03_OIL AND GAS Mobin (Iran) SW & Cooling Water System The project comprises a cooling water project with intake and outlet culverts, pumping basin and some infrastructure (buildings etc). The main parts of the project are a pumping station basin covering an area of 13,000 m2, an intake culvert structure, approx. 1000 m long, and an outlet culvert approx. 400 m long. The cross section of the culverts is 13 x 5 m. Two 120 m long culvert elements will be constructed in a dry dock in Busher, towed to Asaluyeh and installed on the seabed at 20 - 40 m depth. The remaining part of the culvert was prefabricated in 25 meter long sections, transported by barge to site and lifted into position by a crane barge. KEY NUMBERS Pump basin: 13000 m2 | Intake/outlet culverts: 1400 m | Pumping capacity: 106 m3/s TIME PERIOD 2002 - 2004 CLIENT Sadra/Aker Marine Contractors PROJECT Mobin (Iran) SW & Cooling Water System LOCATION Asaluyeh, Iran PROJECT TYPE Detail Engineering Mobin SW & Cooling Water System | Photo: Multiconsultl

Upload: others

Post on 02-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 03 OIL AND GAS Mobin (Iran) - multiconsultgroup.com · 03_OIL AND GAS Mobin (Iran) SW & Cooling Water System The project comprises a cooling water project with intake and outlet culverts,

03_OIL AND GAS

Mobin (Iran)SW & Cooling Water System

The project comprises a cooling water project with intake and outlet culverts, pumping basin and some infrastructure (buildings etc).

The main parts of the project are a pumping station basin covering an area of 13,000 m2, an intake culvert structure, approx. 1000 m long, and an outlet culvert approx. 400 m long. The cross section of the culverts is 13 x 5 m.

Two 120 m long culvert elements will be constructed in a dry dock in Busher, towedto Asaluyeh and installed on the seabed at 20 - 40 m depth. The remaining part of the culvert was prefabricated in 25 meter long sections, transported by barge to site and lifted into position by a crane barge.

KEY NUMBERSPump basin: 13000 m2 | Intake/outlet culverts: 1400 m | Pumping capacity: 106 m3/s

TIME PERIOD2002 - 2004

CLIENTSadra/Aker Marine Contractors

PROJECTMobin (Iran) SW & Cooling Water System

LOCATIONAsaluyeh, Iran

PROJECT TYPEDetail Engineering

Mobin SW & Cooling Water System | Photo: Multiconsultl

Page 2: 03 OIL AND GAS Mobin (Iran) - multiconsultgroup.com · 03_OIL AND GAS Mobin (Iran) SW & Cooling Water System The project comprises a cooling water project with intake and outlet culverts,

03_

00

0,

00

.00

.20

16

OUR SERVICES Multiconsult has a contract for the detailed design of civil structures with Aker Marine Contractors. Aker has a contract with Iran Marine Industrial Company (SADRA), which is a turn-key contractor for the cooling water project versus Mobin. The Aker contract is including detailed design of civil structures and mari-ne operations. For parts of the work Multiconsult has engaged the local consulting company Sazeh Pardazi Iran (SPI).

DISCIPLINES• Geology• Geotechnics• Landscaping• Roads• Water & sewage• Civil

SCOPE OF WORK Construction of site was performed accordingto plan.