2008* embraer day apresentação do mercado de defesa e governo

30
IMD 239-A08 9 th Embraer Day Defense and Government Market November 2008 Luiz Carlos Siqueira Aguiar Executive Vice President, Defense and Government

Upload: embraer-ri

Post on 25-May-2015

455 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08

9th Embraer Day

Defense and GovernmentMarket

November 2008Luiz Carlos Siqueira Aguiar

Executive Vice President, Defense and Government

Page 2: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 2

Forward Looking Statement

This presentation includes forward-looking statements or statements about events or circumstances

which have not occurred. We have based these forward-looking statements largely on our current

expectations and projections about future events and financial trends affecting our business and our

future financial performance. These forward-looking statements are subject to risks, uncertainties

and assumptions, including, among other things: general economic, political and business

conditions, both in Brazil and in our market.

The words “believes,” “may,” “will,” “estimates,” “continues,” “anticipates,” “intends,” “expects” and

similar words are intended to identify forward-looking statements. We undertake no obligations to

update publicly or revise any forward-looking statements because of new information, future events

or other factors. In light of these risks and uncertainties, the forward-looking events and

circumstances discussed in this presentation might not occur. Our actual results could differ

substantially from those anticipated in our forward-looking statements.

Page 3: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 3

�Low level of investment, no capital risk

�Very positive cash flow programs

Business Model

It means that Embraer Defense programs have

high level of shareholder added value. Besides that the

Defense Programs generate technological spin-offs

Page 4: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 4

Defense Products and Market Segments

Intelligence, Surveillance andReconnaissance

Training Combat

Transport Systems & Services

Page 5: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08

DefensePrograms

Update

Page 6: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 6

Super Tucano – Brazil

�� AA--29 (29 (FAB’sFAB’sdesignation)designation)

�� Two version Two version (single and (single and twintwin--seaterseater))

�� 99 aircraft99 aircraft

�� 59 delivered59 delivered

�� Four operational bases: Four operational bases:

�� Natal (advanced Natal (advanced training),training),

�� Porto Porto VelhoVelho, Boa Vista, , Boa Vista, and Campo Grande AFB and Campo Grande AFB (operational squadrons).(operational squadrons).

Ref.: Oct 2008

Brazilian Air Force (FAB)Brazilian Air Force (FAB)Brazilian Air Force (FAB)

Page 7: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 7

Colombian Air Force (FAC)Colombian Air Force (FAC)

�� AA--2929

�� 25 aircraft (twin25 aircraft (twin--seaterseater))

�� All aircraft already delivered (the last one in August 2008)All aircraft already delivered (the last one in August 2008)

�� Intensive utilization in COIN (Counter Insurgency) missions and Intensive utilization in COIN (Counter Insurgency) missions and successful operations against the FARCsuccessful operations against the FARC

�� Two operational bases: Two operational bases: ApiayApiay and and BarranquillaBarranquilla

Super Tucano – Colombia

Page 8: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 8

Super Tucano Flight Simulator

� Flight Simulator for the FAC’s Super Tucano

� Developed by Embraer

� Operational in the 3rd quarter 2008

� In addition to the simulator, other training and operational tools already developed (CBT – Computer Based Training, MPS/MDS (Mission Planning and Mission Debriefing Stations)) and in operation.

Page 9: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 9

Super Tucano – Chile

�� ContractContract signedsigned in August 2008in August 2008

�� 12 Super Tucano (12 Super Tucano (twintwin--seaterseater))

�� Tactical trainingTactical training

�� First deliveries in the second semester 2009First deliveries in the second semester 2009

ChileanChilean AirAir Force (FACH)Force (FACH)

�� TOSS TOSS –– Training Training andand OperationalOperational SupportSupport

SystemSystem ((MPS/MDSMPS/MDS ((MissionMission

Planning/DebriefingPlanning/Debriefing StationStation), ), FlightFlight Simulator))Simulator))

CONTRACT SIGNED IN 2008!

Page 10: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 10

Super Tucano – Ecuadorian Air Force

�� 24 Super Tucano (24 Super Tucano (twintwin--seaterseater))

�� Advanced training and operational missionsAdvanced training and operational missions

�� Contract already signedContract already signed

�� First deliveries expected in late 2009First deliveries expected in late 2009

CONTRACT SIGNED IN 2008!

Page 11: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 11

� F-5M (FAB’s designation)

� Air superiority fighter

� Fleet: 46 aircraft

� Modernization program includes structural modification and upgrade of avionics, sensors and armament system capability.

� 26 aircraft already delivered

� Last deliveries in 2009

� Additional batch of 11 aircraft can be considered in the near future

Brazilian F-5 Modernization Program

Ref.: October 2008

Page 12: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 12

� A-1M (FAB’s designation)

� Attack and reconnaissance aircraft

� Fleet to be modernized: 43 aircraft

� Modernization program includes upgrade of avionics, sensors and armament system capability, and fleet standardization.

� First deliveries in 2012 and the last ones in 2015

� First two prototypes already being modified and tested by Embraer, and first flight scheduled to 1Q2009.

Brazilian AMX Modernization Program

Page 13: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08

Embraer ISR

Systems

Page 14: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 14

� Cost Effective solutions for ISR� 18 airplanes contracted:

� Brazilian Air Force: 8

� Hellenic Air Force: 4

� Mexican Air Force: 3

� DRDO/CABS (India): 3

Embraer ISR Systems

EMB 145 AGSEMB 145 AGS

AirborneAirborne GroundGroundSurveillanceSurveillance

EMB 145 MP EMB 145 MP Maritime Maritime PatrolPatrol

EMB 145 EMB 145 AEW&CAEW&C

AirborneAirborne EarlyEarly WarningWarningandand ControlControl

Page 15: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 15

EMB 145 AEW&C – India

Platform improvements:� In-flight Refueling

� Increased power generation

� Increased cooling

Mission Systems:� Primary and secondary radars

� SATCOM / COMINT / ELINT

� Countermeasures Systems

Embraer platforms + DRDO/CABS mission systems

DRDO: Defence Research and Development Organization / CABS: Centre for Airborne Systems

Contract:� Three EMB 145 platforms (firm orders)

� Seven optional aircraft

� Signature in July 2008

� First delivery in 2011

CONTRACT SIGNED IN 2008!

Page 16: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08

Transport –Defense and Government

Page 17: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 17

ERJ 145 - Petroecuador

� PetroEcuador (Ecuador)

� Ecuadorian State Oil Company

� One ERJ 145

� Mission: transport of company’s employees

� Delivered in September 2008

CONTRACT SIGNED IN EARLY 2008AND AIRCRAFT ALREADY DELIVERED!

Page 18: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 18

ERJ 135 – Thailand – Army� Royal Thai Army

� Two ERJ 135 (firm orders)

� Mission: transport

� Deliveries: the first one in November 2008 and the second one inthe second semester 2009

Page 19: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 19

ERJ 135 – Thailand – Navy

� Royal Thai Navy

� One ERJ 135

� Mission: Transport and Medical Evacuation

� Delivery in December 2008

Page 20: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 20

Phenom 100 – Pakistan Air Force

� First military customer: Pakistan Air Force

� Four Phenom 100

� Mission: transport

� Deliveries: 1Q2009, 3Q2009 and the last two aircraft in 4Q2010.

CONTRACTS FOR THE THIRD AND FOURTHAIRCRAFT SIGNED IN 2008!

Page 21: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 21

Legacy 600 – Brazil

� Brazilian Air Force (GTE – Special Transportation Group)

� Fleet: 4 + 2 new Legacy 600

� Mission: transport of authorities

� First aircraft delivered in October 2008

� Second one to be delivered in December 2009

CONTRACT SIGNED IN 2008!

Page 22: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 22

EMBRAER 190 – Brazil

� Two EMBRAER 190

� Replacement of the B737-200

� New internal arrangement

� Extra range (additional fuel tanks)

� Contractual delivery dates: March2009 and November 2009

� Brazilian Air Force (GTE – Special Transportation Group)

CONTRACT SIGNED IN 2008!

Page 23: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 23

Legacy 600 – Ecuador

� One Legacy 600

� Mission: presidential aircraft

� Delivery in December 2008

CONTRACT SIGNED IN 2008!

Page 24: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 24

Customer Support – new contracts� French Armed Forces EMB 121 Xingu:

Technical and Logistic Support – 4-yearcontract signed in September 2008;

� FAB’s Legacy and ERJ 145 fleet: 5-yearcontract amended to include more aircraft(total of 15 aircraft);

� Chilean Air Force (FACH) Super Tucano: 5-year contract already signed and to be implemented by November 2009.

Photo: Stéphane PichardEMB 121

ERJ 145

LEGACY 600

SUPER TUCANO - FACH

CONTRACTS SIGNED IN 2008!

Page 25: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08

F-X2 Program

Page 26: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 26

F-X2 Program

� Brazilian F-X program restarted last May 2008

� Multi-role fighter to replace the current fleet of fighters (F-2000, F-5M, A-1M)

� Initial batch of 36 airplanes (up to 120 aircraft)

� Strong emphasis in offset and technology transfer mainly for the Brazilian aeronautical industry.

� Embraer already started talking to short-listed companies, under FAB coordination

� In 2008: RFP

� In 2009:

� RFP analysis

� Final decision

� Contract signature

� In 2015: first F-X2 aircraft in operation

Boeing FBoeing F--18 E/F Super Hornet18 E/F Super Hornet

DassaultDassault RafaleRafale

Saab Saab GripenGripen NGNG

Short-listed aircraft:

Page 27: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08

EMBRAERC-390

Page 28: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 28

EMBRAER C-390 Program Update

�A comprehensive review of aircraft requirements was performed in 2008, together with the Brazilian Air Force and some other selected potential customers

�Some aircraft characteristics were reviewed to better fit such requirements and an even more competitive configuration was defined for the EMBRAER C-390

�A proposal is being delivered to the Brazilian Air Force, in response to a RFP issued last month. A contract for the development of the C-390 is expected to be signed soon

�Global market prospects remain very attractive

�Negotiations with potential partners and suppliers continue and major selections are planned for 2009

Page 29: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 29

Page 30: 2008* Embraer Day   ApresentaçãO Do Mercado De Defesa E Governo

IMD 239-A08 INFORMAÇÃO DE PROPRIEDADE DA EMBRAER 30