Page 1: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

HYDROFEST 2005A FAMILIARISATION COURSE

GEOPHYSICAL SITE SURVEY

HYDROFEST 2005A FAMILIARISATION COURSE

GEOPHYSICAL SITE SURVEY

Presented by Øyvind Ruden.Geophysics Project Manager

Fugro Survey Limited

Presented by Øyvind Ruden.Geophysics Project Manager

Fugro Survey Limited

Page 2: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

• INTRODUCTION• PRINCIPLES, METHODS AND TOOLS• SITE SURVEY OPERATIONS• FUTURE DEVELOPMENTS

Page 3: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

• Exploration Surveys• Rig Site Surveys• Platform Site Surveys• Pipeline Route Surveys• Cable Route Surveys• Field Development Surveys• Clearance, Abandonment and

Inspection

Page 4: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

TYPES OF SURVEYS

JACK UP RIGS SEMI SUBMERSIBLES

PLATFORMS

Page 5: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April
Page 6: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April
Page 7: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April
Page 8: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April
Page 9: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

PRINCIPLES, METHODS AND TOOLS

Page 10: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

Use of geophysical ‘remote sensing’techniques, calibrated by some limited

‘ground truth’ sampling.

BASIC PRINCIPLE

Page 11: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

ACOUSTIC PRINCIPLES

• Source• Receiver• Recorder• Interfaces and Media

Page 12: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

THE EARTH AS A BANDPASS FILTER

Page 13: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

ACOUSTIC METHODS

• Echo SoundingSingle BeamMulti Beam

• Side Scan Sonar

Page 14: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

ECHO SOUNDERS

Page 15: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

ECHO SOUNDERS

Page 16: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

ECHO SOUNDERS

Page 17: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SIDE SCAN SONAR

Page 18: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SIDE SCAN SONAR

Page 19: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SIDE SCAN SONAR

Page 20: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SIDE SCAN SONAR

Page 21: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SEISMIC PRINCIPLES

Page 22: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SEISMIC PRINCIPLES

Page 23: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SINGLE CHANNEL METHODS

• Pingers• Boomers• Mini-airguns• CHIRP• Sparkers

Page 24: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SINGLE CHANNEL METHODS

Page 25: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SINGLE CHANNEL METHODS

Page 26: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SINGLE CHANNEL METHODS

Page 27: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SINGLE CHANNEL METHODS

Page 28: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SINGLE CHANNEL METHODS

Page 29: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SINGLE CHANNEL METHODS

Page 30: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

MULTI CHANNEL METHODS

Page 31: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

MULTI CHANNEL METHODS

Page 32: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

MULTI CHANNEL METHODS

Page 33: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

MULTI CHANNEL METHODS

Page 34: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

HIGH-RESOLUTION 2D SEISMIC

Page 35: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

HIGH-RESOLUTION 2D SEISMIC

Page 36: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

DATA PROCESSING

EDITING

Demultiplexed

Edited

TEST/MAIN PROCESSING

Geometry Specification

Deconvolution

Sorted into CMP’s

Filtered

Amplified

Velocity Analysis

NMO

Stacked

FINAL PROCESSING

Migration

Page 37: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

3D SEISMIC

Page 38: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

3D SEISMIC

Page 39: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April
Page 40: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

GEOTECHNICAL SAMPLING

• Grab Samplers

• Gravity Corers

• Vibrocorers

• Cone Penetrometers

• Boreholes

Page 41: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

INTERPRETATION AND PRESENTATION

Page 42: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SOIL PROVINCES

MAP

Page 43: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

ALIGNMENT SHEET

FORMAT

Page 44: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SEABED VISUALISATION

3D perspective

Shaded relief

Colour coded seabed gradient

Page 45: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

3D VISUALISATION

Page 46: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SITE SURVEY OPERATIONS

Page 47: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

THE SURVEYORS ROLE

• Construction of Survey Programme

• Positioning of Vessel

• Positioning of Sensors

• Quality Control of Bathymetry data

Page 48: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SURVEY DESIGN

• Water Depth

• Type of Installation

• Expected Hazards

• Flexibility of Location

• Environmental Conditions

• Time and Cost

Page 49: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

SURVEY DESIGN

• Dual Pass Survey

• Integrated Surveys

• Dual Streamers

• High Resolution 3D

Page 50: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

THE SURVEY PLATFORMVessel antenna

position

(reference point)Back deck where side scan sonar, boomer and digital

seismic equipment is launched

Bridge

Instrument room

(below water line)Living quarters

Page 51: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

FUTUREDEVELOPMENTS

Page 52: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

FUTURE DEVELOPMENTS

• High Resolution 3D

• Integrated Surveys

• AUV

• GAMBAS (Seismic Refraction)

Page 53: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

COMPARISON WITH EXPLORATION 3D DATA

Page 54: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

GAMBAS SYSTEMR

Page 55: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

FUTURE DEVELOPMENTS: AUV

• Max Working Depth:3000 m

• Max Speed: 8 knots

• Min Speed: 1.5 knots• Survey Speed: 3-6 knots

• Length: 5.5 m• Width: 1.27 m

• Bottom Time: 20 hours• Battery: 42 kwh NMH

AUV Platform

FAQ’sSpecifications

Page 56: 2005-04-05 Geophysical Site Surveys, HydroFest 2005 - 5th April

FUTURE DEVELOPMENTS: AUV