    8 Project Quality Management

    PMI is abbreviation for Project Management Institute as well as trade andservice mark registered in the United States and other nations; PMBOK,is trademarks of the Project Management Institute. Inc.

  • 8/10/2019 1.8. Project Quality Management1

    3/51

    Pito Sumarno 3

    Section 3 :

    Capter 8 : Project Quality Management

    PMBOK PMI ed 2004

    8.1 Quality Planning

    8.2 Perform Quality Assurance

    8.3 Perform Quality Control

    PMBOK p. 179

    PMBOK p. 183-187PMBOK p. 187-190

    PMBOK p. 190-198

  • 8/10/2019 1.8. Project Quality Management1

    4/51

    Pito Sumarno 4

    PROJECT QUALITY MANAGEMENT

    8.1 Quality Planning 1 Inputs

    .1. Enterprise environmental factors

    .2. Organizational process assets

    .3. Project scope statement

    .4. Project management plan2 Tools and Technniques.1. Cost benefit analysis.2. Benchmarking.3. Design of experiments

    .4. Cost of quality (COQ).5. Additional quality planning tools3 Outputs.1. Quality management plan.2. Quality matrics.3. Quality checklists.4. Process improvement plan.5. Quality baseline.6. Project management plan (updates)

    8.2 Perform Quality Assurance1 Inputs

    .1. Quality management plan

    .2. Quality matrics

    .3. Process improvement plan

    .4. Work performance information

    .5. Approved change requests

    .6. Quality control measurements

    .7. Implemented change requests

    .8. Implemented corrective actions

    .9. Implemented defect repair10.Implemented preventive actions2 Tools and Technniques

    .1. Quality planning tools and techniques

    .2. Quality audits

    .3. Process analysis

    .4. Quality control tools and techniques3 Outputs

    .1. Requested changes

    .2. Recommended corrective actions

    .3. Organizational process assets (updates)

    .4. Project management plan (updates)

    8.3 Perform Quality Control 1 Inputs.1. Quality management plan.2. Quality matrics.3. Quality checklists.4. Organizational process assets.5. Work performance information.6. Approved change requests.7. Deliverables 2 Tools and Technniques

    .1. Cause and effect diagram.2. Control charts

    .3. Flowcharting

    .4. Histogram

    .5. Pareto chart

    .6. Run chart

    .7. Scatter diagram

    .8. Statistical sampling

    .9. Inspection10. Defect repair review 3 Outputs.1. Quality control measurements.2. Validated defect repair

    .3. Quality baseline (update).4. Recommended corrective actions

    .5. Recommended preventive actions

    .6. Requested changes

    .7. Recommended defect repair

    .8. Organizational process assets (upda tes)

    .9. Validated deliverables10. Project management plan (updates)

    (PMBOK Guide p. 182 )

    Overview

  • 8/10/2019 1.8. Project Quality Management1

    5/51

    Pito Sumarno 5

    8. Project Quality Management

    Project quality management processes include all theactivities of the performing organization that determinequality policies, objectives, and responsibilities so thatthe project will satisfy the needs for which it was

    undertaken.

  • 8/10/2019 1.8. Project Quality Management1

    6/51

    Pito Sumarno 6

    OrganizationalProcess Assets

    EnterpriseEnvironmental Factors

    Gavernmental Standards,Rules & GuidelinesCommercial database

    QualityPlanning

    8.1(3.2.2.12)

    Project Management Plan

    Project Management Plan (updates)

    Develop ProjectManagement Plan

    4.3(3.2.2.1)

    Quality Management PlanQuality MatricsQuality ChecklistsProcess Improvement planQuality Baseline

    Approved Changes RequestsApproved Corrective ActionsApproved Preventive Actions

    Scope Definition5.2

    (3.2.2.3)

    Aproved Change requests

    Quality policies, Procedures,and Guidelines, lessons learnedKnowledge base

    Close Project4.7

    (3.2.5.1)

    Project Scope Statement

    Implemented Change RequestsImplemented Corrective ActionsImplemented Defect RepairImplemented Preventive ActionsWork performance Information

    Organizationals Process Assets(Updates)

    Requested ChangesRecommended Corrective ActionsProject Management Plan (updates)

    Direct & ManageProject Execution

    3.2(3.2.3.1) Deliverables

    PerformQuality

    Control 7.3(3.2.4.7)

    Integrated ChangeControl

    4.6 (3.2.4.2)

    Quality Control Measurements

    Quality Control measurementsQuality baseline (updates)Recommended Corective ActionsRecommended preventive ActionsRecommended Defact RepairProject Management Plan (updates)Validated Deliverables

    Validated Defect RepairRequested Changes

    Project Quality Management Process Flow Diagram

    Perform Quality

    Assurance8.2 (3.2.3.2)

  • 8/10/2019 1.8. Project Quality Management1

    7/51

    Pito Sumarno 7

    Goals of Quality Program

    Fitness of useProduct Service produced must satisfy real needs

    (If a product or service is capable of being used, it is assumed that it will providethe customer the economic satisfaction desired)

    Customer satisfactionProduct / Service meets customers expectations and provides the belief that the

    product or service has economic value.

    Conformance to the requirementsThe project must produce what it said it would produce ( precisely what the

    customer desire)

    Fitness for PurposeThe Product or Service will meet its intended purpose in all respects and

    provide the customer economic satisfaction.

  • 8/10/2019 1.8. Project Quality Management1

    8/51

    Pito Sumarno 8

    Quality Concepts

    ZERO DEFECTS No Tolerance for errors within the system (six-sigma goal)

    THE CUSTOMER IS THE NEXT PERSON IN THE PROSESSConformance to requirements & customer satisfaction

    DO THE RIGHT THING RIGHT THE FIRST TIMEDo it once in complete & correct manner

    CONTINOUS IMPROVEMENT PROCESSPlan Do Check Act

    PROCESS CAPABILITYCapable of performing the required functions to achieve the desire outcome

  • 8/10/2019 1.8. Project Quality Management1

    9/51

    Pito Sumarno 9

    Quality Concepts

    Sig SigmaSix Sigma is a quantitative statistical measurement meaning fewer thanfour defects per million apportunities. Performing at the Six Sigma levelmeans that products and processes satisfy the customer 99.99966% of thetimeSix Sigme include :

    Measure of Quality

    Process of continuous improvement : DMAIC (improve existing process and

    product) and DFSS (New design process & product)Enabler for culture change.

    6

    LowerSpecification

    Limit

    UpperSpecification

    Limit

  • 8/10/2019 1.8. Project Quality Management1

    10/51

    Pito Sumarno 10

    Quality Concepts

    Balanced ScorecardAlignmeent of the program/initiative into strategy, including alignment of programsmeasurement4 perspective : financial. Customer, internal business process, learning & growth.

    ISO 9000A framework of standard requirement that should be complied, and implemented

    Close related to standard procedurJust in Time (Strategi stok material) yaitu sumberdaya yang diperlukan sudah harussiap pada saat diperlukan, namun untuk menghemat penggunaan dana , stok tidak perlyberlebihan, tetapi cukup menjamin tidak terganggunya proses produksi.

    To decrease the amount of inventory, then decrease the investment and cost ofinventory;

    Continues Improvement/KaizenQuality of process improves in small increments on a continuous basis.Total Quality Management

    All level in all unit responsible to the quality of the productCompanies and imployee focus on finding ways to continuously improve thequality.

  • 8/10/2019 1.8. Project Quality Management1

    11/51

    Pito Sumarno 11

    Quality Concepts

    Gold PlatingExtras services to customer (extra functionality, higher quality component, extrasow). It is not recommended because no value added, better spend the time tomonitor the project conform to requirement.

    Marginal AnalysisOptimal qulity is reached at the point where the incremental revenue fromimprovement equal the increment cost to secure it.

    Other TermsMutually exclusive

    Two event cannot occur in single trialStatistical independence

    The probability of one event occuring does not affect the probability of another eventoccuring

    ProbabilityExpressed in percent

    Normal distributionUsed to measure variations

    Standard DeviationTo measure how far for the mean ((P O)/6

  • 8/10/2019 1.8. Project Quality Management1

    12/51

    Pito Sumarno 12

    Quality vs Grade

    Quality is the degree to which a set of inherent characteristic fulfillrequirements

    Grade is a category assigned to products or services having the same

    functional use but different technical characteristics

    LOW QUALITY is always problem, LOW GRADE is not necessary aproblem

  • 8/10/2019 1.8. Project Quality Management1

    13/51

    Pito Sumarno 13

    Cost of Quality

    The total costs incurred by investment in preventing nonconformance torequirements, appraising the product or service for conformance torequirement (rework)

    Failure cost are often categorized into internal and external. Failure costare also called cost of poor quality

    There are three types of costs that are incurred; Prevention costs,appraisal costs, and failure costs

    Prevention costAppraisal costInternal failure costExternal failure costMeasurement and test equipment

  • 8/10/2019 1.8. Project Quality Management1

    14/51

    Pito Sumarno 14

    Cost of Prevention & Defect

    Cost of Prevention/ConformanceEducation & trainingInspection and testingImprove design for quality purposesQuality staffQuality audit

    Cost of Defect/NonconformanceScrapReworkRepairReplacement

    Loss of future businessLegal issuesRisk to life

  • 8/10/2019 1.8. Project Quality Management1

    15/51

    Pito Sumarno 15

    Cost of Quality Before and After QualityInitiative

    % OFTURNOVER

    .

    rework

    Savings

    Inspection

    prevention

    Rework

    preventionPrevention

    Before After

  • 8/10/2019 1.8. Project Quality Management1

    16/51

    Pito Sumarno 16

    8.1 QUALITY PLANNING

    Identifying which quality standards are relevant to the project anddetermining how to satisfy them

    1. Interprise environmentalfactors

    2. Organizational processassets

    3. Project scope statement

    4. Project Management Plan

    1. Cost Benefit Analysis

    2. Banchmarking

    3. Design of Experiments

    4. Cost of Quality (CoQ)

    5. Additional Quality PlanningTools

    1.Quality ManagementPlan

    2. Quality Metrics

    3. Quality Checklist

    4. Process Improvementplan

    5. Quality Baseline

    6. Project ManagementPlan (updates)

    INPUTS TOOLS & TECHNIQUES OUTPUTS

  • 8/10/2019 1.8. Project Quality Management1

    17/51

    Pito Sumarno 17

    8.1 QUALITY PLANNING INPUTS

    Inputs

    1. Interprise environmental factors2. Organizational process assets3. Project scope statement4. Project Management Plan

    1. Interprise environmental factors (4.1.1.3 p. 83)Regulations, Rules, Standards, and Guidelinesspecific to the application area may affect the

    project.

    2. Organizational Process Assets (4.1.1.4 p. 84)

    Organizational Quality policies, procedures andguidelines, historical database and Lessons learnedfrom previous projects specific to the applicationarea may affect the project.

    3. Project Scope Statement (5.2.3.1 p 113) WBS iskey input to quality planning since it documentsmajor project deliverables, the project objective thatserve to define requirements (which were derivedfrom stakeholder needs, wants, and expectations),thresholds, and acceptance criteria.

    4. Project Management

    Plan (4.3 p.88)

  • 8/10/2019 1.8. Project Quality Management1

    18/51

    Pito Sumarno 18

    8.1 QUALITY PLANNING TOOLS & TECHNIQUES

    1. Cost-Benefit Analysis (p.185) Less rework, higher productifity, lower costs, andincreased stakeholder satisfaction.Cost of meeting quality requirements is the expenseassociated with Project Quality Management activities

    2. Benchmarking (p.185)Comparing actual or planned project practices to those ofother projects to generate ideas for improvement and to

    provide a basis by which to measure performanc.

    3. Design of Experiments (DOE) (p.185)is statistical method that helps identify which factors may

    influence specific variables of a product or process underdevelopment or in production.

    4. Cost of Quality (COQ) (p. 186)are the total costs incurred by investment in preventingnonconformance to requirements, appraising the product

    or service for conform to requirements, and REWORK.

    Tools & Techniques1. Cost Benefit Analysis2. Banchmarking3. Design of Experiments4. Cost of Quality (CoQ)5. Additional Quality Planning

    Tools

    5. Additional QualityPlanning Tools (p.186)Other quality planning toolsused to help better define thesituation and help planeffective quality management

    activities: (brainstorming,affinity diagrams, force fieldanalysis, nominal grouptechniques, matrix diagrams,flowcharts, and prioritizationmatrices.

  • 8/10/2019 1.8. Project Quality Management1

    19/51

    Pito Sumarno 19

    8.1 QUALITY PLANNING OUTPUTS

    1. Quality Management Plan (p.186) as Inputs to the avewrall project management plan and mustaddress quality control (QC), Quality assurance (QA), andcontinuous process improvement fot the project

    QMP may be formal or informal, highly detaild or broadly framed, based on the requirements of the project.

    2. Quality Metric (p.186)used in the QA and QC processes.Defect density, failure rate, availability, realibility and testcoverage.

    3. Quality Cheklists (p.187)a structured tool, usually component-specific, used to verify that aset of required steps has been performed. (Do this) or (have

    you done this?) 4. Process Improvement Plan (p. 187)

    Process boundaries ( purpose, start-end, input-output,etc)Process configuration (Flowchart-analysis)Process metrics ( maintain control over status of process)Target for improved performance (guides process improv)

    5. Quality Baseline (p.187)Basis for measuring and reportingquality performance as part of the

    performance measurement baseline.

    Outputs1.Quality Management Plan2. Quality Metrics3. Quality Checklist4. Process Improvement plan5. Quality Baseline6. Project Management Plan

    (updates)

    6. Project management Plan

    (updates) (p.187) updatesthrough the inclusion of asubsidiary quality management

    plan and process improvement plan (4.3 p.88) Requested changes(additions, modifications,deletions) review and dispositionthrough the Integrated ChangeControl process (4.6 p.96)

  • 8/10/2019 1.8. Project Quality Management1

    20/51

    Pito Sumarno 20

    Project Quality Plan (PQP)

    SHOULD ADDRESS, BUT NOT LIMITTED TO:

    PROJECT MANAGEMENT METHODSROLES & RESPONSIBILITIESDELIVERABLES & MILESTONESSTANDARDS FOR MONITORING & CONTROL PURPOSES

    PROCESS REVIEWSMAJOR CHEKPOINTSINPECTION & ACCEPTANCE CRITERIA

  • 8/10/2019 1.8. Project Quality Management1

    21/51

    Pito Sumarno 21

    8.2 PERFORM QUALITY ASSURANCE

    Applying the planned, systematic quality activities to ensure that theproject employs all processes needed to meet requirement

    1.Quality Management Plan2.Quality Metrics3. Process Improvement Plan4. Work Performance

    Information6. Approve Change Request7. Quality Control Measurement

    8. Implemented ChangeRequest9. Implemented Defect Repair10. Implemented Preventive

    Action

    1.Quality Planning Tools andTechniquest

    2. Quality Audits

    3. Process Analysis

    4. Quality Control Tools andTechniques

    1.Requested Changes

    2. RecommendedCorrective Action

    3. Organizational ProcessAssets (updates)

    4. Project ManagementPlan (updates)

    INPUTS TOOLS & TECHNIQUES OUTPUTS

  • 8/10/2019 1.8. Project Quality Management1

    22/51

    Pito Sumarno 22

    8.2 PERFORM QUALITY ASSURANCEINPUTS

    1. Quality management Plan (p. 188)How QA will be performed within the project(8.1.3.1 p. 186)

    2. Quality matrics (8.1.3.2 p. 186)

    3. Process Improvement Plan (8.1.3.4 p. 187)

    6. Quality Control measurements (8.3.3.1 p.197)are the results of quality control activities that are fed back tothe QA process for use in re-evaluating and analyzing thequality standards and processes of the performing

    organization.

    4. Work performanceInformation (4.4.3.7 p.94 )including technical performancemeasures, project deliverable status,required corrective actions, and

    performance reports (10.3.3.1 p. 233)

    5. Approved Change requests(4.4.1.4 p.92 ) include modificationsto work methods, product requirements,quality requirements, scope, andschedule. Need to be analyzed for anyaffects upon the quality management

    plan, quality metrics, or quality

    checklists. Can be used as audits, qualityreviews, and process analyses.

    7. Implemented Change Requests (4.4.3.3 p. 93)

    8. Implemented Corrective Actions (4.4.3.4 p. 93)

    9. Implemented Defect Repair (4.4.3.6 p. 94)

    10. Implemented Preventive Actions (4.4.3.5 p. 93)

    Inputs

    1.Quality Management Plan2.Quality Metrics3. Process Improvement Plan4. Work Performance Information6. Approve Change Request7. Quality Control Measurement8. Implemented Change Request9. Implemented Defect Repair10. Implemented Preventive Action

  • 8/10/2019 1.8. Project Quality Management1

    23/51

    Pito Sumarno 23

    8.2 PERFORM QUALITY ASSURANCETOOLS & TECHNIQUES

    1. Quality Planning Tools and Techniques (8.1.2 p.185) can be used for QA activities

    2. Quality Audit (p.189)independent review to determine whether project activitiescomply with organizational and project policies,

    processes, and procedures.Objective: to identify inefficienct and ineffective policies,

    processes, and procedures in use on the projectConfirm the implementation of approved change requests,corrective actions, defect repairs, and preventive actions.

    3. Process Analysis (p.189)

    Examines problem experienced, constraints experienced,and non-value added activities identified during processoperation.Include root cause analysis, a specific techniqueto analyze a problem/situation, create preventive action forsimilar problems.

    4. Quality Control Tools and techniques (8.3.2 p.192)

    Tools & Techniques

    1.Quality Planning Tools andTechniquest2. Quality Audits3. Process Analysis4. Quality Control Tools and

    Techniques

  • 8/10/2019 1.8. Project Quality Management1

    24/51

    Pito Sumarno 24

    8.2 PERFORM QUALITY ASSURANCE OUTPUTS

    1. Requested ChangesQuality improvement include taking action to increase theeffectiveness and efficiency of the policies, processes, and

    procedures of the performing organization, which should provideadded benefits to the stakeholders of all projects (4.4.3.2. p.93)

    2. Recommended Corrective Actions Recommended immediately as a result of quality assuranceactivities, such as audits and process analyses

    3. Organizational process Assets (updates)used during the Perform Quality Control process (8.3 p 190)

    4. Project management Plan (updates)(4.3 p. 88) wiil be updated from changes to the qualitymanagement plan that result from changes to the Perform QualityAssurance process.

    Outputs1.Requested Changes2. Recommended Corrective

    Actions3. Organizational Process Assets

    (updates)4. Project Management Plan

    (updates)

  • 8/10/2019 1.8. Project Quality Management1

    25/51

    Pito Sumarno 25

    8.3 PERFORM QUALITY CONTROLMonitoring specific project results to determine wheter they comply with

    relevant quality standards and identifying ways to eliminate causes ofunsatisfactory performance

    1.Quality Management Plan2.Quality Metrics3. Quality Checklists4. Organizational Process

    Assets5. Work Performance

    Information6. Approved Change Requests7. Deliverables

    1.Cause and Effect Diagram2.Control Chart3. Flowcharting4. Histogram5. Pareto Chart6. Run Chart7. Scatter Diagram8. Statistical Sampling9. Inspection10. Deffect Repair Review

    1. Quality Controlmeasurement

    2.Validated Deffect Repair3. Quality Baseline

    (updates)4. Recommended

    Corrective Actions5. Recommended

    Preventive Actions6. Requested Changes7. Recommended Deffect

    Repair8. Organizational ProcessAssets (updates)

    9. Validated Deliverables10. Project Management

    Plan (updates)

    INPUTS TOOLS & TECHNIQUES OUTPUTS

  • 8/10/2019 1.8. Project Quality Management1

    26/51

    Pito Sumarno 26

    8.2 PERFORM QUALITY CONTROLINPUTS

    1. Quality management Plan (p. 188)How QA will be performed within the project(8.1.3.1 p. 186)

    2. Quality matrics (8.1.3.2 p. 186)

    3. Quality Checklists (8.1.3.3 p.187)

    5. Work Performance Information (4.4.3.7) .Including technical performance measures, projectdeliverables completion status, inputs to QC

    4. Organizationals Process Assets(4.1.1.4 )

    6. Approved Change Requests (4.4.1.4) includemodifications such as revised work methods and schedule.

    7. Deliverables (4.4.3.1)

    1. Quality Management Plan

    2. Quality Metrics3. Quality Checklists4. Organizational Process Assets5. Work Performance Information6. Approved Change Requests7. Deliverables

  • 8/10/2019 1.8. Project Quality Management1

    27/51

    Pito Sumarno 27

    8.2 PERFORM QUALITY CONTROLTOOLS & TECHNIQUES

    1. Cause and Effect Diagram

    2. Control Charts

    3. Flowcharting

    4. Histogram

    5. Pareto Chart

    6. Run Chart

    7. Scatter Diagram

    8. Statistical Sampling

    9. Inspection

    10. Defect Repair Review

    Tools & Techniques 1.Cause and Effect Diagram2.Control Chart3. Flowcharting4. Histogram5. Pareto Chart6. Run Chart7. Scatter Diagram

    8. Statistical Sampling9. Inspection10. Deffect Repair Review

  • 8/10/2019 1.8. Project Quality Management1

    28/51

    Pito Sumarno 28

    Quality Team for a Project

    Quality team in project included; senior management,project manager, project staff, client, vendor and supplier,subcontractor and regulatory authorities

    CLIENT

    .

    SENIORMANAGEMENT

    REGULATORYAUTHORITIES

    VENDOR/SUPPLIER

    PROJECT STAFF SUBCONTRACTOR

    PROJECTMANAGER

  • 8/10/2019 1.8. Project Quality Management1

    29/51

    Pito Sumarno 29

    Statistical Quality Control

    Method used to measure variability in a product forevaluation and corrective actions.When the product exceeds the bounds of acceptabilitybase on statistical inference the product can be rejectedwith reasonable assurance that it does not meetrequirements.

  • 8/10/2019 1.8. Project Quality Management1

    30/51

    Pito Sumarno 30

    Major systems are used in statisticalquality control

    Process control chartAcceptance sampling

  • 8/10/2019 1.8. Project Quality Management1

    31/51

    Pito Sumarno 31

    Ishikawa Diagram (Cause and Effect analysis)

    TIME MACHINE METHOD MATERIAL

    ENERGY MEASUREMENT PERSONNEL ENVIRONMENT

    MACHINE METHOD MATERIAL

    ENERGYMEASUREMENT PERSONNEL ENVIRONMENT

    TIME

    CORRECTIVEACTION

    USE :

    Solution AnalysisMethod

    MAJORDEFECT

    USE : Random Method Systematic Method

    Process Analysis Method

    POTENTIAL CAUSE EFFECT

    Always ask : Who? What? Where? When? Why? How?

  • 8/10/2019 1.8. Project Quality Management1

    32/51

    Pito Sumarno 32

    Sample of Ishikawa Diagram (Cause and Effect analysis)

    Machinery Material

    People Method

    Phone NotAnswered

    Zero out not established

    Re-direct issues

    Suport Staff has Audix

    BusinessCall

    Talking onother line

    Personalcall

    Call comes

    before/afterhours

    LAN Directory

    not UpdatedDirectory

    Wrongextensionin book

    At lunch

    Away fromdesk

    At meeting

    Audix Exists

    Audix

    Line busy

    Reason Phone Not Answered

  • 8/10/2019 1.8. Project Quality Management1

    33/51

    Pito Sumarno 33

    Control Chart

    UCL

    LCL

    =X

    99.73%95.46%68.26% _

    X

  • 8/10/2019 1.8. Project Quality Management1

    34/51

    Pito Sumarno 34

    Control Chart (in control)

    UCL

    LCL

    _

    X

  • 8/10/2019 1.8. Project Quality Management1

    35/51

    Pito Sumarno 35

    Control Chart (out of control)

    UCL

    LCL

    _

    X

  • 8/10/2019 1.8. Project Quality Management1

    36/51

    Pito Sumarno 36

    Control Chart (Hugging Control Limit)

    UCL

    LCL

    _

    X

  • 8/10/2019 1.8. Project Quality Management1

    37/51

    Pito Sumarno 37

    Control Chart (Cycle)

    UCL

    LCL

    _

    X

  • 8/10/2019 1.8. Project Quality Management1

    38/51

    Pito Sumarno 38

    Control Chart (Trend)

    UCL

    LCL

    _

    X

  • 8/10/2019 1.8. Project Quality Management1

    39/51

    Pito Sumarno 39

    What happen when we increasethe number of samples in the SPC

    (Statistical Process Control)

    The Upper Control Limit and Lower ControlLimit bands will be narrow

  • 8/10/2019 1.8. Project Quality Management1

    40/51

    Pito Sumarno 40

    Process Flowchart

    ProjectRequest

    Compliancecopy

    DevelopArtwork

    Artwork

    ApprovedVendors

    makeProofsArtwork outfor proofs

    Change controlfor specs

    Approved ProofBack to vendor

    Specs signed(package & QA

    OrderMaterialQA review/

    Approval

    PackageDevelopment

    review/approval

    Yes Yes

    Yes

    No

    No

    No

  • 8/10/2019 1.8. Project Quality Management1

    41/51

    Pito Sumarno 41

    Pareto Diagram (Chart) Histogram

    30

    40

    20

    10

    0

    100%

    75%

    50%

    25%

    0

    Car Problems

    N u m

    b e r o f

    D e f e c

    t i v e

    C a s e s

    P e r c e n t a g e o f

    D e f e c

    t i v e

    C a s e s

    I m p r o p e r

    R o t a t

    i o n

    N o i s e

    W o b

    b l e

    P r e s s u r e

    A x l e

    C a u l

    k i n g

    C a s e

    W o b

    b l e s

    O t h e r

    Kumulative percentage

    Pareto Chart : concept of 80/20 rule : 80% of cost of defects is caused by 20 % of the problems.

    Concertrated on the problem s where the most benefit will result (in limited effort consideration)

  • 8/10/2019 1.8. Project Quality Management1

    42/51

    Pito Sumarno 42

    Control Chart (Run)

    UCL

    LCL

    _

    X

  • 8/10/2019 1.8. Project Quality Management1

    43/51

    Pito Sumarno 43

    Scatter Diagram

    SCATTER DIAGRAM (Low to Moderate Negative)

    SCATTER DIAGRAM (Highly Negative)

    Diagram yang menunjukkan plot data antara dua variabel yang salingberhubungan. Sumbu X : variabel untuk membuat ramalan; Sumbu Y :variabel untuk diramalkan.

  • 8/10/2019 1.8. Project Quality Management1

    44/51

    Pito Sumarno 44

    Scatter Diagram

    SCATTER DIAGRAM (Highly positive)

    SCATTER DIAGRAM (Zero Correlation)

  • 8/10/2019 1.8. Project Quality Management1

    45/51

    Pito Sumarno 45

    Rule of Seven

    is a rule of thumb or heuristic (7 contoh ambil 1 rusak 6)

    Non randdom data points grouped together in series

    that total seven on one side of the mine

    although the data points are inside of control limit, but it

    categorize out of control and should investigated

  • 8/10/2019 1.8. Project Quality Management1

    46/51

    Pito Sumarno 46

    Acceptance Sampling

    To determine whether or not the lot conform tothe specification or standards necessary to supportthe overall project requirements.

    Because 100 percent inspection is timeconsuming and expensive and stiil may notguarantee zero defects.

    Factors must be determined prior to performing

    acceptance sampling; Sample size

    Limits of defects that will cause rejection

  • 8/10/2019 1.8. Project Quality Management1

    47/51

    Pito Sumarno 47

    Quality Responsibility

    Decision as to the type and amount of work to be accomplished inany project organization is the responsibility of management,while performing it is the responsibility of the team member.

    The primary responsibility for quality rest with the management in acompany.

  • 8/10/2019 1.8. Project Quality Management1

    48/51

    Pito Sumarno 48

    8.2 PERFORM QUALITY CONTROL OUTPUTS

    1. Quality Control Measurements

    represent the results of QC activities that are feed back to QA (8.2)to reevaluate and analyze the quality standards and processes of the performing organization.

    2. Validated Defect repair Reinspected and will be either accepted or rejected beforenotivication of the decision is provided (4.4) Rejected items may

    be require further defect repair.

    3. Quality Baseline (updates) (8.1.3.5)

    4. Recommended Corrective Actions(4.5.3.1) action taken as a result of a QC measurement thatindicates that the manufacturing or development process exceeds

    established parameters.

    5. Recommended Preventive Actions(4.5.3.2) action taken to forestall a condition that may exceedestablished parameters in manufacturing or development process,which may have been indicated through a QC measurement.

    1. Quality Control measurement

    2.Validated Deffect Repair3. Quality Baseline (updates)4. Recommended Corrective

    Actions5. Recommended Preventive

    Actions6. Requested Changes7. Recommended Deffect Repair

    8. Organizational Process Assets(updates)

    9. Validated Deliverables10. Project Management Plan

    (updates)

  • 8/10/2019 1.8. Project Quality Management1

    49/51

    Pito Sumarno 49

    8.2 PERFORM QUALITY CONTROL OUTPUTS

    6. Requested Changes

    if the recommended corrective or preventive actions require achange to the project, a change request (4.4.3.2) should be initiatedin accordance with the define Integrated Change Control process.

    7. Recommended defect reapair Defect is where a component does not meet its requirements orspecifications, and needs to be repaired or replaced.

    8. Organization Process Assets (updates)Completed cheklists. (4.1.1.4)Lessons Learned Documentation (causes of variances, should bedocumented so that they become part of the historical database for

    both this project and the performaing organization.(4.1.1.4)

    9. Validated Deliverablesa goal of quality control is to determine the correcness ofdeliverables. The results of the execution quality control processesare validfated deliverables

    10. Project Management Plan (updates)updated to reflect changes to the quality management plan that

    result from changes in performing the QC process. (4.6)

    1. Quality Control measurement

    2.Validated Deffect Repair3. Quality Baseline (updates)4. Recommended Corrective

    Actions5. Recommended Preventive

    Actions6. Requested Changes7. Recommended Deffect Repair

    8. Organizational Process Assets(updates)

    9. Validated Deliverables10. Project Management Plan

    (updates)

  • 8/10/2019 1.8. Project Quality Management1

    50/51

    Pito Sumarno 50

    Area of Feasible solutions for Quality Work

    JOB PERFORMANCE TEAM MEMBER

    WORK TO BEACCOMPLISHED(MANAGERSDECISION)

    WRONG RIGHT

    Right-Wrong Right-Right

    Wrong-Wrong Wrong-RightWRONG

    RIGHT

  • 8/10/2019 1.8. Project Quality Management1