2018 contech calendar

13
2018 CONTECH CALENDAR SUN MON TUES WED THUR FRI SAT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DECEMBER 2017 Here’s to another year, partnering with you to provide civil and site solutions through innovation, speed, quality, and technical expertise!

Upload: contech-engineered-solutions

Post on 24-Jan-2018

83 views

Category:

Marketing


0 download

TRANSCRIPT

Page 1: 2018 Contech Calendar

2018CONTECH CALENDAR

SUN MON TUES WED THUR FRI SAT

1 2

3 4 5 6 7 8 9

10 11 12 13 14 15 16

17 18 19 20 21 22 23

24 25 26 27 28 29 30

31

DECEMBER 2017

Here’s to another year, partnering with you to provide civil and site solutions through innovation, speed, quality, and technical expertise!

Page 2: 2018 Contech Calendar

w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2

P I P E S O L U T I O N S

SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY

1 2 3 4 5 6

7 8 9 10 11 12 13

14 15 16 17 18 19 20

21 22 23 24 25 26 27

28 29 30 31

BNSF RAILWAY ALLIANCE IMF EXPANSION

PIPE SOLUTIONS

NEW YEAR’S DAY

MARTIN LUTHER KING DAY

Haslet, TexasULTRA FLO® CSP (7,000 LF) Smooth Cor™ Double Wall CSP (350 LF)

Installation Date: February 2017

The BNSF Railway Alliance Intermodal Facility (IMF) was in need of an expansion. The engineer of record worked directly with Contech to identify the best solution for the storm sewer systems that would be needed. Given the complexity of the site and the high fill in one particular area, two different storm sewer systems were specified.

JANUARY 2018

DECEMBER 2017SUN MON TUES WED THUR FRI SAT

1 2

3 4 5 6 7 8 9

10 11 12 13 14 15 16

17 18 19 20 21 22 23

24/31 25 26 27 28 29 30

FEBRUARY 2018SUN MON TUES WED THUR FRI SAT

1 2 3

4 5 6 7 8 9 10

11 12 13 14 15 16 17

18 19 20 21 22 23 24

25 26 27 28

Page 3: 2018 Contech Calendar

w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2

STRUCTURES S O L U T I O N S

SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY

1 2 3

4 5 6 7 8 9 10

11 12 13 14 15 16 17

18 19 20 21 22 23 24

25 26 27 28

RICHLAND CREEK RESERVOIR AND DAM

PRESIDENTS’ DAY

VALENTINE’S DAY

Paulding County, GeorgiaMULTI-PLATE® Single Radius Arch26’ span x 13’ rise x 185’ length

Installation Date: August 2016

An independent water supply was critically needed in Paulding County. Access to the new reservoir required the installation of an environmentally-friendly structure that could follow the alignment changes of the stream without impacting the waterway – saving both time and money. The County selected a 184’ long MULTI-PLATE structure as the best solution.

FEBRUARY 2018

JANUARY 2018SUN MON TUES WED THUR FRI SAT

1 2 3 4 5 6

7 8 9 10 11 12 13

14 15 16 17 18 19 20

21 22 23 24 25 26 27

28 29 30 31

MARCH 2018SUN MON TUES WED THUR FRI SAT

1 2 3

4 5 6 7 8 9 10

11 12 13 14 15 16 17

18 19 20 21 22 23 24

25 26 27 28 29 30 31

Page 4: 2018 Contech Calendar

w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2

STORMWATER S O L U T I O N S

SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY

1 2 3

4 5 6 7 8 9 10

11 12 13 14 15 16 17

18 19 20 21 22 23 24

25 26 27 28 29 30 31

ARIZONA BEVERAGE

Filter

GOOD FRIDAY

ST. PATRICK’S DAYDAYLIGHT SAVING TIME

Woodbridge, New JerseyJellyFish® Filter 12’ dia. units (6) & The Stormwater Management StormFilter® 8’x24’ vaults (3) to treat over 25 CF

Installation Date: September 2017

Arizona Beverage Company constructed a new filling facility in Woodbridge, New Jersey. Jellyfish and StormFilter treatment systems were chosen to meet 80% reduction of TSS due to their ability to treat high flows in a compact footprint. Moreover, their configuration flexibility allowed the engineer to eliminate unnecessary structures, thus reducing costs.

MARCH 2018

FEBRUARY 2018SUN MON TUES WED THUR FRI SAT

1 2 3

4 5 6 7 8 9 10

11 12 13 14 15 16 17

18 19 20 21 22 23 24

25 26 27 28

APRIL 2018SUN MON TUES WED THUR FRI SAT

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30

Page 5: 2018 Contech Calendar

w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2

RETAINING WALLS S O L U T I O N S

SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30

THE PARK AT OWA

EASTER

EARTH DAY

TAX DAY

Foley, AlabamaKeystone Retaining Wall Systems® with Stonegate® Country Manor - 3,642 SFBEBO® Precast Bridge System, Triple Cell20’ span x 9’-2” rise x 14’ length

Installation Date: Spring of 2017

Keystone’s segmental retaining wall system was employed to wrap concrete pillars rising from the arch footing to form 30-inch square columns and the headwalls for this triple cell BEBO® precast bridge. Keystone engineered the bridge wall design which provides both reinforcing structural support needed for the sandy soils, as well as a charming Old World appearance for the new park gateway.

APRIL 2018

MAY 2018SUN MON TUES WED THUR FRI SAT

1 2 3 4 5

6 7 8 9 10 11 12

13 14 15 16 17 18 19

20 21 22 23 24 25 26

27 28 29 30 31

MARCH 2018SUN MON TUES WED THUR FRI SAT

1 2 3

4 5 6 7 8 9 10

11 12 13 14 15 16 17

18 19 20 21 22 23 24

25 26 27 28 29 30 31

Page 6: 2018 Contech Calendar

w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2

P I P E S O L U T I O N S

SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY

1 2 3 4 5

6 7 8 9 10 11 12

13 14 15 16 17 18 19

20 21 22 23 24 25 26

27 28 29 30 31

DFW AIRCRAFT HARDSTAND RAMP EXPANSION

PIPE SOLUTIONSSTEEL REINFORCED PE TECHNOLOGY

MEMORIAL DAY

MOTHER’S DAY

Dallas, TexasDuroMaxx® SRPE Pipe with WC Joints Two runs of 134 LF of 96” dia.13,053 CF of volume storage

Installation Date: August 2017

The Dallas/Fort Worth (DFW) International Airport needed a cost-effective solution to properly store stormwater contaminated with deicing fluid prior to being treated as part of the aircraft hardstand ramp expansions. A DuroMaxx SRPE glycol storage tank was selected.

MAY 2018

APRIL 2018SUN MON TUES WED THUR FRI SAT

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30

JUNE 2018SUN MON TUES WED THUR FRI SAT

1 2

3 4 5 6 7 8 9

10 11 12 13 14 15 16

17 18 19 20 21 22 23

24 25 26 27 28 29 30

Page 7: 2018 Contech Calendar

w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2

STRUCTURES S O L U T I O N S

SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY

1 2

3 4 5 6 7 8 9

10 11 12 13 14 15 16

17 18 19 20 21 22 23

24 25 26 27 28 29 30

LOUDOUN COUNTY PARKWAY

FATHER’S DAY

Loudoun County, VirginiaCON/SPAN® O-Series®Triple Cell 65’ span x 13.5’ rise x 128’ length

Installation Date: Summer 2016

When access was needed for a new high-end development, a triple cell CON/SPANO-Series was selected in lieu of a conventional bridge. The prefabricated arch system choice resulted in faster installation time, substantial savings, and efficiently allowed critical fiber optic lines to remain untouched during the installation process.

JUNE 2018

MAY 2018SUN MON TUES WED THUR FRI SAT

1 2 3 4 5

6 7 8 9 10 11 12

13 14 15 16 17 18 19

20 21 22 23 24 25 26

27 28 29 30 31

JULY 2018SUN MON TUES WED THUR FRI SAT

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30 31

Page 8: 2018 Contech Calendar

w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2

STORMWATER S O L U T I O N S

SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30 31

PORT OF GULFPORT

PIPE SOLUTIONS

INDEPENDENCE DAY

Gulfport, MississippiVortechs® Model 1522 (6) & Model 1421 (2)Contech Slotted Drain™ - 6,000 LF, variable height, 18” - 36” diameters

Installation Date: Summer 2016

The Port of Gulfport expansion brought challenges of additional rainfall to the site. The water had to be collected as well as treated before it was discharged into the Gulf of Mexico. The local engineer worked with Contech to design a solution which utilized Slotted Drain for collection and conveyance of the stormwater and Vortechs hydrodynamic separators to treat the stormwater before flowing into the Gulf of Mexico.

JULY 2018

JUNE 2018SUN MON TUES WED THUR FRI SAT

1 2

3 4 5 6 7 8 9

10 11 12 13 14 15 16

17 18 19 20 21 22 23

24 25 26 27 28 29 30

AUGUST 2018SUN MON TUES WED THUR FRI SAT

1 2 3 4

5 6 7 8 9 10 11

12 13 14 15 16 17 18

19 20 21 22 23 24 25

26 27 28 29 30 31

Page 9: 2018 Contech Calendar

w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2

P I P E S O L U T I O N S

SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY

1 2 3 4

5 6 7 8 9 10 11

12 13 14 15 16 17 18

19 20 21 22 23 24 25

26 27 28 29 30 31

LAKEHURST NAVAL AIR STATION RELINE

PIPE SOLUTIONS

Lakehurst, New JerseySPR™ PE structural lining for 786 LF of48” dia. RCP & 703 LF of 54” dia. RCP

Installation Date: March 2014

During a routine inspection at the Lakehurst Naval Air Station, it was discovered that a number of reinforced concrete pipe (RCP) runs used to carry stormwater had deteriorated and were no longer hydraulically or structurally sufficient. The facilities engineer decided to reline the existing RCP with SPR™ PE through the manholes directly.

AUGUST 2018

JULY 2018SUN MON TUES WED THUR FRI SAT

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30 31

SEPTEMBER 2018SUN MON TUES WED THUR FRI SAT

1

2 3 4 5 6 7 8

9 10 11 12 13 14 15

16 17 18 19 20 21 22

23/30 24 25 26 27 28 29

Page 10: 2018 Contech Calendar

w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2

STRUCTURES S O L U T I O N S

SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY

1

2 3 4 5 6 7 8

9 10 11 12 13 14 15

16 17 18 19 20 21 22

23/30 24 25 26 27 28 29

CLARK COUNTY - SALEM NOBLE ROAD

LABOR DAY

Charleston, IndianaSteadfast® Vehicular TrussKeystone® Style120’ span x 34’ width

Installation Date: March 2017

In order to improve the roadway conditions along Salem Noble Road and avoid the regular flooding that occurred at the Pleasant Run crossing, Clark County chose a 120’ clear span Steadfast truss structure as the replacement. The new bridge can accommodate the rapid growth in the area and increased traffic volume.

SEPTEMBER 2018

AUGUST 2018SUN MON TUES WED THUR FRI SAT

1 2 3 4

5 6 7 8 9 10 11

12 13 14 15 16 17 18

19 20 21 22 23 24 25

26 27 28 29 30 31

OCTOBER 2018SUN MON TUES WED THUR FRI SAT

1 2 3 4 5 6

7 8 9 10 11 12 13

14 15 16 17 18 19 20

21 22 23 24 25 26 27

28 29 30 31

Page 11: 2018 Contech Calendar

w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2

STORMWATER S O L U T I O N S

SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY

1 2 3 4 5 6

7 8 9 10 11 12 13

14 15 16 17 18 19 20

21 22 23 24 25 26 27

28 29 30 31

UPPER NORTH PARKING LOT

COLUMBUS DAY

HALLOWEEN

Red Rocks, Colorado120” Aluminized CMP DetentionCDS® Hydrodynamic Separators - CDS2025-5 (2)

Installation Date: March 2017

A detention system was needed that would have minimal impact to the breathtaking mountains that provide the unequaled acoustics for which the 640 acre Red Rocks open air amphitheater is famous. The solution? A stormwater system consisting of a CMP detention system pretreated with a CDS hydrodynamic separator, to meet water quality and quantity requirements.

OCTOBER 2018

SEPTEMBER 2018SUN MON TUES WED THUR FRI SAT

1

2 3 4 5 6 7 8

9 10 11 12 13 14 15

16 17 18 19 20 21 22

23/30 24 25 26 27 28 29

NOVEMBER 2018SUN MON TUES WED THUR FRI SAT

1 2 3

4 5 6 7 8 9 10

11 12 13 14 15 16 17

18 19 20 21 22 23 24

25 26 27 28 29 30

Page 12: 2018 Contech Calendar

w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2

HARD ARMOR S O L U T I O N S

SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY

1 2 3

4 5 6 7 8 9 10

11 12 13 14 15 16 17

18 19 20 21 22 23 24

25 26 27 28 29 30

BOARDMAN DAM REMOVAL & RIVER RESTORATION

THANKSGIVING DAY

VETERANS DAY

Boardman, MichiganArmorFlex® Articulating Concrete Blocks 11,068 sq. ft. of ArmorFlex Class 40T

Installation Date: July 2017

When fully implemented, the Boardman Dam Removal & River Restoration Project will reconnect over 160 miles of river and tributary streams while restoring wetlands and upland habitats. It is the most comprehensive dam removal and restoration projects in Michigan’s history and one of the largest such projects in the Great Lakes Basin. Contech provided ArmorFlex erosion control mats as an advanced protective measure during the drawdown stages of the Boardman Dam.

NOVEMBER 2018

OCTOBER 2018SUN MON TUES WED THUR FRI SAT

1 2 3 4 5 6

7 8 9 10 11 12 13

14 15 16 17 18 19 20

21 22 23 24 25 26 27

28 29 30 31

DECEMBER 2018SUN MON TUES WED THUR FRI SAT

1

2 3 4 5 6 7 8

9 10 11 12 13 14 15

16 17 18 19 20 21 22

23/30 24/31 25 26 27 28 29

Page 13: 2018 Contech Calendar

w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2

STORMWATER S O L U T I O N S

9025 CENTRE POINTE DRIVE, SUITE 400 | WEST CHESTER, OH 45069 © 2017 Contech Engineered Solutions LLC, a QUIKRETE Company

ENGINEERED SOLUTIONS

ENGINEERED SOLUTIONSCOMPLETE SITE SOLUTIONS

SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY

1

2 3 4 5 6 7 8

9 10 11 12 13 14 15

16 17 18 19 20 21 22

23/30 24/31 25 26 27 28 29

ROBERSTON RANCH

®

CHRISTMAS

Carlsbad, California

Filterra® Bioscape™ (20 vaults)

Installation Date: August 2016

Twenty Filterra Bioscape vaults were installed upstream of infiltration to meet stormwater requirements in a large subdivision in Carlsbad, CA. The original design utilized large ponds that took up the entire green spaces making them unusable for other purposes. The Filterra vaults have a much smaller footprint, blend well with the other landscaping, and increase the property values of the homes closest to the green spaces.

DECEMBER 2018

NOVEMBER 2018SUN MON TUES WED THUR FRI SAT

1 2 3

4 5 6 7 8 9 10

11 12 13 14 15 16 17

18 19 20 21 22 23 24

25 26 27 28 29 30

JANUARY 2019SUN MON TUES WED THUR FRI SAT

1 2 3 4 5

6 7 8 9 10 11 12

13 14 15 16 17 18 19

20 21 22 23 24 25 26

27 28 29 30 31

CHRISTMAS EVE/NEW YEAR’S EVE