1 - development of beidou navigation satellite system of beidou navigation satellite system china...

41
Development of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7 th Meeting of International Committee on GNSS

Upload: dothuan

Post on 02-Jul-2018

245 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Development of BeiDouNavigation Satellite System

China Satellite Navigation Office

November 5, 2012Beijing, China

The 7th Meeting of International Committee on GNSS

Page 2: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Part Ⅰ Development Plan

Part Ⅱ System Progress

Part Ⅲ Contribution to GNSS

Page 3: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Part Ⅰ Development Plan

Part Ⅱ System Progress

Part Ⅲ Contribution to GNSS

Page 4: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

1. Development Objective

Stable, reliable and high quality service

Serve the world, benefit the mankind

Meet the requirements of national security and social economic development.

Accelerate informationization drive as well as economy development mode transformation.

Realize social and economic benefits.

Make contribution to international GNSS community.

Objective:

Page 5: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

2. Development Plan

BeiDou DemonstrationSystem

BeiDou Navigation Satellite System

1st Step2nd Step

3rd Step

BeiDou Navigation Satellite System

1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020

Page 6: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

2. Development Plan

Page 7: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

2. Development Plan

Page 8: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

2. Development Plan

Page 9: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Provide continuous space-based PVT services for global users free of charge, continue maintenance and complement in order to enhance service performance.

Formulate application industry plan and standard to push forward development of GNSS industry and promote BeiDou worldwide use.

Strengthen international cooperation, including advocating for international GNSS Monitoring and Assessment, achieving compatibility and interoperability between BeiDou and other GNSS, ensuring BeiDou diversified applications.

3. Basic Policy

Page 10: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

5 GEO Satellites 30 Non-GEO Satellites

Master Control Station (MCS) Uplink Stations (US) Monitoring Stations (MS)

System Structure

4. System Description

BeiDou user terminals Terminals compatible with

other GNSS

Page 11: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Service and Performance

4. System Description

Page 12: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Part Ⅰ Development Plan

Part Ⅱ System Progress

Part Ⅲ Contribution to GNSS

Page 13: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

1. System Construction

1) Satellite launch record

Since ICG-6

2012.2.25

GEO

2012.4.10

2 MEO

2012.9.19

2 MEO

2011.12.2

IGSO

2012.10.25

GEO

2007 1

2009 1

2010 5

2011 3

2012 6

Page 14: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

1. System Construction

2) Constellation status

Stage BeiDou Navigation Satellites System

Num 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16

Type MEO GEO GEO GEO IGSO GEO IGSO IGSO IGSO IGSO GEO MEO MEO MEO MEO GEO

Date 2007.4.14

2009.4.15

2010.1.17

2010.6.2

2010.8.1

2010.11.1

2010.12.18

2011.4.10

2011.7.27

2011.12.2

2012.2.25

2012.4.30

2012.4.30

2012.9.19

2012.9.19

2012.10.25

Status

Operational Flight test In maintenance

14 BeiDou operational satellites in orbit.

Constellation of 5GEOs,5IGSOs and 4MEOs.

Page 15: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

1. System Construction

Construction of Master Control Station, Uplink Stations and Monitoring Stations have been accomplished.

Employ BeiDou Time (BDT) and CGCS2000 Coordinate.

3) Ground control segment

US MSMCS

Page 16: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

1. System Construction

Service area:

4) Coverage

Service area PDOP VDOP

55 oS ~55 oN, 55 oE ~180 oE.

HDOP

Page 17: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

5) Initial Operational Capability

1. System Construction

On December 27, 2011,

started to provide IOC.

ICD of BeiDou System (test

version) and Development

of BeiDou Navigation

Satellite System (V2.0) was

released.

Page 18: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Positioning and velocity accuracy Horizontal ≤ 10m(95%). Vertical ≤ 15m(95%). Velocity ≤ 0.2m/s.

0 30 60 90 120 150 180 210 240 270 300-4

-2

0

2

4

6

8

10-10

-5

0

5

10

15

20-20-15-10

-505

101520

PDO

P

DOY(2012)

PDOP

PDOP(95%) = 4.77PDOP(95%) = 7.35PDOP(95%) = 8.76 PDOP(95%) = 4.74

2D(95%) = 4.92m2D(95%) = 9.31m

2D/m

2D(EN)

4G+5I+2M(from 2012/07/01)4G+5I(from 2012/04/16)3G+5I(from 2012/02/07)3G+4I

2D(95%) = 10.21m

dU(95%) = 7.38mdU(95%) = 14.73mdU(95%) = 15.57m

BJF1 station SPP(B1 with K8 for ionosphere delay correction)

dU/m

dU

dU(95%) = 5.78m

2D(95%) = 4.83m

6) Practical Operational Capability

1. System Construction

Page 19: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Broadcast ephemeris precision

URE ≤ 1.5m.

Clock bias ≤ 5ns.

1. System Construction

6) Practical Operational Capability

Page 20: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Orbit determination and time synchronization

1. System Construction

Orbit determination < 10 m.

Time synchronization < 2ns.

6) Practical Operational Capability

Page 21: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

1. System Construction

Ionospheric Model

Ionospheric correction of Klobuchar 8 model is

about 80%.

6) Practical Operational Capability

Page 22: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

1. System Construction

Satellite clock performance

DS01 t:208203372.972973 y:92826.3367588608 d: 2012/8/6 18:16:12

91800

92000

92200

92400

92600

92800

93000

93200

93400

93600

93800

207.8M 208.0M 208.2M 208.4M 208.6M 208.8M

Pesgo1Sub Title

Val

ue

(sec

)

Time (sec)

DS01 t:2411.4825613079 y:-45.1199912958736 d: 2006/1/1 0:40:11

-50-50-50

-40-40-40

-30-30-30

-20-20-20

-10-10-10

000

101010

202020

-8-8-8

-6-6-6

-4-4-4

-2-2-2

000

222

444

666

2404 2406 2408 2410 2412 2414 2416 2418

Pesgo1Sub Title

Res

idu

al o

f lin

ear

fitt

ing

(ns)

Res

idua

l of

linea

r fi

ttin

g (n

s)R

esid

ual

of

linea

r fi

ttin

g (n

s)

Res

idu

al o

f 2

nd

poly

nom

ial f

itti

ng

(n

s)R

esid

ual

of

2n

d po

lyn

omia

l fit

tin

g (

ns)

Res

idu

al o

f 2

nd

poly

nom

ial f

itti

ng

(n

s)

time (sec)

Subset 1 Subset 2 DS01 t:3540.59019379292 y:9.43446172283875E-15 d: 2006/1/1 0:59:00

-1410

-1310

-1210

-1110

100 101 102 103 104 105 106

Pesgo1Sub Title

Ove

rlap

pin

g A

llan

Dev

Tau (sec)

frequency accuracy of the master clock is 1.62E-12 .

drift is 3.05E-14.

ten thousand seconds stability is 6.59E-14.

6) Practical Operational Capability

Page 23: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Since IOC provision, the continuous

constellation deployment, gradual improvement

of service performance has

promoted R&D of BeiDou chips and terminals.

Implemented application demonstration in

various industries and regions.

Popularized mass market.

2. System Application

Page 24: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Chips, antennas, OEM have been launched to market.

1) Fundamental Products

2. System Application

Chips AntennaOEM

Page 25: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

2) Industry PopularizationTransportation

Road transportation management.

Marine Fishery

Vessel position monitoring.

Emergency rescue and region alarm.

Port entry and depart management.

2. System Application

Page 26: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Rescuerescue dispatching.

emergency communication.

rapid report.

MeteorologyMeteorological sounding.

Meteorological monitoring.

Meteorological informationgathering and release.

2. System Application

2) Industry Popularization

Page 27: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

3) Popular Application

BeiDou chips embedded mobile phones andvehicle terminals have been in practicallyused.

2. System Application

Page 28: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Undertake more international responsibilities through ICG related activities.

Cooperate with major GNSS, and popularize applications with neighbor countries.

Promote international technical exchange.

Promote BeiDou to merge into international standards.

3. International Activity

Page 29: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

3. International Activity

Deeply participate in activities of ICG as one of core system providers.Host the 7th meeting of ICG.Speed up iGMAS construction, strengthen cooperation with IGS, related organizations and other GNSS.

1) Multilateral Coordination

8th meeting of ICG Providers’ forum 55th meeting of COPUOUS iGMAS tracking stations

Page 30: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Comply with radio regulations of ITU.

carry out more than 10 rounds of bilateral and multilateral coordination to jointly share frequency and orbit resources.

2) Bilateral Coordination

5th Frequency coordination of China and US

2011 orbit safety consultation meeting for140E

12th Satellite Network coordination meeting between China and Japan

Technical Working Group meeting on C&I between China and Europe

3. International Activity

Page 31: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Meetings between China and Russia Satellite Navigation Cooperation to promote satellite navigation monitoring, interoperability and application.

Satellite navigation cooperation meetings between China and Pakistan to jointly promote BeiDou/GNSS international popularization.

The 2nd China-Pakistan Satellite Navigation Cooperation Meeting

2nd China-Russia Aerospace cooperation working group meeting

3. International Activity

2) Bilateral Coordination

Page 32: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Host world-oriented China Satellite Navigation Conference, more than 2000 persons presented in CSNC 2012.

Take part in academic exchange activities sponsored by GNSS, international and regional organizations more than 10 times.

3) International Exchange

3. International Activity

Page 33: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Set up international GNSS exchange and training center in Beihang University.

Established GNSS frontier technology summer school.

Established MASTA programme on GNSS

International GNSS exchange and training center

GNSS frontier technology summer school

Education and training3) International Exchange

3. International Activity

Page 34: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Take part in 3 significant meetings of International Civil Aviation Organization (ICAO),promote BeiDouto enter into ICAO standard framework.

Accomplish application procedure, promote BeiDoustandardization in marine application.

4) International Standardization

3. International Activity

ICAO meeting Multi-GNSS marine application standardization meeting

Page 35: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Part Ⅰ Development Plan

Part Ⅱ System Progress

Part Ⅲ Contribution to GNSS

Page 36: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

1. Unique Development Pattern

Form the development philosophy of Region

highlighted, Global service and Distinguished

features.

Explore the roadmap of gradual development.

Adopt the integration method of passive

position and short message communication.

Page 37: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

2. Innovative Technology

Design hybrid asymmetry constellation:

consists of GEOs, IGSOs and MEOs, rapidly

realize application step by step.

Provide triple frequency signals.

Optimize system mechanism by uniting RDSS,

RNSS and Wide-area differential services.

Page 38: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

3. Numerous Application Occasions

Having service capability in Asia-Pacific region, provide numerous choices of multi-systems compatible application.

Having service capability of triple frequency navigation signals, expand innovative chances of high-precision application.

Having integrated service capability of RNSS and short message communication, support diversified application.

Page 39: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

ConclusionsBeiDou Construction The second deployment step has been

accomplished. BeiDou will possess full operational capability

early next year. BeiDou is expected to enter into comprehensive

operational service stage.BeiDou Application BeiDou chips is matured day by day. Application is promoted in large scale. ICD (formal version) is to be released to

support industry development .

Page 40: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International

Conclusions

BeiDou International Activity

Carry out international exchange, coordination and cooperation.

Carry out BADEC, promote multi-GNSS fusion applications.

Speed up the construction of iGMAS, support international monitoring and assessment to ensure reliable GNSS services for global users.

Page 41: 1 - Development of BeiDou Navigation Satellite System of BeiDou Navigation Satellite System China Satellite Navigation Office November 5, 2012 Beijing, China The 7th Meeting of International