1 business integration update to prs june 2011 includes: 2011 project portfolio update parking deck...

26
1 Business Integration Update to PRS June 2011 Includes: • 2011 Project Portfolio Update • Parking Deck Impact Assessment • 2012 Project Prioritization

Upload: damian-bridges

Post on 29-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

1

Business Integration Update to PRS

June 2011

Includes:• 2011 Project Portfolio Update• Parking Deck Impact Assessment• 2012 Project Prioritization

2

– 2011 Project Portfolio Update p. 3-7

• Project Portfolio Gantt Chart– Sorted by go-live date

• Recent Developments

– Parking Deck Impact Assessment p. 8-10

• Introductory Comments • Impact Assessment Results• Endorsement Consideration (vote)

– 2012 Project Prioritization p. 11-20

• Schedule• Introductory Comments• Funding Summary• Details by Project Category• Endorsement Consideration (vote)

– Appendix p. 21-26

• Summary Project Descriptions

Business Integration Update – Agenda (revised)

3Date

Project Portfolio – as of 6/13/2011 – Sorted by Go-Live Date

4Date

Project Portfolio – as of 6/13/2011 – Sorted by Go-Live Date

5Date

Project Portfolio – as of 6/13/2011 – Sorted by Go-Live Date

6Date

Project Portfolio – as of 6/13/2011 – Sorted by Go-Live Date

7

Project Portfolio – Recent Developments

• TAC and Board Approved Several Additions to the PPL

– NPRR310, NPRR350, SCR764

• Go-Lives Planned for June / July– NPRR285 – Settlements portion

• Effective 6/6/2011

– NPRR341 – Remove AS Offers from SASM that Do Not Meet the Lead Time• Effective 6/22/2011

– NPRR339 – Modifications to Heuristic Rules• Effective 6/22/2011 – Day Ahead and Real Time

• Effective 7/20/2011 – CRR

– NPRR146 – ICCP Telemetry Information Submittals• Effective 7/1/2011 if Board approves at June meeting

– NPRR323 – Correct DAM Credit Exposure Language and Enable Qualified Expiring CRRs to Offset PTP Bid Exposure

• Effective 7/20/2011

– NPRR282 – Dynamic Ramp Rates Use in SCED• Effective 7/22/2011

8

Parking Deck Impact Assessments – Phase 2 / 3 – Comments

• ERCOT has completed the Impact Analysis for 10 of the NPRRs in the Phase 2 / Phase 3 portion of the Parking Deck

– Summary of results on the next slide

• Since the 2012 project prioritization process is also underway, ERCOT has suggested delivery targets for these NPRRs

– See “Delivery Target” column on the next slide– These dates coincide with future year funding recommendations (slides 16-17)

• CBAs– CBAs for these Parking Deck items are being worked in parallel with the approval

process– Goal: Have draft CBAs ready for 6/23 PRS meeting and final CBAs ready for 7/7 TAC

• ERCOT will initiate market discussions on the remaining Parking Deck items

– These items will benefit from additional discussion before the IAs are completed

9

Parking Deck Impact Assessments – Phase 2 / 3 – IA Results

Rev Request

Description Estimated Cost

Estimated Duration

Delivery Target

NPRR181 FIP Definition Revision $210k-$225k 10-12 weeks 2013

NPRR207 Unit Deselection $50k-$55k 9-11 weeks 2012

NPRR210 Wind Forecasting Change to P50, Sync w/PRR841 $45k-$55k 8-16 weeks 2013

NPRR222 Half-Hour Start RUC Clawback $15k-$20k 5-7 weeks 2012

NPRR240 Proxy Energy Offer Curve $50k-$60k 12-14 weeks 2013

NPRR241 AIL Calc and Credit Reports Publish Corrections $100k-$120k 5-10 months 2013

NPRR244 Clarification of Other Binding Documents $10k-$15k n/a 2011

NPRR256 Sync w/PRR787, Add Non-Compliance Language to QSE Performance Standards

$120k-$135k 9-10 months 2013

NPRR258 Sync with PRR824 and PRR833 $55k-$60k 8-10 weeks 2011

NPRR272 Definition and Participation of Quick Start Generation Resources $145k-$160k 20-22 weeks 2012

NPRR257 Synchronization with Nodal Operating Guide Section 9, Monitoring Programs

TBD TBD TBD

NPRR260 Providing Access to MIS Secure Area to MIS Registered Users TBD TBD 2012

NOGRR034 Rescind Telemetry Performance Calculation Exclusions TBD TBD TBD

SCR755 ERCOT.com Website Enhancements TBD TBD TBD

Further Discussion with the Market Requested

Completed Impact Analyses

*

* O&M effort – no project required

10

– Suggested endorsement language:

• PRS endorses the Impact Analysis documents for the following Parking Deck revision requests :

– NPRR181: FIP Definition Revision– NPRR207: Unit Deselection– NPRR210: Wind Forecasting Change to P50, Sync with PRR841– NPRR222: Half-Hour Start RUC Clawback– NPRR240: Proxy Energy Offer Curve– NPRR241: Aggregate Incremental Liability (AIL) Calculation and Credit

Reports Publish Corrections– NPRR244: Clarification of Other Binding Documents– NPRR256: Sync with PRR787, Add Non-Compliance Language to QSE

Performance Standards– NPRR258: Sync with PRR824 and PRR833– NPRR272: Definition and Participation of Quick Start Generation

Resources

Parking Deck Impact Assessments – Phase 2 / 3 – Endorsement

11

2012 Project Prioritization – Schedule

• April 2011– ERCOT prepares draft 2012 project list and reviews schedule with market

• Request input from the market on new additions

• May 2011– Initial review at market subcommittee meetings

• COPS (May 10)• WMS (May 11)• ROS (May 12)• RMS (May 18)

• June 2011– Approval/endorsement by market subcommittees

• COPS (June 14)• WMS (June 15)• ROS (June 16)• RMS (June 22)• PRS (June 23)

• July 2011– Approval/endorsement by TAC (July 7)– Available for F&A and Board review (July 18)

COPS endorsed 3 changes in rank

12

2012 Project Prioritization – Introductory Comments

• ERCOT is working diligently to limit the 2012 budget to the most critical needs

• $15M has been allocated for capital projects

• Is $15M sufficient for ERCOT’s capital project needs?– Answer: Yes– Due to the recent Data Center Hardware project, 2012 is expected to

have a more labor-intensive project mix than usual– Supporting information:

• 2012 – total project labor estimate = 108,000 hours

• 2011 – YTD internal PPL project labor = $2.31M (~35,500 hours)

• 2010 – total internal PPL project labor = $2.73M (~42,000 hours)

• 2009 – total internal PPL project labor = $3.96M (~61,000 hours)

13

Project Category Definitions

• Key Areas of Focus (Project Categories)– Regulatory

• Required by Legislature, PUCT, NERC, FERC or legal ruling

– Business Strategy• Market driven enhancements and efficiencies

• ERCOT strategic initiatives

– Efficiencies & Enhancements• Internally driven operational improvements

• Enhanced customer service

– Technical Foundation• Required maintenance and upgrades

• Technical evolution and performance

• Systemic growth

14

2012 Project Prioritization - Funding Summary

Project Category Target Funding Projects Started in Previous Years

New 2012 Projects

Regulatory $ 1,600,000 2 1

Business Strategy $ 5,950,000 5 15

Efficiencies & Enhancements

$ 2,050,000 2 9

Technical Foundation $ 6,500,000 4 7

Total $ 16,100,000 13 32

ERCOT will manage within the projected $15M project funding allocation.

As active projects move through the project lifecycle and new projects are considered for initiation, they will be reassessed for criticality, cost/benefit and resource availability against other projects in the portfolio.

Inclusion on the preliminary 2012 PPL does not guarantee funding!

15

2012 Project Prioritization – Regulatory

Project Category2012 Rank

Project 2012 Budget 2013 Budget 2014 Budget

Regulatory 1 REC Enhancements $500k-$1M - -

Regulatory 2 CFTC Compliance $100k-$250k - -

Regulatory 3 Compliance Software Tool $500k-$1M - - **

* Projected carryover project from 2011

See Appendix for brief project descriptions

16

2012 Project Prioritization – Business Strategy (page 1)

*

* Projected carryover project from 2011

***

Project Category2012 Rank

Project 2012 Budget 2013 Budget 2014 Budget

Business Strategy 1 TXSET4.0 $250k-$500k - -

Business Strategy 2 SCR760 $1M-$2M $100k-$250k -

Business Strategy 3 Cyber Security Project #1 $50k-$100k - -

Business Strategy 4 Cyber Security Project #2, Phase 1 <$50k - -

Business Strategy 5 TSAT Wind Model $100k-$250k - -

Business Strategy 6 PRR830/NPRR269 - Reactive Power Capability$250k-$500k - -

Business Strategy 7 Demand Response (Look Ahead SCED) $500k-$1M $3M-$5M -

Business Strategy 8 Facilities Project $1M-$2M - -

Business Strategy 9 Cyber Security Project #3 $500k-$1M - -

Business Strategy 10 Cyber Security Project #4 $500k-$1M - -

Business Strategy 11 NPRR347 - Single Daily Invoice $50k-$100k - -

Business Strategy 12 NPRR260 - MIS Secure Access $100k-$250k - -

Business Strategy 13 MarkeTrak Upgrade/Enhancements $500k-$1M - -

Business Strategy 14 TML Transition to MIS $100k-$250k - -

Business Strategy 15 Planning Site Transition to MIS $100k-$250k - -

Business Strategy 16 NPRR222 - Half Hour Start Clawback <$50k - -

Business Strategy 17 Cyber Security Project #2, Phase 2 $100k-$250k - -

*

Ranking changes by COPS

See Appendix for brief project descriptions

17

2012 Project Prioritization – Business Strategy (page 2)

Project Category2012 Rank

Project 2012 Budget 2013 Budget 2014 Budget

Business Strategy 18 NPRR326 - Adjust RT SPP Calc. <$50k - -

Business Strategy 19 NPRR272 - Quick Start Resources $100k-$250k - -

Business Strategy 20 NPRR207 - Unit Deselection $50k-$100k - -

Business Strategy 21 Cert. Data Product Subscription Stand. - $100k-$250k -

Business Strategy 22 EPS Metering DB Redesign - $250k-$500k -

Business Strategy 23 NPRR181: FIP Definition Revision - $100k-$250k -

Business Strategy 24 NPRR210: Wind Forecasting Change to P50, Sync with PRR841- <$50k -

Business Strategy 25 NPRR241: AIL Calc & Credit Reports Publish Corrections- $100k-$250k -

Business Strategy 26 NPRR256: Sync with PRR787, Add Non-Compliance Language to QSE Performance Standards- $100k-$250k -

Business Strategy 27 NPRR240 - Proxy Energy Offer Curve - <$50k -

Business Strategy 28 Incremental Update Capability - Phase 2 - $1M-$2M $1M-$2M

Business Strategy 29 MP Online Data Entry - Ph 2 - $1M-$2M -

Business Strategy 30 MP Online Data Entry - Ph 3 - - $1M-$2M

Business Strategy 31 NPRR257: Sync with NOG Section 9 - - -

Business Strategy 32 SCR755: Access to MIS Secure Area - - -

Business Strategy 33 NOGRR034: Rescind Telemetry Perf Calc Exclusions - - -

See Appendix for brief project descriptions

18

2012 Project Prioritization – Efficiencies and Enhancements

Project Category2012 Rank

Project 2012 Budget 2013 Budget 2014 Budget

Effi ciencies/Enhancements 1 Incremental Update Capability - Phase 1 $100k-$250k - -

Effi ciencies/Enhancements 2 MP Online Data Entry - Ph 1 $500k-$1M - -

Effi ciencies/Enhancements 3 CMS and MIR replacement $250k-$500k $500k-$1M

Effi ciencies/Enhancements 4 ERCOT Website Enhancements - 2012 $250k-$500k - -

Effi ciencies/Enhancements 5 Macomber Map NERC SA/Compliance Enhancements$250k-$500k - -

Effi ciencies/Enhancements 6 IGRID Implementation <$50k - -

Effi ciencies/Enhancements 7 Contingency Functionality Enhmts. <$50k - -

Effi ciencies/Enhancements 8 SMTNET Improvements $50k-$100k - -

Effi ciencies/Enhancements 9 MP Communications Tool $50k-$100k - -

Effi ciencies/Enhancements 10 Smartphone Interface ("MyGrid") $100k-$250k - -

Effi ciencies/Enhancements 11 OA Grid Health Operator View <$50k - -

Effi ciencies/Enhancements 12 Secure File Transfer - $50k-$100k -

Effi ciencies/Enhancements 13 EMIL and View by Protocol Enh. - $100k-$250k -

Effi ciencies/Enhancements 14 Replace N2N System - $50k-$100k -

Effi ciencies/Enhancements 15 Contract Mgmt Software - $100k-$250k -

Effi ciencies/Enhancements 16 Voice Analytics - $100k-$250k -

Effi ciencies/Enhancements 17 OTS Enhancements - $100k-$250k -

Effi ciencies/Enhancements 18 ERCOT Website Enhancements - 2013 - $100k-$250k -

Effi ciencies/Enhancements 19 ERCOT Website Enhancements - 2014 - - $100k-$250k

*

* Projected carryover project from 2011

*

See Appendix for brief project descriptions

19

2012 Project Prioritization – Technical Foundation

Project Category2012 Rank

Project 2012 Budget 2013 Budget 2014 Budget

Technical Foundation 1 Data Center Migration $100k-$250k - -

Technical Foundation 2 Minor Cap - Critical - 2012 $500k-$1M - -

Technical Foundation 3 Information Lifecycle Mgmt Phase 2 $500k-$1M - -

Technical Foundation 4 Settlement Upgrade $1M-$2M $1M-$2M -

Technical Foundation 5 Oracle 11g Upgrade $1M-$2M - -

Technical Foundation 6 EMS Upgrade $1M-$2M $3M-$5M $1M-$2M

Technical Foundation 7 Enterprise DW Platform Transition $500k-$1M $3M-$5M -

Technical Foundation 8 Job Scheduling Upgrade v8 $100k-$250k - -

Technical Foundation 9 Siebel Upgrade $250k-$500k - -

Technical Foundation 10 NMMS Upgrade $100k-$250k - -

Technical Foundation 11 DC Growth & Asset Replacement - 2012 $500k-$1M $1M-$2M -

Technical Foundation 12 CRR Upgrade - $100k-$250k -

Technical Foundation 13 Business Intelligence Software Upgrade - $500k-$1M -

Technical Foundation 14 Capacity growth - storage/comp. - $250k-$500k -

Technical Foundation 15 Job Scheduling Upgrade v9 - $250k-$500k -

Technical Foundation 16 User Authentication Upgrade - $50k-$100k -

Technical Foundation 17 Replace Sun DSEE - $500k-$1M $500k-$1M

Technical Foundation 18 Replace Sun IDM - $500k-$1M $500k-$1M

Technical Foundation 19 Minor Cap - Critical - 2013 - $1M-$2M -

Technical Foundation 20 Minor Cap - Critical - 2014 - - $1M-$2M

Technical Foundation 22 DC Growth & Asset Replacement - 2013 - $1M-$2M -

Technical Foundation 23 DC Growth & Asset Replacement - 2014 - - $3M-$5M

*

* Projected carryover project from 2011

***

See Appendix for brief project descriptions

20

2012 Project Prioritization – Motion

Suggested Motion

Motion to approve/endorse ERCOT’s initial project rank and preliminary funding by project category

• <as amended by PRS>

21

Appendix

22

Project Descriptions – Regulatory

Rank Project Name Project Description

1 REC Enhancements Enhance the REC tool to comply with PUCT rules and incorporate additional functionality

2 CFTC Compliance Funds for use in a project to support ERCOT’s application for a CFTC exemption

3 Compliance Software Tool Automate the tracking of compliance obligations

23

Project Descriptions – Business Strategy

Rank Project Name Project Description

1 TX SET 4.0 Continuation of TX SET 4.0 project

2 SCR760 SCR760 Recommended Changes Needed for Information Model Manager and Topology Processor for Planning Models

3 Cyber Security Project #1 Enhancement to system administrator infrastructure

4 Cyber Security Project #2, Phase 1 Enhancement to virus protection

5 TSAT Wind Model Implement wind models in TSAT application. Enhance reliability by delivering closer to real time stability information.

6 PRR830/NPRR269 – Reactive Power Capability

Potential system changes needed due to final resolution between ERCOT and market stakeholders

7 Demand Response / Look-Ahead SCED

Initial planning phase of the next major evolutionary phase of the Nodal systems (Nodal 2.0)

8 Facilities Project Funding reserved for relocation of remaining functions from the Met Center (if necessary)

9 Cyber Security Project #3 Enhancement to remote access capability

10 Cyber Security Project #4 Enhancement to malware protection

24

Project Descriptions – Business Strategy

Rank Project Name Project Description

11 NPRR347 – Single Daily Invoice NPRR347 - Single Daily Invoice

12 NPRR260 – MIS Secure Access NPRR260 - MIS Secure Access

13 MarkeTrak Upgrade/Enhancements Enhance underlying MarkeTraksoftware and deploy enhancements agreed upon by ERCOT and market stakeholders

14 TML Transition to MIS Migrate remaining functions that support the Retail market from TML to MIS

15 Planning Site Transition to MIS Migrate Planning functions/data that currently reside on the POI to MIS

16 NPRR222–Half Hour Start Clawback NPRR222 - Half Hour Start Clawback

17 Cyber Security Project #2, Phase 2 Extend capabilities developed in the phase 1

18 NPRR326 – Adjust RT SPP Calc. NPRR326-Adjut RT SPP Calc.

19 NPRR272 – Quick Start Resources NPRR272 - Quick Start Resources

20 NPRR207 – Unit Deselection NPRR207 - Unit Deselection

25

Project Descriptions – Efficiencies / Enhancements

Rank Project Name Project Description

1 Incremental Update Capability –

Phase 1

Provide incremental update capability to all production systems for all model related data

2 MP Online Data Entry – Phase 1 Allow Market Participant and Resource registration through an electronic user interface to submit and view MP and Resource registration information

3 CMS and MIR Replacement Replace applications used to deploy web content to enhance scalability and reliability

4 ERCOT Website Enhancements 2012 Continuous improvement of www.ercot.com and public market communications

5 Macomber Map NERC SA/Compliance Enhancements

Enhance the Macomber Map application to further address control room situational awareness

6 IGRID Implementation Improve operator situational awareness by bringing the Market, Outage Scheduler and EMS into a set of operator dashboards

7 Contingency Functionality Enhancements Enhance NMMS capabilities to allow business owners to submit, via NOMCR, contingency group configurations with a higher level of specificity

8 SMTNET Improvements SMTNET time point improvements to troubleshoot time points

9 MP Communications Tool Create a tool to be placed in market participant control rooms, to ensure that they are receiving continual high-level status information

10 Smartphone Interface (“MyGrid”) Create a smart-device (e.g., Android, Apple iOS, Blackberry) application showing a high-level view of system status

11 OA Grid Health Operator View Give operators a view into overall grid health that incorporates a variety of operational parameters into a single graphical dashboard interface

26

Project Descriptions – Technical Foundation

Rank Project Name Project Description

1 Data Center Migration Completion of Data Center Hardware project

2 Minor Cap – Critical – 2012 Critical Minor Cap items for 2012

3 Information Lifecycle Management Phase 2

Continuation of project to implement a strategy for efficient data storage utilization while continuing to meet Protocol data retention requirements

4 Settlement Upgrade Continuation of project to rewrite the modules of the settlement system so they run more efficiently and are easier to maintain

5 Oracle 11g Upgrade Upgrade database software to the latest version

6 EMS Upgrade Upgrade EMS software to the latest version

7 Enterprise Data Warehouse Platform Transition

Evaluate the platform that is the core foundation of market data transparency and archival requirements to determine the long-term approach to increasing overall reliability and maximize capacity utilization

8 Job Scheduling Upgrade v8 Upgrade batch job software to a more current version

9 Siebel Upgrade Upgrade software to the latest version

10 NMMS Upgrade Upgrade NMMS software to the latest version

11 Data Center Growth & Asset Replacement

Funding for continued demand for growth of computing environment (storage, servers, etc.)