2011 BRIDGE INSPECTION REPORT
BYRD PARK PUMP STATION BRIDGE OVER KANAWHA CANAL
April 2011 FINAL December 2011
Looking - from Abutment B to Abutment A
Prepared by:
WHITMAN, REQUARDT, & ASSOCIATES, LLP 9030 Stony Point Pkwy, #220
Richmond, VA 23235
Note: The railing depicted in this report has been replaced since2011. Repair plans reflect the current railing which will be replacedwith currently advertised repair project.
Page 1 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
Cnty/City: Richmond Feature Intersected: Kanawha Canal
Main Route: Main Access to Power
House
Facility Carried: Main Access to Power
House (Gated drive
intersecting Pump House
Drive)
Location:
Lead Inspector: L. Cundiff, P.E. Signature of Team Leader:
Additional Inspectors: M. Bolt
B. Cole
SPECIAL REQUIREMENTS Fracture Critical Fatigue Prone Details Pin & Hanger
36 TRAFFIC SAFETY FEATURES
1. Bridge Railing 0
2. Transition 0
3. Approach Guardrail 0
4. Approach Guardrail Terminal 0
58 DECK 6
59 SUPERSTRUCTURE 4
60 SUBSTRUCTURE 4
61 CHANNEL & CHANNEL PROTECTION 4
62 CULVERT N
FIELD POSTING
R12-1 ( Ton) N
R12-5 Type 3 ( Ton) N
R12-5 Type 3S2 ( Ton) N
1. Legibility N
2. Visibility N
See page 22 for a description of the rating system.
Electronic Copy
Page 2 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
Looking - from Abutment B to Abutment A
Looking - from Abutment A to Abutment B
Page 3 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
Looking- Downstream
Looking Upstream
Page 4 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
COMPONENT RATINGS 36 TRAFFIC SAFETY FEATURES 60 SUBSTRUCTURE 4
1. Bridge Railing 0 1 Abutment
2. Transition 0 1A. Wings G
3. Approach Guardrail 0 1B. Backwall G
4. Approach Guardrail Terminal 0 1C. Bearing Seats -
1D. Breast Wall F
58 DECK 6 1E. Weep Holes -
1. Wearing Surface G 1F. Footing G
2. Deck Structural Condition G 1G. Piles -
3. Curbs F 1H. Erosion/Scour/Undermining F
4. Median - 1I. Settlement G
5. Sidewalks - 2 Piers or Bents
6. Parapet - 2A. Caps G
7. Railing P 2B. Bearing Seats -
8. Drains F 2C. Columns, Stem or Wall F
9. Lighting Standards - 2D. Footing G
10. Utilities F 2E. Piles -
11. Expansion Joints or Devices P 2F. Bracing -
2G. Erosion/Scour/Undermining G
59 SUPERSTRUCTURE 4 2H. Settlement G
1. Bearing Devices F 3 Pile Bents
2. Stringers - 3A. Caps -
3A. Girder or Beams General P 3B. Bearing Seats -
3B. Diaphragms or Cross Frames G 3C. Piles -
3C. Bracing - 3D. Bracing -
4. Floor Beams -
5A. Trusses General - 61 CHANNEL & CHANNEL PROTECTION N
5B. Portals - 1. Channel Scour -
5C. Bracing - 2. Embankment Erosion -
6. Paint - 3. Drift -
Year Painted ( 1987 ) 4. Vegetation -
7. Machinery (Movable Span) -- 5. Fender System - 6. Spur Dikes & Jetties -
7. Rip Rap Or Slope Protection - 8. Adequacy of Opening -
FIELD POSTING R12-1 ( Ton) R12-5 Type 3 ( Ton) R12-5 Type 3S2 ( Ton) 1. Legibility N 2. Visibility N
* Not Visible
Page 5 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
DESCRIPTION Two reinforced concrete beam spans, 66’-9” long total.
ORIENTAION Looking upstream, Abutment A is on the Left. Beams are numbered
from left to right looking at Abutment B.
MISCELLANEOUS (Items which are structure specific and cannot be included in another
section.)
Bridge Coordinates
N 37°32'10"
W 77°29'7"
SPECIAL REQUIREMENTS (Special Equipment needed or
Special Inspections required such as: Fracture Critical, Underwater,
Fatigue Prone, Scour Critical, Moveable Bridge, Segmental
Concrete, Pin and Hanger, etc.)
An extension ladder was used to facilitate access to the
structure.
Some conduits on structure could potentially contain asbestos.
WORK DONE None.
STRUCTURAL ANALYSIS Load Rating
OVERALL CONDITION Poor
The condition rating of Poor is primarily resulting from the beam
condition (Photos 8, 16 and 19) and the deck drainage and
expansion joint condition which will allow the beams to
deteriorate more quickly.
RECOMMENDATIONS Repair
- Replace/modify rail to meet current standards
- Perform joint reconstruction at Abutment B
- Close utility with open junction box
- Repair delaminated/spalled areas of concrete on
superstructure and substructure
- Extend deck drains beyond bottom of beam
- Replace scoured material and provide scour protection
- Remove debris in stream bed reducing hydraulic opening
Monitor
- Inspections of the bridge should be established on a set
interval.
Page 6 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
DECK
Top of Deck Good
- 9SF of delaminated concrete in Span 2. (Photo #6)
Bottom of Deck Good
- 5SF of delaminated/spalled concrete in Span 1 adjacent to
Beam 1.
- 4SF of delaminated/spalled concrete in Span 1 adjacent to
Beam 3.
Curbs
Railing
Fair
- 1SF of delaminated concrete on north curb and 13SF of
delaminated concrete on south curb.
Poor
- Hand rail does not meet current standards.
- Hand rail deflected approximately 4” on north side.
(Photo #4)
- 2 posts damaged at base on south side. (Photo #3)
- Rail to post connection failure at Abutment B on north side.
(Photo #5)
Utilities Fair
- North deck overhang (Photo #15)
6 - 6” diameter utility line (possibly containing asbestos)
1 - 3” diameter utility line
- South deck overhang (Photo #16)
3 - 3” diameter utility lines
1 – 6” diameter gas line
- Junction box on 3” diameter utility under southern deck
overhang is open with exposed wiring. (Photo #17)
Drains
Expansion Joints
Fair
- Drains are flush with exterior face of curb. (Photo #7)
Poor
- No deficiencies noted at Abutment A joint. (Photo #2)
- Joint at Abutment B has failed. (Photo #1)
Page 7 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
SUPERSTRUCTURE
Bearings Devices Fair
- Bearings at Abutment A are misaligned transversely by ½”.
(Photo #20)
GIRDERS, BEAMS OR SLABS
Beams
Poor
- 70SF delaminated/spalled concrete with exposed corroded
rebar along Beam 1 in Span 1.
- 122SF delaminated/spalled concrete with exposed corroded
rebar along Beam 3 in Span 1. (Photos #8 and #19)
- 20SF delaminated/spalled concrete along Beam 1 in Span 2.
- 2SF delaminated/spalled concrete along Beam 2 in Span 2.
- 19SF delaminated/spalled concrete along Beam 3 in Span 2.
- Up to 20% section loss in bottom row of reinforcing steel.
Diaphragms Good
- No deficiencies noted.
SUBSTRUCTURE
ABUTMENTS
Wings Good
- No deficiencies noted.
Backwalls
Good
- No deficiencies noted.
Breastwall Fair
- Abutment A is notched to accommodate conduits.(Photo #13)
- Entire face of Abutment B is delaminated. (Photo #11)
- Entire top of Abutment B breastwall is delaminated.
Footings Good
- No deficiencies noted.
Undermining Fair
- Scour at downstream end of Abutment B approximately 1 foot
under footing by 8 feet along abutment. (Photos #11 and #12)
Page 8 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
Settlement Good
- No deficiencies noted.
PIERS
Caps Good
- No deficiencies noted.
Walls Fair
- Pier 1 is notched to accommodate conduits on north side of
structure.(Photo #14)
- 9SF delaminated/spalled concrete on Span 1 side of Pier 1.
(Photo #9)
- 10SF delaminated/spalled concrete on Span 2 side of Pier 1.
(Photo #10)
- 5SF delaminated/spalled concrete on southern face of Pier 1.
Footings Good
- No deficiencies noted.
Undermining Good
- No deficiencies noted.
Settlement Good
- No deficiencies noted.
CHANNEL AND SLOPE PROTECTION
Channel
Vegetation
Fair
- Debris has collected under bridge.(Photo #18)
Good
- No deficiencies noted.
Slope Protection - None in place.
Page 9 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
FIELD POSTING
Actual Posting - Not Posted.
Legibility - N/A
Visibility - N/A
Advanced Warning Signs (In accordance with Traffic Engineering Division Memorandum MM-313 and MM-314 dated 2/24/2003)
- N/A
OTHER
APPROACH PAVEMENT Fair
- Deterioration in approach pavement and failed expansion
joint at Abutment B. (Photo #1)
TRAFFIC SAFETY FEATURES
RAILING
TRANSITION
APPROACH GUARDRAIL
APPROACH GUARDRAIL
TERMINAL
- Does not meet current standards
- N/A
- N/A
- N/A
OBJECT MARKERS - None
Page 10 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
Load Rating
A load rating was completed for the bridge following the AASHTO method
outlined in The Manual for Bridge Evaluation. Based on this method, a
structure receives two different ratings in ASD, inventory and operating.
AASHTO defines inventory rating as: “The inventory rating level generally
corresponds to the customary design level of stresses but reflects the
existing bridge and material conditions with regard to deterioration and
loss of section. Load ratings based on the Inventory level allow
comparisons with the capacity for new structures and, therefore, result in
a live load, which can safely utilize an existing structure for an
indefinite period of time.”
AASHTO defines operating rating as: “Load ratings based on the operating
rating level generally describe the maximum possible live load to which
the structure may be subjected. Allowing unlimited numbers of vehicles to
use the bridge at Operating level may shorten the life of the bridge.”
An HS20 design truck was modeled for the rating with a total vehicular
weight of 36 tons.
Following AASHTO’s method the following results were found for an HS20
truck:
Load Rating Results (Tons)
Inventory Operating
Span 1 20 37
Span 2 20 37
The superstructure’s operating rating is greater than 36 tons, indicating
that the structure is capable of taking the applied load indefinitely on
an occasional basis. Continued deterioration can compromise the load
carrying capacity greatly.
Page 11 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
PHOTOS
PHOTO #1 – Deterioration in approach pavement and failed expansion joint at Abutment B
PHOTO #2 – Expansion joint at Abutment A
Page 12 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
PHOTO #3 – Typical crack on curb and railing post failure
PHOTO #4 – Deflection of approximately 4” in handrail
Page 13 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
PHOTO #5 – Rail to post connection failure
PHOTO #6 – Concrete delamination on top of deck
Page 14 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
PHOTO #7 – Typical deck drain in curb
PHOTO #8 – Abutment A elevation showing spalling in Span 1 with exposed rebar
Page 15 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
PHOTO #9 – Span 1 elevation of Pier 1 showing spalling
PHOTO #10 – Span 2 elevation of Pier 1 showing delamination
Page 16 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
PHOTO #11 – Abutment B elevation showing delamination along entire face and scour at downstream footing
PHOTO #12 – Scour at downstream footing of Abutment B
Page 17 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
PHOTO #13 – Notch chipped out at Abutment A to accommodate utility lines
PHOTO #14 – Notch chipped out at Pier 1 to accommodate utility lines exposing rebar
Page 18 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
PHOTO #15 – 7 Utility lines on north side of bridge
PHOTO #16 – 4 Utility lines on south side of bridge
Page 19 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
PHOTO #17 – Open junction box exposing electrical lines
PHOTO #18 – Typical debris collecting under bridge
Page 20 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
PHOTO #19 – Typical spalling with exposed rebar on beam
PHOTO #20 – Typical bearing at Abutment A misaligned transversely ½”
Page 21 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16
STREAM PROFILE
Page 22 City of Richmond DPU
STRUCTURE INSPECTION REPORT – COMMENTARY
Date of Inspection: 04/5/2011
Date Printed 11/30/16