2010 regional intelligent transportation systems plan: 2015 progress report on implementation

10
2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation

Upload: adelia-booth

Post on 05-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation

2010 Regional Intelligent Transportation Systems Plan:

2015 Progress Report on Implementation

Page 2: 2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation

Intelligent Transportation Systems

•The technology tools and systems that local agencies and jurisdictions use to manage transportation operations and to increase safety and efficiency

Page 3: 2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation

The Regional ITS Plan

•Purpose: Identify existing and future ITS communications networks and devices needed to enhance transportation and economic competitiveness throughout the region

•Vision: Implement a regional ITS network to maximize the safety and efficiency of transportation in the region

Page 4: 2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation

Regional Loop•Fiber optic ring along US 98 to SR 231 in

Bay County, north to I-10, west on I-10 to I-110 in Escambia County, and south on I-110 to US 98 ▫784,000 of 822,935 linear feet of fiber optic

cable completed or currently being installed

Page 5: 2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation
Page 6: 2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation

Florida-Alabama TPO • ITS working group made up of representatives

from:▫Escambia County▫Santa Rosa County▫City of Milton▫City of Gulf Breeze▫City of Pensacola▫FDOT

• Conducting a feasibility study and ITS Implementation Plan for development and operations of an Advanced Transportation Management System

Page 7: 2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation

Okaloosa-Walton TPO – Okaloosa County•Travel time monitoring system installed at

four intersections on US 98 to assist with the Cody Avenue fly-over project▫Parish Blvd, Florosa Elem, Cody Ave,

Doolittle Blvd•10 CCTV’s installed at various locations

throughout the County•6 radar type detection systems installed •8 battery back-up systems for traffic

signals installed

Page 8: 2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation

Okaloosa-Walton TPO – Walton County•Walton County has entered into a Joint

Participation Agreement with FDOT to fund a traffic engineer▫Facilitate ITS deployment in Walton County▫Maximize capabilities of existing signal

system▫Procure additional resources to support ITS

implementation

Page 9: 2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation

Bay County TPO •Recent Projects:

▫Two adaptive traffic control systems installed Panama City Beach Parkway from SR 79 to

Woodlawn Drive 23rd Street from SR 77 to Lisenby Avenue

▫Extended the fiber optic system north along SR 79 from Panama City Beach Parkway to SR 388

•Total System:▫137 intersections running in the ITS system▫86 pan/tilt/zoom cameras▫4 Dynamic Messaging Systems▫2 remote weather stations