground and polished to achieve the desired surface finish and other aerofoil requirements.

There are also other small sections e.g. Fitting Section, Tool and Cutter Grinding, Toolings Repair Section in Blade Shop.

Inspection Device

3 D Coordinate Measuring Machines for taper and rhomboid checking.

Moment weighing Equipment

Real time Frequency analyzer for checking frequency of free standing blades.

Contour plotter for plotting of blade profile with various magnifications.

Fir- tree root inspection device.

Magna spray crack detection equipment.

MANUFACTURING PROCESS

The manufacturing process of turbine blades primarily depends on the type of blade e.g. Bar type, Brazed type, Free standing (Forged type), Gas Turbine Compressor blades. The bar type and brazed type blades are also known as drum stage glades. The manufacturing technology of each of these blades along with recommended machine tools / equipment is furnished below.

Page 20: 59228227 Ravi Bhel Report

9.BROAD SPECIFICATION OF

MAJOR/IMPORTANT MACHINE TOOLS & MACHINES

A: CNC MACHINE TOOLS

CNC HORIZONTAL BORERS:

1. Item Description : CNC Horz. Borer

Model : RAPID 6C

Supplier : WOTN, GERMANY

CNC Control System : FANUC 12M

Spindle Dia. : 200mm

Table : 4000 x 4000 mm

Max. Load on Table : 100 T

Travers : X=20000, Y=5000, X=1400mm

Ram traverse : W = 1000 mm

Ram size : 400 x 400 mm

Power Rating : 90 KW

Weight of the m/c : 111 T

ATC Capacity : 60 Nos.

Plan No. : 1-227 (Block-I)

2. Item Description : CNC Stub Borer

Model : DW 1800

Page 21: 59228227 Ravi Bhel Report

Supplier : HEYLIGENSTAEDT, GERMANY

CNC LATHE FOR ROTOR MACHINING

Page 22: 59228227 Ravi Bhel Report

CNC Control System : SINUMERIK – 7T

Boring Dai : 625 – 2500 mm

Table : 4000 x 4000 mm

Headstock Travel : 4000 mm

Spindle Speed : 0.5 –90 RPM (in 4 Steps)

Power Rating : 63 KW

Max. Load Capacity : 100 T

Weight of the m/c : 72 T

Plan No. : 27-420 (Block-III)

3. Item Description : CNC Horz. Borer (2 Nos.)

Model : W200 HB –NC

Supplier : SKODA, CZECH

CNC Control System : SINUMERIK 850 M

Spindle Dia. : 200 mm

Traverse : X=12500,

Y=5000,

Z=2000mm

CNC LATHES

4. Items Description : CNC Centre Lathe

Model : D-1800 NYF

Supplier : HOESCH MFD, GERMANY

CNC Control System : SINUMERIK 3T

Page 23: 59228227 Ravi Bhel Report

Centre Distance : 8000 mm

Swing Over Carriage : 1800 mm

Swing Over Bed : 2400 mm

Spindle Speed : 0 – 125 RPM

Power Rating : 92 KW

Weight of the Job : 110 TON

Weight of the m/c : 124 TON

Plan No. : 2-394 (Block-III)

5. Item Description : CNC Centre Lathe

Mode : D-2300 NYFS-1

Supplier : HOESCH MFC, GERMANY

CNC Control System : SINUMERIK 7T

Centre Distance : 18000 mm

Swing Over Carriage : 2300 mm

Swing Over Bed : 2900 mm

Spindle Speed : 5 – 125 RPM

Power Rating : 110 KW

Weight of the job : 320 TON

Weight of the m/c : 216 TON

Plan No. : 2-360 (Block-III)

6. Item Description : CNC Centre Lathe

Model : KV2-1100 CNC

Page 24: 59228227 Ravi Bhel Report

Supplier : RANVENSBURG, GERMANY

CNC Control System : SINUMERIK 820 T

Centre Distance : 12000 mm

Centre Height : 900 mm

Swing Over Carriage : 1100 mm

Swing Over Bed : 1400 mm

Max. Turning Length : 12000 mm

Spindle Speed : 2-600 RPM

Longitudinal Cutting Feed (Z-Axis) : 1-5000 mm / min.

Transfer Cutting Feed (X-Axis) : 1-5000 mm/min.

Main Spindle Drive Motor : 95.5 KW DC

Max. Feed Force – Z/X Axis : 45000 N

No. of Tool carriers : 3

Plan No. : 1-120 (Block-III)

CNC MILLING MACHINES

7. Item Description : CNC Horz. Milling M/c (6 Nos.)

Model : BFH-15

Supplier : BATLIBOI, INDIA

CNC Control System : SINUMERIK 810 M

Table : 1500 x 400 mm

Traverse : X=1170 mm

Y=420 mm

Z=420 mm

Page 25: 59228227 Ravi Bhel Report

Spindle Speed : 45 to 2000 RPM

Power Rating : 11 KW

Max. Load Capacity : 630 Kg

Weight of the m/c : 4200 Kg

Plan No. : 2-449, 2-453, 2-454, 2-459, 2-460 (Block-

IIITBM)

8. Item Description : Universal Milling M/cs (2Nos.)

Model : BFK-15

Supplier : BATLIBOI, INDIA

CNC Control System : SINUMERIK 810 M

Table : 1500 x 400 mm

Traverse : X=1170 mm

Y=420 mm

Z=420 mm

Spindle Speed : 45-2000 RPM

Power Rating : 11 KW

Max. Load Capacity : 630 Kg

Weight of the m/c : 4200 Kg

Plan No. : 2-463, 2-466 (Block-III: TBM)

9. Item Description : CNC Bed Type Milling M/c

Model : FSQ 80 CNC

Supplier : TOSKURIM, CZECH

Page 26: 59228227 Ravi Bhel Report

CNC Control System SINUMERIK 810 M

Table : 3000 x 800 mm

TEE SLOT 28H7

Traverse : X= 3000 mm

Y= 870 mm

Z= 850 mm

Spindle Speed Range : H – 2500 RPM

Spindle Drive Power : 18 KW continuous

22 KW intermittent

Spindle Head Size : 620 x 500 incldg ram

543 x 420 encldg ram

ATC Capacity : 24 Nos.

Table Load : 2500 Kg

Plan No. : 2-484 (Block-III)

CNC MACHINING CENTRES

10. Item Description : SPL. Purpose 6 Station T-Root Machining Centre (2nos.)

Supplier : MIH, JAPAN

CNC Control System : FANUC 7M

Indexing Table : 1900 mm dia

Indexing Position : 6 Nos.

Plan No. : 2-356, 2-41 (Block-III: TBM)

Page 27: 59228227 Ravi Bhel Report

11. Item Description : SPL Purpose FIR Tree Root M/cing Cenre

Model : NTH 200

Supplier : RIGID, SWITZERLAND

CNC Control System : SINUMERIK 7M

Table : 1400 x 1400 mm

Traverse : X= 1950 mm

Y= 900 mm

Z= 600 mm

Spindle Speed : 30600 RPM

No of Spindle : 4

Power Rating : 22 KW

Plan No. 2-354 (Block-III TBM)

CNC VERTICAL BORERS

12. Item Description : CNC Vertical Borer

Model : TMD – 40 / 50

Supplier : OSAKA MACHINES, JAPAN

CNC Control System : FANUC 6TB, 3TC

Table dia : 4000 mm

Turning dia : 5000 mm

Turning Height : 4200 mm

Spindle Speed : 0.23-30 RPM

Page 28: 59228227 Ravi Bhel Report

No. of Ram : 2

OTHER SPECIAL PURPOSE CNC MACHINES

13. CNC SURFACE BROACHING M/C

Make : Marbaix Lapointe, UK

Model : Champion 32 /10, 300

CNC System : SINUMERIC 850 M

Broaching capacity (pulling force) : 320 KN

Broaching slide stroke : 10.3 mm

Broaching slide width : 1500 mm

Max tool length (continuous /row) : 9650 mm

Broaching Speed (cutting stroke) : 1-25 M/min

Broaching Speed (return stroke) : 60 M/min

Drive power rating : 135 KW

Broaching slide movement : Electro-mechanical

Maximum noise level : < 80 Dbs

Max. dia of the disc (mountable) : 2300 mm

Max. weight of the job : 3000 Kgs

Indexing & rotating tables φ : 1500 mm, 1000 mm

Indexing accuracy : +/- 3 Arc sec.

Plan No. : 2-485

14. CREEP FEED GRINDING M/C

Make : ELB CHLIFE, GERMANY

Model : ELTAC SFR 200 CNC

CNC System : SINUMERIC 3 GG

Page 29: 59228227 Ravi Bhel Report

Work-piece diameter : 200 – 2000 mm

CNC BROACHING MACHINE

Page 30: 59228227 Ravi Bhel Report

Work height : 2400 mm

Rotary & indexing table dia. : 2050 mm

Indexing accuracy : +/- 1 ARC SEC

Max. load capacity : 20000 KG

Y-axis (grinding head movement)

Vert. Traverse : 750 mm

Z- axis (grinding head support)

Movement on cross rail)

Horizontal traverse : 2400 mm

Traverse feed rate : 02 – 1200 mm /min

Grinding head main support

Drive motor : 34 KW

Grinding wheel max. Dia. : 500 mm

Max. Width : 100 mm

Bore : 203.2 mm

Surface speed : 16-35 M/Sec.

Plan No. : 2-49

Page 31: 59228227 Ravi Bhel Report

10.NON-CNC MACHINE TOOLS

PRECISION HEAVY DUTY LATHE

Manufacturer: Karamatorsk Heavy Machine Tool Works (USSR); Model KS-1614

Specifications

1. Maximum Swing 2000mm2. Maximum Diameter of work piece over the Saddle 1500 mm3. Maximum Distance between Centres 8000mm4. Diameter of Spindle bore 80 mm5. Maximum Taper when machining by the method of Combined Feeds 0.15 mm6. Maximum Length between Centres when machining by the method of

Combined Freeds 1200 mm

7. Maximum Weight of work piece 20000 kg8. Maximum Length of Machine over the Saddle 8000 kg9. Maximum Summary Effort of Cutting 10,000 kg10. Limit Dimension of Thread Cut:

BALANCING MACHINE

Manufacturer: SCHENK (West Germany)

Model: Dj 90

Specifications

1. Weight of rotor 10,000 to 80,000 kg

2. Minimum weight without considerable loss of measuring sensitivity, provided the berings can accommodate such small rotors.

5000 kg

3. Maximum weight for one bearing pedestal 45,000 kg4. Height of rotor axis above machine bed 1600 mm5. Rotor diameter (free swing over machine bed) not considering the funnel 4000 mm6. Diameter of journal Max. 540 mm7. Diameter of journal, with special sleeve bearing cups made from high

grade material.Max. 600 mm

8. Minimum distance between bearings for less than 10 tons rotor 1500 mm9. Minimum distance between bearings for more than 10 tons rotor 1900 mm10. Maximum distance between coupling plague and center of the scond

bearing pedestals13500 mm

11. Rotational Speeds Min. 800 rpm(a) For rotors from 5 to 10 tons Max. 4000 rpm

Page 32: 59228227 Ravi Bhel Report

Min. 700 rpm(b) For rotors from 10 to 20 tons Max. 3600 rpm

Min. 600 rpm(c) For rotors from 20 to 80 tons Max. 3600 rpm

12. Maximum test speed and overspeeds(a) For rotors upto 50 tons

(b) For rotors upto 50 to 80 tons

4500 rpm

3600 rpm13. Maximum centrifugal force admissible on each bearing pedestals for short

period of time50,000 Kg

14. Balancing accuracy to be obtained depending on Selling Weight 0.3 to 3 micron

SPECIAL DRILLING & BORING MACHINE

Manufacturer: Machine Tool Works, Ryazan (USSR)

Model: PT 182 H5

SPECIFICATIONS:

1. Swing over bed 800 mm2. Drilling dia 40-80 mm3. Boring dia 80-250 mm4. Swing of job in rest Max

Min

300 mm

110 mm5. Swing of job in

Headstock chuck

Max.

Min.

300

110 mm6. Maximum length of job 3000 mm7. Maximum weight of job 2000 Kg8. Number of spindles Headstock

Stemstock

1

19. Spindle location Horizontal10. Distance to spindle axis: From bed wasy

From floor

400 mm

1100 mm11. Head stock Spindle speed Max

Min.

750 r.p.m.

71. r.p.m.

Page 33: 59228227 Ravi Bhel Report