1of3 argus- by dead puppet society - geodesic … by dead puppet society ... g995 orchid 36% 4% 92...

6
1 of 3 As per Whitney Eglington4 Technical Director 0419585511| [email protected] Argus- By Dead Puppet Society Touring Technical Specification B V1 Music Playback Option Touring Company 4 Cast Members 1x SM Equipment with Touring Company Set 1x 4m Circle Truss (in 4 arcs) 12x plywood set cladding 12x steel arms w/scaff clamp 6x cladding joins 2x 1000mm roller legs 2x 3000mm steel roller legs 4x short cross brace pipe 3x 2500mm 48 OD Steel pipe 3x 2000mm 48 OD Steel Pipe 2x 3200mm 48 OD Steel Pipe 2x 3900mm 48 OD Steel Pipe 2x Cross brace length 6x Fixed (90 Degree) scaff clamps 27x Swivel scaff clamps Costume and Props 2x Small props road case Lighting 3x LED par (Venue to supply if available) 4x Festoon lengths 5x BC pendant bulb fittings

Upload: dangdat

Post on 18-Apr-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

1"of"3"

As"per"Whitney"Eglington4"Technical"Director"0419585511|"[email protected]"

Argus- By Dead Puppet Society Touring Technical Specification B V1 Music Playback Option "

Touring"Company"

4"Cast"Members"

1x"SM"

"Equipment"with"Touring"Company"

Set$ 1x"4m"Circle"Truss""(in"4"arcs)"

" 12x"plywood"set"cladding"

" 12x"steel"arms"w/scaff"clamp"

" 6x"cladding"joins"

" 2x"1000mm"roller"legs"

" 2x"3000mm"steel"roller"legs"

" 4x"short"cross"brace"pipe"

" "

" 3x"2500mm"48"OD"Steel"pipe"

" 3x"2000mm"48"OD"Steel"Pipe"

" 2x"3200mm"48"OD"Steel"Pipe"

" 2x"3900mm"48"OD"Steel"Pipe"

" 2x"Cross"brace"length"

" 6x"Fixed"(90"Degree)"scaff"clamps""27x"Swivel"scaff"clamps"

$

Costume$and$Props$$ 2x"Small"props"road"case$

$ ""

Lighting$$ "3x"LED"par""(Venue"to"supply"if"available)"

$ 4x"Festoon"lengths""5x"BC"pendant"bulb"fittings"

"

2"of"3"

As"per"Whitney"Eglington4"Technical"Director"0419585511|"[email protected]"

" "

Sound" 1x"Macbook"Pro"with"QLab"playback"system"

"

Performance$

Running"time"of"45"minutes,"no"interval"

"

Pre6rig$and$set$up$ Lighting$4"Lighting"to"be"rigged,"coloured"and"patched"prior"to"companies"arrival"as"per"venue"issued"lighting"plan"4"Floor"Electrics"to"be"prepped"and"circuits"to"be"run4"however"will"be"placed"following"the"set"build"4"Lighting"to"be"focussed"during"company"bump"in"4Show"file"is"in"both"ION"format"and"MA"format4"Please"advise"on"venue"console"

" Staging)

) 4"Scaff"pipe"and"scaff"clamps"for"wheel"structure"may"be"provided"by"the"venue4"TBC"in"liaison"with"the"venue"

" *Risk"Assessments"and"Safe"Work"Method"Statements"(SWMS)"Available"prior"to"bump"in*"

$

Bump$In$ $ $ 4"2x"Lighting"technicians"for"5"hours"

$ 41x"Staging"for"4"hours"

4"1x"Sound"technician"for"3"hours"(Or"minimum"call)"

(Expecting"that"the"venue"has"pre4rigged"lighting,"and"PA"is"currently"installed"in"standard"position)"

" " " " "

Performance$ 6$1x$Sound$Operator$6$1x$Lighting$Operator"

"

Bump$Out$ 4"1x"Staging"for"3"hours"(Or"minimum"call)"

4"1x"Lighting"for"3"hours"(Or"minimum"call)"

41x"Sound"for"3"hours"(Or"minimum"call)"

"

$$

3"of"3"

As"per"Whitney"Eglington4"Technical"Director"0419585511|"[email protected]"

Dimensions$ $ $ Black"Box"set"Up"Proscenium"Set"Up""Minimum"5m"usable"stage"width"Stage"Depth"min"6m"

" " " " " Floor"to"Grid"Height"Minimum"4m""General$Storage$ $ Storage"space"is"required"in"the"theatre"for"any"excess"

touring"equipment"not"used."243"cubic"metres"if"possible."$$$Lighting$ $ $ $ Venue"specific"plans"and"paperwork"to"be"provided"closer"

to"date."Generic"plan,"patch"sheets"and"focus"notes"to"come."""Audio$and$Talkback$ $

Venue$to$Supply:$

$1x"mixing"console"with"facility"for"stereo"input"from"computer"

FOH"audio"set"up"(+"subs,"if"possible)""

2x"condenser"mics"on"short"stands"DS"of"wheel4"Performers"vocal"

1x"Choir"mic,"hung"in"centre"of"circle4"Performers"vocal"

3x"Talkback"headsets"(2x"control"position,"1x"stage"level)"

"

Dressing$Rooms$ 1x"dressing"room"for"cast"members"1x"production"dressing"room""

Wardrobe/Laundry$ Access"to"washing"machine"and"dryer"+"ironing/steaming"facilities"1"Clothes"rack"in"performer"dressing"room"

ARGUSBy Dead Puppet SocietySET DRAWING V11:25 @ A1

Drawn By Whitney EglingtonAs at 5 July 2013

Side View- Opposite Prompt

Front View

Top View

Notes:- Drawings do not depict plywood cladding- bare truss only

- Dimensions are subject to change

- All pipe is 48 OD- Steel

- Build drawing only- Venue specific plans to be issued prior to bump in

3900

3600

4000

ARGUSBy Dead Puppet Society Standard Production Schedule B

(Music Playback Option)

1 of 1

Whitney Eglington0419585511

[email protected]

Time Activity Required

0800 Load into venue SM, Venue CrewSet Position, venue induction etc

0830 Begin Set construction SMStaging x 1

1230 Sound Set Up 1x SoundProps bump in SM, CastLX Prac Rig 2x LX

1330 LX Focus Commence SM, 2x LX

1530 LX Plot/ Fixups SM , 2x LX

1730 DINNER All

Crew Summary: 1x Staging (4hrs), 2x LX (5hrs), 1x SND (4hrs)

Please note this is a sample schedule- actual schedule to be issued prior to bump in subject to venue specific needs.

CL

1 2 3 41234 55

CL 1 2 3 41234 55

9

The following table lists MIX mode colors sorted by DMX % level. A source temperatureof 3200 degrees K. is presumed.

Mix Mode Color Table - Sorted by DMX % Level

front string back string front string back string

Color Chan 1 Chan 2 Chan 1 Chan 2

Number Color Name DMX % DMX % DMX (dec) DMX (dec)

--- CLEAR 49% 45% 125 115

--- CUSTOMER 2 49% 100% 125 255

--- CUSTOMER 1 100% 45% 255 115

L116 MED BLU GRN 0% 63% 0 161

L139 PRIMARY GREEN 0% 95% 0 242

G905 DARK BLUE 4% 0% 10 0

R83 MEDIUM BLUE 4% 4% 10 10

R80 PRIMARY BLUE 4% 9% 10 23

L132 MEDIUM BLUE 4% 13% 10 33

R69 BRILLIANT BLUE 4% 27% 10 69

G740 OFF BLUE 4% 31% 10 79

L124 DARK GREEN 4% 85% 10 217

R90 DRK YELL GRN 4% 90% 10 230

L181 CONGO BLUE 9% 0% 23 0

R383 SAPPHIRE BLUE 9% 4% 23 10

G835 AZTEC BLUE 9% 13% 23 33

G810 MOON BLUE 9% 18% 23 46

L118 LIGHT BLUE 9% 27% 23 69

G690 BLUEGRASS 9% 54% 23 138

G915 TWILIGHT 13% 4% 33 10

G760 AQUA BLUE 13% 31% 33 79

G725 PRINCESS BLUE 13% 40% 33 102

G685 PISTACHIO 13% 63% 33 161

G650 GRASS GREEN 13% 85% 33 217

G945 ROYAL PURPLE 18% 0% 46 0

G847 CITY BLUE 18% 18% 46 46

G815 MOODY BLUE 18% 22% 46 56

R65 DAYLIGHT BLUE 18% 27% 46 69

G710 BLUE GREEN 18% 36% 46 92

G680 KELLY GREEN 18% 63% 46 161

G660 MED GREEN 18% 81% 46 207

R358 ROSE INDIGO 22% 0% 56 0

L180 DARK LAVENDER 22% 4% 56 10

G950 PURPLE 22% 9% 56 23

R64 LIGHT STEEL BLUE 22% 22% 56 56

R57 LAVENDER 27% 13% 69 33

G940 LIGHT PURPLE 27% 18% 69 46

L201 FULL CT BLUE 27% 27% 69 69

L117 STEEL BLUE 27% 36% 69 92

R86 PEA GREEN 27% 85% 69 217

10

G960 MEDIUM LAVENDER 31% 18% 79 46

G790 ELECTRIC BLUE 31% 36% 79 92

G995 ORCHID 36% 4% 92 10

G990 DARK LAVENDER 36% 13% 92 33

R52 LIGHT LAVENDER 36% 22% 92 56

R54 SPECIAL LAVENDER 36% 31% 92 79

G540 PALE GREEN 36% 67% 92 171

R48 ROSE PURPLE 40% 9% 102 23

L203 1/4 CT BLUE 40% 40% 102 102

L101 YELLOW 40% 95% 102 242

R344 FOLIES PINK 45% 9% 115 23

R10 MEDIUM YELLOW 49% 90% 125 230

G450 SAFFRON 54% 85% 138 217

R312 CANARY 54% 90% 138 230

L104 DEEP AMBER 54% 95% 138 242

G325 BASTARD AMBER 58% 58% 148 148

R09 PALE AMBER GOLD 58% 72% 148 184

R14 MEDIUM STRAW 58% 90% 148 230

G155 LIGHT PINK 63% 54% 161 138

G330 SEPIA 63% 63% 161 161

L204 FULL CT ORANGE 63% 85% 161 217

R15 DEEP STRAW 63% 90% 161 230

G160 CHORUS PINK 67% 54% 171 138

G343 HONEY 67% 81% 171 207

L179 CHROME ORANGE 67% 90% 171 230

L110 MIDDLE ROSE 72% 58% 184 148

L105 ORANGE 72% 95% 184 242

R36 MEDIUM PINK 76% 63% 194 161

R318 MAYAN SUN 76% 81% 194 207

G335 CORAL 76% 95% 194 242

G130 ROSE 81% 54% 207 138

L111 DARK PINK 81% 63% 207 161

R23 ORANGE 81% 90% 207 230

G315 AUTUMN GLORY 81% 95% 207 242

R44 MIDDLE ROSE 85% 54% 217 138

R32 MEDIUM SALMON PINK 85% 81% 217 207

R22 DEEP AMBER 85% 95% 217 242

G110 DARK ROSE 90% 49% 230 125

G120 BRIGHT PINK 90% 58% 230 148

G180 CHERRY 90% 76% 230 194

R19 FIRE 90% 95% 230 242

L128 BRIGHT PINK 95% 54% 242 138

R39 EXOTIC SANGRIA 95% 58% 242 148

R46 MAGENTA 95% 76% 242 194

R26 LIGHT RED 95% 95% 242 242

FOH 1

LX 1

LX 2

LX 3

SET POSITIONED APPROX 1m-2m US of Setting LineSightlines for set will determine its position in each venue. This will in turn solidify LX Bar positions.

Position from setting line- US 0.0m - 1.5m

Position from setting line- US 2.0m - 3.0m

Position from setting line- US 4.0m - 5.0m

Position from setting line- DS 2.5m - 4.0m

SETTING LINE

BLIN

DER

N/C

16

DSC

1DSC

2

DSC

3

Ring

8

DSC

Let

terb

ox200/R132

12

Bridge

201/R

132

13Bridge

201/R132

14

Ring

B

5

Ring

A

4

Curtain Call

202/R

119

18Curt

ain Call

202/R119

19

31

BOTTLE LED RGB STRIP

FLOOR LX

43

HAZER

22 24 25

On fly pully to be rigged above DSC of wheel

Venue to provideif available

FROSTED BULB

30

Spac

e fly

tigh

t

200/R132

15

23 26 2721

Extreme Approx sightline 45º Extreme Approx sightline 45º

FESTOONTo be hung above set between LX positions on stage

ARGUSBy Dead Puppet Society

PURP

OSE

COLOUR

CHANNELPACIFIC23º - 50º

1200FRESNEL

FESTOON STRINGPLUG POSITION

BAYONET

IRIS

VEN

UE NOTES

- All Fresnels to be rigged with Barndoors. - All profiles have 4 workable shutters.- All Lamps to be rigged with full colour and accessories.- All gel is LEE unless otherwise stated.- All measurements of lighting positions from setting line take into account an approx LX bar height of 6m from stage floor.- All hanging bayonets are clear white bulbs- can be mix fancy/reg size.- Gobos in twin spins are standard medium breaks ups.

PRODUCTION TEAMdirector DAVID MORTON

lighting designer JASON GLENWRIGHTtouring Stage manager/realiser SAMUEL MAHER

NATIONAL TOURING

STANDARD LIGHTING PLAN

1:50 @ A3 DRAWN BY J.G. © JASON GLENWRIGHT

06/05/2015- VER 1.07.5" CXI

SCROLLERROSCO

TWIN SPINCustom Gobo

Chan 8

CXI COLOUR CHEAT SHEET

PROFILE30º - 40º

TOU

RIN

G

Items positioned USC of 'wheel' set structure

BOTTLE LED FLY