Safety Expectations at the Union Pacific

Ron Ruisz Chicago, Illinois October 5, 2011

2

3

Automated Gate System (AGS)AGS has many benefits, one of them being the absence of human exposure on the ground.

4

Manned GateFocus by all participants is mandatory!

5

RulesFive Man Electrical Band……..Signs, Signs, Everywhere are Signs!

6

Speed controlPerhaps one of the biggest challenges in an Intermodal facility.

7

Crossing protection/Stop signsAnother major point of exposure.

8

It is still construction season!Beware of your surroundings at all times!

9

No Drive ZoneNever drive under a crane unless instructed to do so.

10

Beware of the pinch points.At times you may encounter areas where your turning radius is a challenge.

11

Roadability Repair Area RulesNO EXCEPTIONS!

12

Roadability Repair Area SafetyThe safe way is most often the fastest route for corrective action!

13

Roadability precaution

14

Additional Roadability Lane Precaution

15

Flip Area Rules

16

Container – Chassis MismountWhat should you NOT do?