1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels – VP Intermodal Operations

Upload: justyn-tayman

Post on 31-Mar-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

1

Intermodal Equipment Maintenance Current and Future State

5th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois

Barry D. Michaels – VP Intermodal Operations

Page 2: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

2

Agenda

Page 3: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

3

“Got Damage ? “

Page 4: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

4

Problem Statement

Page 5: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

5

Key Drivers of Performance - Inadequacies

Page 6: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

6

Maintenance and Repair Costs ($ Million)US Railroads

Page 7: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

7

Multiple Direct and Indirect PartiesComplex Relationships

Equipment – M&R

Customers CCM

AAR

M&R Vendors

Manufacturers

Motor Carriers

FMCSA Chassis Leasing Co

OTR Service M&R Vendors

Gate Inspection Co.’s IT M&R Co’s

Water Carriers

CCIB

Railroads Suppliers

Facility Operators

State DOT

OSHA

Cal BIT

Page 8: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

8

Intermodal Maintenance M&R Vendors – Contract Structure / Demands

Page 9: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

9

Damage – In Terminal – Outside Terminal “Who Done it?”

Technology has the ability to close the Information gaps and improve inspections to determine correct liability

Over the Road

In Terminal - Motor Carrier

Terminal Damage – RR

At Customers Facility

Page 10: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

10

Intermodal Maintenance Terminal Facility Impact - Process/Design/Resource

• Terminal Congestion

• Inspection Lane Design

• Track Side Parking

• Stacking - Chassis/Containers

• Roadability Repair Area

• Lighting

• Drive Lanes

Page 11: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

11

Intermodal MaintenanceInspection Process/Procedures/Policies

• Roadability/Loadability

• AGS Gates – Limitations

• Standard Gates – Human Error

• Damage vs. Defect Definitions

• FMCSA Motor Carrier Inspections

• IEP’s Policies/UIIA I/C Agreements

• Inspectors Qualifications

• Tire Inspections

Page 12: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

12

Gate Inspections: Manual Gates

Page 13: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

13

Gate Inspections: AGS Gates

Page 14: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

14

Motor Carrier – RailroadRelationships/Satisfaction

• Motor Carriers are the face of our customers

• IEP’s have leverage against MC’s to assess damage claims

• FMCSA Roadability requirements – Limited success

– Pre-Ingate Reporting

– Pre-Outgate use of Roadability Lanes

Page 15: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

15

Roadability Impacts to M&R – Chassis

• Success Limited(*)

– June 2010 to Sept 2011

– 2.8 mil Total Reports (**) - 45,194 RCD Reports = 1.6% Exceptions

– Outbound MC Pre-Inspections – Roadability Data Not Available

* Based on IANA Data

** DVIR No Defect Suspension by FMCSA

Page 16: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

16

Summary

Page 17: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

17

Future Solutions

Page 18: 1 Intermodal Equipment Maintenance Current and Future State 5 th Annual CCIB Intermodal Seminar October 5, 2011 - Tinley Park, Illinois Barry D. Michaels

18

Questions?