Presentation of 4 weeks summer training ,Dept of civil

engineering ,ABES ENGINEERING COLLEGE .

Student detail

• Name : Anand bhatnagar• Course: B.Tech. (civil engineering)• Year/sem:3rd /6th

GREEN ORCHID BY S.L. GROUPS

• Residential projects in new Moradabad.• APPROX 5km from Moradabad railway station on NH 24.• State : Uttar Pradesh.

What is there in this presentation

• About the project.• Highlights of project.• Works during training session.• Difficulties face in this project and the

solution.• Learning outcome.

About project

• Green orchid project in new Moradabad by eleven groups is providing residential buildings in Moradabad.

• Project Info-3 Towers, 350 Units, 3 Acre• Units-2, 3 BHK Flat (1030 - 1605 sqft)• Status-Launch Feb 2015, Possession by Dec,

'17

Floor plan in green orchid

Highlights

• 4 Km from Railway Station• 4.5 Km from Roadways Stand• 2 Km from Hospital• 2 Km from School & University (Delhi Public School, Wilsonia School,

Model Public School)• 1 Km from 5 Star hotel (Holiday Regency)• 1 Km from local market• 0.5 Km from ATM• National Highway Facing Corner Plot.• 24 Hrs Transportation • 0.5 km from ATM • National highway Facing Corner Plot

Works performed during training session

• During my training period I have learned about basement works of Tower A construction.

• First of all we make foundation and footings for Tower in this project we used poured concrete foundation and continuous spread footings.

• After completing the foundation works we make basement 2 on the construction site.

• Firstly we make columns for basement2 on site which are 16*16 feet apart.

• After that we make walls of basement2 which are 18 inches thick.

Pictures

Basement1

Basement2

Difficulties face in this project and the solution

• Because of the rainy season many times work is affected due to rain.

• Many times there is labour shortages occur.• Some column got cracked due to wrong

proportion of water added by labour.

Solution for difficulties in project

• We can use weathercasts for working season on which days we find forecasts of rain on those days we off the site in place on Saturday and Sunday.

• Accurate forecast of labour demand is to be necessary.

• Engineer should check every time the right proportions added by lobour.

Learning outcome

• In this summer training I am learned about various ground details about civil engineering.

• Some of the main objectives of learned things as follows.

1. How to read drawings.2. Foundation and footings design.3. Basement construction details.4. Ground experience.